Loading...
HomeMy WebLinkAboutLandscape Plan - 2026-02-27C180LANDSCAPING PLANC1801LANDSCAPING PLANSCALE: 1" = 100'N LBANRJVRevisionsNO:DATE:DESCRIPTION:104/30/2024REVISED PER TOWN COMMENTS207/30/2024REVISED PER TOWN COMMENTS308/28/2024REVISED PER TOWN COMMENTS408/22/2025REVISED PER TOWN COMMENTS510/08/2025REVISED PER TOWN SOLAR LAW UPDATE601/12/2026ADJUSTED TRAIL LOCATIONNOT FOR CONSTRUCT IONDRAWING NAME:2/27/2026 3:03:23 PM DRAWING NUMBER:DATE:ISSUED FOR:DRAWN BY:REVIEWED BY:PROJECT NUMBER:© 2022 LaBella Associates\\cash.lab\U\Projects\Freestone Renewables LLC\2231869 - Jacob Rd Solar Yorktown NY\06_Drawings\Civil\01_C180_223186_LANDSCAPE.dwg FREESTONERENEWABLES, LLCP.O. BOX 630678HIGHLANDS RANCH, CO 80163JACOB ROAD SOLAR1805 JACOB ROAD, TOWN OF YORKTOWN,WESTCHESTER COUNTY, NEW YORK2231869TOWN REVIEW02/23/2024It is a violation of New York Education Law Art. 145 Sec.7209 & Art. 147 Sec. 7307, for any person, unless actingunder the direction of a licensed architect, professionalengineer, or land surveyor, to alter an item in any way. If anitem bearing the seal of an architect, engineer, or landsurveyor is altered; the altering architect, engineer, or landsurveyor shall affix to the item their seal and notation"altered by" followed by their signature and date of suchalteration, and a specific description of the alteration.4 British American BoulevardLatham, NY 12110518-439-8235labellapc.comCERTIFICATE OF AUTHORIZATION NUMBER:PROFESSIONAL ENGINEERING: 018281LAND SURVEYING: 017976GEOLOGICAL: 018750702/27/2026NEW TRAIL CONFIGURATIONEXP: 6/30/20280'100'200'300'PLANT LISTQTYSPACINGSIZECONDAVG GROWTH RATECOMMON NAMEABRVBOTANICAL NAMETREESNOTES:EVERGREEN PLANTING DETAIL