HomeMy WebLinkAbout00_Cover & Table of Contents800 East Main Street
preliminary Draft Environmental Impact Statement (pDEIS)
Lead Agency:
Town of Yorktown Town Board
Town Hall
363 Underhill Avenue
Yorktown Heights, New York 10598
Contact:
John A. Tegeder, Director of Planning
914-962-6565
Submission Date: July 10, 2024
Date Accepted: TBD
Public Hearing: TBD
DEIS Comments due by: 10 days after
the close of the public hearing
Prepared by:
AKRF, Inc.
34 South Broadway
White Plains, New York 10601
Town of Yorktown
800 East Main Street Redevelopment
preliminary Draft Environmental Impact Statement (pDEIS)
JULY 10, 2024
Lead Agency: Town of Yorktown Town Board
Town Hall
363 Underhill Avenue
Yorktown Heights, New York 10598
Contact: John A. Tegeder, Director of Planning
914-962-6565
SEQRA Classification: Type I Action
Project Location: 800 East Main Street, Yorktown, New York, 10588
Tax Map: 5.19-1-15
Applicant/Petitioner: 800 East Main Street Dev AMS LLC
Contact: Ryan Sutherland, AIA
Phone: 212-695-7585
Prepared by: AKRF, Inc.
34 South Broadway
White Plains, New York 10601
Contact: Peter Feroe, AICP
Phone: 914-922-2350
DEIS Acceptance Date:
DEIS Public Hearing:
DEIS Comments Accepted Through*:
* Written comments on the DEIS will be accepted until the close of business on, or 10 days following the
close of the public hearing, whichever is later. The comment period may be extended at the discretion of the
Lead Agency.
Written comments may be submitted to the Lead Agency via:
USPS:
Lead Agency, as above
E-mail:
____@_____
This document is the preliminary Draft Environmental Impact Statement for the 800 East Main
Street Redevelopment. Copies of the accepted DEIS will be available for review at the office of
the Lead Agency, on the internet [URL], and at the [Yorktown Public Library].
DEIS Preparer: AKRF, Inc.
34 South Broadway, Suite 300
White Plains, New York, 10601
Legal Counsel: DelBello Donnellan Weingarten Wise & Wiederkehr, LLP
1 North Lexington Avenue
White Plains, New York 10601
Architect: Perkins Eastman
422 Summer Street
Stamford, Connecticut 06901
Site/Civil Engineer: Site Design Consultants
251-F Underhill Ave
Yorktown Heights, New York 1059i2
Electrical/Water Engineer: Stantec
30 Oak Street
Stamford, Connecticut 06905
Surveyor: Dynamic Survey
1904 Main Street
Lake Cuomo, New Jersey 07719
Landscape Architect: A2 Land Consulting, PLLC
30 Rocky Hill Road
New Fairfield, Connecticut 06812
This DEIS will be sent to the following Involved and Interested Agencies:
Involved Agencies
Town of Yorktown Town Board, Lead Agency
Town of Yorktown Planning Board
New York State Department of Transportation
New York State Department of Environmental Conservation, Region 3
Westchester County Department of Health
Interested Agencies
Town of Yorktown Water Department
Town of Yorktown Advisory Board on Architecture and Community Appearance
Town of Yorktown Conservation Board
Town of Yorktown Tree Conservation Advisory Commission
Town of Yorktown Advisory Committee on Open Space
Town of Yorktown Police Department
Lake Mohegan Fire Department
Lake Mohegan Volunteer Ambulance Corps Westchester County Department of Planning
Putnam County Department of Planning
Town of Putnam Valley
NYS Office of Parks, Recreation and Historic Preservation
Others
The Environmental Notice Bulletin (ENB), enb@gw.dec.state.ny.us
DRAFT TOC-1 07/10/2024
Table of Contents
Executive Summary .................................................................................................................. S-1
Chapter 1: Project Description ................................................................................................ 1-1
A. Introduction .................................................................................................................... 1-1
B. Project Description ........................................................................................................ 1-2
Project Site and Surrounding Area ........................................................................ 1-2
Proposed Project.................................................................................................... 1-3
Proposed Zoning Amendments ............................................................................. 1-6
C. Project Purpose and Need .............................................................................................. 1-7
D. Reviews and Approvals Required .................................................................................. 1-8
Chapter 2: Land Use, Zoning, and Public Policy ................................................................... 2-1
A. Introduction and Summary of Findings ......................................................................... 2-1
B. Land Use ........................................................................................................................ 2-1
Existing Conditions ............................................................................................... 2-1
The Future without the Proposed Project .............................................................. 2-3
The Future with the Proposed Project (the “Build Condition”) ............................ 2-4
Mitigation .............................................................................................................. 2-5
C. Zoning ............................................................................................................................ 2-5
Existing Conditions ............................................................................................... 2-5
The Future without the Proposed Project .............................................................. 2-8
The Future with the Proposed Project ................................................................... 2-8
Mitigation .............................................................................................................. 2-8
D. Public Policy .................................................................................................................. 2-9
Existing Conditions ............................................................................................... 2-9
The Future without the Proposed Project ............................................................ 2-13
The Future with the Proposed Project ................................................................. 2-13
Mitigation ............................................................................................................ 2-15
Chapter 3: Visual and Community Character ....................................................................... 3-1
A. Introduction and Summary of Findings ......................................................................... 3-1
B. Existing Conditions ........................................................................................................ 3-1
Visual Character of the Project Site ...................................................................... 3-1
Visual Character of the Surrounding Areas .......................................................... 3-2
Views of the Project Site and Existing Buildings from the Surrounding Area ..... 3-3
C. The Future without the Proposed Project ....................................................................... 3-4
D. The Future with the Proposed Project ............................................................................ 3-4
800 East Main Street Redevelopment
07/10/2024 TOC-2 DRAFT
Visual and Community Character of the Project Site ............................................ 3-4
Views of the Project Site and Proposed Buildings from Vantage Points .............. 3-6
E. Mitigation ....................................................................................................................... 3-8
Chapter 4: Cultural Resources ................................................................................................ 4-1
A. Introduction and Summary of Findings .......................................................................... 4-1
B. Archaeological Resources .............................................................................................. 4-1
Existing Conditions ............................................................................................... 4-1
The Future without the Proposed Project .............................................................. 4-3
The Future with the Proposed Project ................................................................... 4-3
Mitigation .............................................................................................................. 4-3
C. Historic Resources .......................................................................................................... 4-3
Existing Conditions ............................................................................................... 4-3
The Future without the Proposed Project .............................................................. 4-4
The Future with the Proposed Project ................................................................... 4-4
Mitigation .............................................................................................................. 4-5
Chapter 5: Geology, Soils, and Topography ........................................................................... 5-1
A. Introduction and Summary of Findings .......................................................................... 5-1
B. Existing Conditions ........................................................................................................ 5-1
Soils ....................................................................................................................... 5-1
Topography ............................................................................................................ 5-2
Geology ................................................................................................................. 5-2
C. The Future with the Proposed Project ............................................................................ 5-3
D. Mitigation Measures ....................................................................................................... 5-4
Chapter 6: Ecological Resources .............................................................................................. 6-1
A. Introduction and Summary of Findings .......................................................................... 6-1
Summary of Findings ............................................................................................ 6-1
B. Existing Conditions ........................................................................................................ 6-2
Groundwater .......................................................................................................... 6-2
Floodplains ............................................................................................................ 6-3
Wetlands and Surface Water Resources ................................................................ 6-3
Terrestrial Resources ............................................................................................. 6-4
Threatened, Endangered, and Special Concern Species and Significant Natural
Communities ..................................................................................................................... 6-11
C. The Future without the Proposed Project ..................................................................... 6-15
D. The Future with the Proposed Project .......................................................................... 6-16
Groundwater ........................................................................................................ 6-16
Floodplains .......................................................................................................... 6-16
Wetlands and Surface Water Resources .............................................................. 6-16
Terrestrial Resources ........................................................................................... 6-16
Threatened, Endangered, and Special Concern Species and Significant Natural
Communities ..................................................................................................................... 6-19
Table of Contents
DRAFT TOC-3 07/10/2024
E. Mitigation Measures .................................................................................................... 6-21
F. References .................................................................................................................... 6-22
Chapter 7: Socioeconomic and Fiscal Impacts ....................................................................... 7-1
A. Introduction and Summary of Findings ......................................................................... 7-1
B. Existing Conditions ........................................................................................................ 7-1
Demographic Conditions and Trends .................................................................... 7-1
Housing Stock, Tenure and Trends ....................................................................... 7-3
Town’s and Westchester County’s Affordable Housing Goals and Policies ........ 7-6
Employment .......................................................................................................... 7-7
Fiscal Conditions ................................................................................................... 7-9
C. The Future without the Proposed Project ..................................................................... 7-10
D. The Future with the Proposed Project .......................................................................... 7-10
Economic & Fiscal Benefits of Proposed Project (IMPLAN) ............................ 7-10
Municipal Fiscal Impact Assessment .................................................................. 7-14
Impact to Town’s Population and Demographics ............................................... 7-15
E. Mitigation Measures .................................................................................................... 7-15
Chapter 8: Community Facilities ............................................................................................ 8-1
A. Introduction and Summary of Findings ......................................................................... 8-1
B. Police ............................................................................................................................. 8-1
Existing and Potential Future Conditions without the Proposed Project .............. 8-1
The Future with the Proposed Project ................................................................... 8-3
Mitigation Measures .............................................................................................. 8-4
C. Fire ................................................................................................................................. 8-4
Existing and Potential Future Conditions with the Proposed Project.................... 8-4
The Future with the Proposed Project ................................................................... 8-5
Mitigation Measures .............................................................................................. 8-6
D. Emergency Medical Services ......................................................................................... 8-6
Existing and Future Conditions without the Proposed Project .............................. 8-6
The Future with the Proposed Project ................................................................... 8-6
Mitigation Measures .............................................................................................. 8-7
E. Parks, Recreation and Open Space ................................................................................ 8-7
Existing Conditions ............................................................................................... 8-7
The Future without the Proposed Project .............................................................. 8-8
The Future with the Proposed Project ................................................................... 8-8
Mitigation Measures .............................................................................................. 8-9
F. Solid Waste and Recycling ............................................................................................ 8-9
Existing Conditions ............................................................................................... 8-9
The Future without the Proposed Project .............................................................. 8-9
The Future with the Proposed Project ................................................................. 8-10
Mitigation Measures ............................................................................................ 8-10
800 East Main Street Redevelopment
07/10/2024 TOC-4 DRAFT
Chapter 9: Water and Wastewater .......................................................................................... 9-1
A. Introduction and Summary of Findings .......................................................................... 9-1
B. Existing Conditions ........................................................................................................ 9-1
B.1. Water Supply ......................................................................................................... 9-1
B.2. Sanitary Sewage .................................................................................................... 9-1
C. The Future without the Proposed Project ....................................................................... 9-2
D. The Future with the Proposed Project ............................................................................ 9-2
D.1. Water Supply ......................................................................................................... 9-2
D.2. Sanitary Sewage .................................................................................................... 9-2
E. Mitigation Measures ....................................................................................................... 9-3
E.1. Water Supply ......................................................................................................... 9-3
E.2. Sanitary Sewage .................................................................................................... 9-3
Chapter 10: Stormwater Management .................................................................................. 10-1
A. Introduction and Summary of Findings ........................................................................ 10-1
B. Existing Conditions ...................................................................................................... 10-1
Watershed and Drainage Patterns ........................................................................ 10-1
Existing Drainage Areas ...................................................................................... 10-2
C. The Future without the Proposed Project ..................................................................... 10-3
D. The Future with the Proposed Project .......................................................................... 10-3
Proposed Drainage Areas .................................................................................... 10-3
Post-Development Conditions ............................................................................. 10-4
E. Mitigation Measures ..................................................................................................... 10-5
Chapter 11: Use and Conservation of Energy ...................................................................... 11-1
A. Introduction and Summary of Findings ........................................................................ 11-1
B. Existing Conditions ...................................................................................................... 11-1
C. The Future without the Proposed Project ..................................................................... 11-1
D. The Future with the Proposed Project .......................................................................... 11-1
E. Mitigation Measures ..................................................................................................... 11-2
Chapter 12: Traffic and Transportation ............................................................................... 12-1
A. Introduction and Summary of Findings ........................................................................ 12-1
B. Capacity Analysis Methodology .................................................................................. 12-1
B.1. Signalized Intersections ....................................................................................... 12-1
B.2. Unsignalized Intersections ................................................................................... 12-3
C. 2023 Existing Conditions ............................................................................................. 12-3
C.1. Roadway Characteristics ..................................................................................... 12-4
C.2. Intersection Level of Service Conditions ............................................................ 12-6
C.3. Pedestrian and Bicycle Conditions ...................................................................... 12-6
C.4. Public Transportation .......................................................................................... 12-6
D. Crash History and Safety Assessment .......................................................................... 12-7
D.1. Intersection Crashes ............................................................................................. 12-7
E. No Action Condition .................................................................................................. 12-16
Table of Contents
DRAFT TOC-5 07/10/2024
E.1. Intersection Level of Service Conditions .......................................................... 12-17
E.2. Pedestrian and Bicycle Conditions .................................................................... 12-17
E.3. Public Transportation ........................................................................................ 12-17
F. With Action Condition ............................................................................................... 12-18
F.1. Project Description ............................................................................................ 12-18
F.2. Project Trip Generation ..................................................................................... 12-18
F.3. Project Trip Distribution and Assessment ......................................................... 12-18
F.4. Intersection Level of Service Conditions .......................................................... 12-19
F.5. Parking Conditions ............................................................................................ 12-19
F.6. Pedestrian and Bicycle Conditions .................................................................... 12-19
F.7. Public Transportation ........................................................................................ 12-19
F.8. Delivery and Service Vehicle Access ............................................................... 12-20
F.9. Alternative Site Access ..................................................................................... 12-20
G. Traffic Mitigation ...................................................................................................... 12-21
Chapter 13: Air Quality ......................................................................................................... 13-1
A. Introduction and Summary of Findings ....................................................................... 13-1
Summary of Findings .......................................................................................... 13-1
B. Existing Conditions ...................................................................................................... 13-1
C. The Future without the Proposed Project ..................................................................... 13-2
D. The Future with the Proposed Project .......................................................................... 13-2
Stationary Source Analysis ................................................................................. 13-2
Mobile Source Analysis ...................................................................................... 13-4
E. Mitigation Measures .................................................................................................... 13-5
Chapter 14: Noise .................................................................................................................... 14-1
A. Introduction and Summary of Findings ....................................................................... 14-1
B. Noise Fundamentals ..................................................................................................... 14-1
“A”-Weighted Sound Level (dBA) ..................................................................... 14-1
Noise Descriptors Used in Impact Assessment ................................................... 14-2
Noise Standards and Impact Criteria ................................................................... 14-3
Proposed Project Impact Criteria ........................................................................ 14-4
C. Methodology ................................................................................................................ 14-4
D. Existing Conditions ...................................................................................................... 14-4
Selection of Noise Receptor Locations ............................................................... 14-4
Noise Monitoring ................................................................................................ 14-5
Equipment Used During Noise Monitoring ........................................................ 14-5
Existing Noise Levels at Noise Receptor Locations ........................................... 14-5
E. The Future without the Proposed Project ..................................................................... 14-6
F. The Future with the Proposed Project .......................................................................... 14-6
Mobile Sources of Noise (Traffic) ...................................................................... 14-6
Stationary Sources of Noise ................................................................................ 14-7
Noise Exposure at Proposed Uses ....................................................................... 14-7
800 East Main Street Redevelopment
07/10/2024 TOC-6 DRAFT
G. Mitigation Measures ..................................................................................................... 14-7
Chapter 15: Hazardous Materials ......................................................................................... 15-1
A. Introduction and Summary of Findings ........................................................................ 15-1
B. Existing Conditions ...................................................................................................... 15-1
Phase I Environmental Site Assessment .............................................................. 15-1
Confirmation Assessment .................................................................................... 15-2
Updated WCDOH Petroleum Bulk Storage Registry .......................................... 15-3
Potential of Buildings to Contain Hazardous Materials ...................................... 15-3
C. The Future without the Proposed Project .................................................................... 15-4
D. The Future with the Proposed Project .......................................................................... 15-4
E. Mitigation Measures ..................................................................................................... 15-5
Chapter 16: Construction ....................................................................................................... 16-1
A. Introduction and Summary of Findings ........................................................................ 16-1
B. Construction Schedule .................................................................................................. 16-2
Stage 1: Perimeter Fencing and Tree Clearing .................................................... 16-2
Stage 2: Mobilization, Earthwork, and Site Utilities ........................................... 16-2
Stage 3: Foundations and Site Stabilization ........................................................ 16-2
Stage 4: Building Framing and MEP Rough-in ................................................... 16-2
Stage 5: Interior Finishes ..................................................................................... 16-2
Stage 6: Site Work, Landscaping and Occupancy ............................................... 16-3
C. Construction Period Impacts and Mitigation ................................................................ 16-3
Erosion and Sediment Control ............................................................................. 16-3
Traffic and Transportation ................................................................................... 16-4
Air Quality ........................................................................................................... 16-5
Noise .................................................................................................................... 16-5
Blasting and Subsurface Investigations ............................................................... 16-7
Chapter 17: Alternatives......................................................................................................... 17-1
A. Introduction .................................................................................................................. 17-1
B. Alternative 1: No Action – Existing Site Conditions and Re-Occupancy of Office
Buildings ............................................................................................................................... 17-1
Description of Alternative ................................................................................... 17-1
Potential Impacts of Alternative .......................................................................... 17-2
C. Alternative 2: Development Under Existing OB District Zoning ................................ 17-4
Description of Alternative ................................................................................... 17-4
Potential Impacts ................................................................................................. 17-5
D. Alternative 3: Non-Age-Restricted Development ........................................................ 17-8
Description of Alternative ................................................................................... 17-8
Potential Impacts ................................................................................................. 17-8
E. Alternative 4: Alternative Site Layout ....................................................................... 17-12
Description of Alternative ................................................................................. 17-13
Land Use, Zoning, and Public Policy ................................................................ 17-13
Table of Contents
DRAFT TOC-7 07/10/2024
Visual and Community Character ..................................................................... 17-16
Cultural Resources ............................................................................................ 17-20
Geology, Soils, and Topography ....................................................................... 17-21
Ecological Resources ........................................................................................ 17-22
Socioeconomic and Fiscal Impacts ................................................................... 17-24
Community Facilities ........................................................................................ 17-28
Water and Wastewater ...................................................................................... 17-30
Stormwater Management .................................................................................. 17-31
Use and Conservation of Energy ....................................................................... 17-33
Traffic and Transportation ................................................................................ 17-34
Air Quality ........................................................................................................ 17-36
Noise ................................................................................................................. 17-37
Hazardous Materials .......................................................................................... 17-38
Construction ...................................................................................................... 17-38
F. Alternative 5: Development under Existing RSP-2 District Regulations .................. 17-38
Description of Alternative ................................................................................. 17-38
Potential Impacts with Reduced Program ......................................................... 17-39
Potential Impacts of Increased Footprint .......................................................... 17-40
Chapter 18: Cumulative Impacts of Proposed Zoning Text Change ................................. 18-1
Chapter 19: Mitigation ........................................................................................................... 19-1
A. Ecological Resources ................................................................................................... 19-1
B. Traffic and Transportation ........................................................................................... 19-2
Chapter 20: Sustainability ..................................................................................................... 20-1
Chapter 21: Growth-Inducing Aspects ................................................................................. 21-1
Chapter 22: Irreversible and Irretrievable Commitment of Resources ............................ 22-1
Chapter 23: Unavoidable Adverse Impacts .......................................................................... 23-1
800 East Main Street Redevelopment
07/10/2024 TOC-8 DRAFT
List of Tables
S-1 Proposed Project Buildings and Parking............................................................................... S-3
S-2 Existing and Proposed Building and Impervious Surface Coverage .................................. S-12
S-3 Projected Annual Property Tax Revenues for Proposed Project ........................................ S-15
S-4 Estimated Water/Sanitary Generation ................................................................................ S-16
S-5 Existing Zoning Alternative – Land Cover ......................................................................... S-27
S-6 Projected Annual Property Tax Revenues for Alternative Site Layout .............................. S-32
S-7 Design Point 1 – Proposed Peak Runoff Rates ................................................................... S-33
S-8 Design Point 2 – Proposed Peak Runoff Rates ................................................................... S-33
S-9 Increased Footprint Option – Slope Disturbance ................................................................ S-36
S-10 Alternatives Impact Comparison ...................................................................................... S-37
1-1 Proposed Project Buildings and Parking ............................................................................... 1-3
1-2 Proposed Zoning Amendments ............................................................................................. 1-6
5-1 Study Area Soils ................................................................................................................... 5-2
5-2 Existing Slopes within the Project Site (Surveyed Area) ...................................................... 5-2
5-3 Existing and Proposed Building and Impervious Surface Coverage .................................... 5-3
6-1 Vegetation Observed in the Ecological Resources Study Area ............................................ 6-5
6-2 Birds Documented During the NYSDEC 2000–2005 Second Breeding Bird Atlas (Block
5957a) and the NYSDEC 2020–2024 Third Breeding Bird Atlas (Mohegan Lake NW and
CW Blocks) ......................................................................................................................... 6-8
6-3 NYS Reptiles and Amphibians (Herp) Atlas (1990–1999) for the Mohegan Lake
USGSQuadrangle .............................................................................................................. 6-10
6-4 Inventory of Federally and State-Listed Species That May Occur Within the Ecological
Resources Study Area ....................................................................................................... 6-11
6-5 Land Use Impacts ............................................................................................................... 6-17
6-6 Proposed Project – Tree Removal Quantities ..................................................................... 6-18
7-1 Residential Population Trends (2010–2020) ......................................................................... 7-2
7-2 Age of Population (2021) ...................................................................................................... 7-2
7-3 Racial Demographics (2021) ................................................................................................ 7-3
Table of Contents
DRAFT TOC-9 07/10/2024
7-4 Household Income Characteristics (2010 and 2021) ............................................................ 7-3
7-5 Household Income Distribution ............................................................................................ 7-3
7-6 Housing Units ....................................................................................................................... 7-4
7-7 Percent of Housing Units by Structure Size ......................................................................... 7-4
7-8 Vacancy Rates ...................................................................................................................... 7-4
7-9 Median House Value for Owner-Occupied Units (2021) ..................................................... 7-5
7-10 House Value for Owner-Occupied Units (2021) ................................................................ 7-5
7-11 Year Householder Moved Into Unit ................................................................................... 7-6
7-12 Year Housing Unit Built ..................................................................................................... 7-6
7-13 Top Employment Sectors for Yorktown Residents (Primary Jobs) (2021) ........................ 7-7
7-14 Top Places Where Yorktown Residents Work (2021)........................................................ 7-8
7-15 Top Employment Sectors in Yorktown (2021) .................................................................. 7-9
7-16 2023 Annual Property Tax Revenues ............................................................................... 7-10
7-17 Estimated Annual Operational Benefits ........................................................................... 7-13
7-18 Projected Annual Property Tax Revenues for Proposed Project ...................................... 7-14
8-1 Police Department Calls for Service (2018 to 2023) ............................................................ 8-2
8-2 Proposed Project – Resident Population Projections ............................................................ 8-3
8-3 Proposed Project – Projected Police Service Level .............................................................. 8-4
9-1 Estimated Water/Sanitary Generation .................................................................................. 9-2
10-1 24-Hour Rainfall Amounts ............................................................................................... 10-3
10-2 Summary of Existing Peak Rates of Runoff ..................................................................... 10-3
10-3 Design Point 1 – Proposed Peak Runoff Rates ................................................................. 10-5
10-4 Design Point 2 – Proposed Peak Runoff Rates ................................................................. 10-5
10-5 Water Quality Analysis .................................................................................................... 10-5
12-1 Summary of Project-Related Traffic Impacts ................................................................... 12-1
12-2 LOS Criteria for Signalized Intersections ......................................................................... 12-3
12-3 LOS Criteria for Unsignalized Intersections .................................................................... 12-3
12-4 2023 Existing Conditions Level of Service Analysis ..................................................... 12-23
12-5 Crash Summary ................................................................................................................ 12-7
12-6 Barger Street and U.S. Route 6 Crash Types .................................................................... 12-8
12-7 Taconic Southbound Ramp and U.S. Route 6 Crash Types ............................................. 12-9
12-8 Taconic Northbound Ramp and U.S. Route 6 Crash Types ........................................... 12-10
12-9 East Main Street and U.S. Route 6 Crash Types ............................................................ 12-11
800 East Main Street Redevelopment
07/10/2024 TOC-10 DRAFT
12-10 Lee Boulevard and U.S. Route 6 Crash Types .............................................................. 12-12
12-11 Lee Road and East Main Street Crash Types ................................................................ 12-13
12-12 Hill Boulevard and U.S. Route 6 Crash Types ............................................................. 12-14
12-13 Hill Boulevard and East Main Street Crash Types ....................................................... 12-15
12-14 Indian Hill Road and East Main Street Crash Types .................................................... 12-15
12-15 Old Jefferson Valley Road and East Main Street Crash Types ..................................... 12-16
12-16 2026 No Action Conditions LOS Analysis ................................................................... 12-25
12-17 Trip Generation Summary ............................................................................................ 12-18
12-18 2026 No Action and 2026 With Action Conditions LOSAnalysis ............................... 12-27
12-19 Proposed Mitigation Measures ...................................................................................... 12-21
12-20 2026 No Action, 2026 With Action, and 2026 Mitigation Conditions LOS Analysis .... 12-29
13-1 Representative Monitored Ambient Air Quality Data ...................................................... 13-2
14-1 Common Noise Levels ...................................................................................................... 14-2
14-2 Noise Measurement Locations .......................................................................................... 14-5
14-3 Existing Noise Levels (in dBA) ........................................................................................ 14-6
14-4 Future Noise Levels without the Proposed Project (in dBA) ............................................ 14-6
14-5 Future Noise Levels with the Proposed Project (in dBA) ................................................. 14-7
16-1 Typical Noise Emission Levels for Construction Equipment ........................................... 16-6
17-1 Re-Occupancy Alternative – Trip Generation Summary .................................................. 17-4
17-2 Compliance ofExisting Zoning Alternative with OB District Regulations ....................... 17-5
17-3 Existing Zoning Alternative – Slope Disturbance ............................................................ 17-6
17-4 Existing Zoning Alternative – Land Cover ....................................................................... 17-6
17-5 Existing Zoning Alternative – Trip Generation Summary ................................................ 17-8
17-6 Zoning Compliance of Non-Age-Restricted Alternative with R-3 District Regulations ..... 17-9
17-7 Non-Age-Restricted Alternative – Resident Population ................................................. 17-10
17-8 Non-Age-Restricted Alternative – Public School Aged Children .................................. 17-11
17-9 Non-Age-Restricted Alternative – Trip Generation Summary ....................................... 17-12
17-10 Compliance OF Alternative Site Layout with Existing RSP-2 District Regulations .... 17-15
17-11 Alternative Site Layout – Slope Disturbance ................................................................ 17-22
17-12 Alternative Site Layout – Tree Removal Quantities ..................................................... 17-23
17-13 Alternative Site Layout – Land Use Impacts ................................................................ 17-23
17-14 Estimated Construction Benefits ................................................................................... 17-25
17-15 Estimated Annual Operational Benefits ........................................................................ 17-26
Table of Contents
DRAFT TOC-11 07/10/2024
17-16 Annual Economic Benefits of Resident Spending ........................................................ 17-27
17-17 Projected Annual Property Tax Revenues for Alternative Site Layout ........................ 17-28
17-18 Alternative Site Layout – Resident Population Projections .......................................... 17-29
17-19 Alternative Site Layout – Projected Police Service Level ............................................ 17-29
17-20 Estimated Water/Sanitary Generation .......................................................................... 17-31
17-21 Design Point 1 – Proposed Peak Runoff Rates ............................................................. 17-32
17-22 Design Point 2 – Proposed Peak Runoff Rates ............................................................. 17-32
17-23 Alternative Site Layout – Energy Loads ...................................................................... 17-34
17-24 Alternative Site Layout – Trip Generation Summary ................................................... 17-35
17-27 Reduced Program Option – Trip Generation Summary ............................................... 17-40
17-28 Increased Footprint Option – Slope Disturbance .......................................................... 17-41
17-A Alternatives Impact Comparison ................................................................................... 17-42
17-25 2026 No Action AND 2026 Alternative Site Layout With Action Conditions Level of
Service Analysis ............................................................................................................. 17-46
17-26 2026 No Action, 2026 Alternative Site Layout With Action, and 2026 Alternative Site
Layout Mitigation Conditions Level of Service Analysis .............................................. 17-48
800 East Main Street Redevelopment
07/10/2024 TOC-12 DRAFT
List of Figures
Note: Figures appear after chapter text.
S-1 Project Location
S-2 Aerial
S-3 Existing Conditions
S-4 Conceptual Site Plan
S-5a Rendering
S-5b Rendering
S-5c Rendering
S-6a Recreational Amenities
S-6b Recreational Amenities
S-6c Recreational Amenities
S-7a Landscaping Plan
S-7b Landscaping Plan
S-7c Landscaping Plan
S-7d Landscaping Plan
S-7e Landscaping Plan
S-7f Landscaping Plan
S-8a Lighting Plan
S-8b Lighting Plan
S-9 Grading Plan
S-10 Project Location
S-11 Aerial
S-12 Land Use
S-13a Photo Simulations
S-13b Photo Simulations
S-13c Photo Simulations
S-13d Photo Simulations
S-13e Photo Simulations
S-13f Photo Simulations
S-13g Photo Simulations
S-14 Photo Simulations
S-15 Areas of Archeaological Sensitivity
S-16 Location of Historic Resources
S-17 Taconic State Parkway Photograph: September 2023
Table of Contents
DRAFT TOC-13 07/10/2024
S-18 Taconic State Parkway Photographs: March 2023
S-19 Proposed Project: View Northeast from the Taconic State Parkway
S-20 Proposed Project: View East from the Taconic State Parkway
S-21 Study Area
S-22 Preliminary Traffic Improvement Plan
S-23a Alternative Options Layout Plan
S-23b Potential Sidewalk Layout
S-23c Alternate 1 Profile
S-23d Alternate 2 Profile
S-24 Existing Zoning Alternative – Conceptual Site Plan
S-25 Existing Zoning Alternative – Sectional Diagram
S-26 Alternative Site Layout – Conceptual Site Plan
S-27a Multi-Family Buildings – Elevations
S-27b Multi-Family Buildings – Elevations
S-27c Multi-Family Buildings – Elevations
S-28 Multi-Family Buildings – Section
S-29 Photo Simulations – Alternative Site Layout
S-30 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan
S-31 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan
1-1 Project Location
1-2 Aerial
1-3 Existing Conditions
1-4 Conceptual Site Plan
1-5a Rendering
1-5b Rendering
1-5c Rendering
1-6a Apartment Building
1-6b Apartment Building
1-6c Apartment Building
1-7a Flats
1-7b Flats
1-8a Villas
1-8b Villas
1-8c Villas
1-9a Clubhouse
1-9b Clubhouse
1-9c Clubhouse
1-10 Townhouses
1-11a Recreational Amenities
1-11b Recreational Amenities
1-11c Recreational Amenities
1-12a Landscaping Plan
800 East Main Street Redevelopment
07/10/2024 TOC-14 DRAFT
1-12b Landscaping Plan
1-12c Landscaping Plan
1-12d Landscaping Plan
1-12e Landscaping Plan
1-12f Landscaping Plan
1-13a Lighting Plan
1-13b Lighting Plan
1-14 Grading Plan
2-1 Project Location
2-2 Aerial
2-3 Land Use
2-4 Zoning
3-1a Key to Photographs
3-1b Project Site Photographs
3-1c Project Site Photographs
3-1d Project Site Photographs
3-1e Project Site Photographs
3-1f Project Site Photographs
3-1g Project Site Photographs
3-2a Key to Surrounding Area Photographs
3-2b Surrounding Area Photographs
3-2c Surrounding Area Photographs
3-2d Surrounding Area Photographs
3-2e Surrounding Area Photographs
3-3a Photo Simulations
3-3b Photo Simulations
3-3c Photo Simulations
3-3d Photo Simulations
3-3e Photo Simulations
3-3f Photo Simulations
3-3g Photo Simulations
3-4a Line-of-Sight Sectional Diagram
3-4b Line-of-Sight Sectional Diagram
3-4c Line-of-Sight Sectional Diagram
3-4d Line-of-Sight Sectional Diagram
3-4e Line-of-Sight Sectional Diagram
3-4f Line-of-Sight Sectional Diagram
3-4g Line-of-Sight Sectional Diagram
4-1 Areas of Archeaological Sensitivity
4-2 Location of Historic Resources
4-3 Hyatt House Photos: Septemer 2023
4-4 Taconic State Parkway Photograph: September 2023
Table of Contents
DRAFT TOC-15 07/10/2024
4-5 Taconic State Parkway Photographs: March 2023
4-6 Proposed Project: View Northeast from the Taconic State Parkway
4-7 Proposed Project: View East from the Taconic State Parkway
5-1 NYCS Soils
5-2 Topography
5-3 Surficial Geology
5-4 Bedrock Geology
6-1 FEMA Effective FIRM 2007
6-2 Ecological Communities
6-3 Key to Photographs
6-4a Photographs
6-4b Photographs
6-4c Photographs
6-4d Photographs
6-4e Photographs
6-4f Photographs
12-1 Study Area
12-2 Existing Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-3 No Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-4 Trip Distribution Percentages Entering/Exiting
12-5 Project-Generated Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-6 With Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes
12-7a Alternative Options Layout Plan
12-7b Potential Sidewalk Layout
12-7c Alternate 1 Profile
12-7d Alternate 2 Profile
12-8 Preliminary Traffic Improvement Plan
14-1 Noise Measurement Locations
17-1 Existing Zoning Alternative – Conceptual Site Plan
17-2 Existing Zoning Alternative – Sectional Diagram
17-3 Alternative Site Layout – Conceptual Site Plan
17-4a Multi-Family Buildings – Elevations
17-4b Multi-Family Buildings – Elevations
17-4c Multi-Family Buildings – Elevations
17-5 Multi-Family Buildings – Section
17-6a Multi-Family Buildings – Floorplans
17-6b Multi-Family Buildings – Floorplans
17-6c Multi-Family Buildings – Floorplans
17-7a Cottages – Elevations
17-7b Cottages – Elevations
17-8 Cottages – Floorplans
17-9a Multi-Family Buildings – Renderings
800 East Main Street Redevelopment
07/10/2024 TOC-16 DRAFT
17-9b Multi-Family Buildings – Renderings
17-10a Photo Simulations – Alternative Site Layout
17-10b Photo Simulations – Alternative Site Layout
17-10c Photo Simulations – Alternative Site Layout
17-10d Photo Simulations – Alternative Site Layout
17-10e Photo Simulations – Alternative Site Layout
17-10f Photo Simulations – Alternative Site Layout
17-10g Photo Simulations – Alternative Site Layout
17-11 Alternative Site Layout – Sectional Diagram
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-12a Alternative Site Layout – Landscaping Plan
17-13a Alternative Site Layout – Lighting Plan
17-13b Alternative Site Layout – Lighting Plan
17-14 Alternative Site Layout Project-Generated Weekday AM/ Weekday PM/ Saturday
Midday Peak Hour Volumes
17-15 Alternative Site Layout With Action Condition Weekday AM/ Weekday PM/ Saturday
Midday Peak Hour Volumes
17-16 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan
17-17 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan
Table of Contents
DRAFT TOC-17 07/10/2024
List of Appendices
Appendix A: SEQRA Documents
A-1: Adopted Draft Environmental Impact Statement (DEIS) Scope of Work
A-2: Zoning Petition
Appendix B: Cultural Resources
Appendix C: Ecological Resources
Appendix D: Town Correspondence
Appendix E: Stormwater Pollution Prevention Plan (SWPPP)
Appendix F: Energy
Appendix G: Traffic
G-1: Traffic Count Data
G-2: 2023 Existing Condition Synchro Reports
G-3: NYSDOT Crash Data
G-4: East Main Street and US Route 6 Crash Diagram
G-5: 2026 No Action Condition Synchro Reports
G-6: Trip Generation
G-7: 2026 With Action Condition Synchro Reports
G-8: 2026 With Action With Mitigation Condition Synchro Reports
G-9: 2026 With Action Alternative Condition Synchro Reports
G-10: 2026 With Action With Mitigation Alternative Condition Synchro Reports
Appendix H: Alternative Site Layout – Synchro 11 Outputs
Appendix I: Site Plans