HomeMy WebLinkAbout000_Table of Contents
DRAFT TOC-1 07/10/2024
Table of Contents
Executive Summary .................................................................................................................. S-1
Chapter 1: Project Description ................................................................................................ 1-1
A. Introduction .................................................................................................................... 1-1
B. Project Description ........................................................................................................ 1-2
Project Site and Surrounding Area ........................................................................ 1-2
Proposed Project.................................................................................................... 1-3
Proposed Zoning Amendments ............................................................................. 1-6
C. Project Purpose and Need .............................................................................................. 1-7
D. Reviews and Approvals Required .................................................................................. 1-8
Chapter 2: Land Use, Zoning, and Public Policy ................................................................... 2-1
A. Introduction and Summary of Findings ......................................................................... 2-1
B. Land Use ........................................................................................................................ 2-1
Existing Conditions ............................................................................................... 2-1
The Future without the Proposed Project .............................................................. 2-3
The Future with the Proposed Project (the “Build Condition”) ............................ 2-4
Mitigation .............................................................................................................. 2-5
C. Zoning ............................................................................................................................ 2-5
Existing Conditions ............................................................................................... 2-5
The Future without the Proposed Project .............................................................. 2-8
The Future with the Proposed Project ................................................................... 2-8
Mitigation .............................................................................................................. 2-8
D. Public Policy .................................................................................................................. 2-9
Existing Conditions ............................................................................................... 2-9
The Future without the Proposed Project ............................................................ 2-13
The Future with the Proposed Project ................................................................. 2-13
Mitigation ............................................................................................................ 2-15
Chapter 3: Visual and Community Character ....................................................................... 3-1
A. Introduction and Summary of Findings ......................................................................... 3-1
B. Existing Conditions ........................................................................................................ 3-1
Visual Character of the Project Site ...................................................................... 3-1
Visual Character of the Surrounding Areas .......................................................... 3-2
Views of the Project Site and Existing Buildings from the Surrounding Area ..... 3-3
C. The Future without the Proposed Project ....................................................................... 3-4
D. The Future with the Proposed Project ............................................................................ 3-4
800 East Main Street Redevelopment
07/10/2024 TOC-2 DRAFT
Visual and Community Character of the Project Site ............................................ 3-4
Views of the Project Site and Proposed Buildings from Vantage Points .............. 3-6
E. Mitigation ....................................................................................................................... 3-8
Chapter 4: Cultural Resources ................................................................................................ 4-1
A. Introduction and Summary of Findings .......................................................................... 4-1
B. Archaeological Resources .............................................................................................. 4-1
Existing Conditions ............................................................................................... 4-1
The Future without the Proposed Project .............................................................. 4-3
The Future with the Proposed Project ................................................................... 4-3
Mitigation .............................................................................................................. 4-3
C. Historic Resources .......................................................................................................... 4-3
Existing Conditions ............................................................................................... 4-3
The Future without the Proposed Project .............................................................. 4-4
The Future with the Proposed Project ................................................................... 4-4
Mitigation .............................................................................................................. 4-5
Chapter 5: Geology, Soils, and Topography ........................................................................... 5-1
A. Introduction and Summary of Findings .......................................................................... 5-1
B. Existing Conditions ........................................................................................................ 5-1
Soils ....................................................................................................................... 5-1
Topography ............................................................................................................ 5-2
Geology ................................................................................................................. 5-2
C. The Future with the Proposed Project ............................................................................ 5-3
D. Mitigation Measures ....................................................................................................... 5-4
Chapter 6: Ecological Resources .............................................................................................. 6-1
A. Introduction and Summary of Findings .......................................................................... 6-1
Summary of Findings ............................................................................................ 6-1
B. Existing Conditions ........................................................................................................ 6-2
Groundwater .......................................................................................................... 6-2
Floodplains ............................................................................................................ 6-3
Wetlands and Surface Water Resources ................................................................ 6-3
Terrestrial Resources ............................................................................................. 6-4
Threatened, Endangered, and Special Concern Species and Significant Natural
Communities ..................................................................................................................... 6-11
C. The Future without the Proposed Project ..................................................................... 6-15
D. The Future with the Proposed Project .......................................................................... 6-16
Groundwater ........................................................................................................ 6-16
Floodplains .......................................................................................................... 6-16
Wetlands and Surface Water Resources .............................................................. 6-16
Terrestrial Resources ........................................................................................... 6-16
Threatened, Endangered, and Special Concern Species and Significant Natural
Communities ..................................................................................................................... 6-19
Table of Contents
DRAFT TOC-3 07/10/2024
E. Mitigation Measures .................................................................................................... 6-21
F. References .................................................................................................................... 6-22
Chapter 7: Socioeconomic and Fiscal Impacts ....................................................................... 7-1
A. Introduction and Summary of Findings ......................................................................... 7-1
B. Existing Conditions ........................................................................................................ 7-1
Demographic Conditions and Trends .................................................................... 7-1
Housing Stock, Tenure and Trends ....................................................................... 7-3
Town’s and Westchester County’s Affordable Housing Goals and Policies ........ 7-6
Employment .......................................................................................................... 7-7
Fiscal Conditions ................................................................................................... 7-9
C. The Future without the Proposed Project ..................................................................... 7-10
D. The Future with the Proposed Project .......................................................................... 7-10
Economic & Fiscal Benefits of Proposed Project (IMPLAN) ............................ 7-10
Municipal Fiscal Impact Assessment .................................................................. 7-14
Impact to Town’s Population and Demographics ............................................... 7-15
E. Mitigation Measures .................................................................................................... 7-15
Chapter 8: Community Facilities ............................................................................................ 8-1
A. Introduction and Summary of Findings ......................................................................... 8-1
B. Police ............................................................................................................................. 8-1
Existing and Potential Future Conditions without the Proposed Project .............. 8-1
The Future with the Proposed Project ................................................................... 8-3
Mitigation Measures .............................................................................................. 8-4
C. Fire ................................................................................................................................. 8-4
Existing and Potential Future Conditions with the Proposed Project.................... 8-4
The Future with the Proposed Project ................................................................... 8-5
Mitigation Measures .............................................................................................. 8-6
D. Emergency Medical Services ......................................................................................... 8-6
Existing and Future Conditions without the Proposed Project .............................. 8-6
The Future with the Proposed Project ................................................................... 8-6
Mitigation Measures .............................................................................................. 8-7
E. Parks, Recreation and Open Space ................................................................................ 8-7
Existing Conditions ............................................................................................... 8-7
The Future without the Proposed Project .............................................................. 8-8
The Future with the Proposed Project ................................................................... 8-8
Mitigation Measures .............................................................................................. 8-9
F. Solid Waste and Recycling ............................................................................................ 8-9
Existing Conditions ............................................................................................... 8-9
The Future without the Proposed Project .............................................................. 8-9
The Future with the Proposed Project ................................................................. 8-10
Mitigation Measures ............................................................................................ 8-10
800 East Main Street Redevelopment
07/10/2024 TOC-4 DRAFT
Chapter 9: Water and Wastewater .......................................................................................... 9-1
A. Introduction and Summary of Findings .......................................................................... 9-1
B. Existing Conditions ........................................................................................................ 9-1
B.1. Water Supply ......................................................................................................... 9-1
B.2. Sanitary Sewage .................................................................................................... 9-1
C. The Future without the Proposed Project ....................................................................... 9-2
D. The Future with the Proposed Project ............................................................................ 9-2
D.1. Water Supply ......................................................................................................... 9-2
D.2. Sanitary Sewage .................................................................................................... 9-2
E. Mitigation Measures ....................................................................................................... 9-3
E.1. Water Supply ......................................................................................................... 9-3
E.2. Sanitary Sewage .................................................................................................... 9-3
Chapter 10: Stormwater Management .................................................................................. 10-1
A. Introduction and Summary of Findings ........................................................................ 10-1
B. Existing Conditions ...................................................................................................... 10-1
Watershed and Drainage Patterns ........................................................................ 10-1
Existing Drainage Areas ...................................................................................... 10-2
C. The Future without the Proposed Project ..................................................................... 10-3
D. The Future with the Proposed Project .......................................................................... 10-3
Proposed Drainage Areas .................................................................................... 10-3
Post-Development Conditions ............................................................................. 10-4
E. Mitigation Measures ..................................................................................................... 10-5
Chapter 11: Use and Conservation of Energy ...................................................................... 11-1
A. Introduction and Summary of Findings ........................................................................ 11-1
B. Existing Conditions ...................................................................................................... 11-1
C. The Future without the Proposed Project ..................................................................... 11-1
D. The Future with the Proposed Project .......................................................................... 11-1
E. Mitigation Measures ..................................................................................................... 11-2
Chapter 12: Traffic and Transportation ............................................................................... 12-1
A. Introduction and Summary of Findings ........................................................................ 12-1
B. Capacity Analysis Methodology .................................................................................. 12-1
B.1. Signalized Intersections ....................................................................................... 12-1
B.2. Unsignalized Intersections ................................................................................... 12-3
C. 2023 Existing Conditions ............................................................................................. 12-3
C.1. Roadway Characteristics ..................................................................................... 12-4
C.2. Intersection Level of Service Conditions ............................................................ 12-6
C.3. Pedestrian and Bicycle Conditions ...................................................................... 12-6
C.4. Public Transportation .......................................................................................... 12-6
D. Crash History and Safety Assessment .......................................................................... 12-7
D.1. Intersection Crashes ............................................................................................. 12-7
E. No Action Condition .................................................................................................. 12-16
Table of Contents
DRAFT TOC-5 07/10/2024
E.1. Intersection Level of Service Conditions .......................................................... 12-17
E.2. Pedestrian and Bicycle Conditions .................................................................... 12-17
E.3. Public Transportation ........................................................................................ 12-17
F. With Action Condition ............................................................................................... 12-18
F.1. Project Description ............................................................................................ 12-18
F.2. Project Trip Generation ..................................................................................... 12-18
F.3. Project Trip Distribution and Assessment ......................................................... 12-18
F.4. Intersection Level of Service Conditions .......................................................... 12-19
F.5. Parking Conditions ............................................................................................ 12-19
F.6. Pedestrian and Bicycle Conditions .................................................................... 12-19
F.7. Public Transportation ........................................................................................ 12-19
F.8. Delivery and Service Vehicle Access ............................................................... 12-20
F.9. Alternative Site Access ..................................................................................... 12-20
G. Traffic Mitigation ...................................................................................................... 12-21
Chapter 13: Air Quality ......................................................................................................... 13-1
A. Introduction and Summary of Findings ....................................................................... 13-1
Summary of Findings .......................................................................................... 13-1
B. Existing Conditions ...................................................................................................... 13-1
C. The Future without the Proposed Project ..................................................................... 13-2
D. The Future with the Proposed Project .......................................................................... 13-2
Stationary Source Analysis ................................................................................. 13-2
Mobile Source Analysis ...................................................................................... 13-4
E. Mitigation Measures .................................................................................................... 13-5
Chapter 14: Noise .................................................................................................................... 14-1
A. Introduction and Summary of Findings ....................................................................... 14-1
B. Noise Fundamentals ..................................................................................................... 14-1
“A”-Weighted Sound Level (dBA) ..................................................................... 14-1
Noise Descriptors Used in Impact Assessment ................................................... 14-2
Noise Standards and Impact Criteria ................................................................... 14-3
Proposed Project Impact Criteria ........................................................................ 14-4
C. Methodology ................................................................................................................ 14-4
D. Existing Conditions ...................................................................................................... 14-4
Selection of Noise Receptor Locations ............................................................... 14-4
Noise Monitoring ................................................................................................ 14-5
Equipment Used During Noise Monitoring ........................................................ 14-5
Existing Noise Levels at Noise Receptor Locations ........................................... 14-5
E. The Future without the Proposed Project ..................................................................... 14-6
F. The Future with the Proposed Project .......................................................................... 14-6
Mobile Sources of Noise (Traffic) ...................................................................... 14-6
Stationary Sources of Noise ................................................................................ 14-7
Noise Exposure at Proposed Uses ....................................................................... 14-7
800 East Main Street Redevelopment
07/10/2024 TOC-6 DRAFT
G. Mitigation Measures ..................................................................................................... 14-7
Chapter 15: Hazardous Materials ......................................................................................... 15-1
A. Introduction and Summary of Findings ........................................................................ 15-1
B. Existing Conditions ...................................................................................................... 15-1
Phase I Environmental Site Assessment .............................................................. 15-1
Confirmation Assessment .................................................................................... 15-2
Updated WCDOH Petroleum Bulk Storage Registry .......................................... 15-3
Potential of Buildings to Contain Hazardous Materials ...................................... 15-3
C. The Future without the Proposed Project .................................................................... 15-4
D. The Future with the Proposed Project .......................................................................... 15-4
E. Mitigation Measures ..................................................................................................... 15-5
Chapter 16: Construction ....................................................................................................... 16-1
A. Introduction and Summary of Findings ........................................................................ 16-1
B. Construction Schedule .................................................................................................. 16-2
Stage 1: Perimeter Fencing and Tree Clearing .................................................... 16-2
Stage 2: Mobilization, Earthwork, and Site Utilities ........................................... 16-2
Stage 3: Foundations and Site Stabilization ........................................................ 16-2
Stage 4: Building Framing and MEP Rough-in ................................................... 16-2
Stage 5: Interior Finishes ..................................................................................... 16-2
Stage 6: Site Work, Landscaping and Occupancy ............................................... 16-3
C. Construction Period Impacts and Mitigation ................................................................ 16-3
Erosion and Sediment Control ............................................................................. 16-3
Traffic and Transportation ................................................................................... 16-4
Air Quality ........................................................................................................... 16-5
Noise .................................................................................................................... 16-5
Blasting and Subsurface Investigations ............................................................... 16-7
Chapter 17: Alternatives......................................................................................................... 17-1
A. Introduction .................................................................................................................. 17-1
B. Alternative 1: No Action – Existing Site Conditions and Re-Occupancy of Office
Buildings ............................................................................................................................... 17-1
Description of Alternative ................................................................................... 17-1
Potential Impacts of Alternative .......................................................................... 17-2
C. Alternative 2: Development Under Existing OB District Zoning ................................ 17-4
Description of Alternative ................................................................................... 17-4
Potential Impacts ................................................................................................. 17-5
D. Alternative 3: Non-Age-Restricted Development ........................................................ 17-8
Description of Alternative ................................................................................... 17-8
Potential Impacts ................................................................................................. 17-8
E. Alternative 4: Alternative Site Layout ....................................................................... 17-12
Description of Alternative ................................................................................. 17-13
Land Use, Zoning, and Public Policy ................................................................ 17-13
Table of Contents
DRAFT TOC-7 07/10/2024
Visual and Community Character ..................................................................... 17-16
Cultural Resources ............................................................................................ 17-20
Geology, Soils, and Topography ....................................................................... 17-21
Ecological Resources ........................................................................................ 17-22
Socioeconomic and Fiscal Impacts ................................................................... 17-24
Community Facilities ........................................................................................ 17-28
Water and Wastewater ...................................................................................... 17-30
Stormwater Management .................................................................................. 17-31
Use and Conservation of Energy ....................................................................... 17-33
Traffic and Transportation ................................................................................ 17-34
Air Quality ........................................................................................................ 17-36
Noise ................................................................................................................. 17-37
Hazardous Materials .......................................................................................... 17-38
Construction ...................................................................................................... 17-38
F. Alternative 5: Development under Existing RSP-2 District Regulations .................. 17-38
Description of Alternative ................................................................................. 17-38
Potential Impacts with Reduced Program ......................................................... 17-39
Potential Impacts of Increased Footprint .......................................................... 17-40
Chapter 18: Cumulative Impacts of Proposed Zoning Text Change ................................. 18-1
Chapter 19: Mitigation ........................................................................................................... 19-1
A. Ecological Resources ................................................................................................... 19-1
B. Traffic and Transportation ........................................................................................... 19-2
Chapter 20: Sustainability ..................................................................................................... 20-1
Chapter 21: Growth-Inducing Aspects ................................................................................. 21-1
Chapter 22: Irreversible and Irretrievable Commitment of Resources ............................ 22-1
Chapter 23: Unavoidable Adverse Impacts .......................................................................... 23-1
800 East Main Street Redevelopment
07/10/2024 TOC-8 DRAFT
List of Tables
S-1 Proposed Project Buildings and Parking............................................................................... S-3
S-2 Existing and Proposed Building and Impervious Surface Coverage .................................. S-12
S-3 Projected Annual Property Tax Revenues for Proposed Project ........................................ S-15
S-4 Estimated Water/Sanitary Generation ................................................................................ S-16
S-5 Existing Zoning Alternative – Land Cover ......................................................................... S-27
S-6 Projected Annual Property Tax Revenues for Alternative Site Layout .............................. S-32
S-7 Design Point 1 – Proposed Peak Runoff Rates ................................................................... S-33
S-8 Design Point 2 – Proposed Peak Runoff Rates ................................................................... S-33
S-9 Increased Footprint Option – Slope Disturbance ................................................................ S-36
S-10 Alternatives Impact Comparison ...................................................................................... S-37
1-1 Proposed Project Buildings and Parking ............................................................................... 1-3
1-2 Proposed Zoning Amendments ............................................................................................. 1-6
5-1 Study Area Soils ................................................................................................................... 5-2
5-2 Existing Slopes within the Project Site (Surveyed Area) ...................................................... 5-2
5-3 Existing and Proposed Building and Impervious Surface Coverage .................................... 5-3
6-1 Vegetation Observed in the Ecological Resources Study Area ............................................ 6-5
6-2 Birds Documented During the NYSDEC 2000–2005 Second Breeding Bird Atlas (Block
5957a) and the NYSDEC 2020–2024 Third Breeding Bird Atlas (Mohegan Lake NW and
CW Blocks) ......................................................................................................................... 6-8
6-3 NYS Reptiles and Amphibians (Herp) Atlas (1990–1999) for the Mohegan Lake
USGSQuadrangle .............................................................................................................. 6-10
6-4 Inventory of Federally and State-Listed Species That May Occur Within the Ecological
Resources Study Area ....................................................................................................... 6-11
6-5 Land Use Impacts ............................................................................................................... 6-17
6-6 Proposed Project – Tree Removal Quantities ..................................................................... 6-18
7-1 Residential Population Trends (2010–2020) ......................................................................... 7-2
7-2 Age of Population (2021) ...................................................................................................... 7-2
7-3 Racial Demographics (2021) ................................................................................................ 7-3
Table of Contents
DRAFT TOC-9 07/10/2024
7-4 Household Income Characteristics (2010 and 2021) ............................................................ 7-3
7-5 Household Income Distribution ............................................................................................ 7-3
7-6 Housing Units ....................................................................................................................... 7-4
7-7 Percent of Housing Units by Structure Size ......................................................................... 7-4
7-8 Vacancy Rates ...................................................................................................................... 7-4
7-9 Median House Value for Owner-Occupied Units (2021) ..................................................... 7-5
7-10 House Value for Owner-Occupied Units (2021) ................................................................ 7-5
7-11 Year Householder Moved Into Unit ................................................................................... 7-6
7-12 Year Housing Unit Built ..................................................................................................... 7-6
7-13 Top Employment Sectors for Yorktown Residents (Primary Jobs) (2021) ........................ 7-7
7-14 Top Places Where Yorktown Residents Work (2021)........................................................ 7-8
7-15 Top Employment Sectors in Yorktown (2021) .................................................................. 7-9
7-16 2023 Annual Property Tax Revenues ............................................................................... 7-10
7-17 Estimated Annual Operational Benefits ........................................................................... 7-13
7-18 Projected Annual Property Tax Revenues for Proposed Project ...................................... 7-14
8-1 Police Department Calls for Service (2018 to 2023) ............................................................ 8-2
8-2 Proposed Project – Resident Population Projections ............................................................ 8-3
8-3 Proposed Project – Projected Police Service Level .............................................................. 8-4
9-1 Estimated Water/Sanitary Generation .................................................................................. 9-2
10-1 24-Hour Rainfall Amounts ............................................................................................... 10-3
10-2 Summary of Existing Peak Rates of Runoff ..................................................................... 10-3
10-3 Design Point 1 – Proposed Peak Runoff Rates ................................................................. 10-5
10-4 Design Point 2 – Proposed Peak Runoff Rates ................................................................. 10-5
10-5 Water Quality Analysis .................................................................................................... 10-5
12-1 Summary of Project-Related Traffic Impacts ................................................................... 12-1
12-2 LOS Criteria for Signalized Intersections ......................................................................... 12-3
12-3 LOS Criteria for Unsignalized Intersections .................................................................... 12-3
12-4 2023 Existing Conditions Level of Service Analysis ..................................................... 12-23
12-5 Crash Summary ................................................................................................................ 12-7
12-6 Barger Street and U.S. Route 6 Crash Types .................................................................... 12-8
12-7 Taconic Southbound Ramp and U.S. Route 6 Crash Types ............................................. 12-9
12-8 Taconic Northbound Ramp and U.S. Route 6 Crash Types ........................................... 12-10
12-9 East Main Street and U.S. Route 6 Crash Types ............................................................ 12-11
800 East Main Street Redevelopment
07/10/2024 TOC-10 DRAFT
12-10 Lee Boulevard and U.S. Route 6 Crash Types .............................................................. 12-12
12-11 Lee Road and East Main Street Crash Types ................................................................ 12-13
12-12 Hill Boulevard and U.S. Route 6 Crash Types ............................................................. 12-14
12-13 Hill Boulevard and East Main Street Crash Types ....................................................... 12-15
12-14 Indian Hill Road and East Main Street Crash Types .................................................... 12-15
12-15 Old Jefferson Valley Road and East Main Street Crash Types ..................................... 12-16
12-16 2026 No Action Conditions LOS Analysis ................................................................... 12-25
12-17 Trip Generation Summary ............................................................................................ 12-18
12-18 2026 No Action and 2026 With Action Conditions LOSAnalysis ............................... 12-27
12-19 Proposed Mitigation Measures ...................................................................................... 12-21
12-20 2026 No Action, 2026 With Action, and 2026 Mitigation Conditions LOS Analysis .... 12-29
13-1 Representative Monitored Ambient Air Quality Data ...................................................... 13-2
14-1 Common Noise Levels ...................................................................................................... 14-2
14-2 Noise Measurement Locations .......................................................................................... 14-5
14-3 Existing Noise Levels (in dBA) ........................................................................................ 14-6
14-4 Future Noise Levels without the Proposed Project (in dBA) ............................................ 14-6
14-5 Future Noise Levels with the Proposed Project (in dBA) ................................................. 14-7
16-1 Typical Noise Emission Levels for Construction Equipment ........................................... 16-6
17-1 Re-Occupancy Alternative – Trip Generation Summary .................................................. 17-4
17-2 Compliance ofExisting Zoning Alternative with OB District Regulations ....................... 17-5
17-3 Existing Zoning Alternative – Slope Disturbance ............................................................ 17-6
17-4 Existing Zoning Alternative – Land Cover ....................................................................... 17-6
17-5 Existing Zoning Alternative – Trip Generation Summary ................................................ 17-8
17-6 Zoning Compliance of Non-Age-Restricted Alternative with R-3 District Regulations ..... 17-9
17-7 Non-Age-Restricted Alternative – Resident Population ................................................. 17-10
17-8 Non-Age-Restricted Alternative – Public School Aged Children .................................. 17-11
17-9 Non-Age-Restricted Alternative – Trip Generation Summary ....................................... 17-12
17-10 Compliance OF Alternative Site Layout with Existing RSP-2 District Regulations .... 17-15
17-11 Alternative Site Layout – Slope Disturbance ................................................................ 17-22
17-12 Alternative Site Layout – Tree Removal Quantities ..................................................... 17-23
17-13 Alternative Site Layout – Land Use Impacts ................................................................ 17-23
17-14 Estimated Construction Benefits ................................................................................... 17-25
17-15 Estimated Annual Operational Benefits ........................................................................ 17-26
Table of Contents
DRAFT TOC-11 07/10/2024
17-16 Annual Economic Benefits of Resident Spending ........................................................ 17-27
17-17 Projected Annual Property Tax Revenues for Alternative Site Layout ........................ 17-28
17-18 Alternative Site Layout – Resident Population Projections .......................................... 17-29
17-19 Alternative Site Layout – Projected Police Service Level ............................................ 17-29
17-20 Estimated Water/Sanitary Generation .......................................................................... 17-31
17-21 Design Point 1 – Proposed Peak Runoff Rates ............................................................. 17-32
17-22 Design Point 2 – Proposed Peak Runoff Rates ............................................................. 17-32
17-23 Alternative Site Layout – Energy Loads ...................................................................... 17-34
17-24 Alternative Site Layout – Trip Generation Summary ................................................... 17-35
17-27 Reduced Program Option – Trip Generation Summary ............................................... 17-40
17-28 Increased Footprint Option – Slope Disturbance .......................................................... 17-41
17-A Alternatives Impact Comparison ................................................................................... 17-42
17-25 2026 No Action AND 2026 Alternative Site Layout With Action Conditions Level of
Service Analysis ............................................................................................................. 17-46
17-26 2026 No Action, 2026 Alternative Site Layout With Action, and 2026 Alternative Site
Layout Mitigation Conditions Level of Service Analysis .............................................. 17-48
800 East Main Street Redevelopment
07/10/2024 TOC-12 DRAFT
List of Figures
Note: Figures appear after chapter text.
S-1 Project Location
S-2 Aerial
S-3 Existing Conditions
S-4 Conceptual Site Plan
S-5a Rendering
S-5b Rendering
S-5c Rendering
S-6a Recreational Amenities
S-6b Recreational Amenities
S-6c Recreational Amenities
S-7a Landscaping Plan
S-7b Landscaping Plan
S-7c Landscaping Plan
S-7d Landscaping Plan
S-7e Landscaping Plan
S-7f Landscaping Plan
S-8a Lighting Plan
S-8b Lighting Plan
S-9 Grading Plan
S-10 Project Location
S-11 Aerial
S-12 Land Use
S-13a Photo Simulations
S-13b Photo Simulations
S-13c Photo Simulations
S-13d Photo Simulations
S-13e Photo Simulations
S-13f Photo Simulations
S-13g Photo Simulations
S-14 Photo Simulations
S-15 Areas of Archeaological Sensitivity
S-16 Location of Historic Resources
S-17 Taconic State Parkway Photograph: September 2023
Table of Contents
DRAFT TOC-13 07/10/2024
S-18 Taconic State Parkway Photographs: March 2023
S-19 Proposed Project: View Northeast from the Taconic State Parkway
S-20 Proposed Project: View East from the Taconic State Parkway
S-21 Study Area
S-22 Preliminary Traffic Improvement Plan
S-23a Alternative Options Layout Plan
S-23b Potential Sidewalk Layout
S-23c Alternate 1 Profile
S-23d Alternate 2 Profile
S-24 Existing Zoning Alternative – Conceptual Site Plan
S-25 Existing Zoning Alternative – Sectional Diagram
S-26 Alternative Site Layout – Conceptual Site Plan
S-27a Multi-Family Buildings – Elevations
S-27b Multi-Family Buildings – Elevations
S-27c Multi-Family Buildings – Elevations
S-28 Multi-Family Buildings – Section
S-29 Photo Simulations – Alternative Site Layout
S-30 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan
S-31 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan
1-1 Project Location
1-2 Aerial
1-3 Existing Conditions
1-4 Conceptual Site Plan
1-5a Rendering
1-5b Rendering
1-5c Rendering
1-6a Apartment Building
1-6b Apartment Building
1-6c Apartment Building
1-7a Flats
1-7b Flats
1-8a Villas
1-8b Villas
1-8c Villas
1-9a Clubhouse
1-9b Clubhouse
1-9c Clubhouse
1-10 Townhouses
1-11a Recreational Amenities
1-11b Recreational Amenities
1-11c Recreational Amenities
1-12a Landscaping Plan
800 East Main Street Redevelopment
07/10/2024 TOC-14 DRAFT
1-12b Landscaping Plan
1-12c Landscaping Plan
1-12d Landscaping Plan
1-12e Landscaping Plan
1-12f Landscaping Plan
1-13a Lighting Plan
1-13b Lighting Plan
1-14 Grading Plan
2-1 Project Location
2-2 Aerial
2-3 Land Use
2-4 Zoning
3-1a Key to Photographs
3-1b Project Site Photographs
3-1c Project Site Photographs
3-1d Project Site Photographs
3-1e Project Site Photographs
3-1f Project Site Photographs
3-1g Project Site Photographs
3-2a Key to Surrounding Area Photographs
3-2b Surrounding Area Photographs
3-2c Surrounding Area Photographs
3-2d Surrounding Area Photographs
3-2e Surrounding Area Photographs
3-3a Photo Simulations
3-3b Photo Simulations
3-3c Photo Simulations
3-3d Photo Simulations
3-3e Photo Simulations
3-3f Photo Simulations
3-3g Photo Simulations
3-4a Line-of-Sight Sectional Diagram
3-4b Line-of-Sight Sectional Diagram
3-4c Line-of-Sight Sectional Diagram
3-4d Line-of-Sight Sectional Diagram
3-4e Line-of-Sight Sectional Diagram
3-4f Line-of-Sight Sectional Diagram
3-4g Line-of-Sight Sectional Diagram
4-1 Areas of Archeaological Sensitivity
4-2 Location of Historic Resources
4-3 Hyatt House Photos: Septemer 2023
4-4 Taconic State Parkway Photograph: September 2023
Table of Contents
DRAFT TOC-15 07/10/2024
4-5 Taconic State Parkway Photographs: March 2023
4-6 Proposed Project: View Northeast from the Taconic State Parkway
4-7 Proposed Project: View East from the Taconic State Parkway
5-1 NYCS Soils
5-2 Topography
5-3 Surficial Geology
5-4 Bedrock Geology
6-1 FEMA Effective FIRM 2007
6-2 Ecological Communities
6-3 Key to Photographs
6-4a Photographs
6-4b Photographs
6-4c Photographs
6-4d Photographs
6-4e Photographs
6-4f Photographs
12-1 Study Area
12-2 Existing Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-3 No Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-4 Trip Distribution Percentages Entering/Exiting
12-5 Project-Generated Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-6 With Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-7a Alternative Options Layout Plan
12-7b Potential Sidewalk Layout
12-7c Alternate 1 Profile
12-7d Alternate 2 Profile
12-8 Preliminary Traffic Improvement Plan
14-1 Noise Measurement Locations
17-1 Existing Zoning Alternative – Conceptual Site Plan
17-2 Existing Zoning Alternative – Sectional Diagram
17-3 Alternative Site Layout – Conceptual Site Plan
17-4a Multi-Family Buildings – Elevations
17-4b Multi-Family Buildings – Elevations
17-4c Multi-Family Buildings – Elevations
17-5 Multi-Family Buildings – Section
17-6a Multi-Family Buildings – Floorplans
17-6b Multi-Family Buildings – Floorplans
17-6c Multi-Family Buildings – Floorplans
17-7a Cottages – Elevations
17-7b Cottages – Elevations
17-8 Cottages – Floorplans
17-9a Multi-Family Buildings – Renderings
800 East Main Street Redevelopment
07/10/2024 TOC-16 DRAFT
17-9b Multi-Family Buildings – Renderings
17-10a Photo Simulations – Alternative Site Layout
17-10b Photo Simulations – Alternative Site Layout
17-10c Photo Simulations – Alternative Site Layout
17-10d Photo Simulations – Alternative Site Layout
17-10e Photo Simulations – Alternative Site Layout
17-10f Photo Simulations – Alternative Site Layout
17-10g Photo Simulations – Alternative Site Layout
17-11 Alternative Site Layout – Sectional Diagram
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-13a Alternative Site Layout – Lighting Plan
17-13b Alternative Site Layout – Lighting Plan
17-14 Alternative Site Layout Project-Generated Weekday AM/ Weekday PM/ Saturday
Midday Peak Hour Volumes
17-15 Alternative Site Layout With Action Condition Weekday AM/ Weekday PM/ Saturday
Midday Peak Hour Volumes
17-16 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan
17-17 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan
Table of Contents
DRAFT TOC-17 07/10/2024
List of Appendices
Appendix A: SEQRA Documents
A-1: Adopted Draft Environmental Impact Statement (DEIS) Scope of Work
A-2: Zoning Petition
Appendix B: Cultural Resources
Appendix C: Ecological Resources
Appendix D: Town Correspondence
Appendix E: Stormwater Pollution Prevention Plan (SWPPP)
Appendix F: Energy
Appendix G: Traffic
G-1: Traffic Count Data
G-2: 2023 Existing Condition Synchro Reports
G-3: NYSDOT Crash Data
G-4: East Main Street and US Route 6 Crash Diagram
G-5: 2026 No Action Condition Synchro Reports
G-6: Trip Generation
G-7: 2026 With Action Condition Synchro Reports
G-8: 2026 With Action With Mitigation Condition Synchro Reports
G-9: 2026 With Action Alternative Condition Synchro Reports
G-10: 2026 With Action With Mitigation Alternative Condition Synchro Reports
Appendix H: Alternative Site Layout – Synchro 11 Outputs
Appendix I: Site Plans