Loading...
HomeMy WebLinkAboutSigned Site Plan - Manganiello6 Paml'. i GPPUIhPionhruaos O i 6 � o� ? UltlahJUhgP$faPPi O $ Ie QV!"3VhPAaffl � , G"grralrtiPg Nipmeltpgau4 NkMlaaLfauaON,0 m,M1etlPC�. SOI i g {{ e 6ygiamav0 S LOCATION MAP NOTTOSCALE I WYiilii�E OWNER I DEVELOPER: PROJECT LOCATION: EXISTING TOWN ZONING: PROPOSED USE: TOWN TAX MAP DATk SITE AREA: SEWAGE FACILITIES: WATER FACILITIES: AUDRA MANGANIELLO 770 BLACKBERRY LANE YORKTOWN HEIGHTS, NY 10598 770 BLACKBERRY LANE YORKTOWN HEIGHTS, NY 10598 R1.20, ONE FAMILY RESIDENTIAL R1.201 ONE FAMILY RESIDENTIAL SECTION26.08, BLOCK1, LOT68 49ACRES (21,237SF7 PUBLICSEWERS PUBLIC WATER FACILITIES Enter Site Data For Drainage Area to be Treated by Ill Percent Drainage Contributing Impervious Precipitatio Area Area Area Imperviou Rv I n Description Number Yes, A,cresl S lump 1 0.02 0.02 11)8 0.95 227 2.78 0 Sent rain garden type Filtration Ram Garden Design Criteria Frirged5edge toter UnCar ying a01 In11 ra[ICn raLE I C86EC ongeotechnical testing, refertoAppendix 8.F 6 Is the contributing area a designated hoislow II° Juwdil EnterlDadingratio6fjX:1) I Does the contributing area exceed 1,000 aft? Yes Does nom meet design aterre EnterdistancefromdDwnspoutor Imperaw area treated jii) 30 m Does contrbutorg area contain parkNg lot or roadway runoff? N0 Enter depth to seasonal high water table (1'i 8 Enter depth to bedrock (4) 8 Enter depth ofsurface layer (inches) 12 EnterdraineQz laverdeFthrin at Es: it Siong Criteria f. INISISNOTASURVEY.AllSURVEYINfORMATIONSHOWNONTHISPIANNASBFEN Value Unh Notes tuatarDuali Volume WDv 277 cf t. Enter Depth of Sol Media df 1.5 ft SCALE:1°=1U'U" Enter Perrneati ly Flow Rate k 1 Tdav Enter Average Height ofPondng of 0.5 ft , Enter Filter Time tf 2 days Requuad F'Ihe*aa Af 85 sf Enter ProYldedFilter Area Af 90 Sf Recalculated 171fater aual't}' VDWR (based on prof'med filer areal idOv cels 248 ct STREAM BUFFER DISTURBANCE; rag nd. Fire Pit b St0 �e �Or too 0 0 0 TAX LOT 67 LOT 5,24 36' 27.2' 16" Stone Brook Stone all /22 M , TAX LOT 16 2M I 20"M 8"M T , Brook \ TAX Lc2 \ LOT ,22 10ItM� 6" TAX LOT 68 LOT 5,25 �T / 24 10 M \ 2G p 2�M 6°M 22 M 16 M 0 -- (�° o --� 22"M cg9ti / V n FILTERMEDl WATER QUALITY. I ELEV. =91.00 \ — °T 0 6 M STABILIZEDRIP•RAP. 94------- EMERGENCY OVERFLOW. P m ' ,,�I� PROPOSED RAINGARDEN I ROCS SHED TO BE RELOCATED Sy TJ'T \ i PROPOSED 4' 0 HDPE PIPE.6 M M L=24' SLOPE =2%MIN. / From / e \ Shed PROPOSED PAT0„M I) \� �. / TRENCH DRAIN4"M r� /” �� \ 0 40"T r W 22°M 14N 10"Tri Planter rr M 1 �� \ 0 i 70 rr X� . t. DII �T/O 31.1' 2—Story 0 Frame Garage Dwe ing L Und. + Bsmnt, Hse No,770 1—S Plat Brick 30'5' — Pier N ° 2nd Rim. Over to a Brick all >)��..: �.. too I� a Brick 4O4' Brick LO Brick Pier a aii d� N I Grass 0 w D U 0 I ,-� (� .... - • o7i utilit Boxe: 00 �� 18 2 10 / 2a3 21 S8 . RELOCATED I SHED Card. 7$ r MITIGATION PLANT LEOD: 3 - REMIER V06VO - CORNUS 5ERICEA (C5) - 2" GAL. I - RED MAPLE - AGER RUE3RUM (Aru) - 2" GAL. 3 - hINTERBERRY HOLLY - ILEX VERTIGILLATA (IV) - 2 6AL, 4 - ARROMOOD - VIBURNUM DENTA'1URN (VD) - 2 6AL, 4 hITCHHAZEL - HARNEMETI5 VIR61NIARA (HV) - 2 6AL. 3 - SPIGEBUSH - LINDERA BENZOIN (LB) - 2 GAL. �' 1 IMPERVIOUS PERVIOUS EXISTING 11169 SF 11,665 SF PROPOSED 21200 SF 10,634 SF NET1,031 SF •11031 SF rag nd. Fire Pit b St0 �e �Or too 0 0 0 TAX LOT 67 LOT 5,24 36' 27.2' 16" Stone Brook Stone all /22 M , TAX LOT 16 2M I 20"M 8"M T , Brook \ TAX Lc2 \ LOT ,22 10ItM� 6" TAX LOT 68 LOT 5,25 �T / 24 10 M \ 2G p 2�M 6°M 22 M 16 M 0 -- (�° o --� 22"M cg9ti / V n FILTERMEDl WATER QUALITY. I ELEV. =91.00 \ — °T 0 6 M STABILIZEDRIP•RAP. 94------- EMERGENCY OVERFLOW. P m ' ,,�I� PROPOSED RAINGARDEN I ROCS SHED TO BE RELOCATED Sy TJ'T \ i PROPOSED 4' 0 HDPE PIPE.6 M M L=24' SLOPE =2%MIN. / From / e \ Shed PROPOSED PAT0„M I) \� �. / TRENCH DRAIN4"M r� /” �� \ 0 40"T r W 22°M 14N 10"Tri Planter rr M 1 �� \ 0 i 70 rr X� . t. DII �T/O 31.1' 2—Story 0 Frame Garage Dwe ing L Und. + Bsmnt, Hse No,770 1—S Plat Brick 30'5' — Pier N ° 2nd Rim. Over to a Brick all >)��..: �.. too I� a Brick 4O4' Brick LO Brick Pier a aii d� N I Grass 0 w D U 0 I ,-� (� .... - • o7i utilit Boxe: 00 �� 18 2 10 / 2a3 21 S8 . RELOCATED I SHED Card. 7$ r MITIGATION PLANT LEOD: 3 - REMIER V06VO - CORNUS 5ERICEA (C5) - 2" GAL. I - RED MAPLE - AGER RUE3RUM (Aru) - 2" GAL. 3 - hINTERBERRY HOLLY - ILEX VERTIGILLATA (IV) - 2 6AL, 4 - ARROMOOD - VIBURNUM DENTA'1URN (VD) - 2 6AL, 4 hITCHHAZEL - HARNEMETI5 VIR61NIARA (HV) - 2 6AL. 3 - SPIGEBUSH - LINDERA BENZOIN (LB) - 2 GAL. �' 1 nU`AREA THEASHALLBE RESTOREDTOANATURAL CONDITION.FOUR \ TREES TO BE PLANTED AND SHRUBS SHALL BE 5yrk ALL NATIVE SPECIES, CROSS HATCHED AREA TO l BE COVERED WITH ERNMX"167 MEADOW SEED ,6"T MIX, APPLICATION RATE SHALL BE AS PER MANUFACTURERS SPECIFICATIONS. V \1 0 Frame Shed PORTION OF TERRACE TO BE REMOVED , u,l PROPOSED STAIS' TAX LOT 69 LOT 5.26 �AIN6A���N I'I,�N�ING 1�C��1� NOF ro5Cx PAIN 61WOENPI,ANTIN6 5Gf1l Qualify 5yrk eormaNam l Pod Type 1� 5A 61000W 5cild(Owfm 211 P14 1� GG Frirged5edge Caracriga 6 JF 5d iPu� Juwdil 0 N h N U a i m z o 0� A N i .z SAFE DIG 0 m 1 pwU � NOTE: meNq o� cuwsramra tl,nNmamnat 0 f. INISISNOTASURVEY.AllSURVEYINfORMATIONSHOWNONTHISPIANNASBFEN Ua 0 � t. w w TAKEN FAOMSURVEI'NAPPAEPAREDBYRONAIDPERSAUDIANDSUMaEYNG,P.C., SCALE:1°=1U'U" N r, w 0 z h 0 S 10 20 A N I .z SAFE DIG m j Before You Dig, Drill orBlasl! � NOTE: o� cuwsramra tl,nNmamnat � f. INISISNOTASURVEY.AllSURVEYINfORMATIONSHOWNONTHISPIANNASBFEN t. nw�mwco&nuaowwror e��,�am�m�mmno, �, TAKEN FAOMSURVEI'NAPPAEPAREDBYRONAIDPERSAUDIANDSUMaEYNG,P.C., SCALE:1°=1U'U" "„"'��'"" "'"°� 0 .q � Nro , a z- w 0 h 0 S 10 20 A N w 0 0 S 10 20 I SAFE DIG Before You Dig, Drill orBlasl! � NOTE: cuwsramra tl,nNmamnat � f. INISISNOTASURVEY.AllSURVEYINfORMATIONSHOWNONTHISPIANNASBFEN t. nw�mwco&nuaowwror e��,�am�m�mmno, �, TAKEN FAOMSURVEI'NAPPAEPAREDBYRONAIDPERSAUDIANDSUMaEYNG,P.C., SCALE:1°=1U'U" "„"'��'"" "'"°� � 04TED9124t2D24. Tf�ENGINFfRA6SUlAE6NORf6PON61BNiYFORIT6ACCURACY. w 0 Brook 485.4 - - I 489.42 i 22„M489.58 U 489.99 20"M \ N\ 8 MM 4/40 T TAX LO2 � p Tax LOT 16 "'l 488.63 ,Brook LOT .22 4 o 490.73 ��9�f3 10"M / 6",r�� % TAX LOT 68 S LOT 5,25, 7"T / 24 \ > 10 'v/ 2'M '490 6M 22M 16M u °1 7/— 22„M , Agti / c n 1 ��qq, PROPOSED RAINGARDEN 0 5 T ° 61M ----494------- n p\ 94.56 Z 14M Pit,\ �1 Rod PROPOSED PATIO Frame �N�.' Shed / /��. PROPOSED SILT -1--\ , FENCE 14"M / 7r"avel— PROPOSED SOIL—l-\ STOCKPILE.ITYP.) Fire p / Pit vv a 0� 0 0 TAX LOT 67 LOT 5,24 36°M E NOTE; 1. THIS THISISNOTASURVEY.ALLSURVEYINFORMATIONSHOWNONTHISPLANHASBEEN TAKEN FROM SURVEY MAP PREPARED BY RONALD PERSAUD LAND SURVEYING, P.C., DATED9QQ024. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. 4.24 495.89 ' / 0 PROPOSED LIMIT OF \ [DISTURBANCE = 2,680 S.F. 0M y 4 p 10 0 40) 22"M 490Q2; 77 11 „M °T 502 Frame, Shed/ OF TERRACE TO BE REMOVED \ 0 TAX LOT 69 LOT 5,26 APPROVED Resolution Number 26 -06 Dater a2 6 0 6 10 20 L SAFE DIG Before You Dig, Doll or ""I WU6PIl�Vorfa 3M rrrmemmaam�w�ws , I faxoxoYl9 dnrob,Eammm SCALE: 1'=W h w 0 3 Q z 3 0 w 0 p 0 F W 0 �o mm wO �N 3 A CON 0 QI WPN L Oro � a oP� �a0 " Q 1 Q � Eat aaro ,C Qam E�q�q ro it Umd aV N w N vNN APPROVED Resolution Number 26 -06 Dater a2 6 0 6 10 20 L SAFE DIG Before You Dig, Doll or ""I WU6PIl�Vorfa 3M rrrmemmaam�w�ws , I faxoxoYl9 dnrob,Eammm SCALE: 1'=W h w 0 3 Q z 3 0 w 0 p 0 F 0 mm wO �N G " Q 0 Eat E�q�q Umd vNN Nd 0 AN N 0 x 0 z"" APPROVED Resolution Number 26 -06 Dater a2 6 0 6 10 20 L SAFE DIG Before You Dig, Doll or ""I WU6PIl�Vorfa 3M rrrmemmaam�w�ws , I faxoxoYl9 dnrob,Eammm SCALE: 1'=W h w 0 3 Q z 3 0 w 0 p 0 F mm wO �N G " Q 0 APPROVED Resolution Number 26 -06 Dater a2 6 0 6 10 20 L SAFE DIG Before You Dig, Doll or ""I WU6PIl�Vorfa 3M rrrmemmaam�w�ws , I faxoxoYl9 dnrob,Eammm SCALE: 1'=W h w 0 3 Q z 3 0 w 0 p 0 F GENERAL NOTES: 1. THE ENGINEER WHOSESEALAPPEARS HEREON IF NOT RETAINED FOR SUPERVISION OF CONSTRUCTION, ISNOT RESPONSIBLE FOR CONSTRUCTION AND THEREFORE ASSUMES NO RESPONSIBILITY FOR CONSTRUCTION PRACTICES, PROCEDURES, AND RESULTS THEREFROM. 2. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE OR HELD ACCOUNTABLE FOR THE INTEGRITY OF ANY STRUCTURES CONSTRUCTED OR UNDER CONSTRUCTION PRIOR TO THE APPROVAL OF THE PLANS. 3. ALL WORK IS TO BE IN ACCORDANCE WITH THE TOM OFYORIKTOWNCODE AND NEW YORK STANDARDS AND SPECIIFICATIONS FOR EROSION AND SEDIMENT CONTROL 4. ALL CONDITIONS,LOCATIONS, AND DIMENSIONS SHALL BE FIELD VERIFI ED AND THE ENGINEER SHALL BE IM MEDIATELY NOTIFIED OF ANY DISCREPANCIES, 5. ALL CHANGES MADE TO THE PLANS SHALL BE APPROVED BY THE ENGINEER WHOSE SEAL APPEARS ON THESE DRAWINGS. ANY SUCH CHANGES SHALL BE FILED AS AMENDMENTS TO THE STORNIATERPOLLUTIONPREVENTIONPIAN. 6. All WRITTEN DIMENSIONS ON THE DRAW NGS SKALLTAKE PRECEDENCE OVER ANY SCALED DIM ENSIONS, 7. IT IS THE CONTRACTORS RESPONSIBILITY TO CALL IN A'CODE753' PRIOR TO CONSTRUCTION FOR UNDERGROUND UOLNY LOCATIONS, 8. SUBSTRUCTURES AND THEIR ENCROACHMENTS BELOW GRADE, IF ANY, ARE NOT SHOWN. 9. ANY PROPOSED ELECTRIC ANDIORTELEPHONE SERVICE LINES ARE TOBEPLACED UNDERGROUND. 10. THE DESIGN ENGINEER DISCbAIMSANY LIABILITYFOR DAMAGE OR LOSS INCURRED DURING ORAFTER CONSTRUCTION, 11. ALL CONDITIONS, LOCATIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE OWNERENGINEER NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO THE START OF WORK THE OWNERIENGINEER WILL EVALUATE THE SITUATION AND MODIFY THE PLAN AS NECESSARY. CONTRACTOR RESPONSIBILITIES: t. ALL WORK ON THE PROJECT SHALL BE PERFORMED IN A WORKMAN LIKE MANN ER AND SKUBE IN ACCORDANCE WIT HTHE STANDARDSOFTHE INDUSTRY. THE OWNER WILL BE THE SOLE JUDGE OF THE ACCEPTABILITY OF THE WORK MATERIALS AND WORK DEEMED UNACCEPTABLE WILL BE REMOVEDAND REDONE AT THE SOLE COSTAND RESPONSIBILITY OF THE CONTRACTOR. 2. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT HIS WORK AND WILL BE HELD RESPONSIBLE FOR CONSEQUENTIAL DAMAGESDUETOHIS ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OMER FOR THE ACTS AND OMISSIONS OF HIS EMPLOYEE, AND THEIR AGENTS AND EMPLOYEES, AND ANY OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A SEPARATE CONIRACTWTM THE CONTRACTOR. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROPERLYSHORE EXISTING UTILITIES IF REQUIRED BY CONSTRUCTION. 4. IT SHAIt BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE THE TOWN ENGINEER IN ADVANCE OF HIS WORK ORAS THE INSPECTOR DEEMS APPROPRIATE, 5. ALL CONDITIONS, LOCATIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE OWNENENGINEER NOTIFIED IN WRITING OFANY DISCREPANCIES PRIOR TO THE START OFWORK. THE O'WNERENGINEER WILL EVALUATE THE SITUATION AND MODIFY THE PLAN AS NECESSARY, 6. ALL CHANGES MADE TO THIS PLAN SHALL BE APPROVED BYTHE ENGINEER WHOSE SEAL APPEARS ONTHESE DRAWINGS, ANY UNAUTHORIZED ALTERATION OR ADDITIONS TO THIS DRAWING ISAVIOLATION OF SECTION 7209 (2) OFTHE NEW YORK STATE EDUCATION LAW, 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING All PORhONS OF THE WORK UNDER TH IS CONTRACT. 8. THE CONTRACTOR SHALL BE RESPONSIBLE TOTHE OWNER FOR THE ACTS AND OMISSIONS OF HIS EMPLOYEES, SUBCONTRACTORS, AND THEIR AGENTS AND EMPLOYEES, AND ANY OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR. 9. THECONTRACTOR SHALL VERIFY ALLSUBSTRUCTURES ENCOUNTERED DUIIING CONSTRUCTION, 10. THE CONTRACTOR SHALL SECURE& PAY FOR A BUILDERS RISK POLICY TO COVER THE PEROD OF CONSTRUCTION. THE ENGINEER &OWNER SHALL BE NAMED AS ADDITIONAL INSURED, ALL CONTRACTORS EMPLOYED AT THE SITE SHALL BE COVERED BY WORKMAN'S COMPENSATION. GENERAL CONSTRUCTION NOTES: 1. THE CONTRACTOR SHALL REQUEST ABENCH MARK FROM THE SURVEYOR INTHE SAME DATUM ASTHE DESIGN RAS. 2. FINISHED GRADES SHALL BE OF SUCH ELEVATION THAT THE GROUND WILL SLOPE AWAY FROM IT IN ALL DIRECTIONS. 3. CONSTRUCTION ACTIVITY SHALL BE LIM ITED FROM 8:00 AM TO 6 P.M., AND NO CONSTRUCTION ACTIVITY SHALL OCCUR ON SUNDAYS OR LEGAL NEW YORK STATE HOUDAYS. WHERE BLASTING IS NECESSARY, IT SHALL OCCUR FROM MONDAY THROUGH FRIDAYBETY10 THE HOURS OF 8:08 A.M. AND SAD P.M. NO BLASTING SHALLOCCURON HOLIDAY$ SATURDAY ORSUNDAY, ALL BLASTING SHALL ALSO BE COMPLETED IN ACCORDANCE WITH THE TOWN OF NORTH SALEM AND NEWYORK STATE BLASTING ORDINANCES. 4. ANY SOIL THAT IS UNSUITABLE FOR DEVELOPMENT OF BUILDINGS OR ROADWAYS SHALL BE REMOVED FROM AREASTOBE DEVELOPEDAND SHALL BE DISPOSED OF WITHIN THE SITE IN NEIN EMBANKMENTSWHERE STRUCTURAL LOADING, LE.A BUILDING OR ROADWAY, WILL NOT TAKE PLACE. WHEN CONSTRUCTION IS PROPOSED TO OCCUR IN SPECIFIC AREAS WHERE SOILS ARE OF QUESTIONABLE SUITABILITY, THE OWNER SHALL REIAINASOILS ENGINEER TO EVALUATE AND PREPARE DESIGN FOR THE CONDITION. 5. ROCK CUT STABILITY IS TO BE FIELD VERIFIED BY A GEOTECHNICAL ENGINEER AND SHALL BE MODIFIED IF REQUIRED. 6. NO CRUSHIMPROCESSINGISPERMITTEDONTHESITEWITHOUTPRIORAPPROVALBYTHETOWNOFNORTHSALEMBOARD. 7. ALL DEMOLITION DEBRIS SHALL BE REMOVED FROM THE SIT EAND DISPOSED OFINACCORDANCE Win HFEDERAL STATE, OR LOCAL STANDARDS. IF NECESSARY THE REMOVAL SHALL BE DONE BY A CONTRACTOR LICENSED TO REMOVE AND DISPOSE OF VARIOUS MATERIALS. CONTRACTOR CERTIFICATION STATEMENT: Contractor CeNgat on Shfemant • MI contractors and subcontractors bleu in a SWPPP in accordance with Part HIM (SPDES General Permit for Sherri Rund from Construction AaW ity, 31142541, January 2025) of this pent shell sign a copy of the folbwdng cedfiatan statement before undertaking any constriction adivityatthe site Merttified in the SW'PPP, 11 herebycerdly under penalty dlaw that I un Tess and and agree W comply with the terms and condigons 0 M SWPPP and agree to implement any corrective actions identfied byme qualified inspector during a she Inspection. I also undersand Me the owner oroperator mug comply with mh terms and conditions rime most arrant version of 14 New York Sli PolkhmDiscarge Eliminat on System CSPDES')general permit for smmwaardischarges from construction adift and Mathis unlawful for any person to cause or omi to av1dabon of water quatly slandard.Furbemore, I am were d attihre are signill parishes for submitting false Intonation, that I do not believe b be true, including the possibility of fine and Impdsomegfor knowing voa8ons' Individual Contractor: Name and Title (please ON) SlgnowedCnbacta Name dTralad Individual Company I Contracting Finn: Name of Company Address dCompany Teaphone Numbed Cell Number She Idomgion: AddressdSia Today's Data, OWNER I OPERATOR CERTIFICATION: 'I hereby oar dy under Angry of law mg I understand and agree m comply with the terms and conditions of the SWPPP and agreelo irpkemod anyanedve actions Mentifhd by Me qualified inspector during a site inspection. I also undersand mat the owner or operator mustamptywim Me toms and condidons rime most current version of the New Yom Sate Pollutant Discharge FJunmaton Statham rSPDEST general permit for stomnvaardlsdarges Mom construction acrivilles and tat R is unewful for any person to cause or conabithe to a violation owaderqualiy sandards.Fudhemore, I am aware that there are s tin trent penalties for submi We imfomation, mat I do not bolaertobehe, includingthe possiNlitydline and imprisonment for knowing vlo dors' Name (please pant) Tia Oger Address Phone E4nail S'pngoe Name of Tmtoed Indrviduel GENERAL EROSION CONTROL NOTES: 1. Contractor shall beresponsibleforoomptiance with all sediment andemsioncontrolpractces.Thesedimadanderosbncontrdprackas amtobeinstalledpdartoanymajorsdldiWrbances,andmainta'nedundparmanentprotedan6established. Roadsurfac0owshom Me she should be dissipated with backing pad orapproprate measures during adjacent road shoulder regrading. Contractor is responsible forme installation and maintenance of all sot erosion and sedimentation control devices throughout tlhcourse of construction. 2. COhedninletprotectionmustbeinstalledandoperatingatalllimesungirbdaryareashavebeanstabilized,Whenpoesibkefiaws should be stabilized before reading inlet protection structure. Timely maintenance ofsediment oonhol structures is the responstaility ofthe Connector. 3. All out res shall bemathtalnadhgoodwoHngorderatallImes.ThesedimentlevelInadsedimenthapsMotbecoselymonNoredand sediment removed promptly when maximum levels are reached or as ordered bymeerginiAtsediment cont lsWduressholbe inspected on a regular basis, and after each heavy rain to insure proper operation as desgned, An inspection schedule Mat be adId print toMestart dconsWdon. 4. ThebcationsandtoinskllabonImesdmasedimentcapWdngstandardsshallbeasspedfietlinthereplans,asordered4theEngioeer, and in accordance 4 to West edition 0the New York Standards and Spedftcallons for Erosion and Sediment Contri (NYSSESC). 5. Al hot shall be Aaced in a selillibecl slockpile for rouse an the she All goi material required for final goging and ark on she shall be temporadty seeded and mulched within 7 days. Refer to sdl stockpile decade, 6. Any disturbed areas mat will be left exposed more ban 7 days and ma subject to construction Iraffx; shall Immediately receive temporary seeding. Mulch shall be used Its season prevents the embodiment do temporaryorver. Disturbed areas shall nor be limed and fatlNaed prior to temporary seeding. 7. All disluted am Obn 500 feet of an inhabited dwelling shall beweledasnamarytoproAdedudconiml. 8. The contractor gral keep the roadways within to project dear of soil and III and is responsible for any great clearing necessary during Me course ofthe project. 9. Sedimord and erosion coortiol structures bell be removed and Me area stabilized when Me drainage area has been properly stabilized by pemaned measures. 10. WI sediment and erosion control measures shall be irsalled In acconknce with current edition of NYSSESC. 11. NI regraded areas must be sablkaed appropriately prior to any rock Maraft titling, ardor till ng of adds. Special are should be taken during construction to insure ON14ell Ing montenarce and inteftof control gmcNres. 12. Any sHpes graded at 3:1 or greater shall be stabilized with erosion Wall to be staked into pace in accordancewim me manufactures requirement. Erosion barkels may also be required 9 the disunion of Town oNdals or Project Engineer, When stabilized blanket is utilized fordrannel Mobilization, place all dtovolume of seed mix prorto Il net oras recommended by Me monuadurer. 13. To prevent heavy construction equipment and trucks from tri ng sol ofli anshda pervious crushed Blame pad. Lodge and construct pads as detailed in these place. 14. Contractor is responsible for controlling dust dl sprinkling exposed soil area perlodogy with waaras required. Contractor to supply all equipment and well 15, Contractor shall be region be for construction inspectors asper NYSDECGP-025-001 and Town dYaMownCode. MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL STRUCTURES: N.Y.BD.E.C. GP425401 EXPOSURE RESTRICTIONS-Satesthg any exposed eadhxorkshall be stabilvnd in acwrdancewith me gddelinesdmaplan. 1. Traesandv¢yatat'ronahallbepdecedatallbrosasshamonmedoaildravtlngandasdirecedbymeEngineer, 2. CareshoulbetakensoasnoMdramnelconcentratedmnd1hroughtheareasofconstructionactivityonMeft. 3. FM and sitedisNrhanasshouldndbecastedwhichauseswalerta0offsleoonadjacentpropedas. 4. RunoffromlanddisMhancesshopnotbedischargedorhavehepoven6dtodischageo8srtewithoutfrstbeinginfoceptatlbya control structure, such asa siltfence. Sedimentshall be removed Are exceeding 50% of the retention sWdu es capacity. 5. For finished grading, adequate grade Mat be provided so tat water 91 rid pond on owns for more ban 24 hours after rainfall, except in swale flow areas whirl maydron (oras long as 48 hours aherainfall. 6. Nlewkandathearasdcancembatedlowshallbepropertystabilbedwilltemporaryoomindmeasurestopreventerooslonand sedimedhavel. Surface Prows overatand 111 arcs shall be sfadlaed stall times. 7. 9 s"ll be stabilbed wt erosion antral materials within 7 days offing grading. MAINTENANCE SCHEDULE: MAINTENANCE OF PERMANENT CONTROL STRUCTURES DURING CONSTRUCTION: The gomwnter man igementsystam and code structure shall be Impeded on a regular basis and aflerevery recti event Sediment huiM up shill be removed 6om tih ictal pmkb reguladyto ®sure detention apadty and proper drainage.OutletshcureshagbeheeofobsWclons.NIpiprganddaminletsshallbehesdolign on. Any sediment bdld up shall be removed. MAINTENANCE OF CONTROLS AFTER CONSTRUCTION: Controls(ndWingrespe*eougetsWdures)M dbe repi babdially for Mefirst few manmsafter anshuchon andon an annual basis Manager. Theyshould also be Impeded a termajorstom event. DEBRIS AND LITTER REMOVAL: Twice a year, inspect outletskucare and dain idea foracoumulaled debts. Also, remove anyacoumuab'ons during W mowing operation. STRUCTURAL REPAIRIREPLACEMENT: OuksWdure mug be Inspected Woe ayear for evidence of structural damage and repaired immediately. EROSION CONTROL: Unstable area dbuary to the basin shot immadiaaly he sabilaed with vegetation pother appropriate erosion antral measures SEDIMENT REMOVAL: Sediment should be removed ft I has readhd a maximum depth of five inches above the slam water management system floor, Construction Sequence Rear tome pan set for all plans and details which raises to construction sequence. 1. Prior b Me beginning of any sitersorik be major features of be ormalmodon mug be No slaked by a licensed surveyor. These include Me building, Monts ofdishabena,utilitylines, and slone ahtprai 2. Prior 0the shut dmepmjed,anommopre remoronmeetirg011beheld.Thiswillbeattendedbybepriowner,me opened responsible for complying; with the approved cocelnxtan drawings including the erosion and sediment control (EBSC) An aro details, Me design engineer, IN engineer responsible for EBSC monitoring during ave lmdsn, lown representatives from the arpircedng department and code edamemed. 3. A licensed surveyor mug define infrastructure motors, limits of distubi shamovelor basin imi and grades in Me lki prior to gain ofany wroun sn.Limbsofdalurbanceshallbemarkedwithtlte'msmllatlonofconstructionfenceorapprovedequal. The exam doe sromwdermanagement system shall he cordoned off ho minimize the doombance on this area. 4. Insalt all perimeter erosion control measures, conslrud'om entrance as shown on the ancon and sediment control plan and Me assodaad deails. install sitfencing at the bodom of slopes. Strip site, dear vegetation, and pace topsail in stodgdle locations shown on the plan. 5. Begin demallion of existing improvements to be removed. A] demolRon Moroi shall be removed from the she am property disposed d. 6. Perfomconstruction dmepool. 7. Begin toexava8arardinstoMtiondmestomwntermanagement symem PmWtrenches and open excavations from erosion. Entry inti Me system shall be Nocied off unY at has reachedlinal stabilization. Once system has ben ingalad, backfill, seed where necessary ant re rsall measures to cordon off mesystem from d sWrbance. 8. Outing she constructor maintain and reesabllsh as required erosion control and saNliralion measures as required byMesia pmanddeails 9. Ingell gravel surface, Once insteled, !Net to drator system may be unblocked, 10. Install and backfill curbs, grade, place final ad topping and pd in on pamhnentvegetadue cover overall disturbed areas, landscape beds, slopes, V. Winter Stabilization Notes: I oansbudon acNes are expected to stand'mm o am dump the wino r seam the connector shall anticipate proper sabilizalbn and sequencing. construction shall be sequenced such mat wherever possible areas of disturbance thatan be completed and permanently stabil'aed shah be done by applying and establishing permanent vegetative cover Wore the first had. areas subject to hemporery disturbance Mat Oil not be wnYxed for an extended most oftime shall be treated with temporaryseetl, mud, ardor erosion bankels, TOPSOIL: 9 A Noting Iopseil will be removed and gored in pinta sufficiently as to ad mixing with Omar NECESSARY AFTER DAILY WEEKLY MONTHLY RAINFALL TO MAINTAIN APPROVAL NYSDOT): FUNCTION OF INSPECTOR SILT FENCE ---- INSP. ______ INSP. CLEAN/ REMOVE 3, Gradation SIEVE SIZE %PASSINGBYWGT. 21NCH 100 REPLACE SOIL INSP. ______ INSP. _____ REMOVE STOCKPILE 114 INCH 65TOIDD NO. 200MESH 2OTOBO CONSTRUC. INSP. _____ INSP. CLEWREMOVE 1. SITE PREPARATION. ENTRANCE ce 11 INSTALL EROSION CONTROL MEASURES. i REPLACE MAINTENANCE OF PERMANENT CONTROL STRUCTURES DURING CONSTRUCTION: The gomwnter man igementsystam and code structure shall be Impeded on a regular basis and aflerevery recti event Sediment huiM up shill be removed 6om tih ictal pmkb reguladyto ®sure detention apadty and proper drainage.OutletshcureshagbeheeofobsWclons.NIpiprganddaminletsshallbehesdolign on. Any sediment bdld up shall be removed. MAINTENANCE OF CONTROLS AFTER CONSTRUCTION: Controls(ndWingrespe*eougetsWdures)M dbe repi babdially for Mefirst few manmsafter anshuchon andon an annual basis Manager. Theyshould also be Impeded a termajorstom event. DEBRIS AND LITTER REMOVAL: Twice a year, inspect outletskucare and dain idea foracoumulaled debts. Also, remove anyacoumuab'ons during W mowing operation. STRUCTURAL REPAIRIREPLACEMENT: OuksWdure mug be Inspected Woe ayear for evidence of structural damage and repaired immediately. EROSION CONTROL: Unstable area dbuary to the basin shot immadiaaly he sabilaed with vegetation pother appropriate erosion antral measures SEDIMENT REMOVAL: Sediment should be removed ft I has readhd a maximum depth of five inches above the slam water management system floor, Construction Sequence Rear tome pan set for all plans and details which raises to construction sequence. 1. Prior b Me beginning of any sitersorik be major features of be ormalmodon mug be No slaked by a licensed surveyor. These include Me building, Monts ofdishabena,utilitylines, and slone ahtprai 2. Prior 0the shut dmepmjed,anommopre remoronmeetirg011beheld.Thiswillbeattendedbybepriowner,me opened responsible for complying; with the approved cocelnxtan drawings including the erosion and sediment control (EBSC) An aro details, Me design engineer, IN engineer responsible for EBSC monitoring during ave lmdsn, lown representatives from the arpircedng department and code edamemed. 3. A licensed surveyor mug define infrastructure motors, limits of distubi shamovelor basin imi and grades in Me lki prior to gain ofany wroun sn.Limbsofdalurbanceshallbemarkedwithtlte'msmllatlonofconstructionfenceorapprovedequal. The exam doe sromwdermanagement system shall he cordoned off ho minimize the doombance on this area. 4. Insalt all perimeter erosion control measures, conslrud'om entrance as shown on the ancon and sediment control plan and Me assodaad deails. install sitfencing at the bodom of slopes. Strip site, dear vegetation, and pace topsail in stodgdle locations shown on the plan. 5. Begin demallion of existing improvements to be removed. A] demolRon Moroi shall be removed from the she am property disposed d. 6. Perfomconstruction dmepool. 7. Begin toexava8arardinstoMtiondmestomwntermanagement symem PmWtrenches and open excavations from erosion. Entry inti Me system shall be Nocied off unY at has reachedlinal stabilization. Once system has ben ingalad, backfill, seed where necessary ant re rsall measures to cordon off mesystem from d sWrbance. 8. Outing she constructor maintain and reesabllsh as required erosion control and saNliralion measures as required byMesia pmanddeails 9. Ingell gravel surface, Once insteled, !Net to drator system may be unblocked, 10. Install and backfill curbs, grade, place final ad topping and pd in on pamhnentvegetadue cover overall disturbed areas, landscape beds, slopes, V. Winter Stabilization Notes: I oansbudon acNes are expected to stand'mm o am dump the wino r seam the connector shall anticipate proper sabilizalbn and sequencing. construction shall be sequenced such mat wherever possible areas of disturbance thatan be completed and permanently stabil'aed shah be done by applying and establishing permanent vegetative cover Wore the first had. areas subject to hemporery disturbance Mat Oil not be wnYxed for an extended most oftime shall be treated with temporaryseetl, mud, ardor erosion bankels, TOPSOIL: 9 A Noting Iopseil will be removed and gored in pinta sufficiently as to ad mixing with Omar exavabon. Smclpiles shall be surrounded by erasion control as outlined on rhea place. The punishing dnew topsoil shall be of a baiter or equal to the following nitrate (SS713.01 NYSDOT): 1. The pH of the matedalshall bessM7.6. 2. The organic content shall ndbeassthan2%or more ban 711%. 3, Gradation SIEVE SIZE %PASSINGBYWGT. 21NCH 100 IINCH 85TO100 �wF 114 INCH 65TOIDD NO. 200MESH 2OTOBO PERMANENT VEGETATIVE COVER: U"m 1. SITE PREPARATION. ce 11 INSTALL EROSION CONTROL MEASURES. i 12, SCARIFY COMPACTED SOIL AREAS. 0 13. LIME AS REQUIRED TO PH 6.5. L 14, FERTILIZE WITH 10444LiBS11,000BY 1S. INCORPORATE AMENDMENTS INTO SOIL WITH DISC HARROW. i m 2. SEED MIXTURES FOR USE ONSWALESAND CUT AND FILL ARM. MIXTURE LBSIACRE "a x ALTA KENTUCKY BLUEGRASSb IN H 20 CREEPING RED FESCUE O Uk 5 26 0 0tl � RYE GRASS ORREDTOP 1 00 5 tl 00 A bD defy > ? ALT. B CREEPING RED FESCUE Im a z"" 23 REDTOP ~r 2 n TALL FESCUEISMOOTH BLOOM GRASS ~a " o o 2D 3. SEEDING 3.1. PREPARE SEED BED BY RAKING TO REMOVE STONES, TWlGS,RDOTSAND N OTHER FOREIGN MATERML. N 32. APPLY SOIL AMENDMENTS AND INTEGRATE IMO SOIL. 3.3. APPLY SEED UNIFORMLY BY CYCLONE SEEDER CULT4PACEROR HYDRO -SEEDER AT RATE INDICATED. 3.4. STABILIZE SEEDED AREAS IN DRAINAGE SWALES. 3.5. IRRIGATE TO FULLY SATURATE SOIL LAYERS, BUT NOT TO DISLODGE PLANTING SOIL. 3.6. SEED BETWEEN APROLISTAND MAY ISTH ORAUGUST 15THAND OCTOBER 15TH. 3.7. SEEDING MAY OCCUR MAY 15TH AND AUGUST 15TH IFADEQUATE IRRIGATION IS PROVIDED. SUE PREPARATION: LL 1. INSTALL EROBION CONTROL MEASURES.2 SCARIFY AREAS OF COMPACTED SOIL. 3. FERTILIZE WITH 1MM0AT40NACRE. 4. LIME AS REQUIRED TO PH 6.5 SEED SPECIES: MIXTURE: LBS.IACRE: RAPIDLY GERMINATING ANNUAL RYEGRASS 20 (ORAPPROVED EQUAL) PERENNIAL RYEGRASS 20 CEREAL OATS 36 SEEDING: SAME AS Pi APPROVED Resolution Number Zb 16 Date 3 Lb a U 9 A h N C �wF U"m N 0� c Poo C IN M a z"" a U 9 A h N C 0 0 r4" W C i i DESIGN Y MULCH BED 12'SOILMEDIA 29WASHEDGRAVEL RAINGARDEN SURFACE GUIDELINE DING LAYER - an MAX SOIL MEDIA LAYER 17. IF MAX 0.05 FT -1 FTTYP. BED RAINGARDEN SIZING CALCULATION where I WATER QUALITY VOLUME VOLUME OF SOIL MEDIA WON=WaosedadtyVardenSurface Nee (� WOv=IP(Rv)A)112 Vsm-(A,g)(Dam)Nam) DIM = Sol Mai Dept (9) P=90%RAINFALL: 2.iB' Vsm=(100sg(1.5S)(0.2) DdImNs"LaysrDeplh(t) Rv-0.05+chi Vsm=210d DIP = Forcing Depth (4) 1=lmpamousoover(%I Vsm-Vdumeof Sol Made (cq VOLUME OFDRAINAGE LAYER Rv=O.OsfD009(tDO) Vol - Volume of Drainage Made (c) PIN =ggg Vdl= Arg xOrn xNit Nam = Porosity 0 Sol Media (°A) 08,276SF Vdl=(676sf)(1.0)(0.4) Not =Porosity ofDrainage Media (%) WON =(2.78'0.95'8,276]112 Vol =270Ac1 WON =1,80.34 `D 0 M T N VAIN <Vsm+Vd+(Dip xArg) 1,803 of < 2101.50 x 676) 1,803cl<818.4c O.K. a SOIL MEDIA SPECIFICATIONS: Aj COMPOSITION-50%SANDI2030%TOPSOIL WI LESS THAN 5% CLAYS, 20130% LEAF COMPOST POROSITY -02 DRAINAGE LAYER SPECIFICATIONS: POROSRY-0.40 Q 0C w PLANT SPECIFICATIONS: Supoed Shmbs UM Suggested Herbaceous PlantLHl WITCH HAZELjHamen isvigioiane) CINNAMON FERN (Osmundadnnamomce) WINTERBERRY(Ilexvedallata) CUTLEAF CONEFLOWERgiudbsoMaki iota) ARROWWOOD(V'humumdeni WOCURASS(Sdryu Wrinua) BROOK-SIDEALDER (All semilds) NEWENGLAND ASTER pour roveaerglHe) RED-0ISERDOGWOOD (Comusslohngera) FOX SEDGE Corex culpis idea) SWEET PEPPERBUSH(CWraani SPOTTED J06PYEWEED (EupaNrumreculatlm) SWITCH GRASS (Panum v'rgalum) GREAT BLUE LOBELIA (Lobego dpha8ce) WILD BERGAMOT (Monads fdulosa) NOTE: RED MILKWEED (AsdepMaincome%) 1. The upland side of Me ram garden shad be protected from upgradentsubswiace oordi 4 14 insiahelon of all tox lay banner or placement of 6 mil patyetlrylene sheeting along the exca+eMd sMewalls of We drainage layers, SW-1 RAIN GARDEN DETAIL NOT TO SCALE D-1 SECTION A -A 30'-O'MINIMUM A START AT EXIST. PAVEMENT PLAN INSTALLATION NOTES: 1. Stone size - use Ymin. Stone, orreclaimed orrecycled concrete equNalent. 2. Length - as required, but not less than 50 feel except onasingle residence lot where a30 foot minimum engtll would apply 3. Thickness - not less than six (6) inches. 4. Wdh-10 tot minimum, but riot lea than dlefull widlhalpoints where ingress or egress occur. 24hg single enhance to age. 5, Surface water - all surface waterkiingordivededtowardconstructionentrancesshallbepipedacross the entrance. 9 piping is impractical, a mountable berm with 5:1 slopes will be permitted. 6. Maintenance - the entrance shall be maintained in a condition which MIT prevent backing onRowing of sediment onto public right of way this may require periodic top dressing with additional stone as conditions demand and repair andlordeanouta of any measures used to hap sediment. All sediment spilled, dropped, washed or tacked onto public dgM of way must be removed immediately. 7. Washing -wheels shall becleaned toremove sod 1mantpnor toentrance onto pubicright ofway, When washing a required, it shall be done on an area stabilized with stone and which drains into an approved sediment trapping device. 8. Periodic inspection and needed maintenance shall be provided ager each rain STABILIZE ENTIRE FILE WITH r r 2 VEGETATION OR COVER r r r r r �1 SLOPEORIESS r r rrrrr r r + rr rr+r++rrr rrr rr 1 r r r r rr+ r r r r f r r rrr+ r rr r r rr rrrrrrrr+ rrr+r r +rr r r rr r r r r +r r r r r r r r rrr r rr r r r r r rrrrrr r r r r r r �rr"rh""wrrv+xrvrrrrrrrrm r �rr'T+rrnl u m m I- _111_111 ILII III_; � I-II. L-IH-��� MIN SLOPE SIRAWB4LESORSILTFENCE MIN SLOPE SYMBOL 3& NOTES: 1. Area chosen for stockpiling operations shall be dry andslable. 2. Maximum slope ofslockpleshall be1:2. 3. Upon completion of soil slockjoiling, each I shall be surrounded with either sill fencing orstrawbages, ten slarbitzscl with vegetation oroovened, 4. See detadPorinslaggianofalliance. E•l STABILIZED CONSTRUCTION ACCESS DETAIL E•2 WOOD OR METAL DRNE POSTS ATB'41' O.C. MAX. ATTACH SILT FABRIC ON UPHILLSIDE OF POSTS AND BACKFILL OVER FABRIC FLOW i Galvanized Metal Grate PROPEX81 OPFABRDQR v � APPROVEEDDEQUgUP1 r SOIL TOBERETAINED DIG B'X6'TRE INCH INSTALL FABRIC AND BACKFILL II NAT VE SOIL II EXISTING AREA TO BE PROTECTED SECTION 4-314" OUTER WIDTH, 4 LIS" INNER Will 10 FT LONG NEUTRAL CHANNELS CIURED FROM PVL, MADE IN THE U.S.A. AND CONNECTED WITH COUPHNGS IRYI.THE N254GRATES ARE MANUFACTURED FROM GALVANIZED STEEL AND INNS L WITH THE REQUIRED #229 SCREWS. THE CHANNEL DRAIN SYSTEM CAN GNED WITH A SLOPED GRADE AT THE SURFACE TO INTERCEPT SHEET HOW TO AN APPROPRIATE OUTLET, ADA COMPLIANT. I AS OUTLETS CAN BE CONFIGURED AS BOTTOM OR END OUTLETS SOLDSEPARATELY) 04 Class B + Loads of 61,175 psi. Recommended lot medium -My pneumatic ine (rel autos and light trucks a1 speeds less Than 20Inch pN NOW "A RMOOlermo a yR+ Lghn"M wgaw I°GKN 1NUV mAlbeoldk°A91p'1YlttKKi. ,drreWl ue=PW* vtA mmh Ost*M Mmes for suWgs ant Wtt S 45 IMA AAI Nrxpawropede Nn IRnlllmmr�npxdmm" ,In Ud morn �a Nrs � pwrmxnn n mitt ro rkrtlua ma t.=*uxa�umw. mynl, pWt t�nX Ne kwgm d N Wuvua In rum IN �Vutmxl UN mtrnemMsarz muVk'wpmmptv." wmnpuraarA XpSiSmem Ymmr+>b�aM xeOlk A�µr Rev 3104/24 TRENCH DETAIL NOT TO SCALE POSTS FASTENED TOGETHER PLAN VIEW: JOINING SECTIONS WOODEN FENCE POST 4 FT. LENGTH SUPPORT NET FILTER FABRIC Z x 0 ANCHOR FABRIC V BELOW EXISTING CHANNEL WHEN CROSSING STREAM CHANNEL ELEVATION NOTES: 1. Filter cloth to be fastened socurely to post steel star t or u type or 2' hardwood posts at top and mo socion. 2. When Two salons of III dot adjoin each other they shall be overlapped by6inches and folded. Filter cloth shall bemiral1BOX, staMlinka t140n or approved equal 3. Maintenance shall be performed as needed and mal removed when 'bulges'III inthe silt fence. 4. Excavate 4 inch bench along the lower perimeter of file site, 5. Unroll a section at a gme and posilion to post against the back (downstream) wall of the trench hat side away from direction of low). 6. Drivethepostintotlhegroundunitthenettingisapproximately2inchesfromthebenchbottom, SYMBOL 1. lay the teem flap of fabric onto the undisturbed bottom of the trench, backfill to trench and tamp the soil. Steeper slopes require an intercept bench. 6. Join sections as shown above. E-3 I SILT FENCE DETAIL NOTTOSCALE SOIL STOCKPILE DETAIL NOT TO SCALE LEADER MUST REMAIN INTACT, DO NOT PRUNE HEAD UNLESS SPECIFICALLY INSTRUCTED BY THE LANDSCAPE ARCHITECT. GUYING FOR TREES UP TO 16' HEIGHT SHALL REQUIRE 2 STRANDS OF 12 GAUGE GALVANIZED MIRE & 141 RUBBER HOSE. (3) 7 X 7 CEDAR OR HARDWOOD STAKES G'-0' LONG MINIMUM, SET 1200 APART. TRUNKWRAPPING 3' DEEP MULCH OF ii BARK CHIPS IN SAUCER, ROOT CROWN SHALL RARE SAME RELATIONSHIP TO NEW GRADE AS TO GRADE WHERE DUG. CUT BURLAP LOOSE FROM TOP OF BALL AND FOLD DOWN, PLANTING SOIL: 3 PARTS TOPSOIL I PART PEAT MOSS S LBSICY BONE MEAL 3LBSICY5.IMFERT. LOOSEN SUBSOIL TO 6' BELOW PR. NOTES: L Pt to be l2'deeper&2fkerlhanbal. 2. Loceensutsoil6'bebwpt, P.1 TREE PLANTING DETAIL NOT TO SCALE N 00 0 vL HEIGHTANDSPREAD. 0 Y NICK LAYER OF 1.117BARICMULCH CHIPS IN SAUCER ON � An 4 0 «m m THAN FINISHED GRADE. lU9N A d `D 0 M T N a OroQ Aj 0 UkoG 1 M Q 0C w rnrn M O d b V/ <00 N '0 b0 r > QNN W 0 " 0 A,UoC\ i NINEN DIRECTED BY LANDSCAPE ARCHITECT, HEDGES SHALL BE PRUNED TO UNIFORM HEIGHTANDSPREAD. Y NICK LAYER OF 1.117BARICMULCH CHIPS IN SAUCER c 0 DECIDUOUS STOCK MAY BE SET V. 3' DEEPER m THAN FINISHED GRADE. a CUT BURLAP LOOSE FROM TOP OF BALL AND FOLD DOWN. PLANTING SOIL:3 PARTS TOPSOIL 1 PART PEAT MOSS SLBSICY BONE MEAL SUBSIDY SIRS FERT. NOTES: 1. Donotadd fer6lhertaplarsigW.Forfallplaotlngseespectical'ons, 2. lot to be? dceper& 12' kerlhan Ball o*astspread of bare Ws, 3. AsingMhxhshollbedugforallSMub8haWarh4e. P_2 TYPICAL SHRUB PLANTING DETAIL NOT TO SCALE APPROVED Resolution Number _fib-_-� Date 312. U 0. w 0