Loading...
HomeMy WebLinkAboutSite Plan - 2026-08-05SURVEY NOTES: -ALL SURVEY AND TOPOGRAPHY DATA WAS PROVIDED BY WARD CARPENTER ENGINEERS INC. SURVEY/ PLAT PREPARED BY: 3665 BARGER STREET, SHRUB OAK, NY 10588 CONSTRUCTION OF NEW BUILDING TAX ID(S): 16.07 - 1 - 2 OWNER: MOUNDROUKAS VICKI 3665 BARGER ST SHRUB OAK, NY 10588 TAX MAP PARCEL ID: 16.07 - 1 - 2 LOT SIZE:13,771 SF, ACRES= 0.32 AC +- ZONING: (C-2) TITLE SHEET 1/9 ENGINEER: GREGORY CACCIOPPOLI, P.E. 441 CENTRAL PARK AVE. STE 1238 SCARSDALE, NY 10583 NYS LIC. NO. 105839 DRAWING LIST TITLE SHEET - SHEET 1 OF 9 EXISTING CONDITIONS / REMOVALS & STEEP SLOPES - SHEET 2 OF 9 PROPOSED CONDITIONS / SITE PLAN - SHEET 3 OF 9 EROSION CONTROL / GRADING PLAN - SHEET 4 OF 9 UTILITY PLAN - SHEET 5 OF 9 UTILITY PROFILE - SHEET 6 OF 9 UTILITY DETAILS - SHEET 7 OF 9 DRIVEWAY PLAN & PROFILE - SHEET 8 OF 9 STORMWATER PRE/POST ANALYSIS - SHEET 9 OF 9 GREGORY CACCIOPPOLI, P.E. 441 CENTRAL PARK AVE. STE 1238 SCARSDALE, NY 10583 CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 423.1 423.9 424.4 424.5 425.1 425.5 425.6 426.6 426.4 426.4 425.7 426.8 427.0 427.2 426.5 425.2 425.5 424.3 Chain Link Fence Floodplain 100-YEAR / 500-YEAR FLOOD ZONE TOTAL OF LOT 13,771 S.F. DECK 269 S.F. STEPS 11 S.F. HOUSE 1076 S.F. GARAGE 341 S.F. ASPHALT DRIVEWAY 2313 S.F. WALKWAYS 63 S.F. PLAT 52 S.F. DEMOLITION SCHEDULE: 1.8" TREE TO BE REMOVED 2.10" TREE TO BE REMOVED 3.10" TREE TO BE REMOVED 4.10" TREE TO BE REMOVED 5.10" TREE TO BE REMOVED 6.8" TREE TO BE REMOVED 7.18" TREE TO BE REMOVED 8.10" TREE TO BE REMOVED 9.8" TREE TO BE REMOVED 10.12" TREE TO BE REMOVED 11.DWELLING TO BE REMOVED 12.CONC. WALK AND PLAT TO BE REMOVED 13.GATE TO BE REMOVED 14.WOOD FENCE TO BE REMOVED 15.BSMT AND CONC. TO BE REMOVED 16.WOOD DECK TO BE REMOVED 17.CHAIN LINK FENCE TO BE REMOVED 18.WOOD FENCE TO BE REMOVED 19.GARAGE TO BE REMOVED GENERAL NOTES: 1.The design engineer shall not be responsible for the supervision of the construction of structures. 2.No changes shall be made to these plans except as per NYS law chapter 987. 3.All work and materials shall comply with all applicable codes, including but not limited to ACI, AISC, Zoning, and the New York State Building Code. 4.All conditions, locations and dimensions shall be field verified and the engineer shall be immediately notified of any discrepancies. 5.All changes made to the plans shall be approved by the engineer and any such changes shall be filed as amendments to the original building permit. 6.The contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract. 7.The contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors and their agents and employees, and other persons performing any of the work under a contact with the contractor. 8.Safety during construction shall be the responsibility of the contractor and shall conform to all local, state and federal agencies in effect during the period of construction. 9.The contractor and his subcontractors shall make application to receive all necessary permits to perform the work under contract. The contractor and his subcontractors shall be licensed to do all work as required by the local, county, and state agencies which may have jurisdiction over those trades, and shall present the owner with copies of all licenses and insurance certificates. 10.Final grading around the building area shall slope away from the structure. 11.All written dimensions on the drawings shall take precedence over any scaled dimensions. 12.Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, and roofs. Provisions shall be made to control water runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining building should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. 13.Industrial code rule 753: The contractor shall notify all utility companies 72 hours prior to the start of his operations and shall comply with all the latest industrial code rule 753 regulations. 14.All proposed residences shall be located within the building envelope. 15.House footprint and location may vary based on model home selection. 16.THE LAND OWNER ACKNOWLEDGES AND GRANTS THE VILLAGE AND OTHER AGENCIES HAVING JURISDICTION THE RIGHT TO ENTER THE PROPERTY AT REASONABLE TIMES AND IN A REASONABLE MANNER FOR THE PURPOSE OF INSPECTION EXISTING CONDITIONS / REMOVALS & STEEP SLOPES 2/9 PROJECT INFORMATION: 1.Owner Information: Moundroukas Vicki 2.Owner Address: 3665 Barger Street, Shrub Oak, NY 10588 3.Applicant: Same As Engineer 4.Property Location: 3665 Barger Street, Shrub Oak, NY 10588 TMDN: Section: 16.07 Block: 1 Lot: 2 Zone: C-2 - Business (Retail Store) Total Lot Area: 13,771 sqft (0.32 AC) 5.Approximate Start Date: October 2024 Approximate Completion Date: May 2025 6.Survey & topography data shown hereon provided by Ward Carpenter Engineers Inc. Dated: June 29, 2023 7.Sewer: Ossining Sewer District Water: Briarcliff Manor Village Water District Watershed: Pocantico and Saw Mill River Basin 8.Soils located on site (USDA Web Soil Survey): Soils on Site: Ff: FLUVAQUENTS-UDIFLUVENTS COMPLEX, FREQUENTLY FLOODED (1.2%) Uc: UDORTHENTS, WET SUBSTRATUM (78.8%) Uf: URBAN LAND (20%) 9.Excavation equipment stored on site and kept within the disturbed areas. SITE SLOPE ANALYSIS GREGORY CACCIOPPOLI, P.E. 441 CENTRAL PARK AVE. STE 1238 SCARSDALE, NY 10583 CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 0 FEET 10 20 SCALE 1"-10' N.F.S. EXISTING CONDITIONS & REMOVALS PLAN SCALE: 1"=10'1 2 SOIL MAP N.F.S.3 LEGEND PROPERTY BOUNDARY TREE TO BE REMOVED 100-YEAR / 500-YEAR FLOOD ZONE COVERAGE CALCULATION SCHEME 1" = 40' 4 1 2 3 4 5 6 7 8 1213 11 10 9 S2 S2 H/CH/C PEDESTRIAN SIGN STOP SIGN PEDESTRIAN SIGN CULTEC CHAMBERS LOCATION PROPOSED 1 STORY BUILDING NO. 3665 20 20 29.45 26.5 6 5 . 0 4 30.63 1 8 9 2 4 . 3 1 R 6 R7.0 1 4 4 7 8 3 1 3 . 4 4 12 12 R1 2 R12 R12 R 1 2 8 4 PROPOSED WALKWAY P R O P O S E D D R I V E W A Y P R O P O S E D D R I V E W A Y 1 8 9 G A R B A G E A R E A H V A C 3 . 3 1 18.79 PROPOSED CURB RAMP OPTION 2 PER NYS DOT STD 608-01, TYP. ALL SIDEWALK RAMPS SAWCUT LINE AS NEEDED, 2' FROM CURB FACE CURB IN THE R.O.W TO BE TYPE VF 150 (NYSDOT 609-03) OR SIMILAR APPROVED IN SHRUB OAK 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 0 FEET 10 20 SCALE 1"-10' ZONE - ( C-2 ) GENERAL NOTES: 1.The design engineer shall not be responsible for the supervision of the construction of structures. 2.No changes shall be made to these plans except as per NYS law chapter 987. 3.All work and materials shall comply with all applicable codes, including but not limited to ACI, AISC, Zoning, and the New York State Building Code. 4.All conditions, locations and dimensions shall be field verified and the engineer shall be immediately notified of any discrepancies. 5.All changes made to the plans shall be approved by the engineer and any such changes shall be filed as amendments to the original building permit. 6.The contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract. 7.The contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors and their agents and employees, and other persons performing any of the work under a contact with the contractor. 8.Safety during construction shall be the responsibility of the contractor and shall conform to all local, state and federal agencies in effect during the period of construction. 9.The contractor and his subcontractors shall make application to receive all necessary permits to perform the work under contract. The contractor and his subcontractors shall be licensed to do all work as required by the local, county, and state agencies which may have jurisdiction over those trades, and shall present the owner with copies of all licenses and insurance certificates. 10.Final grading around the building area shall slope away from the structure. 11.All written dimensions on the drawings shall take precedence over any scaled dimensions. 12.Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, and roofs. Provisions shall be made to control water runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining building should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. 13.Industrial code rule 753: The contractor shall notify all utility companies 72 hours prior to the start of his operations and shall comply with all the latest industrial code rule 753 regulations. 14.All proposed residences shall be located within the building envelope. 15.House footprint and location may vary based on model home selection. *For lots with buildings having greater than 3,500 square feet of gross floor area CONSTRUCTION PHASING PHASE I PRIOR TO TREE REMOVAL OR ANY CLEARING, THE SITE WILL BE SECURED BY INSTALLING SILT FENCE AROUND THE PERIMETER OF THE DISTURBED AREA LIMITS AS SHOWN. TRACKING PAD WILL BE INSTALLED AT THE ROAD ENTRANCE. TO LIMIT THE ADVERSE EFFECT OF DRAINAGE ON ADJOINING PROPERTIES DURING CONSTRUCTION, TREES AND GROUND VEGETATION SHALL REMAIN AND BE PROTECTED UNTIL IT IS NECESSARY FOR REMOVAL. PHASE II THE SECOND PHASE WILL BE THE EXCAVATION OF THE BUILDING. AND INSTALLATION OF ROADWAY UTILITIES. PHASE III THE THIRD PHASE OF CONSTRUCTION WILL ENTAIL THE CONSTRUCTION OF THE STORMWATER SYSTEM AND ENTRY DRIVEWAY. IN CONJUNCTION WITH THIS CONSTRUCTION WILL BE THE INCREASE IN IMPERVIOUS SURFACES. AS MENTIONED ABOVE, SUBSURFACE RETENTION SYSTEMS WILL BE INSTALLED TO CAPTURE STORMWATER RUNOFF FROM IMPERVIOUS SURFACES. (I.E., ROOF TOPS, PATIOS DRIVEWAY, ETC.). PHASE IV FINAL FINE GRADING, LANDSCAPING AND STABILIZATION, REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROLS, RESTORE AND STABILIZE ANY DISTURBED AREAS REMAINING UPON REMOVAL OF TEMPORARY ESC MEASURES PROPOSED CONDITIONS/ SITE PLAN SCALE: 1"=10'1 GENERAL NOTES: 1.The design engineer shall not be responsible for the supervision of the construction of structures. 2.No changes shall be made to these plans except as per NYS law chapter 987. 3.All work and materials shall comply with all applicable codes, including but not limited to ACI, AISC, Zoning, and the New York State Building Code. 4.All conditions, locations and dimensions shall be field verified and the engineer shall be immediately notified of any discrepancies. 5.All changes made to the plans shall be approved by the engineer and any such changes shall be filed as amendments to the original building permit. 6.The contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract. 7.The contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors and their agents and employees, and other persons performing any of the work under a contact with the contractor. 8.Safety during construction shall be the responsibility of the contractor and shall conform to all local, state and federal agencies in effect during the period of construction. 9.The contractor and his subcontractors shall make application to receive all necessary permits to perform the work under contract. The contractor and his subcontractors shall be licensed to do all work as required by the local, county, and state agencies which may have jurisdiction over those trades, and shall present the owner with copies of all licenses and insurance certificates. 10.Final grading around the building area shall slope away from the structure. 11.All written dimensions on the drawings shall take precedence over any scaled dimensions. 12.Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, and roofs. Provisions shall be made to control water runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining building should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. 13.Industrial code rule 753: The contractor shall notify all utility companies 72 hours prior to the start of his operations and shall comply with all the latest industrial code rule 753 regulations. 14.All proposed residences shall be located within the building envelope. 15.House footprint and location may vary based on model home selection. PROJECT INFORMATION: 1.Owner Information: Moundroukas Vicki 2.Owner Address: 3665 Barger Street, Shrub Oak, NY 10588 3.Applicant: Same As Engineer 4.Property Location: 3665 Barger Street, Shrub Oak, NY 10588 TMDN: Section: 16.07 Block: 1 Lot: 2 Zone: C-2 - Business (Retail Store) Total Lot Area: 13,771 sqft (0.32 AC) 5.Approximate Start Date: October 2024 Approximate Completion Date: May 2025 6.Survey & topography data shown hereon provided by Ward Carpenter Engineers Inc. Dated: June 29, 2023 7.Sewer: Ossining Sewer District Water: Briarcliff Manor Village Water District Watershed: Pocantico and Saw Mill River Basin 8.Soils located on site (USDA Web Soil Survey): Soils on Site: Ff: FLUVAQUENTS-UDIFLUVENTS COMPLEX, FREQUENTLY FLOODED (1.2%) Uc: UDORTHENTS, WET SUBSTRATUM (78.8%) Uf: URBAN LAND (20%) 9.Excavation equipment stored on site and kept within the disturbed areas. PROPOSED CONDITIONS / SITE PLAN 3/9 LEGEND PROPOSED BELGIAN BLOCK CURB PROPERTY LINE PROPOSED WALKWAY/PATIO PROPOSED ASPHALT DRIVEWAY PROPOSED SETBACK 1 2 3 4 5 6 7 8 1213 11 10 9 S2 S2 H/CH/C PEDESTRIAN SIGN STOP SIGN PEDESTRIAN SIGN CULTEC CHAMBERS LOCATION PROPOSED 1 STORY BUILDING NO. 3665 F.F.E. = 427.0 B.F.E. = 416.0 424 426 42 6 42 6 4 2 4 42 4 XXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXX SOIL STOCKPILE X X X X X X X X -2.1% -2.4% -2.0% -3. 5 % -3. 6 % -3. 7 % -2.2% -5.6% - 7 . 6 % -2. 5 % -9. 0 % - 2 . 1 % -6. 9 % -4.3% - 7 . 4 % -9.4% -19.9% -2.0% -24.9% -4 . 0 % PROPOSED LIMIT OF DISTURBANCE (13771 SF) PROPOSED TREE PROTECTION CONCRETE WASHOUT PITS. ALL CONCRETE SHOULD BE POURED PRIOR TO INSTALLING THE STORMWATER SYSTEMS TO PREVENT CONTAMINATION. XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X -1.2% -8. 9 % TC: 424.57 BC: 424.07 (TO MATCH EX.) TC: 423.99 BC: 423.49 TO MATCH EX. TC: 424.39 BC: 423.89 TC: 423.19 BC: 422.69 TC: 425.30 BC: 424.80 TC: 425.66 BC: 425.16 TC: 426.00 BC: 425.50 TC: 426.19 BC: 425.69 (TO MATCH EX.) TC: 427.28 BC: 426.78 TC: 427.01 BC: 426.51 TC: 426.08 BC: 425.58 TC: 426.39 BC: 425.89 TC: 426.25 BC: 425.75 TC: 425.90 BC: 425.40 TC: 424.90 BC: 424.40 TC: 424.58 BC: 424.08 TC: 424.82 BC: 424.32 TC: 425.81 BC: 425.31 (TO MATCH EX.) 427.97 TO MATCH EX. 425.97 TO MATCH EX. 423.13 TO MATCH EX. 423.16 TO MATCH EX. 425.90425.90 426.33 426.84426.84 425.19 426.50 426.31 426.50 TC: 425.48 BC: 424.98 TC: 425.17 BC: 424.67 - 7 . 5 % -3. 6 % W W TC: 424.50 BC: 424.00 -3 . 1 % -2 . 8 % -3.0 % 427.00 427.00 427.00 427.00 TC: 426.60 BC: 426.10 TC: 426.84 BC: 426.34 - 5 . 2 % S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS INV.EL: 418.52 CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCE -46.8:1 -5.6:1 SILT FENCE, TYP. 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 EROSION CONTROL/GRADING PLAN 4/9 INSTALLATION & MAINTENANCE OF EROSION CONTROL: CONSTRUCTION SCHEDULE NOTIFY APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 5 DAYS PRIOR TO START. *IMPORTANT* CONTRACTOR MUST UTILIZE EROSION CONTROL BLANKETS OR APPROVED EQUAL ON ALL DISTURBED AREAS. CONTRACTOR MUST PERFORM WEEKLY INSPECTIONS OF THE EROSION CONTROL MEASURES AND BE SURE THE SITE IS CONTAINED BEFORE EVERY RAIN STORM. EROSION CONTROL MEASURES INSTALL ALL EROSION CONTROL MEASURES PRIOR TO START OF CONSTRUCTION. CALL FOR INSPECTION FROM THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 2 DAYS PRIOR TO FINISH. INSPECTION BY MUNICIPALITY MAINTENANCE (TO BE PERFORMED DURING ALL PHASES OF CONSTRUCTION) AFTER ANY RAIN CAUSING RUNOFF, CONTRACTOR TO INSPECT HAYBALES, ETC. AND REMOVE ANY EXCESSIVE SEDIMENT AND INSPECT STOCKPILES AND CORRECT ANY PROBLEMS WITH SEED ESTABLISHMENT. INSPECTIONS SHALL BE DOCUMENTED IN WRITING AND SUBMITTED TO THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION. INSPECTION BY MUNICIPALITY - FINAL GRADING REMOVE UNNEEDED SUBGRADE FROM SITE. CALL FOR INSPECTION FROM THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 2 DAYS PRIOR TO FINISH. INSPECTION BY MUNICIPALITY - LANDSCAPING SPREAD TOPSOIL EVENLY OVER AREAS TO BE SEEDED. HAND RAKE LEVEL. BROADCAST 1.25 LB. BAG OF JONATHAN GREEN "FASTGROW" MIX OR EQUAL OVER AREA TO BE SEEDED. APPLY STRAW MULCH AND WATER WITHIN 2 DAYS OF COMPLETION OF TOPSOILING. CALL FOR INSPECTION FROM THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 2 DAYS PRIOR TO FINISH. INSPECTION BY MUNICIPALITY - FINAL LANDSCAPING GRASS ESTABLISHED. CALL FOR INSPECTION FROM THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 2 DAYS PRIOR TO FINISH. INSPECTION BY MUNICIPALITY - FINAL INSPECTION ALL EROSION CONTROL MEASURES REMOVED AND GRASS ESTABLISHED. CALL FOR INSPECTION FROM THE APPROPRIATE MUNICIPAL AGENCY HAVING JURISDICTION AT LEAST 2 DAYS PRIOR TO FINISH. 2' - 0 " ± VARIES FINISHED GRADE LINE ENTIRE SWALE WITH EROSION CONTROL MATTING PLANT WITH LAWN SEED MIX SPECIFIED IN PERMANENT STABILIZATION NOTES GRASS SWALE 6" TOPSOIL GENERAL NOTES: 1.The design engineer shall not be responsible for the supervision of the construction of structures. 2.No changes shall be made to these plans except as per NYS law chapter 987. 3.All work and materials shall comply with all applicable codes, including but not limited to ACI, AISC, Zoning, and the New York State Building Code. 4.All conditions, locations and dimensions shall be field verified and the engineer shall be immediately notified of any discrepancies. 5.All changes made to the plans shall be approved by the engineer and any such changes shall be filed as amendments to the original building permit. 6.The contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract. 7.The contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors and their agents and employees, and other persons performing any of the work under a contact with the contractor. 8.Safety during construction shall be the responsibility of the contractor and shall conform to all local, state and federal agencies in effect during the period of construction. 9.The contractor and his subcontractors shall make application to receive all necessary permits to perform the work under contract. The contractor and his subcontractors shall be licensed to do all work as required by the local, county, and state agencies which may have jurisdiction over those trades, and shall present the owner with copies of all licenses and insurance certificates. 10.Final grading around the building area shall slope away from the structure. 11.All written dimensions on the drawings shall take precedence over any scaled dimensions. 12.Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, and roofs. Provisions shall be made to control water runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining building should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. 13.Industrial code rule 753: The contractor shall notify all utility companies 72 hours prior to the start of his operations and shall comply with all the latest industrial code rule 753 regulations. 14.All proposed residences shall be located within the building envelope. 15.House footprint and location may vary based on model home selection. Scale:1/2"=1'-0" DETAIL OF ASPHALT DRIVEWAY Width Variable Sl 1/4" per ft.Sl 1/4" per ft. Compacted Subgrade 3" Base Course NYSDOT Specs Item 403.07 Asphalt Conc. Type 1A Base 2" Top Course-NYSDOT Specs item 403.01 Asphalt Conc. Type 1A Top Existing Ground Existing Ground 3" Crushed Stone may be used on single driveways serving one house. 3" Binder Paint Mix must be used for driveways serving 2 of more houses. Note: If driveway grade exceeds 10%, than 2 off street parking at driveway entrance must be provided. The width of the driveway giving access to potential building lots shall be a function of the intensity of its use and shall constructed accordance with the following table: No. of Potential Dwellings Pavement Width Right-of-Way Width 1 2 3 4 or more 24' 16' 18' 12' 50' 20' 25' 15' CONSTRUCTION SPECIFICATIONS STABILIZED CONSTRUCTION ENTRANCE 3'5:1 PLAN VIEW PROFILE EXISTING GROUND FILTER CLOTH EXISTING PAVEMENT MOUNTABLE BERM (OPTIONAL) EXISTING PAVEMENT AS N O T E D . 12 ' M I N . AS NOTED 6" M I N . EXISTING GROUND AS NOTED 12'MIN. 1.STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY). 3.THICKNESS - NOT LESS THAN SIX (6) INCHES. 4.WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 5.GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 6.SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 7.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. 8.WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 9.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. CONSTRUCTION SPECIFICATIONS SILT FENCE WOVEN WIRE FENCE (MIN. 14 GAUGE W/ MAX. 6" MESH SPACING) 36" MIN. LENGTH FENCE POSTS DRIVEN MIN. 16" INTO GROUND. HEIGHT OF FILTER = 16" MIN. 6" M I N . FLO W FLO W 10' MAX. C. TO C. UNDISTURBED GROUND EMBED FILTER CLOTH A MIN. OF 6" IN GROUND. 4" 16 " M I N . WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE W/ MAX. 6" MESH SPACING) WITH FILTER CLOTH 36" MIN. FENCE POST FLOW COMPACTED SOIL 20 " M I N . PERSPECTIVE VIEW SECTION VIEW 1.WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD. 2.FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING. 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. 4.PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT. 5.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. 1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE. 2. SOILS OR FILL TO BE STOCKPILED ON SITE DURING CUTTING AND FILLING ACTIVITIES SHOULD BE LOCATED ON LEVEL PORTIONS OF THE SITE WITH A MINIMUM OF 50-75 FOOT SETBACKS FROM TEMPORARY DRAINAGE SWALES. 3. MAXIMUM SLOPE OF STOCKPILE SHALL BE 1:2. 4. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH EITHER SILT FENCING OR STRAWBALES, THEN STABILIZED WITH VEGETATION OR COVERED. 5. STOCKPILES REMAINING IN PLACE FOR MORE THAN A WEEK SHOULD BE SEEDED AND MULCHED OR COVERED WITH GEOTEXTILE FABRIC SURROUNDED BY SILT FENCE. 6. SEE SPECIFICATIONS (THIS MANUAL) FOR INSTALLATION OF SILT FENCE. INSTALLATION NOTES STRAWBALES OR SILTFENCE STABILIZE ENTIRE PILE WITH VEGETATION OR COVER MIN. SLOPE 2 1 SLOPE OR LESS MIN. SLOPE SOIL STOCKPILING SYMBOL CONSTRUCTION SPECIFICATIONS STRAW BALE DIKE ANGLE FIRST STAKE TOWARDS PREVIOUSLY LAID BALE. DRAINAGE AREA NO MORE THAN 1/4 ACRE PER 100 FEET OF STRAW BALE DIKE FOR SLOPES LESS THAN 25%. BEDDING DETAIL NOT TO SCALE 2 RE-BARS, STEEL PICKETS OR 2"X2" STAKES PLACED 1 1/2' TO 2' IN GROUND. DRIVE STAKES FLUSH WITH TOP OF BALE. ANCHORING DETAIL NOT TO SCALE FLOW BOUND BALES PLACED ON CONTOUR. 4" VERTICAL FACE FLOW 1.BALES SHALL BE PLACED AT THE TOE OF A SLOPE OR ON THE CONTOUR AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. 2.EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF (4) INCHES, AND PLACED SO THE BINDINGS ARE HORIZONTAL. 3.BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER TWO STAKES OR RE-BARS DRIVEN THROUGH THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE BALE. 4.INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5.BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULLNESS SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. SYMBOL LANDGRADING DETAIL DITCH OR DIVERSION TO DIVERT SURFACE FLOW GRADE 2-3% 2:1 O R F L A T T E R 1'MIN. BENCH X Y(MAX) 2 20' 3 30' 4 40' 1 X Y MAX. Y MAX. EROSION CONTROL BLANKET CREATED BY DEWITT 34 LB, 4FT X 112.5FT MATERIAL: EXCELSIOR WEIGHT: 34LB KEY/ANCHOR MATERIAL AT TOP OF SLOPE SINGLE NET EROSION CONTROL BLANKET KEY/ANCHOR MATERIAL TO TOE OF SLOPE 12" MIN. SPACING TYP. 4" M I N . SPA C I N G T Y P . MIN . 2 " - 6 " O V E R L A P DE-WATERING SEDIMENT BAG BAG PLACED ON AGGREGATE OR STRAW HIGH STRENGTH DOUBLED STITCHED "J" SEAMS SEWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE WATER IN FLOW FROM PUMP OPENING FOR UP TO 4" HOSE DIRT BAG INLET PROTECTION (SILT SACK OR EQUAL) INSTALLED AT DRIP LINE TREE PROTECTION NOTES: 1. THE CONTRACTOR SHALL INSTALL 3" OF WOOD CHIPS OR MULCH, WITH BURLAP LAID OVER IT WITHIN THE FENCED AREA PROTECTING THE TREE WHERE NOTED. 2. THE CONTRACTOR SHALL TAKE SPECIAL CARE TO PROTECT ALL EXISTING TREES AND THEIR SYSTEMS. ANY EXCAVATION WITHIN DRIPLINES SHALL BE KEPT TO A MINIMUM AND MUST BE COMPLETED BY HAND, ONLY IN THE PRESENCE OF THE CONSTRUCTION INSPECTOR AND AT NO ADDITIONAL EXPENSE TO THE COUNTY. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY REMEDIAL WORK SUCH AS ROOT AND TOP PRUNING REQUIRED AND NECESSARY TO PREVENT LOSS OF PLANT MATERIAL. ALL CORRECTIVE WORK SHALL BE ACCORDING TO STANDARD ACCEPTED HORTICULTURAL PRACTICE AND PERFORMED BY A NEW YORK STATE LICENSED ABORISTS, AS DIRECTED BY VILLAGE ARBORIST. 3. THE LIMITS OF THE PROPOSED TREE PROTECTION SHALL BE AT THE TREE DRIP LINE. 4. ANY DAMAGE TO EXISTING TREES DURING CONSTRUCTION WILL BE THE CONSTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL REPLACE SUCH DAMAGED TREES TO THE SATISFACTION OF THE VILLAGE ARBORIST, AT THE CONTRACTOR'S EXPENSE. 5. THE TREE PROTECTION SHALL BE INSTALLED PRIOR TO ANY WORK AND SHALL REMAIN UNTILL THE END OF ALL WORK INSTALL 3" OF MULCH OR WOOD CHIPS OVER ROOTS WITHIN FENCED AREA ONLY WHERE NOTED ON THE PLANS. PROTECTED AREA TO BE FREE OF MATERIAL AND STOCKPILES. ORANGE CONSTRUCTION FENCE TO BE MAINTAINED DAILY. 4' MIN CLEARANCE FROM TRUNK OF TREE ORANGE CONSTRUCTION FENCE OR APPROVED EQUAL TREE PROTECTION DETAIL AREA OF DISTURBANCE CALC AREA OF DISTURBANCE TOTAL AREA (INCLUDING PROTECTED AREAS):13,771 SF AREA OF TREE PROTECTION:47 SF AREA OF DISTURBANCE WITHIN THE FLOODPLAIN:1,537 SF NET AREA OF DISTURBANCE:13,724 SF PROJECT INFORMATION: 1.Owner Information: Moundroukas Vicki 2.Owner Address: 3665 Barger Street, Shrub Oak, NY 10588 3.Applicant: Same As Engineer 4.Property Location: 3665 Barger Street, Shrub Oak, NY 10588 TMDN: Section: 16.07 Block: 1 Lot: 2 Zone: C-2 - Business (Retail Store) Total Lot Area: 13,771 sqft (0.32 AC) 5.Approximate Start Date: October 2024 Approximate Completion Date: May 2025 6.Survey & topography data shown hereon provided by Ward Carpenter Engineers Inc. Dated: June 29, 2023 7.Sewer: Ossining Sewer District Water: Briarcliff Manor Village Water District Watershed: Pocantico and Saw Mill River Basin 8.Soils located on site (USDA Web Soil Survey): Soils on Site: Ff: FLUVAQUENTS-UDIFLUVENTS COMPLEX, FREQUENTLY FLOODED (1.2%) Uc: UDORTHENTS, WET SUBSTRATUM (78.8%) Uf: URBAN LAND (20%) 9.Excavation equipment stored on site and kept within the disturbed areas. 0 FEET 10 20 SCALE 1"-10' BALE CONFIGURATION 10 ' M I N . A A SECTION A-A 1" M I N . 18 " M I N . 18 " M I N . 36" MIN. 24 " M I N . NOTES: 1. FACE SIGN TOWARD NEAREST STREET OR ACCESS POINT 2. LOCATE CONCRETE WASHOUT 50 FT. MINIMUM FROM DRAINAGE INLETS OR WATERCOURSES THIS SECTION REMOVED FOR GRAPHICAL REPRESENTATION ONLY. PT WOOD PERIMETER SHALL BE CONTINUOUS. TYP OF 4 SIDES 2X12 PT WOOD BOXED OUT W/ WOOD SCREWS 2"x2" STAKES OR #4 J-BARS 2 PER BALE TYP. 2X12 PT WOOD BOXED OUT W/ WOOD SCREWS 60 MIL POLYETHYLENE SIGN CONCRETE WASHOUT AREA CONCRETE WASHOUT EROSION CONTROL / GRADING PLAN SCALE: 1"=10'1 TEMPORARY SILT FENCE OR STRAW BALE DIKE LEGEND PROPOSED BELGIAN BLOCK CURB TEMPORARY INLET PROTECTION TEMPORARY SOIL STOCKPILE AREA PROPERTY LINE STABILIZED CONSTRUCTION ENTRANCE PROPOSED WALKWAY/PATIO PROPOSED ASPHALT DRIVEWAY ORANGE CONSTRUCTION FENCE PROPOSED LIMIT OF DISTURBANCE X XX X X X X X X X SOIL STOCKPILE PROPOSED CONTOUR X X X X IMPERVIOUS AREA TOTAL 10,656 sq. ft. BUILDING 2450 S.F. DRIVEWAY 6944 S.F. WALK 1181 S.F. STEPS 44 S.F. GARBAGE AREA 284 S.F. PAD 54 S.F. 1 2 3 4 5 6 7 8 1213 11 10 9 S2 S2 H/CH/C PEDESTRIAN SIGN STOP SIGN PEDESTRIAN SIGN CULTEC CHAMBERS LOCATION PROPOSED 1 STORY BUILDING NO. 3665 F.F.E. = 427.0 B.F.E. = 416.0 42 4 426 42 6 42 6 4 2 4 42 4 STORM STORM STORM STORM STORM STORM STORM S T O R M S T O R M S T O R M S T O R M S T O R M S T O R M S T O R M S T O R M S T O R M STORMSTORMSTORMSTORMSTORMSTORM S T O R M S T O R M ST O R M W PROPOSED 8" ACO DRIVEWAY DRAIN (1FT MIN. FROM EDGE OF CONC SADDLE TO PROP LINE) PROPOSED WQ-4 RIM: 422.70 INV. IN.: 420.14 INV. OUT.: 420.14 PROPOSED WQ-2 RIM: 425.91 INV. IN.: 422.56 INV.IN.: 422.56 INV. OUT.: 422.56 PROPOSED WQ-3 RIM: 425.18 INV. IN.: 422.06 INV. OUT.: 420.44 PROPOSED WQ-1 RIM: 426.54 INV. IN: 422.83 INV. OUT: 422.83 PROPOSED 1" COPPER TYPE K WATER SERVICE CONNECT PROPOSED WATER SERVICE LINE TO EXISTING WATER VALVEPROPOSED 4" ACO DRAIN (1FT MIN. FROM EDGE OF CONC SADDLE TO PROP LINE) PROPOSED 6" SOLID SDR 35 PIPE @ 0.5% 55 L.F. PROPOSED 6" SOLID SDR 35 PIPE @ MIN 2.5% 75 L.F. PROPOSED 6" SOLID SDR 35 PIPE @ 1.0% 50 L.F. PROPOSED 6" SOLID SDR 35 PIPE @ 1% 30 L.F. PROPOSED 6" SOLID SDR 35 PIPE @ 2% 27 L.F. PROPOSED 48 EA 330 XLHD CULTEC UNITS INV IN: 419.84 BOTTOM GRAVEL (9" BASE) EL: 417.54 FLOW FLOW FLOW F L O W FLOW FLOW FLOW FLOW FLOW F L O W FLO W FL O W F L O W FL O W FL O W PROPOSED 6" SOLID SDR 35 PIPE @ MIN 0.5%, 42 L.F. PROPOSED 6" SOLID SDR 35 PIPE @ 8.0% 8 L.F. 1 1 . 7 8 24.93 1 3 . 1 6 82.79' of 6" PVC @ 1.04% 267.36' of 6" PVC @ 1.04% 38.99' of 6" PVC @ 1.04% S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S PROPOSED 6" SOLID SDR 35 PIPE @ MIN 0.5% 41 L.F. 70.97' of 6" PVC SDR 35 @ 1.04% PROPOSED MANHOLE 2 RIM:421.21 SUMP:414.90 INV IN:415.00 6" INV OUT:414.90 6" EXISTING MANHOLE SSMH RIM:421.60 SUMP:414.39 INV IN:414.49 6" INV.OUT:413.20 INV.EL: 417.78 INV.EL: 418.52 C/O C/O C/O C/O C/O C/O C/O C/O C/O PROPOSED CLEAN-OUT @EVERY 50', TYP. FD PROPOSED 1 EA 330 XLHD CULTEC UNIT FOR FOOTING DRAIN ONLY INV IN: 414.94 BOTTOM GRAVEL EL: 412.40 PROPOSED 4" SOLID SDR 35 PIPE @ 0.5%, 13 L.F. OBSERVATION PORTS, TYP. 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 UTILITIES PLAN 5/9 0 FEET 20 40 SCALE 1"-20' UTILITY PLAN SCALE: 1"=20'1 DRAINAGE CALCULATION LEGEND PROPOSED BELGIAN BLOCK CURB PROPERTY LINE PROPOSED WALKWAY/PATIO PROPOSED ASPHALT DRIVEWAY PROPOSED SETBACK PROPOSED STORM PIPE STORM STORM PROPOSED STORMWATER INFILTRATION SYSTEM PROPOSED CATH BASIN PROPOSED SEWER PIPE SS SS SS PROPOSED WATER PIPE W W W PERC TEST DATA TEST 1 -0.58 MIN/INCH TEST 2 -0.25 MIN/INCH TEST 3 -0.25 MIN/INCH TEST 4 -0.25 MIN/INCH ASSUMED PERCOLATION RATE :0.33 MIN/INCH SEWER NOTE: STEEL PLATES TO BE PLACED OVER TRENCH END OF EVERY DAY MAXIMUM 6" PVC PIPE CAPACITY @1.04% SLOPE IS 0.67 CFS WHAT IS ENOUGH TO SERVE PROPOSED SEWER FLOW FOOTING DRAIN FD 417 420 430 417 420 430 0+00 1+00 2+00 2+30 0+00 42 5 . 0 1 42 4 . 7 8 7 1+00 42 6 . 5 5 42 6 . 6 5 4 2+00 2+30 PROPOSED GRADE, TYP. EXISTING GRADE, TYP. 7.56' of 6" PVC SDR 35 @ 8.00% WQ-3 RIM:425.18 INV IN:422.06 6" PVC INV OUT:420.44 6" PVC 49.55' of 6" PVC SDR 35 @ 1.00% WQ-2 RIM:425.91 INV IN:422.56 6" PVC INV OUT:422.56 6" PVC 55.31' of 6" PVC SDR 35 @ 0.50% WQ-1 RIM:426.54 INV IN:422.83 6" PVC INV OUT:422.83 6" PVC 41.63' of 6" PVC SDR 35 @ 0.50%42.39' of 6" PVC SDR 35 @ 0.50% 4" ACO DRAIN CONNECTION 8" ACO DRAIN CONNECTION 330 XLHD CULTEC MINIMUM 24" FROM BOTTOM OF GRAVEL TO GROUNDWATER 410 420 430 410 420 430 -0+30 0+00 1+00 2+00 3+00 4+00 4+90 42 5 . 5 5 42 6 . 3 7 8 42 3 . 4 0 42 3 . 3 2 42 4 . 0 0 42 2 . 3 5 PROPOSED GRADE, TYP. EXISTING GRADE, TYP. MANHOLE 2 RIM:421.21 INV IN:415.00 6" PVC INV OUT:414.90 6" PVC 82.79' of 6" PVC SDR 35 @ 1.04% 267.36' of 6" PVC SDR 35 @ 1.04% 38.99' of 6" PVC SDR 35 @ 1.04% EXISTING MANHOLE SSMH RIM:421.6 INV IN:413.3 (6" PVC) INV IN:413.3 (EX. 8" LATERAL) INV OUT:413.2 (EX. 8" LATERAL) 70.97' of 6" PVC SDR 35 @ 1.04% CLEANOUT INV.EL:418.89 INV.EL:420.06 0.8' EL:426.39 CLEANOUT CLEANOUT CLEANOUT CLEANOUT INV.EL:414.48 INV.EL:418.60INV.EL:418.86 CLEANOUT CLEANOUT 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 UTILITIES PROFILE 6/9 ACO-1...330XRLHD CULTEC RECHARGER PROFILE SCALE: HOR: 1"=20' VERT: 1"=4' 1 PROPOSED SEWER LATERAL PROFILE SCALE: HOR: 1"=20' VERT: 1"=4' 2 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 UTILITY DETAILS 7/9 4 OZ. NON-WOVEN FILTER FABRIC AROUND STONE 95% COMPACTED FILLPAVEMENT/ GRASS RECHARGER UNIT 12" MIN 6" "C" 6" "B""A"12" Recharger unit by Cultec, Inc. of Brookfield, ct. refer to Cultec, Inc.'s current recommended installation guidelines. Use recharger 330HD heavy duty for traffic and/or H20 applications. Recharger 330HD heavy duty units are marked with a color stripe formed into the part along the length of the chamber. GENERAL NOTES Maintain 10 ft. clearance to buildings and private property lines. This system is only designed to receive runoff from the new additional impervious surfaces. Do not connect footing drains to this system . Install separate system for the footing drains and sump pumps. PAVEMENT/ GRASS PAVEMENT SUB-BASE 95% COMPACTED FILL 4 OZ. NON-WOVEN FILTER FABRIC AROUND STONE 1-2 INCH WASHED CRUSHED STONE BENEATH AND AROUND CHAMBER BED CULTEC CHAMBER SEE PLAN FOR MODEL 6" INLET AT TOP OR TOP SOIL BACKFILL 6" OUTLET AT TOP All recharger chambers must be installed in accordance with all applicable local, state and federal regulations. 6" VIEW PORT 1 PER ROW WITH CAP 8" PERF. PIPE OR F24 CONECTOR 6" PVC PIPE VIEW PORT WITH SOLID CAP ONE PER ROW PER PLAN SEE PLAN FOR ACTUAL LOCATION AND ELEVATIONS OF PIPES AS REQUIRED SEE PLAN LEDGE @ 29.67 3' MIN EL. 32.67 EL. 36.21 INV EL. 35.12+- PROPOSED INFILTRATION UNITS - CULTEC 330 XL UNITS WATER QUALITY STRUCTURE (WQ) 24X24 36 " S U M P MI N 6 " HDPE IN FLOW 6" HDPE OUTFLOW 6" MIN. No.2 CRUSHED STONE PROVIDE 8" DIA. OPEN'G. FOR ELEV. SEE PLAN FOR ELEV. SEE PLAN NYLOPLAST 18" ENVIROHOOD FOR UP TO 12" OUTLETS BY ADS OR APPROVED EQUAL THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL EETING THE REQUIREMENTS OF CLASS I, CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. MAINTENANCE INSTRUCTIONS: 1. THE STRUCTURE SHOULD BE INSPECTED AT LEAST ONCE PER MONTH FOR THE FIRST YEAR, OR UNTIL THE SITE HAS STABILIZED. 2. THE STRUCTURE SHALL BE CLEANED IF ACCUMULATED DEBRIS IS EQUAL OR GREATER THAN THE FOLLOWING: A. DEBRIS IN SUMP - 18" MAX B. FLOATABLE DEBRIS - 6" MAX 3. THE DEBRIS SHALL BE CLEANED AND RINSED THOROUGHLY AS SPECIFIED BY ENGINEER BASED ON SITE CONDITIONS. CONTRACTOR MUST CONTACT ENGINEER PRIOR TO CLEANING. CLEAN-OUT PLUG 3.50 MAX CONCRETE 4000 PSI STRENGTH @ 28 DAYS 24" x 24" HEAVY DUTY FRAME AND COVER BY EXPANDED SUPPLY PRODUCTS OR APPROVED EQUAL. SEWERS - PARALLEL INSTALLATION SEPARATION OF WATER MAINS AND REQUIRES SEPARATE APPROVAL OF THE WESTCHESTER COUNTY HEALTH DEPT. 18" HOWEVER, AN EXCEPTION TO THE 10' MINIMUM HORIZONTAL SEPARATION FIELD CONDITIONS, THE VERTICAL CLEAR DISTANCE SHALL BE A MINIMUM OF WHERE A 10' HORIZONTAL SEPARATION CANNOT BE OBTAINED DUE TO SANITARY SEWER STORM OR SEPARATION OF WATER MAINS AND BE REQUIRED. SEPARATE APPROVAL OF THE WESTCHESTER COUNTY HEALTH DEPARTMENT SHALL WHERE AN 18" SEPARATION CANNOT BE OBTAINED DUE TO FIELD CONDITIONS, IN THE WATER MAIN SHALL BE KEPT AS FAR AS POSSIBLE FROM THE SEWER. SUPPORTED AS DIRECTED BY THE ENGINEER. TO THE EXTENT FEASIBLE, JOINTS 18" MIN. BETWEEN THE SEWER AND WATER MAIN AND THE SEWER SHALL BE WATER MAINS PASSING UNDER SEWERS SHALL HAVE A VERTICAL CLEARANCE OF UNUSUAL CONDITIONS NOTE: SEE NOTE SANITARY SEWER OR STORM DRAIN CROSSING OF WATER LINE UNDER SANITARY SEWER OR STORM DRAIN WHERE WATER LINE PASSES BENEATH SEWER LINE OR STORM DRAIN, CROSSING AND THE SANITARY SEWER SHALL BE CLASS 100 PRESSURE PIPE & THE STORM DRAIN SHALL BE DUCTILE IRON PIPE. THE JOINTS OF THE PIPE SHALL BE A MIN. OF 10' FROM THE POINT OF 18" MINIMUM SANITARY SEWER OR STORM DRAIN CROSSING OF WATER LINE OVER PRESSURE PIPE & THE STORM DRAIN SHALL BE DUCTILE IRON. OF CROSSING AND THE SANITARY SEWER SHALL BE CLASS 100 OR STORM DRAIN SHALL BE A MINIMUM OF 10' FROM THE POINT REQUIREMENTS SHALL BE MET. THE JOINTS OF THE SANITARY SEWER FOR ANY CONDITIONS OTHER THAN SHOWN ABOVE THE FOLLOWING SEWER CROSSINGS HOUSE, STORM, OR SANITARY SEWER NORMAL CONDITIONS WATER 18" MINIMUM 4' MINIMUM NOTE : L/2 NOTE : (PRESSURE PIPE) L/2 WATER LINE WATER LINE NORMAL CONDITIONS 5' MINIMUM 4' M I N I M U M WATER DEFLECT PIPE AS PER MANUFACTURER'S RECOMMENDATIONS 18" 10' MIN. DRAIN LINE SEWER OR 10' MIN. CAP 4" C.I.P. 4"Ø-45° BEND 4"Ø CONNECTION (TYP.) 4"x4" C.I.P. WYE 4" C.I.P.6" CRUSHED STONE GRAVEL CAMPBELL FRAME & GRATE # 4152 N.T.S. SEWER CLEANOUT DETAIL (GRAVITY) FLOW NOTES: 1.ALL SEWER SERVICES TO BE 4"Ø XHCIP @ 1.0% MINIMUM. 2.IN ACCORDANCE WITH THE NYS RESIDENTIAL BUILDING CODE, THE FOLLOWING REQUIREMENTS APPLY: A. CLEANOUTS SHALL BE INSTALLED NOT MORE THAN 100 FEET APART IN HORIZONTAL DRAINAGE LINES (P3005.2.2). B. CLEANOUTS SHALL BE INSTALLED AT EACH CHANGE OF DIRECTION OF THE DRAINAGE SYSTEM GREATER THAN 45 DEGREES. C. CLEANOUTS SHALL BE INSTALLED SO THAT THE CLEANOUT OPENS TO ALLOW CLEANING IN THE DIRECTION OF THE FLOW OF THE DRAINAGE LINE (P3005.2.8). DETAIL - CONNECTION 4" PVC TO 4" SERVICE LINE UNDER WALL. TOWN APPROVED "FERNCO" OR "MISSION" CPG. 4" XHCIP4" PVC 8"x4" PVC WYE SHORT PIECE OR SWEEP 3/4" CRUSHED STONE ENCASEMENT 6" MIN. ALL AROUND-FROM 8" PVC TO 6" BEYOND CPLG. 1/4" / FT. OR A.O.B.E. PR O P E R T Y L I N E 2 X 4 M A R K E R X.H.C.I.P. SANITARY SEWER SERVICE LINES NOTE : IF WALL EXISTS AT PROPERTY LINE; EXTEND 6" 6" PLUG SHOULDER RESTORATION 12" SEE SPEC. GRASS SEED TRENCH WIDTH O.D.12" 6" TOPSOIL 6" CLEANFILL UNDISTURBED EARTH TRENCH BEDDING O.D. COMPACTED SELECT GRANULAR MATERIAL BACKFILLED IN 9" LIFTS 12"+ 1/2 DIA. COMPACTED SELECT GRANULAR MATERIAL 1/2 O.D. SUBBASE COURSE TYPE 2 6" SUBBASE COURSE TYPE 2 12"12" 12 " 1.THE APPLICANT/CONTRACTOR SHALL BE REQUIRED TO BACKFILL UTILITY TRENCHES IN THE PUBLIC RIGHT-OF-WAY WITH 50 PSI CONTROLLED DENSITY BACKFILL (K-CRETE). 2.STONES FOUND IN THE TRENCH SHALL BE REMOVED FOR A DEPTH OF AT LEAST SIX (6) INCHES BELOW AND ON EACH SIDE OF ALL PIPES. PAVEMENT REPLACEMENT ASPHALTIC MACADAM 4" BINDER COURSE NYSDOT PROVIDE 5" MIN. OF NYSDOT ITEM NO. 403.13 TYPE 2 SUBBASE FOR REPLACEMENT 1 1/2" TOP COURSE NYSDOT ITEM NO. 403.1701, TYPE 7 MAX. PAYMENT LIMIT TRENCH WIDTH 12" P Bedding 2'-0" 6" Mi n . d Ma x . P a y m e n t L i n e s W. 24"Min. Max. Payment Lines Ground Surface SurfaceOriginalRock 0' to 8' 8' to 12' 12' to 16' 16' to 20' over 20'P + 40" P + 34" P + 28" P + 22" P + 16" "d"ft.Width "W" Depth to F.L.Allowable TABLE SHOWING MAX. PAYMENT LINE FOR ROCK EXC. Bedding 12"12"P 6" Mi n . De p t h a s S p e c i f i e d Ground Surface Trench Width Payment Limit=pt 2'-0' Crushed Stone or Gravel Bedding Backfill over Water Main must be clean fill, no rock larger than 6" for full depth of trench. NOTE: PAYMENT LINE IN EARTH PAYMENT LINE IN ROCK Crushed Stone or Gravel Bedding as required will be paid for separately under the appropriate item. NOTE: N.T.S. DETAIL OF TYPICAL TRENCH SECTIONS SEE NOTE 4 EXPANSION JOINT PAVEMENT PER DESIGN DOCUMENTS NOTES: 1. IT IS NECESSARY TO ENSURE MINIMUM DIMENSIONS SHOWN ARE SUITABLE FOR EXISTING GROUND CONDITIONS. ENGINEERING ADVICE MAY BE REQUIRED. 2. MINIMUM CONCRETE STRENGTH OF 4,000 PSI IS RECOMMENDED. CONCRETE SHOULD BE VIBRATED TO ELIMINATE AIR POCKETS. 3. EXPANSION AND CONTRACTION CONTROL JOINTS AND REINFORCEMENT ARE RECOMMENDED TO PROTECT CHANNEL AND CONCRETE SURROUND. ENGINEERING ADVICE MAY BE REQUIRED. 4. THE FINISHED LEVEL OF THE CONCRETE SURROUND MUST BE APPROX. 1/8" [3mm] ABOVE THE TOP OF THE CHANNEL EDGE. 5. CONCRETE BASE THICKNESS SHOULD MATCH SLAB THICKNESS. ENGINEERING ADVICE MAY BE REQUIRED TO DETERMINE PROPER LOAD CLASS. 6. REFER TO ACO'S LATEST INSTALLATION INSTRUCTIONS FOR FURTHER DETAILS. 6" 3500 PSI CONC. SIDE &BOTTOM ACO-DRAIN DETAIL 1 2 3 4 5 6 7 8 1213 11 10 9 S2 S2 H/CH/C PEDESTRIAN SIGN STOP SIGN PEDESTRIAN SIGN CULTEC CHAMBERS LOCATION PROPOSED 1 STORY BUILDING NO. 3665 F.F.E. = 427.0 B.F.E. = 416.0 424 426 42 6 42 6 4 2 4 42 4 0 + 0 0 1 + 0 0 2+ 0 0 2+ 7 1 420 430 440 420 430 440-0+25 0+25 0+50 0+75 1+25 1+50 1+75 2+25 2+50 2+75 3+25 0+00 42 5 . 8 2 42 5 . 8 1 5 1+00 42 6 . 4 0 42 6 . 3 9 6 2+00 42 4 . 6 3 42 4 . 6 3 2 3+00 2.51%-2.19%-2.98%4.27% 10.32%-1.28% -1.16% EXISTING GRADE FINISH GRADESTA:0+00.00 ELEV:425.82 STA:2+70.78 ELEV:423.95 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 DRIVEWAY PLAN & PROFILE 8/9 0 FEET 10 20 SCALE 1"-10' GENERAL NOTES: 1.The design engineer shall not be responsible for the supervision of the construction of structures. 2.No changes shall be made to these plans except as per NYS law chapter 987. 3.All work and materials shall comply with all applicable codes, including but not limited to ACI, AISC, Zoning, and the New York State Building Code. 4.All conditions, locations and dimensions shall be field verified and the engineer shall be immediately notified of any discrepancies. 5.All changes made to the plans shall be approved by the engineer and any such changes shall be filed as amendments to the original building permit. 6.The contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract. 7.The contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors and their agents and employees, and other persons performing any of the work under a contact with the contractor. 8.Safety during construction shall be the responsibility of the contractor and shall conform to all local, state and federal agencies in effect during the period of construction. 9.The contractor and his subcontractors shall make application to receive all necessary permits to perform the work under contract. The contractor and his subcontractors shall be licensed to do all work as required by the local, county, and state agencies which may have jurisdiction over those trades, and shall present the owner with copies of all licenses and insurance certificates. 10.Final grading around the building area shall slope away from the structure. 11.All written dimensions on the drawings shall take precedence over any scaled dimensions. 12.Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, and roofs. Provisions shall be made to control water runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining building should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. 13.Industrial code rule 753: The contractor shall notify all utility companies 72 hours prior to the start of his operations and shall comply with all the latest industrial code rule 753 regulations. 14.All proposed residences shall be located within the building envelope. 15.House footprint and location may vary based on model home selection. PROPOSED DRIVEWAY - PROFILE VIEW SCALE: 1"=20' HORIZ 1"=10' VERT PROJECT INFORMATION: 1.Owner Information: Moundroukas Vicki 2.Owner Address: 3665 Barger Street, Shrub Oak, NY 10588 3.Applicant: Same As Engineer 4.Property Location: 3665 Barger Street, Shrub Oak, NY 10588 TMDN: Section: 16.07 Block: 1 Lot: 2 Zone: C-2 - Business (Retail Store) Total Lot Area: 13,771 sqft (0.32 AC) 5.Approximate Start Date: October 2024 Approximate Completion Date: May 2025 6.Survey & topography data shown hereon provided by Ward Carpenter Engineers Inc. Dated: June 29, 2023 7.Sewer: Ossining Sewer District Water: Briarcliff Manor Village Water District Watershed: Pocantico and Saw Mill River Basin 8.Soils located on site (USDA Web Soil Survey): Soils on Site: Ff: FLUVAQUENTS-UDIFLUVENTS COMPLEX, FREQUENTLY FLOODED (1.2%) Uc: UDORTHENTS, WET SUBSTRATUM (78.8%) Uf: URBAN LAND (20%) 9.Excavation equipment stored on site and kept within the disturbed areas. DRIVE WAY PLAN SCALE: 1"=10'1 1 1 2 3 4 5 6 7 8 12 13 11 10 9 S2 S2 H/ C H/ C PE D E S T R I A N S I G N ST O P S I G N PE D E S T R I A N S I G N CU L T E C CH A M B E R S LO C A T I O N BASIN POST-2 AREA : 2,008 WEIGHTED CN : 85 T.O.C. : 10.5 MIN BASIN POST-3 AREA : 1,032 WEIGHTED CN : 80 T.O.C. : 1.6 MIN 198' CHANNEL FLOW @0.5% BASIN POST-1 TIME OF CONCENTRATION FLOW LINE BASIN POST-2 TIME OF CONCENTRATION FLOW LINE BASIN POST-3 TIME OF CONCENTRATION FLOW LINE 47' SHEET FLOW @0.8% 15' SHEET FLOW @9.4% 80' SHEET FLOW @1.2% BASIN POST-1 AREA : 10,685 SF WEIGHTED CN : 97 T.O.C. : 2.5 MIN 33' SHALLOW CONCENTRATED FLOW @2.0% BASIN PRE-1 AREA : 13,771 SF WEIGHTED CN : 80 T.O.C. : 14.4 MIN 100' SHEET FLOW @1.7% 8/6/26 GC GC Page No. Date: Scale: Designed By: Checked By: TH I S P L A N N O T V A L I D F O R C O N S T R U C T I O N WI T H O U T E N G I N E E R S S E A L & S I G N A T U R E PROJECT: Revisions DescriptionNo.Date ENGINEER: GREGORY CACCIOPPOLI, P.E. CACCIOPPOLI ENGINEERING, PLLC 441 CENTRAL PARK AVENUE, SUITE 1238 SCARSDALE, NEW YORK 10583 ANY ALTERATIONS OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NYS LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. CONSTRUCTION OF NEW BUILDING 3665 BARGER STREET, SHRUB OAK, NY 10588 9/9 STORMWATER PRE/POST ANALYSIS POST-DEVELOPMENT CONDITIONS PLAN 1" = 10'2 PRE DEVELOPMENT RUNOFF, 100-YR BASIN PRE-1 1.85 TOTAL PRE-DEVELOPMENT RUNOFF, CFS 1.85 PRE-DEVELOPMENT CURVE NUMBER DATA: BASIN PRE-1: OPEN SPACE IN FAIR CONDITIONS (SOIL GROUP D):CN=80, AREA=13,771 SF WEIGHTED CN=80 POST DEVELOPMENT RUNOFF, 100-YR BASIN POST-1*1.26 BASIN POST-2 0.32 BASIN POST-3 0.21 TOTAL POST-DEVELOPMENT RUNOFF, CFS 1.67 POST-DEVELOPMENT CURVE NUMBER DATA: BASIN POST-1: IMPERVIOUS (BUILDING, DRIVEWAY): CN=98, AREA=10,245 SF OPEN SPACE IN GOOD CONDITIONS (SOIL GROUP D) : CN=80, AREA=440 SF WEIGHTED CN=97 *FLOW VALUE IS INDICATED AFTER CULTEC DETENTION (OVERLOW) PRE-DEVELOPMENT CONDITIONS PLAN 1" = 10'1 BASIN 2: IMPERVIOUS (WALKWAYS): CN=98, AREA=606 SF OPEN SPACE IN GOOD CONDITIONS (SOIL GROUP D):CN=80, AREA=1,403 SF WEIGHTED CN=85 BASIN 3: OPEN SPACE IN GOOD CONDITIONS (SOIL GROUP D):CN=80, AREA=1,032 SF WEIGHTED CN=80