Loading...
HomeMy WebLinkAbout00_Cover & Table of Contents800 East Main Street preliminary Draft Environmental Impact Statement (pDEIS) Lead Agency: Town of Yorktown Town Board Town Hall 363 Underhill Avenue Yorktown Heights, New York 10598 Contact: John A. Tegeder, Director of Planning 914-962-6565 Submission Date: July 10, 2024 Date Accepted: TBD Public Hearing: TBD DEIS Comments due by: 10 days after the close of the public hearing Prepared by: AKRF, Inc. 34 South Broadway White Plains, New York 10601 Town of Yorktown 800 East Main Street Redevelopment preliminary Draft Environmental Impact Statement (pDEIS) JULY 10, 2024 Lead Agency: Town of Yorktown Town Board Town Hall 363 Underhill Avenue Yorktown Heights, New York 10598 Contact: John A. Tegeder, Director of Planning 914-962-6565 SEQRA Classification: Type I Action Project Location: 800 East Main Street, Yorktown, New York, 10588 Tax Map: 5.19-1-15 Applicant/Petitioner: 800 East Main Street Dev AMS LLC Contact: Ryan Sutherland, AIA Phone: 212-695-7585 Prepared by: AKRF, Inc. 34 South Broadway White Plains, New York 10601 Contact: Peter Feroe, AICP Phone: 914-922-2350 DEIS Acceptance Date: DEIS Public Hearing: DEIS Comments Accepted Through*: * Written comments on the DEIS will be accepted until the close of business on, or 10 days following the close of the public hearing, whichever is later. The comment period may be extended at the discretion of the Lead Agency. Written comments may be submitted to the Lead Agency via: USPS: Lead Agency, as above E-mail: ____@_____ This document is the preliminary Draft Environmental Impact Statement for the 800 East Main Street Redevelopment. Copies of the accepted DEIS will be available for review at the office of the Lead Agency, on the internet [URL], and at the [Yorktown Public Library]. DEIS Preparer: AKRF, Inc. 34 South Broadway, Suite 300 White Plains, New York, 10601 Legal Counsel: DelBello Donnellan Weingarten Wise & Wiederkehr, LLP 1 North Lexington Avenue White Plains, New York 10601 Architect: Perkins Eastman 422 Summer Street Stamford, Connecticut 06901 Site/Civil Engineer: Site Design Consultants 251-F Underhill Ave Yorktown Heights, New York 1059i2 Electrical/Water Engineer: Stantec 30 Oak Street Stamford, Connecticut 06905 Surveyor: Dynamic Survey 1904 Main Street Lake Cuomo, New Jersey 07719 Landscape Architect: A2 Land Consulting, PLLC 30 Rocky Hill Road New Fairfield, Connecticut 06812 This DEIS will be sent to the following Involved and Interested Agencies: Involved Agencies Town of Yorktown Town Board, Lead Agency Town of Yorktown Planning Board New York State Department of Transportation New York State Department of Environmental Conservation, Region 3 Westchester County Department of Health Interested Agencies Town of Yorktown Water Department Town of Yorktown Advisory Board on Architecture and Community Appearance Town of Yorktown Conservation Board Town of Yorktown Tree Conservation Advisory Commission Town of Yorktown Advisory Committee on Open Space Town of Yorktown Police Department Lake Mohegan Fire Department Lake Mohegan Volunteer Ambulance Corps Westchester County Department of Planning Putnam County Department of Planning Town of Putnam Valley NYS Office of Parks, Recreation and Historic Preservation Others The Environmental Notice Bulletin (ENB), enb@gw.dec.state.ny.us DRAFT TOC-1 07/10/2024 Table of Contents Executive Summary .................................................................................................................. S-1 Chapter 1: Project Description ................................................................................................ 1-1 A. Introduction .................................................................................................................... 1-1 B. Project Description ........................................................................................................ 1-2 Project Site and Surrounding Area ........................................................................ 1-2 Proposed Project.................................................................................................... 1-3 Proposed Zoning Amendments ............................................................................. 1-6 C. Project Purpose and Need .............................................................................................. 1-7 D. Reviews and Approvals Required .................................................................................. 1-8 Chapter 2: Land Use, Zoning, and Public Policy ................................................................... 2-1 A. Introduction and Summary of Findings ......................................................................... 2-1 B. Land Use ........................................................................................................................ 2-1 Existing Conditions ............................................................................................... 2-1 The Future without the Proposed Project .............................................................. 2-3 The Future with the Proposed Project (the “Build Condition”) ............................ 2-4 Mitigation .............................................................................................................. 2-5 C. Zoning ............................................................................................................................ 2-5 Existing Conditions ............................................................................................... 2-5 The Future without the Proposed Project .............................................................. 2-8 The Future with the Proposed Project ................................................................... 2-8 Mitigation .............................................................................................................. 2-8 D. Public Policy .................................................................................................................. 2-9 Existing Conditions ............................................................................................... 2-9 The Future without the Proposed Project ............................................................ 2-13 The Future with the Proposed Project ................................................................. 2-13 Mitigation ............................................................................................................ 2-15 Chapter 3: Visual and Community Character ....................................................................... 3-1 A. Introduction and Summary of Findings ......................................................................... 3-1 B. Existing Conditions ........................................................................................................ 3-1 Visual Character of the Project Site ...................................................................... 3-1 Visual Character of the Surrounding Areas .......................................................... 3-2 Views of the Project Site and Existing Buildings from the Surrounding Area ..... 3-3 C. The Future without the Proposed Project ....................................................................... 3-4 D. The Future with the Proposed Project ............................................................................ 3-4 800 East Main Street Redevelopment 07/10/2024 TOC-2 DRAFT Visual and Community Character of the Project Site ............................................ 3-4 Views of the Project Site and Proposed Buildings from Vantage Points .............. 3-6 E. Mitigation ....................................................................................................................... 3-8 Chapter 4: Cultural Resources ................................................................................................ 4-1 A. Introduction and Summary of Findings .......................................................................... 4-1 B. Archaeological Resources .............................................................................................. 4-1 Existing Conditions ............................................................................................... 4-1 The Future without the Proposed Project .............................................................. 4-3 The Future with the Proposed Project ................................................................... 4-3 Mitigation .............................................................................................................. 4-3 C. Historic Resources .......................................................................................................... 4-3 Existing Conditions ............................................................................................... 4-3 The Future without the Proposed Project .............................................................. 4-4 The Future with the Proposed Project ................................................................... 4-4 Mitigation .............................................................................................................. 4-5 Chapter 5: Geology, Soils, and Topography ........................................................................... 5-1 A. Introduction and Summary of Findings .......................................................................... 5-1 B. Existing Conditions ........................................................................................................ 5-1 Soils ....................................................................................................................... 5-1 Topography ............................................................................................................ 5-2 Geology ................................................................................................................. 5-2 C. The Future with the Proposed Project ............................................................................ 5-3 D. Mitigation Measures ....................................................................................................... 5-4 Chapter 6: Ecological Resources .............................................................................................. 6-1 A. Introduction and Summary of Findings .......................................................................... 6-1 Summary of Findings ............................................................................................ 6-1 B. Existing Conditions ........................................................................................................ 6-2 Groundwater .......................................................................................................... 6-2 Floodplains ............................................................................................................ 6-3 Wetlands and Surface Water Resources ................................................................ 6-3 Terrestrial Resources ............................................................................................. 6-4 Threatened, Endangered, and Special Concern Species and Significant Natural Communities ..................................................................................................................... 6-11 C. The Future without the Proposed Project ..................................................................... 6-15 D. The Future with the Proposed Project .......................................................................... 6-16 Groundwater ........................................................................................................ 6-16 Floodplains .......................................................................................................... 6-16 Wetlands and Surface Water Resources .............................................................. 6-16 Terrestrial Resources ........................................................................................... 6-16 Threatened, Endangered, and Special Concern Species and Significant Natural Communities ..................................................................................................................... 6-19 Table of Contents DRAFT TOC-3 07/10/2024 E. Mitigation Measures .................................................................................................... 6-21 F. References .................................................................................................................... 6-22 Chapter 7: Socioeconomic and Fiscal Impacts ....................................................................... 7-1 A. Introduction and Summary of Findings ......................................................................... 7-1 B. Existing Conditions ........................................................................................................ 7-1 Demographic Conditions and Trends .................................................................... 7-1 Housing Stock, Tenure and Trends ....................................................................... 7-3 Town’s and Westchester County’s Affordable Housing Goals and Policies ........ 7-6 Employment .......................................................................................................... 7-7 Fiscal Conditions ................................................................................................... 7-9 C. The Future without the Proposed Project ..................................................................... 7-10 D. The Future with the Proposed Project .......................................................................... 7-10 Economic & Fiscal Benefits of Proposed Project (IMPLAN) ............................ 7-10 Municipal Fiscal Impact Assessment .................................................................. 7-14 Impact to Town’s Population and Demographics ............................................... 7-15 E. Mitigation Measures .................................................................................................... 7-15 Chapter 8: Community Facilities ............................................................................................ 8-1 A. Introduction and Summary of Findings ......................................................................... 8-1 B. Police ............................................................................................................................. 8-1 Existing and Potential Future Conditions without the Proposed Project .............. 8-1 The Future with the Proposed Project ................................................................... 8-3 Mitigation Measures .............................................................................................. 8-4 C. Fire ................................................................................................................................. 8-4 Existing and Potential Future Conditions with the Proposed Project.................... 8-4 The Future with the Proposed Project ................................................................... 8-5 Mitigation Measures .............................................................................................. 8-6 D. Emergency Medical Services ......................................................................................... 8-6 Existing and Future Conditions without the Proposed Project .............................. 8-6 The Future with the Proposed Project ................................................................... 8-6 Mitigation Measures .............................................................................................. 8-7 E. Parks, Recreation and Open Space ................................................................................ 8-7 Existing Conditions ............................................................................................... 8-7 The Future without the Proposed Project .............................................................. 8-8 The Future with the Proposed Project ................................................................... 8-8 Mitigation Measures .............................................................................................. 8-9 F. Solid Waste and Recycling ............................................................................................ 8-9 Existing Conditions ............................................................................................... 8-9 The Future without the Proposed Project .............................................................. 8-9 The Future with the Proposed Project ................................................................. 8-10 Mitigation Measures ............................................................................................ 8-10 800 East Main Street Redevelopment 07/10/2024 TOC-4 DRAFT Chapter 9: Water and Wastewater .......................................................................................... 9-1 A. Introduction and Summary of Findings .......................................................................... 9-1 B. Existing Conditions ........................................................................................................ 9-1 B.1. Water Supply ......................................................................................................... 9-1 B.2. Sanitary Sewage .................................................................................................... 9-1 C. The Future without the Proposed Project ....................................................................... 9-2 D. The Future with the Proposed Project ............................................................................ 9-2 D.1. Water Supply ......................................................................................................... 9-2 D.2. Sanitary Sewage .................................................................................................... 9-2 E. Mitigation Measures ....................................................................................................... 9-3 E.1. Water Supply ......................................................................................................... 9-3 E.2. Sanitary Sewage .................................................................................................... 9-3 Chapter 10: Stormwater Management .................................................................................. 10-1 A. Introduction and Summary of Findings ........................................................................ 10-1 B. Existing Conditions ...................................................................................................... 10-1 Watershed and Drainage Patterns ........................................................................ 10-1 Existing Drainage Areas ...................................................................................... 10-2 C. The Future without the Proposed Project ..................................................................... 10-3 D. The Future with the Proposed Project .......................................................................... 10-3 Proposed Drainage Areas .................................................................................... 10-3 Post-Development Conditions ............................................................................. 10-4 E. Mitigation Measures ..................................................................................................... 10-5 Chapter 11: Use and Conservation of Energy ...................................................................... 11-1 A. Introduction and Summary of Findings ........................................................................ 11-1 B. Existing Conditions ...................................................................................................... 11-1 C. The Future without the Proposed Project ..................................................................... 11-1 D. The Future with the Proposed Project .......................................................................... 11-1 E. Mitigation Measures ..................................................................................................... 11-2 Chapter 12: Traffic and Transportation ............................................................................... 12-1 A. Introduction and Summary of Findings ........................................................................ 12-1 B. Capacity Analysis Methodology .................................................................................. 12-1 B.1. Signalized Intersections ....................................................................................... 12-1 B.2. Unsignalized Intersections ................................................................................... 12-3 C. 2023 Existing Conditions ............................................................................................. 12-3 C.1. Roadway Characteristics ..................................................................................... 12-4 C.2. Intersection Level of Service Conditions ............................................................ 12-6 C.3. Pedestrian and Bicycle Conditions ...................................................................... 12-6 C.4. Public Transportation .......................................................................................... 12-6 D. Crash History and Safety Assessment .......................................................................... 12-7 D.1. Intersection Crashes ............................................................................................. 12-7 E. No Action Condition .................................................................................................. 12-16 Table of Contents DRAFT TOC-5 07/10/2024 E.1. Intersection Level of Service Conditions .......................................................... 12-17 E.2. Pedestrian and Bicycle Conditions .................................................................... 12-17 E.3. Public Transportation ........................................................................................ 12-17 F. With Action Condition ............................................................................................... 12-18 F.1. Project Description ............................................................................................ 12-18 F.2. Project Trip Generation ..................................................................................... 12-18 F.3. Project Trip Distribution and Assessment ......................................................... 12-18 F.4. Intersection Level of Service Conditions .......................................................... 12-19 F.5. Parking Conditions ............................................................................................ 12-19 F.6. Pedestrian and Bicycle Conditions .................................................................... 12-19 F.7. Public Transportation ........................................................................................ 12-19 F.8. Delivery and Service Vehicle Access ............................................................... 12-20 F.9. Alternative Site Access ..................................................................................... 12-20 G. Traffic Mitigation ...................................................................................................... 12-21 Chapter 13: Air Quality ......................................................................................................... 13-1 A. Introduction and Summary of Findings ....................................................................... 13-1 Summary of Findings .......................................................................................... 13-1 B. Existing Conditions ...................................................................................................... 13-1 C. The Future without the Proposed Project ..................................................................... 13-2 D. The Future with the Proposed Project .......................................................................... 13-2 Stationary Source Analysis ................................................................................. 13-2 Mobile Source Analysis ...................................................................................... 13-4 E. Mitigation Measures .................................................................................................... 13-5 Chapter 14: Noise .................................................................................................................... 14-1 A. Introduction and Summary of Findings ....................................................................... 14-1 B. Noise Fundamentals ..................................................................................................... 14-1 “A”-Weighted Sound Level (dBA) ..................................................................... 14-1 Noise Descriptors Used in Impact Assessment ................................................... 14-2 Noise Standards and Impact Criteria ................................................................... 14-3 Proposed Project Impact Criteria ........................................................................ 14-4 C. Methodology ................................................................................................................ 14-4 D. Existing Conditions ...................................................................................................... 14-4 Selection of Noise Receptor Locations ............................................................... 14-4 Noise Monitoring ................................................................................................ 14-5 Equipment Used During Noise Monitoring ........................................................ 14-5 Existing Noise Levels at Noise Receptor Locations ........................................... 14-5 E. The Future without the Proposed Project ..................................................................... 14-6 F. The Future with the Proposed Project .......................................................................... 14-6 Mobile Sources of Noise (Traffic) ...................................................................... 14-6 Stationary Sources of Noise ................................................................................ 14-7 Noise Exposure at Proposed Uses ....................................................................... 14-7 800 East Main Street Redevelopment 07/10/2024 TOC-6 DRAFT G. Mitigation Measures ..................................................................................................... 14-7 Chapter 15: Hazardous Materials ......................................................................................... 15-1 A. Introduction and Summary of Findings ........................................................................ 15-1 B. Existing Conditions ...................................................................................................... 15-1 Phase I Environmental Site Assessment .............................................................. 15-1 Confirmation Assessment .................................................................................... 15-2 Updated WCDOH Petroleum Bulk Storage Registry .......................................... 15-3 Potential of Buildings to Contain Hazardous Materials ...................................... 15-3 C. The Future without the Proposed Project .................................................................... 15-4 D. The Future with the Proposed Project .......................................................................... 15-4 E. Mitigation Measures ..................................................................................................... 15-5 Chapter 16: Construction ....................................................................................................... 16-1 A. Introduction and Summary of Findings ........................................................................ 16-1 B. Construction Schedule .................................................................................................. 16-2 Stage 1: Perimeter Fencing and Tree Clearing .................................................... 16-2 Stage 2: Mobilization, Earthwork, and Site Utilities ........................................... 16-2 Stage 3: Foundations and Site Stabilization ........................................................ 16-2 Stage 4: Building Framing and MEP Rough-in ................................................... 16-2 Stage 5: Interior Finishes ..................................................................................... 16-2 Stage 6: Site Work, Landscaping and Occupancy ............................................... 16-3 C. Construction Period Impacts and Mitigation ................................................................ 16-3 Erosion and Sediment Control ............................................................................. 16-3 Traffic and Transportation ................................................................................... 16-4 Air Quality ........................................................................................................... 16-5 Noise .................................................................................................................... 16-5 Blasting and Subsurface Investigations ............................................................... 16-7 Chapter 17: Alternatives......................................................................................................... 17-1 A. Introduction .................................................................................................................. 17-1 B. Alternative 1: No Action – Existing Site Conditions and Re-Occupancy of Office Buildings ............................................................................................................................... 17-1 Description of Alternative ................................................................................... 17-1 Potential Impacts of Alternative .......................................................................... 17-2 C. Alternative 2: Development Under Existing OB District Zoning ................................ 17-4 Description of Alternative ................................................................................... 17-4 Potential Impacts ................................................................................................. 17-5 D. Alternative 3: Non-Age-Restricted Development ........................................................ 17-8 Description of Alternative ................................................................................... 17-8 Potential Impacts ................................................................................................. 17-8 E. Alternative 4: Alternative Site Layout ....................................................................... 17-12 Description of Alternative ................................................................................. 17-13 Land Use, Zoning, and Public Policy ................................................................ 17-13 Table of Contents DRAFT TOC-7 07/10/2024 Visual and Community Character ..................................................................... 17-16 Cultural Resources ............................................................................................ 17-20 Geology, Soils, and Topography ....................................................................... 17-21 Ecological Resources ........................................................................................ 17-22 Socioeconomic and Fiscal Impacts ................................................................... 17-24 Community Facilities ........................................................................................ 17-28 Water and Wastewater ...................................................................................... 17-30 Stormwater Management .................................................................................. 17-31 Use and Conservation of Energy ....................................................................... 17-33 Traffic and Transportation ................................................................................ 17-34 Air Quality ........................................................................................................ 17-36 Noise ................................................................................................................. 17-37 Hazardous Materials .......................................................................................... 17-38 Construction ...................................................................................................... 17-38 F. Alternative 5: Development under Existing RSP-2 District Regulations .................. 17-38 Description of Alternative ................................................................................. 17-38 Potential Impacts with Reduced Program ......................................................... 17-39 Potential Impacts of Increased Footprint .......................................................... 17-40 Chapter 18: Cumulative Impacts of Proposed Zoning Text Change ................................. 18-1 Chapter 19: Mitigation ........................................................................................................... 19-1 A. Ecological Resources ................................................................................................... 19-1 B. Traffic and Transportation ........................................................................................... 19-2 Chapter 20: Sustainability ..................................................................................................... 20-1 Chapter 21: Growth-Inducing Aspects ................................................................................. 21-1 Chapter 22: Irreversible and Irretrievable Commitment of Resources ............................ 22-1 Chapter 23: Unavoidable Adverse Impacts .......................................................................... 23-1 800 East Main Street Redevelopment 07/10/2024 TOC-8 DRAFT List of Tables S-1 Proposed Project Buildings and Parking............................................................................... S-3 S-2 Existing and Proposed Building and Impervious Surface Coverage .................................. S-12 S-3 Projected Annual Property Tax Revenues for Proposed Project ........................................ S-15 S-4 Estimated Water/Sanitary Generation ................................................................................ S-16 S-5 Existing Zoning Alternative – Land Cover ......................................................................... S-27 S-6 Projected Annual Property Tax Revenues for Alternative Site Layout .............................. S-32 S-7 Design Point 1 – Proposed Peak Runoff Rates ................................................................... S-33 S-8 Design Point 2 – Proposed Peak Runoff Rates ................................................................... S-33 S-9 Increased Footprint Option – Slope Disturbance ................................................................ S-36 S-10 Alternatives Impact Comparison ...................................................................................... S-37 1-1 Proposed Project Buildings and Parking ............................................................................... 1-3 1-2 Proposed Zoning Amendments ............................................................................................. 1-6 5-1 Study Area Soils ................................................................................................................... 5-2 5-2 Existing Slopes within the Project Site (Surveyed Area) ...................................................... 5-2 5-3 Existing and Proposed Building and Impervious Surface Coverage .................................... 5-3 6-1 Vegetation Observed in the Ecological Resources Study Area ............................................ 6-5 6-2 Birds Documented During the NYSDEC 2000–2005 Second Breeding Bird Atlas (Block 5957a) and the NYSDEC 2020–2024 Third Breeding Bird Atlas (Mohegan Lake NW and CW Blocks) ......................................................................................................................... 6-8 6-3 NYS Reptiles and Amphibians (Herp) Atlas (1990–1999) for the Mohegan Lake USGSQuadrangle .............................................................................................................. 6-10 6-4 Inventory of Federally and State-Listed Species That May Occur Within the Ecological Resources Study Area ....................................................................................................... 6-11 6-5 Land Use Impacts ............................................................................................................... 6-17 6-6 Proposed Project – Tree Removal Quantities ..................................................................... 6-18 7-1 Residential Population Trends (2010–2020) ......................................................................... 7-2 7-2 Age of Population (2021) ...................................................................................................... 7-2 7-3 Racial Demographics (2021) ................................................................................................ 7-3 Table of Contents DRAFT TOC-9 07/10/2024 7-4 Household Income Characteristics (2010 and 2021) ............................................................ 7-3 7-5 Household Income Distribution ............................................................................................ 7-3 7-6 Housing Units ....................................................................................................................... 7-4 7-7 Percent of Housing Units by Structure Size ......................................................................... 7-4 7-8 Vacancy Rates ...................................................................................................................... 7-4 7-9 Median House Value for Owner-Occupied Units (2021) ..................................................... 7-5 7-10 House Value for Owner-Occupied Units (2021) ................................................................ 7-5 7-11 Year Householder Moved Into Unit ................................................................................... 7-6 7-12 Year Housing Unit Built ..................................................................................................... 7-6 7-13 Top Employment Sectors for Yorktown Residents (Primary Jobs) (2021) ........................ 7-7 7-14 Top Places Where Yorktown Residents Work (2021)........................................................ 7-8 7-15 Top Employment Sectors in Yorktown (2021) .................................................................. 7-9 7-16 2023 Annual Property Tax Revenues ............................................................................... 7-10 7-17 Estimated Annual Operational Benefits ........................................................................... 7-13 7-18 Projected Annual Property Tax Revenues for Proposed Project ...................................... 7-14 8-1 Police Department Calls for Service (2018 to 2023) ............................................................ 8-2 8-2 Proposed Project – Resident Population Projections ............................................................ 8-3 8-3 Proposed Project – Projected Police Service Level .............................................................. 8-4 9-1 Estimated Water/Sanitary Generation .................................................................................. 9-2 10-1 24-Hour Rainfall Amounts ............................................................................................... 10-3 10-2 Summary of Existing Peak Rates of Runoff ..................................................................... 10-3 10-3 Design Point 1 – Proposed Peak Runoff Rates ................................................................. 10-5 10-4 Design Point 2 – Proposed Peak Runoff Rates ................................................................. 10-5 10-5 Water Quality Analysis .................................................................................................... 10-5 12-1 Summary of Project-Related Traffic Impacts ................................................................... 12-1 12-2 LOS Criteria for Signalized Intersections ......................................................................... 12-3 12-3 LOS Criteria for Unsignalized Intersections .................................................................... 12-3 12-4 2023 Existing Conditions Level of Service Analysis ..................................................... 12-23 12-5 Crash Summary ................................................................................................................ 12-7 12-6 Barger Street and U.S. Route 6 Crash Types .................................................................... 12-8 12-7 Taconic Southbound Ramp and U.S. Route 6 Crash Types ............................................. 12-9 12-8 Taconic Northbound Ramp and U.S. Route 6 Crash Types ........................................... 12-10 12-9 East Main Street and U.S. Route 6 Crash Types ............................................................ 12-11 800 East Main Street Redevelopment 07/10/2024 TOC-10 DRAFT 12-10 Lee Boulevard and U.S. Route 6 Crash Types .............................................................. 12-12 12-11 Lee Road and East Main Street Crash Types ................................................................ 12-13 12-12 Hill Boulevard and U.S. Route 6 Crash Types ............................................................. 12-14 12-13 Hill Boulevard and East Main Street Crash Types ....................................................... 12-15 12-14 Indian Hill Road and East Main Street Crash Types .................................................... 12-15 12-15 Old Jefferson Valley Road and East Main Street Crash Types ..................................... 12-16 12-16 2026 No Action Conditions LOS Analysis ................................................................... 12-25 12-17 Trip Generation Summary ............................................................................................ 12-18 12-18 2026 No Action and 2026 With Action Conditions LOSAnalysis ............................... 12-27 12-19 Proposed Mitigation Measures ...................................................................................... 12-21 12-20 2026 No Action, 2026 With Action, and 2026 Mitigation Conditions LOS Analysis .... 12-29 13-1 Representative Monitored Ambient Air Quality Data ...................................................... 13-2 14-1 Common Noise Levels ...................................................................................................... 14-2 14-2 Noise Measurement Locations .......................................................................................... 14-5 14-3 Existing Noise Levels (in dBA) ........................................................................................ 14-6 14-4 Future Noise Levels without the Proposed Project (in dBA) ............................................ 14-6 14-5 Future Noise Levels with the Proposed Project (in dBA) ................................................. 14-7 16-1 Typical Noise Emission Levels for Construction Equipment ........................................... 16-6 17-1 Re-Occupancy Alternative – Trip Generation Summary .................................................. 17-4 17-2 Compliance ofExisting Zoning Alternative with OB District Regulations ....................... 17-5 17-3 Existing Zoning Alternative – Slope Disturbance ............................................................ 17-6 17-4 Existing Zoning Alternative – Land Cover ....................................................................... 17-6 17-5 Existing Zoning Alternative – Trip Generation Summary ................................................ 17-8 17-6 Zoning Compliance of Non-Age-Restricted Alternative with R-3 District Regulations ..... 17-9 17-7 Non-Age-Restricted Alternative – Resident Population ................................................. 17-10 17-8 Non-Age-Restricted Alternative – Public School Aged Children .................................. 17-11 17-9 Non-Age-Restricted Alternative – Trip Generation Summary ....................................... 17-12 17-10 Compliance OF Alternative Site Layout with Existing RSP-2 District Regulations .... 17-15 17-11 Alternative Site Layout – Slope Disturbance ................................................................ 17-22 17-12 Alternative Site Layout – Tree Removal Quantities ..................................................... 17-23 17-13 Alternative Site Layout – Land Use Impacts ................................................................ 17-23 17-14 Estimated Construction Benefits ................................................................................... 17-25 17-15 Estimated Annual Operational Benefits ........................................................................ 17-26 Table of Contents DRAFT TOC-11 07/10/2024 17-16 Annual Economic Benefits of Resident Spending ........................................................ 17-27 17-17 Projected Annual Property Tax Revenues for Alternative Site Layout ........................ 17-28 17-18 Alternative Site Layout – Resident Population Projections .......................................... 17-29 17-19 Alternative Site Layout – Projected Police Service Level ............................................ 17-29 17-20 Estimated Water/Sanitary Generation .......................................................................... 17-31 17-21 Design Point 1 – Proposed Peak Runoff Rates ............................................................. 17-32 17-22 Design Point 2 – Proposed Peak Runoff Rates ............................................................. 17-32 17-23 Alternative Site Layout – Energy Loads ...................................................................... 17-34 17-24 Alternative Site Layout – Trip Generation Summary ................................................... 17-35 17-27 Reduced Program Option – Trip Generation Summary ............................................... 17-40 17-28 Increased Footprint Option – Slope Disturbance .......................................................... 17-41 17-A Alternatives Impact Comparison ................................................................................... 17-42 17-25 2026 No Action AND 2026 Alternative Site Layout With Action Conditions Level of Service Analysis ............................................................................................................. 17-46 17-26 2026 No Action, 2026 Alternative Site Layout With Action, and 2026 Alternative Site Layout Mitigation Conditions Level of Service Analysis .............................................. 17-48 800 East Main Street Redevelopment 07/10/2024 TOC-12 DRAFT List of Figures Note: Figures appear after chapter text. S-1 Project Location S-2 Aerial S-3 Existing Conditions S-4 Conceptual Site Plan S-5a Rendering S-5b Rendering S-5c Rendering S-6a Recreational Amenities S-6b Recreational Amenities S-6c Recreational Amenities S-7a Landscaping Plan S-7b Landscaping Plan S-7c Landscaping Plan S-7d Landscaping Plan S-7e Landscaping Plan S-7f Landscaping Plan S-8a Lighting Plan S-8b Lighting Plan S-9 Grading Plan S-10 Project Location S-11 Aerial S-12 Land Use S-13a Photo Simulations S-13b Photo Simulations S-13c Photo Simulations S-13d Photo Simulations S-13e Photo Simulations S-13f Photo Simulations S-13g Photo Simulations S-14 Photo Simulations S-15 Areas of Archeaological Sensitivity S-16 Location of Historic Resources S-17 Taconic State Parkway Photograph: September 2023 Table of Contents DRAFT TOC-13 07/10/2024 S-18 Taconic State Parkway Photographs: March 2023 S-19 Proposed Project: View Northeast from the Taconic State Parkway S-20 Proposed Project: View East from the Taconic State Parkway S-21 Study Area S-22 Preliminary Traffic Improvement Plan S-23a Alternative Options Layout Plan S-23b Potential Sidewalk Layout S-23c Alternate 1 Profile S-23d Alternate 2 Profile S-24 Existing Zoning Alternative – Conceptual Site Plan S-25 Existing Zoning Alternative – Sectional Diagram S-26 Alternative Site Layout – Conceptual Site Plan S-27a Multi-Family Buildings – Elevations S-27b Multi-Family Buildings – Elevations S-27c Multi-Family Buildings – Elevations S-28 Multi-Family Buildings – Section S-29 Photo Simulations – Alternative Site Layout S-30 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan S-31 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan 1-1 Project Location 1-2 Aerial 1-3 Existing Conditions 1-4 Conceptual Site Plan 1-5a Rendering 1-5b Rendering 1-5c Rendering 1-6a Apartment Building 1-6b Apartment Building 1-6c Apartment Building 1-7a Flats 1-7b Flats 1-8a Villas 1-8b Villas 1-8c Villas 1-9a Clubhouse 1-9b Clubhouse 1-9c Clubhouse 1-10 Townhouses 1-11a Recreational Amenities 1-11b Recreational Amenities 1-11c Recreational Amenities 1-12a Landscaping Plan 800 East Main Street Redevelopment 07/10/2024 TOC-14 DRAFT 1-12b Landscaping Plan 1-12c Landscaping Plan 1-12d Landscaping Plan 1-12e Landscaping Plan 1-12f Landscaping Plan 1-13a Lighting Plan 1-13b Lighting Plan 1-14 Grading Plan 2-1 Project Location 2-2 Aerial 2-3 Land Use 2-4 Zoning 3-1a Key to Photographs 3-1b Project Site Photographs 3-1c Project Site Photographs 3-1d Project Site Photographs 3-1e Project Site Photographs 3-1f Project Site Photographs 3-1g Project Site Photographs 3-2a Key to Surrounding Area Photographs 3-2b Surrounding Area Photographs 3-2c Surrounding Area Photographs 3-2d Surrounding Area Photographs 3-2e Surrounding Area Photographs 3-3a Photo Simulations 3-3b Photo Simulations 3-3c Photo Simulations 3-3d Photo Simulations 3-3e Photo Simulations 3-3f Photo Simulations 3-3g Photo Simulations 3-4a Line-of-Sight Sectional Diagram 3-4b Line-of-Sight Sectional Diagram 3-4c Line-of-Sight Sectional Diagram 3-4d Line-of-Sight Sectional Diagram 3-4e Line-of-Sight Sectional Diagram 3-4f Line-of-Sight Sectional Diagram 3-4g Line-of-Sight Sectional Diagram 4-1 Areas of Archeaological Sensitivity 4-2 Location of Historic Resources 4-3 Hyatt House Photos: Septemer 2023 4-4 Taconic State Parkway Photograph: September 2023 Table of Contents DRAFT TOC-15 07/10/2024 4-5 Taconic State Parkway Photographs: March 2023 4-6 Proposed Project: View Northeast from the Taconic State Parkway 4-7 Proposed Project: View East from the Taconic State Parkway 5-1 NYCS Soils 5-2 Topography 5-3 Surficial Geology 5-4 Bedrock Geology 6-1 FEMA Effective FIRM 2007 6-2 Ecological Communities 6-3 Key to Photographs 6-4a Photographs 6-4b Photographs 6-4c Photographs 6-4d Photographs 6-4e Photographs 6-4f Photographs 12-1 Study Area 12-2 Existing Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-3 No Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-4 Trip Distribution Percentages Entering/Exiting 12-5 Project-Generated Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-6 With Action Condition Weekday AM/Weekday PM/Saturday Midday Peak Hour Volumes 12-7a Alternative Options Layout Plan 12-7b Potential Sidewalk Layout 12-7c Alternate 1 Profile 12-7d Alternate 2 Profile 12-8 Preliminary Traffic Improvement Plan 14-1 Noise Measurement Locations 17-1 Existing Zoning Alternative – Conceptual Site Plan 17-2 Existing Zoning Alternative – Sectional Diagram 17-3 Alternative Site Layout – Conceptual Site Plan 17-4a Multi-Family Buildings – Elevations 17-4b Multi-Family Buildings – Elevations 17-4c Multi-Family Buildings – Elevations 17-5 Multi-Family Buildings – Section 17-6a Multi-Family Buildings – Floorplans 17-6b Multi-Family Buildings – Floorplans 17-6c Multi-Family Buildings – Floorplans 17-7a Cottages – Elevations 17-7b Cottages – Elevations 17-8 Cottages – Floorplans 17-9a Multi-Family Buildings – Renderings 800 East Main Street Redevelopment 07/10/2024 TOC-16 DRAFT 17-9b Multi-Family Buildings – Renderings 17-10a Photo Simulations – Alternative Site Layout 17-10b Photo Simulations – Alternative Site Layout 17-10c Photo Simulations – Alternative Site Layout 17-10d Photo Simulations – Alternative Site Layout 17-10e Photo Simulations – Alternative Site Layout 17-10f Photo Simulations – Alternative Site Layout 17-10g Photo Simulations – Alternative Site Layout 17-11 Alternative Site Layout – Sectional Diagram 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-12a Alternative Site Layout – Landscaping Plan 17-13a Alternative Site Layout – Lighting Plan 17-13b Alternative Site Layout – Lighting Plan 17-14 Alternative Site Layout Project-Generated Weekday AM/ Weekday PM/ Saturday Midday Peak Hour Volumes 17-15 Alternative Site Layout With Action Condition Weekday AM/ Weekday PM/ Saturday Midday Peak Hour Volumes 17-16 RSP-2 Zoning with Reduced Building Footprint – Conceptual Site Plan 17-17 RSP-2 Zoning with Increased Building Footprint – Conceptual Site Plan Table of Contents DRAFT TOC-17 07/10/2024 List of Appendices Appendix A: SEQRA Documents A-1: Adopted Draft Environmental Impact Statement (DEIS) Scope of Work A-2: Zoning Petition Appendix B: Cultural Resources Appendix C: Ecological Resources Appendix D: Town Correspondence Appendix E: Stormwater Pollution Prevention Plan (SWPPP) Appendix F: Energy Appendix G: Traffic G-1: Traffic Count Data G-2: 2023 Existing Condition Synchro Reports G-3: NYSDOT Crash Data G-4: East Main Street and US Route 6 Crash Diagram G-5: 2026 No Action Condition Synchro Reports G-6: Trip Generation G-7: 2026 With Action Condition Synchro Reports G-8: 2026 With Action With Mitigation Condition Synchro Reports G-9: 2026 With Action Alternative Condition Synchro Reports G-10: 2026 With Action With Mitigation Alternative Condition Synchro Reports Appendix H: Alternative Site Layout – Synchro 11 Outputs Appendix I: Site Plans 