Loading...
HomeMy WebLinkAbout000_Table of Contents DRAFT TOC-1 07/10/2024 Table of Contents Executive Summary .................................................................................................................. S-1 Chapter 1: Project Description ................................................................................................ 1-1 A. Introduction .................................................................................................................... 1-1 B. Project Description ........................................................................................................ 1-2 Project Site and Surrounding Area ........................................................................ 1-2 Proposed Project.................................................................................................... 1-3 Proposed Zoning Amendments ............................................................................. 1-6 C. Project Purpose and Need .............................................................................................. 1-7 D. Reviews and Approvals Required .................................................................................. 1-8 Chapter 2: Land Use, Zoning, and Public Policy ................................................................... 2-1 A. Introduction and Summary of Findings ......................................................................... 2-1 B. Land Use ........................................................................................................................ 2-1 Existing Conditions ............................................................................................... 2-1 The Future without the Proposed Project .............................................................. 2-3 The Future with the Proposed Project (the “Build Condition”) ............................ 2-4 Mitigation .............................................................................................................. 2-5 C. Zoning ............................................................................................................................ 2-5 Existing Conditions ............................................................................................... 2-5 The Future without the Proposed Project .............................................................. 2-8 The Future with the Proposed Project ................................................................... 2-8 Mitigation .............................................................................................................. 2-8 D. Public Policy .................................................................................................................. 2-9 Existing Conditions ............................................................................................... 2-9 The Future without the Proposed Project ............................................................ 2-13 The Future with the Proposed Project ................................................................. 2-13 Mitigation ............................................................................................................ 2-15 Chapter 3: Visual and Community Character ....................................................................... 3-1 A. Introduction and Summary of Findings ......................................................................... 3-1 B. Existing Conditions ........................................................................................................ 3-1 Visual Character of the Project Site ...................................................................... 3-1 Visual Character of the Surrounding Areas .......................................................... 3-2 Views of the Project Site and Existing Buildings from the Surrounding Area ..... 3-3 C. The Future without the Proposed Project ....................................................................... 3-4 D. The Future with the Proposed Project ............................................................................ 3-4 800 East Main Street Redevelopment 07/10/2024 TOC-2 DRAFT Visual and Community Character of the Project Site ............................................ 3-4 Views of the Project Site and Proposed Buildings from Vantage Points .............. 3-6 E. Mitigation ....................................................................................................................... 3-8 Chapter 4: Cultural Resources ................................................................................................ 4-1 A. Introduction and Summary of Findings .......................................................................... 4-1 B. Archaeological Resources .............................................................................................. 4-1 Existing Conditions ............................................................................................... 4-1 The Future without the Proposed Project .............................................................. 4-3 The Future with the Proposed Project ................................................................... 4-3 Mitigation .............................................................................................................. 4-3 C. Historic Resources .......................................................................................................... 4-3 Existing Conditions ............................................................................................... 4-3 The Future without the Proposed Project .............................................................. 4-4 The Future with the Proposed Project ................................................................... 4-4 Mitigation .............................................................................................................. 4-5 Chapter 5: Geology, Soils, and Topography ........................................................................... 5-1 A. Introduction and Summary of Findings .......................................................................... 5-1 B. Existing Conditions ........................................................................................................ 5-1 Soils ....................................................................................................................... 5-1 Topography ............................................................................................................ 5-2 Geology ................................................................................................................. 5-2 C. The Future with the Proposed Project ............................................................................ 5-3 D. Mitigation Measures ....................................................................................................... 5-4 Chapter 6: Ecological Resources .............................................................................................. 6-1 A. Introduction and Summary of Findings .......................................................................... 6-1 Summary of Findings ............................................................................................ 6-1 B. Existing Conditions ........................................................................................................ 6-2 Groundwater .......................................................................................................... 6-2 Floodplains ............................................................................................................ 6-3 Wetlands and Surface Water Resources ................................................................ 6-3 Terrestrial Resources ............................................................................................. 6-4 Threatened, Endangered, and Special Concern Species and Significant Natural Communities ..................................................................................................................... 6-11 C. The Future without the Proposed Project ..................................................................... 6-15 D. The Future with the Proposed Project .......................................................................... 6-16 Groundwater ........................................................................................................ 6-16 Floodplains .......................................................................................................... 6-16 Wetlands and Surface Water Resources .............................................................. 6-16 Terrestrial Resources ........................................................................................... 6-16 Threatened, Endangered, and Special Concern Species and Significant Natural Communities ..................................................................................................................... 6-19 Table of Contents DRAFT TOC-3 07/10/2024 E. Mitigation Measures .................................................................................................... 6-21 F. References .................................................................................................................... 6-22 Chapter 7: Socioeconomic and Fiscal Impacts ....................................................................... 7-1 A. Introduction and Summary of Findings ......................................................................... 7-1 B. Existing Conditions ........................................................................................................ 7-1 Demographic Conditions and Trends .................................................................... 7-1 Housing Stock, Tenure and Trends ....................................................................... 7-3 Town’s and Westchester County’s Affordable Housing Goals and Policies ........ 7-6 Employment .......................................................................................................... 7-7 Fiscal Conditions ................................................................................................... 7-9 C. The Future without the Proposed Project ..................................................................... 7-10 D. The Future with the Proposed Project .......................................................................... 7-10 Economic & Fiscal Benefits of Proposed Project (IMPLAN) ............................ 7-10 Municipal Fiscal Impact Assessment .................................................................. 7-14 Impact to Town’s Population and Demographics ............................................... 7-15 E. Mitigation Measures .................................................................................................... 7-15 Chapter 8: Community Facilities ............................................................................................ 8-1 A. Introduction and Summary of Findings ......................................................................... 8-1 B. Police ............................................................................................................................. 8-1 Existing and Potential Future Conditions without the Proposed Project .............. 8-1 The Future with the Proposed Project ................................................................... 8-3 Mitigation Measures .............................................................................................. 8-4 C. Fire ................................................................................................................................. 8-4 Existing and Potential Future Conditions with the Proposed Project.................... 8-4 The Future with the Proposed Project ................................................................... 8-5 Mitigation Measures .............................................................................................. 8-6 D. Emergency Medical Services ......................................................................................... 8-6 Existing and Future Conditions without the Proposed Project .............................. 8-6 The Future with the Proposed Project ................................................................... 8-6 Mitigation Measures .............................................................................................. 8-7 E. Parks, Recreation and Open Space ................................................................................ 8-7 Existing Conditions ............................................................................................... 8-7 The Future without the Proposed Project .............................................................. 8-8 The Future with the Proposed Project ................................................................... 8-8 Mitigation Measures .............................................................................................. 8-9 F. Solid Waste and Recycling ............................................................................................ 8-9 Existing Conditions ............................................................................................... 8-9 The Future without the Proposed Project .............................................................. 8-9 The Future with the Proposed Project ................................................................. 8-10 Mitigation Measures ............................................................................................ 8-10 800 East Main Street Redevelopment 07/10/2024 TOC-4 DRAFT Chapter 9: Water and Wastewater .......................................................................................... 9-1 A. Introduction and Summary of Findings .......................................................................... 9-1 B. Existing Conditions ........................................................................................................ 9-1 B.1. Water Supply ......................................................................................................... 9-1 B.2. Sanitary Sewage .................................................................................................... 9-1 C. The Future without the Proposed Project ....................................................................... 9-2 D. The Future with the Proposed Project ............................................................................ 9-2 D.1. Water Supply ......................................................................................................... 9-2 D.2. Sanitary Sewage .................................................................................................... 9-2 E. Mitigation Measures ....................................................................................................... 9-3 E.1. Water Supply ......................................................................................................... 9-3 E.2. Sanitary Sewage .................................................................................................... 9-3 Chapter 10: Stormwater Management .................................................................................. 10-1 A. Introduction and Summary of Findings ........................................................................ 10-1 B. Existing Conditions ...................................................................................................... 10-1 Watershed and Drainage Patterns ........................................................................ 10-1 Existing Drainage Areas ...................................................................................... 10-2 C. The Future without the Proposed Project ..................................................................... 10-3 D. The Future with the Proposed Project .......................................................................... 10-3 Proposed Drainage Areas .................................................................................... 10-3 Post-Development Conditions ............................................................................. 10-4 E. Mitigation Measures ..................................................................................................... 10-5 Chapter 11: Use and Conservation of Energy ...................................................................... 11-1 A. Introduction and Summary of Findings ........................................................................ 11-1 B. Existing Conditions ...................................................................................................... 11-1 C. The Future without the Proposed Project ..................................................................... 11-1 D. The Future with the Proposed Project .......................................................................... 11-1 E. Mitigation Measures ..................................................................................................... 11-2 Chapter 12: Traffic and Transportation ............................................................................... 12-1 A. Introduction and Summary of Findings ........................................................................ 12-1 B. Capacity Analysis Methodology .................................................................................. 12-1 B.1. Signalized Intersections ....................................................................................... 12-1 B.2. Unsignalized Intersections ................................................................................... 12-3 C. 2023 Existing Conditions ............................................................................................. 12-3 C.1. Roadway Characteristics ..................................................................................... 12-4 C.2. Intersection Level of Service Conditions ............................................................ 12-6 C.3. Pedestrian and Bicycle Conditions ...................................................................... 12-6 C.4. Public Transportation .......................................................................................... 12-6 D. Crash History and Safety Assessment .......................................................................... 12-7 D.1. Intersection Crashes ............................................................................................. 12-7 E. No Action Condition .................................................................................................. 12-16 Table of Contents DRAFT TOC-5 07/10/2024 E.1. Intersection Level of Service Conditions .......................................................... 12-17 E.2. Pedestrian and Bicycle Conditions .................................................................... 12-17 E.3. Public Transportation ........................................................................................ 12-17 F. With Action Condition ............................................................................................... 12-18 F.1. Project Description ............................................................................................ 12-18 F.2. Project Trip Generation ..................................................................................... 12-18 F.3. Project Trip Distribution and Assessment ......................................................... 12-18 F.4. Intersection Level of Service Conditions .......................................................... 12-19 F.5. Parking Conditions ............................................................................................ 12-19 F.6. Pedestrian and Bicycle Conditions .................................................................... 12-19 F.7. Public Transportation ........................................................................................ 12-19 F.8. Delivery and Service Vehicle Access ............................................................... 12-20 F.9. Alternative Site Access ..................................................................................... 12-20 G. Traffic Mitigation ...................................................................................................... 12-21 Chapter 13: Air Quality ......................................................................................................... 13-1 A. Introduction and Summary of Findings ....................................................................... 13-1 Summary of Findings .......................................................................................... 13-1 B. Existing Conditions ...................................................................................................... 13-1 C. The Future without the Proposed Project ..................................................................... 13-2 D. The Future with the Proposed Project .......................................................................... 13-2 Stationary Source Analysis ................................................................................. 13-2 Mobile Source Analysis ...................................................................................... 13-4 E. Mitigation Measures .................................................................................................... 13-5 Chapter 14: Noise .................................................................................................................... 14-1 A. Introduction and Summary of Findings ....................................................................... 14-1 B. Noise Fundamentals ..................................................................................................... 14-1 “A”-Weighted Sound Level (dBA) ..................................................................... 14-1 Noise Descriptors Used in Impact Assessment ................................................... 14-2 Noise Standards and Impact Criteria ................................................................... 14-3 Proposed Project Impact Criteria ........................................................................ 14-4 C. Methodology ................................................................................................................ 14-4 D. Existing Conditions ...................................................................................................... 14-4 Selection of Noise Receptor Locations ............................................................... 14-4 Noise Monitoring ................................................................................................ 14-5 Equipment Used During Noise Monitoring ........................................................ 14-5 Existing Noise Levels at Noise Receptor Locations ........................................... 14-5 E. The Future without the Proposed Project ..................................................................... 14-6 F. The Future with the Proposed Project .......................................................................... 14-6 Mobile Sources of Noise (Traffic) ...................................................................... 14-6 Stationary Sources of Noise ................................................................................ 14-7 Noise Exposure at Proposed Uses ....................................................................... 14-7 800 East Main Street Redevelopment 07/10/2024 TOC-6 DRAFT G. Mitigation Measures ..................................................................................................... 14-7 Chapter 15: Hazardous Materials ......................................................................................... 15-1 A. Introduction and Summary of Findings ........................................................................ 15-1 B. Existing Conditions ...................................................................................................... 15-1 Phase I Environmental Site Assessment .............................................................. 15-1 Confirmation Assessment .................................................................................... 15-2 Updated WCDOH Petroleum Bulk Storage Registry .......................................... 15-3 Potential of Buildings to Contain Hazardous Materials ...................................... 15-3 C. The Future without the Proposed Project .................................................................... 15-4 D. The Future with the Proposed Project .......................................................................... 15-4 E. Mitigation Measures ..................................................................................................... 15-5 Chapter 16: Construction ....................................................................................................... 16-1 A. Introduction and Summary of Findings ........................................................................ 16-1 B. Construction Schedule .................................................................................................. 16-2 Stage 1: Perimeter Fencing and Tree Clearing .................................................... 16-2 Stage 2: Mobilization, Earthwork, and Site Utilities ........................................... 16-2 Stage 3: Foundations and Site Stabilization ........................................................ 16-2 Stage 4: Building Framing and MEP Rough-in ................................................... 16-2 Stage 5: Interior Finishes ..................................................................................... 16-2 Stage 6: Site Work, Landscaping and Occupancy ............................................... 16-3 C. Construction Period Impacts and Mitigation ................................................................ 16-3 Erosion and Sediment Control ............................................................................. 16-3 Traffic and Transportation ................................................................................... 16-4 Air Quality ........................................................................................................... 16-5 Noise .................................................................................................................... 16-5 Blasting and Subsurface Investigations ............................................................... 16-7 Chapter 17: Alternatives......................................................................................................... 17-1 A. Introduction .................................................................................................................. 17-1 B. Alternative 1: No Action – Existing Site Conditions and Re-Occupancy of Office Buildings ............................................................................................................................... 17-1 Description of Alternative ................................................................................... 17-1 Potential Impacts of Alternative .......................................................................... 17-2 C. Alternative 2: Development Under Existing OB District Zoning ................................ 17-4 Description of Alternative ................................................................................... 17-4 Potential Impacts ................................................................................................. 17-5 D. Alternative 3: Non-Age-Restricted Development ........................................................ 17-8 Description of Alternative ................................................................................... 17-8 Potential Impacts ................................................................................................. 17-8 E. Alternative 4: Alternative Site Layout ....................................................................... 17-12 Description of Alternative ................................................................................. 17-13 Land Use, Zoning, and Public Policy ................................................................ 17-13 Table of Contents DRAFT TOC-7 07/10/2024 Visual and Community Character ..................................................................... 17-16 Cultural Resources ............................................................................................ 17-20 Geology, Soils, and Topography ....................................................................... 17-21 Ecological Resources ........................................................................................ 17-22 Socioeconomic and Fiscal Impacts ................................................................... 17-24 Community Facilities ........................................................................................ 17-28 Water and Wastewater ...................................................................................... 17-30 Stormwater Management .................................................................................. 17-31 Use and Conservation of Energy ....................................................................... 17-33 Traffic and Transportation ................................................................................ 17-34 Air Quality ........................................................................................................ 17-36 Noise ................................................................................................................. 17-37 Hazardous Materials .......................................................................................... 17-38 Construction ...................................................................................................... 17-38 F. Alternative 5: Development under Existing RSP-2 District Regulations .................. 17-38 Description of Alternative ................................................................................. 17-38 Potential Impacts with Reduced Program ......................................................... 17-39 Potential Impacts of Increased Footprint .......................................................... 17-40 Chapter 18: Cumulative Impacts of Proposed Zoning Text Change ................................. 18-1 Chapter 19: Mitigation ........................................................................................................... 19-1 A. Ecological Resources ................................................................................................... 19-1 B. Traffic and Transportation ........................................................................................... 19-2 Chapter 20: Sustainability ..................................................................................................... 20-1 Chapter 21: Growth-Inducing Aspects ................................................................................. 21-1 Chapter 22: Irreversible and Irretrievable Commitment of Resources ............................ 22-1 Chapter 23: Unavoidable Adverse Impacts .......................................................................... 23-1 800 East Main Street Redevelopment 07/10/2024 TOC-8 DRAFT List of Tables S-1 Proposed Project Buildings and Parking............................................................................... S-3 S-2 Existing and Proposed Building and Impervious Surface Coverage .................................. S-12 S-3 Projected Annual Property Tax Revenues for Proposed Project ........................................ S-15 S-4 Estimated Water/Sanitary Generation ................................................................................ S-16 S-5 Existing Zoning Alternative – Land Cover ......................................................................... S-27 S-6 Projected Annual Property Tax Revenues for Alternative Site Layout .............................. S-32 S-7 Design Point 1 – Proposed Peak Runoff Rates ................................................................... S-33 S-8 Design Point 2 – Proposed Peak Runoff Rates ................................................................... S-33 S-9 Increased Footprint Option – Slope Disturbance ................................................................ S-36 S-10 Alternatives Impact Comparison ...................................................................................... S-37 1-1 Proposed Project Buildings and Parking ............................................................................... 1-3 1-2 Proposed Zoning Amendments ............................................................................................. 1-6 5-1 Study Area Soils ................................................................................................................... 5-2 5-2 Existing Slopes within the Project Site (Surveyed Area) ...................................................... 5-2 5-3 Existing and Proposed Building and Impervious Surface Coverage .................................... 5-3 6-1 Vegetation Observed in the Ecological Resources Study Area ............................................ 6-5 6-2 Birds Documented During the NYSDEC 2000–2005 Second Breeding Bird Atlas (Block 5957a) and the NYSDEC 2020–2024 Third Breeding Bird Atlas (Mohegan Lake NW and CW Blocks) ......................................................................................................................... 6-8 6-3 NYS Reptiles and Amphibians (Herp) Atlas (1990–1999) for the Mohegan Lake USGSQuadrangle .............................................................................................................. 6-10 6-4 Inventory of Federally and State-Listed Species That May Occur Within the Ecological Resources Study Area ....................................................................................................... 6-11 6-5 Land Use Impacts ............................................................................................................... 6-17 6-6 Proposed Project – Tree Removal Quantities ..................................................................... 6-18 7-1 Residential Population Trends (2010–2020) ......................................................................... 7-2 7-2 Age of Population (2021) ...................................................................................................... 7-2 7-3 Racial Demographics (2021) ................................................................................................ 7-3 Table of Contents DRAFT TOC-9 07/10/2024 7-4 Household Income Characteristics (2010 and 2021) ............................................................ 7-3 7-5 Household Income Distribution ............................................................................................ 7-3 7-6 Housing Units ....................................................................................................................... 7-4 7-7 Percent of Housing Units by Structure Size ......................................................................... 7-4 7-8 Vacancy Rates ...................................................................................................................... 7-4 7-9 Median House Value for Owner-Occupied Units (2021) ..................................................... 7-5 7-10 House Value for Owner-Occupied Units (2021) ................................................................ 7-5 7-11 Year Householder Moved Into Unit ................................................................................... 7-6 7-12 Year Housing Unit Built ..................................................................................................... 7-6 7-13 Top Employment Sectors for Yorktown Residents (Primary Jobs) (2021) ........................ 7-7 7-14 Top Places Where Yorktown Residents Work (2021)........................................................ 7-8 7-15 Top Employment Sectors in Yorktown (2021) .................................................................. 7-9 7-16 2023 Annual Property Tax Revenues ............................................................................... 7-10 7-17 Estimated Annual Operational Benefits ........................................................................... 7-13 7-18 Projected Annual Property Tax Revenues for Proposed Project ...................................... 7-14 8-1 Police Department Calls for Service (2018 to 2023) ............................................................ 8-2 8-2 Proposed Project – Resident Population Projections ............................................................ 8-3 8-3 Proposed Project – Projected Police Service Level .............................................................. 8-4 9-1 Estimated Water/Sanitary Generation .................................................................................. 9-2 10-1 24-Hour Rainfall Amounts ............................................................................................... 10-3 10-2 Summary of Existing Peak Rates of Runoff ..................................................................... 10-3 10-3 Design Point 1 – Proposed Peak Runoff Rates ................................................................. 10-5 10-4 Design Point 2 – Proposed Peak Runoff Rates ................................................................. 10-5 10-5 Water Quality Analysis .................................................................................................... 10-5 12-1 Summary of Project-Related Traffic Impacts ................................................................... 12-1 12-2 LOS Criteria for Signalized Intersections ......................................................................... 12-3 12-3 LOS Criteria for Unsignalized Intersections .................................................................... 12-3 12-4 2023 Existing Conditions Level of Service Analysis ..................................................... 12-23 12-5 Crash Summary ................................................................................................................ 12-7 12-6 Barger Street and U.S. Route 6 Crash Types .................................................................... 12-8 12-7 Taconic Southbound Ramp and U.S. Route 6 Crash Types ............................................. 12-9 12-8 Taconic Northbound Ramp and U.S. Route 6 Crash Types ........................................... 12-10 12-9 East Main Street and U.S. Route 6 Crash Types ............................................................ 12-11 800 East Main Street Redevelopment 07/10/2024 TOC-10 DRAFT 12-10 Lee Boulevard and U.S. Route 6 Crash Types .............................................................. 12-12 12-11 Lee Road and East Main Street Crash Types ................................................................ 12-13 12-12 Hill Boulevard and U.S. Route 6 Crash Types ............................................................. 12-14 12-13 Hill Boulevard and East Main Street Crash Types ....................................................... 12-15 12-14 Indian Hill Road and East Main Street Crash Types .................................................... 12-15 12-15 Old Jefferson Valley Road and East Main Street Crash Types ..................................... 12-16 12-16 2026 No Action Conditions LOS Analysis ................................................................... 12-25 12-17 Trip Generation Summary ............................................................................................ 12-18 12-18 2026 No Action and 2026 With Action Conditions LOSAnalysis ............................... 12-27 12-19 Proposed Mitigation Measures ...................................................................................... 12-21 12-20 2026 No Action, 2026 With Action, and 2026 Mitigation Conditions LOS Analysis .... 12-29 13-1 Representative Monitored Ambient Air Quality Data ...................................................... 13-2 14-1 Common Noise Levels ...................................................................................................... 14-2 14-2 Noise Measurement Locations .......................................................................................... 14-5 14-3 Existing Noise Levels (in dBA) ........................................................................................ 14-6 14-4 Future Noise Levels without the Proposed Project (in dBA) ............................................ 14-6 14-5 Future Noise Levels with the Proposed Project (in dBA) ................................................. 14-7 16-1 Typical Noise Emission Levels for Construction Equipment ........................................... 16-6 17-1 Re-Occupancy Alternative – Trip Generation Summary .................................................. 17-4 17-2 Compliance ofExisting Zoning Alternative with OB District Regulations ....................... 17-5 17-3 Existing Zoning Alternative – Slope Disturbance ............................................................ 17-6 17-4 Existing Zoning Alternative – Land Cover ....................................................................... 17-6 17-5 Existing Zoning Alternative – Trip Generation Summary ................................................ 17-8 17-6 Zoning Compliance of Non-Age-Restricted Alternative with R-3 District Regulations ..... 17-9 17-7 Non-Age-Restricted Alternative – Resident Population ................................................. 17-10 17-8 Non-Age-Restricted Alternative – Public School Aged Children .................................. 17-11 17-9 Non-Age-Restricted Alternative – Trip Generation Summary ....................................... 17-12 17-10 Compliance OF Alternative Site Layout with Existing RSP-2 District Regulations .... 17-15 17-11 Alternative Site Layout – Slope Disturbance ................................................................ 17-22 17-12 Alternative Site Layout – Tree Removal Quantities ..................................................... 17-23 17-13 Alternative Site Layout – Land Use Impacts ................................................................ 17-23 17-14 Estimated Construction Benefits ................................................................................... 17-25 17-15 Estimated Annual Operational Benefits ........................................................................ 17-26 Table of Contents DRAFT TOC-11 07/10/2024 17-16 Annual Economic Benefits of Resident Spending ........................................................ 17-27 17-17 Projected Annual Property Tax Revenues for Alternative Site Layout ........................ 17-28 17-18 Alternative Site Layout – Resident Population Projections .......................................... 17-29 17-19 Alternative Site Layout – Projected Police Service Level ............................................ 17-29 17-20 Estimated Water/Sanitary Generation .......................................................................... 17-31 17-21 Design Point 1 – Proposed Peak Runoff Rates ............................................................. 17-32 17-22 Design Point 2 – Proposed Peak Runoff Rates ............................................................. 17-32 17-23 Alternative Site Layout – Energy Loads ...................................................................... 17-34 17-24 Alternative Site Layout – Trip Generation Summary ................................................... 17-35 17-27 Reduced Program Option – Trip Generation Summary ............................................... 17-40 17-28 Increased Footprint Option – Slope Disturbance .......................................................... 17-41 17-A Alternatives Impact Comparison ................................................................................... 17-42 17-25 2026 No Action AND 2026 Alternative Site Layout With Action Conditions Level of Service Analysis ............................................................................................................. 17-46 17-26 2026 No Action, 2026 Alternative Site Layout With Action, and 2026 Alternative Site Layout Mitigation Conditions Level of Service Analysis .............................................. 17-48 800 East Main Street Redevelopment 07/10/2024 TOC-12 DRAFT List of Figures Note: Figures appear after chapter text. S-1 Project Location S-2 Aerial S-3 Existing Conditions S-4 Conceptual Site Plan S-5a Rendering S-5b Rendering S-5c Rendering S-6a Recreational Amenities S-6b Recreational Amenities S-6c Recreational Amenities S-7a Landscaping Plan S-7b Landscaping Plan S-7c Landscaping Plan S-7d Landscaping Plan S-7e Landscaping Plan S-7f Landscaping Plan S-8a Lighting Plan S-8b Lighting Plan S-9 Grading Plan S-10 Project Location S-11 Aerial S-12 Land Use S-13a Photo Simulations S-13b Photo Simulations S-13c Photo Simulations S-13d Photo Simulations S-13e Photo Simulations S-13f Photo Simulations S-13g Photo Simulations S-14 Photo Simulations S-15 Areas of Archeaological Sensitivity S-16 Location of Historic Resources S-17 Taconic State Parkway Photograph: September 2023 Table of Contents DRAFT TOC-13 07/10/2024 S-18 Taconic State Parkway Photographs: March 2023 S-19 Proposed Project: View Northeast from the Taconic State Parkway S-20 Proposed Project: View East from the Taconic State Parkway S-21 Study Area S-22 Preliminary Traffic Improvement Plan S-23a Alternative Options Layout Plan S-23b Potential Sidewalk Layout S-23c Alternate 1 Profile S-23d Alternate 2 Profile S-24 Existing Zoning Alternative – Conceptual Site Plan S-25 Existing Zoning Alternative – Sectional Diagram S-26 Alternative Site Layout – Conceptual Site Plan S-27a Multi-Family Buildings – Elevations S-27b Multi-Family Buildings – Elevations S-27c Multi-Family Buildings – Elevations S-28 Multi-Family Buildings – Section S-29 Photo Simulations – Alternative Site Layout S-30 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan S-31 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan 1-1 Project Location 1-2 Aerial 1-3 Existing Conditions 1-4 Conceptual Site Plan 1-5a Rendering 1-5b Rendering 1-5c Rendering 1-6a Apartment Building 1-6b Apartment Building 1-6c Apartment Building 1-7a Flats 1-7b Flats 1-8a Villas 1-8b Villas 1-8c Villas 1-9a Clubhouse 1-9b Clubhouse 1-9c Clubhouse 1-10 Townhouses 1-11a Recreational Amenities 1-11b Recreational Amenities 1-11c Recreational Amenities 1-12a Landscaping Plan 800 East Main Street Redevelopment 07/10/2024 TOC-14 DRAFT 1-12b Landscaping Plan 1-12c Landscaping Plan 1-12d Landscaping Plan 1-12e Landscaping Plan 1-12f Landscaping Plan 1-13a Lighting Plan 1-13b Lighting Plan 1-14 Grading Plan 2-1 Project Location 2-2 Aerial 2-3 Land Use 2-4 Zoning 3-1a Key to Photographs 3-1b Project Site Photographs 3-1c Project Site Photographs 3-1d Project Site Photographs 3-1e Project Site Photographs 3-1f Project Site Photographs 3-1g Project Site Photographs 3-2a Key to Surrounding Area Photographs 3-2b Surrounding Area Photographs 3-2c Surrounding Area Photographs 3-2d Surrounding Area Photographs 3-2e Surrounding Area Photographs 3-3a Photo Simulations 3-3b Photo Simulations 3-3c Photo Simulations 3-3d Photo Simulations 3-3e Photo Simulations 3-3f Photo Simulations 3-3g Photo Simulations 3-4a Line-of-Sight Sectional Diagram 3-4b Line-of-Sight Sectional Diagram 3-4c Line-of-Sight Sectional Diagram 3-4d Line-of-Sight Sectional Diagram 3-4e Line-of-Sight Sectional Diagram 3-4f Line-of-Sight Sectional Diagram 3-4g Line-of-Sight Sectional Diagram 4-1 Areas of Archeaological Sensitivity 4-2 Location of Historic Resources 4-3 Hyatt House Photos: Septemer 2023 4-4 Taconic State Parkway Photograph: September 2023 Table of Contents DRAFT TOC-15 07/10/2024 4-5 Taconic State Parkway Photographs: March 2023 4-6 Proposed Project: View Northeast from the Taconic State Parkway 4-7 Proposed Project: View East from the Taconic State Parkway 5-1 NYCS Soils 5-2 Topography 5-3 Surficial Geology 5-4 Bedrock Geology 6-1 FEMA Effective FIRM 2007 6-2 Ecological Communities 6-3 Key to Photographs 6-4a Photographs 6-4b Photographs 6-4c Photographs 6-4d Photographs 6-4e Photographs 6-4f Photographs 12-1 Study Area 12-2 Existing Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-3 No Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-4 Trip Distribution Percentages Entering/Exiting 12-5 Project-Generated Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-6 With Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-7a Alternative Options Layout Plan 12-7b Potential Sidewalk Layout 12-7c Alternate 1 Profile 12-7d Alternate 2 Profile 12-8 Preliminary Traffic Improvement Plan 14-1 Noise Measurement Locations 17-1 Existing Zoning Alternative – Conceptual Site Plan 17-2 Existing Zoning Alternative – Sectional Diagram 17-3 Alternative Site Layout – Conceptual Site Plan 17-4a Multi-Family Buildings – Elevations 17-4b Multi-Family Buildings – Elevations 17-4c Multi-Family Buildings – Elevations 17-5 Multi-Family Buildings – Section 17-6a Multi-Family Buildings – Floorplans 17-6b Multi-Family Buildings – Floorplans 17-6c Multi-Family Buildings – Floorplans 17-7a Cottages – Elevations 17-7b Cottages – Elevations 17-8 Cottages – Floorplans 17-9a Multi-Family Buildings – Renderings 800 East Main Street Redevelopment 07/10/2024 TOC-16 DRAFT 17-9b Multi-Family Buildings – Renderings 17-10a Photo Simulations – Alternative Site Layout 17-10b Photo Simulations – Alternative Site Layout 17-10c Photo Simulations – Alternative Site Layout 17-10d Photo Simulations – Alternative Site Layout 17-10e Photo Simulations – Alternative Site Layout 17-10f Photo Simulations – Alternative Site Layout 17-10g Photo Simulations – Alternative Site Layout 17-11 Alternative Site Layout – Sectional Diagram 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-13a Alternative Site Layout – Lighting Plan 17-13b Alternative Site Layout – Lighting Plan 17-14 Alternative Site Layout Project-Generated Weekday AM/ Weekday PM/ Saturday Midday Peak Hour Volumes 17-15 Alternative Site Layout With Action Condition Weekday AM/ Weekday PM/ Saturday Midday Peak Hour Volumes 17-16 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan 17-17 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan Table of Contents DRAFT TOC-17 07/10/2024 List of Appendices Appendix A: SEQRA Documents A-1: Adopted Draft Environmental Impact Statement (DEIS) Scope of Work A-2: Zoning Petition Appendix B: Cultural Resources Appendix C: Ecological Resources Appendix D: Town Correspondence Appendix E: Stormwater Pollution Prevention Plan (SWPPP) Appendix F: Energy Appendix G: Traffic G-1: Traffic Count Data G-2: 2023 Existing Condition Synchro Reports G-3: NYSDOT Crash Data G-4: East Main Street and US Route 6 Crash Diagram G-5: 2026 No Action Condition Synchro Reports G-6: Trip Generation G-7: 2026 With Action Condition Synchro Reports G-8: 2026 With Action With Mitigation Condition Synchro Reports G-9: 2026 With Action Alternative Condition Synchro Reports G-10: 2026 With Action With Mitigation Alternative Condition Synchro Reports Appendix H: Alternative Site Layout – Synchro 11 Outputs Appendix I: Site Plans 