Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
01_Project Description
DRAFT 1-1 07/10/2024 Chapter 1: Project Description A. INTRODUCTION 800 E Main Yorktown Dev AMS LLC (the “Applicant”) has petitioned the Town of Yorktown Town Board (the “Town Board”) for an amendment to the Zoning Map of the Town of Yorktown, to rezone the approximately 35.5-acre property located at 800 East Main Street (Tax ID 5.19-1- 15) (the “Project Site”) from OB Research Laboratory and Office District (the “OB District”) to the RSP-2 Senior Citizens District (“RSP-2 District”) and for text amendments to the Zoning Code of the Town of Yorktown (the “Zoning Code”) affecting the RSP-2 District of the Town. The Zoning Code and Zoning Map amendments are referred to as the “Proposed Zoning.” The Applicant proposes to remove the Project Site’s existing improvements, comprised of approximately 63,617 square feet of office space (in two buildings) and related parking infrastructure, and develop the Project Site with an active adult residential community for residents aged 55 and over, consisting of 250 dwelling units (200 rental units and 50 for-sale townhomes), 383 parking spaces, a clubhouse, approximately 9.4 acres of common open space, approximately 0.9 miles of walking trails, a central water feature (pond), and recreational amenities (the “Proposed Project”). The Proposed Zoning and the Proposed Project are together referred to as the “Proposed Action.” Pursuant to the rules and regulations of the New York State Environmental Quality Review Act (“SEQRA,” Article 8 of the Environmental Conservation Law and its implementing regulations at 6 NYCRR 617), the Town Board, acting as Lead Agency, determined by resolution on March 7, 2023 that the Proposed Action has the potential to result in one or more significant adverse environmental impacts and that an Environmental Impact Statement (“EIS”) shall be prepared. A Scoping Document was prepared as in initial step in the environmental review process to guide the preparation of the Draft EIS (“DEIS”). As set forth in the SEQRA regulations, the primary goals of the scoping process were to focus the DEIS on potentially significant adverse impacts and to eliminate consideration of those impacts that are not significant or that are irrelevant. As required by SEQRA regulations, and in order to allow the public sufficient opportunity to comment on the draft Scoping Document, the Town Board accepted written comments on the draft from March 24, 2023 through April 14, 2023. A public scoping session, for the purposes or receiving oral comments, was held by the Town Board on April 4, 2023 and the draft Scoping Document was reviewed at the April 10, 2023 meeting of the Planning Board and at the April 18, 2023 and April 19, 2023 meetings of the Yorktown Advisory Board on Architecture & Community Appearance and Conservation Board, respectively. On May 2, 2023, the Town Board adopted the final Scoping Document, which sets forth the analyses required in the DEIS (see Appendix A-1). In addition to preparing a detailed analysis of the potential environmental impacts of the Proposed Action, the Applicant has prepared analyses for several alternatives as required by the Scoping 800 East Main Street Redevelopment 07/10/2024 1-2 DRAFT Document and SEQRA regulations. It is the purpose of these alternatives to identify and analyze the potential environmental impacts of a range of alternative actions. B. PROJECT DESCRIPTION PROJECT SITE AND SURROUNDING AREA The Project Site is a 35.5-acre parcel situated at 800 East Main Street in the Town of Yorktown (the “Town”) (Tax Parcel 5.19-1-15), located along the northern boundary of the Town of Yorktown within the hamlet of Jefferson Valley, the largest of the Town’s five hamlets (see Figure 1-1). The Project Site is presently zoned as the OB District. The northern edge of the Project Site borders the Town of Putnam Valley, which is in Putnam County. The Project Site is situated east of the Taconic State Parkway and north of U.S. Route 6 (see Figure 1-2). The Project Site is presently owned by Contractors Register, Inc., and the Applicant is a contract-vendee. The central portion of the Project Site is developed with two three-story office buildings, comprising approximately 63,617 square feet, one constructed in the late 1980s and the other in the early 2000s. The Project Site is improved with 288 surface parking spaces, as well as driveways, landscaping, and associated infrastructure (see Figure 1-3). The elevation of the developed portion of the Project Site, in the vicinity of the existing office buildings, is approximately 70 feet higher than the elevation of the Project Site’s entrance at Old Route 6. The office buildings on the Project Site are currently vacant and have been for several years. Approximately 30 percent of the Project Site (10.74 acres) is currently developed, with the northern 70 percent of the Project Site (approximately 24.79 acres) undeveloped and in a forested state. The Project Site is accessed by a single driveway that enters the Project Site at its southeastern corner, where it connects to Old Route 6. Once inside the Project Site, the driveway slopes uphill, where it joins the ring road that encircles the two office buildings. The Project Site generally slopes north to south. There is a steep drop in elevation between the two existing office buildings, such that the first floor of the northern office building is approximately 25 feet higher than the first floor of the southern office building. To the north and northeast, the Project Site is bordered by the Donald J. Trump State Park, a 436-acre State Park that spans the Towns of Yorktown and Putnam Valley. To the west, the Project Site is bordered by the Taconic State Parkway (the “TSP” or “Parkway”), a New York State Scenic Byway, which runs north-south within the Town. There is an approximately 150-foot-wide vegetative buffer between the Parkway and the Project Site, which provides a natural visual screen between the Parkway and Project Site. The majority of this buffer would remain as part of the Proposed Project. The Project Site is bordered to the southeast by several single-family homes, and to the south by East Main Street and U.S. Route 6. Further west of the Project Site (on the western side of the Taconic State Parkway) is Trump Park Residences, a senior residential community located in the RSP- 2 District. Commercial land uses are located to the southeast and southwest of the Project Site. To the southeast, these commercial uses include strip malls, a gas station, and fast casual dining establishments located along Lee Boulevard and Hill Boulevard, south of East Main Street and north of U.S. Route 6. Additionally, the Jefferson Valley Mall, a local Chapter 1: Project Description DRAFT 1-3 07/10/2024 shopping destination, is located to the south of U.S. Route 6, in close proximity to the other commercial uses. To the southwest of the Project Site, commercial uses include gas stations and fast casual dining establishments, generally located along East Main Street. THE PROPOSED PROJECT The Proposed Project would be an age-restricted residential community, comprised of 250 dwelling units, with 200 rental units located in 12 buildings (of varying building types), and 50 for-sale townhouses in 12 buildings1 (see Figure 1-4). The Proposed Project would include 96 one-bedroom units and 154 two-bedroom units. A total of 383 surface parking spaces would be constructed to serve the development. The parking spaces would be located throughout the Project Site and would include surface parking spaces and garage spaces within buildings (as discussed below). The Proposed Project’s different building and unit types, and associated parking spaces, is provided in Table 1-1. There would be four “villa” buildings (containing 96 total dwelling units), seven “flats” (containing 32 total dwelling units), one apartment building (containing 72 dwelling units), and 12 townhome buildings (containing 50 total dwelling units).2 Dwelling units would have either one or two bedrooms. Renderings of the Proposed Project are provided in Figure 1-5, demonstrating residential buildings that are developed with a transitional yet local vernacular architectural design standing against the backdrop of rolling hills and natural landscapes. Table 1-1 Proposed Project Buildings and Parking Building Type Number of Buildings Dwelling Units Building Height (stories) Building Size (gsf) Parking Spaces Tenure Villa 4 96 4 208,160 144 Rental Flat 7 32 2 55,650 50 Rental Apartment 1 72 4 100,785 113 Rental Clubhouse 1 -- 1 30,500 -- -- Townhomes 12 50 2 374,688 76 For Sale Amenity 1 -- 1 1,500 -- -- Total 24 250 -- 771,283 383 -- Source: Perkins Eastman Much of the proposed redevelopment would take place within the previously developed footprint of the existing office buildings and associated surface parking areas. The Project Site would continue to be served by the existing entrance which connects to East Main Street, however, the driveway for the Proposed Project would be developed slightly to the west of the existing driveway (closer to the TSP), which would slightly increase the area of developable land within the interior of the Project Site. The grade of the driveway for the Proposed Project would be similar to that of the exiting driveway. The driveway would provide connections to interior roads throughout the Project Site, providing access to various buildings of the Proposed Project, as discussed below. The driveway would 1 The townhomes are proposed to be condominiums. 2 The Conceptual Site Plan (see Figure 1-4) shows 48 townhouse units, however, to be conservative in its review, the Applicant assumed the development of 50 townhouse units (two additional units could be in an additional townhouse building). 800 East Main Street Redevelopment 07/10/2024 1-4 DRAFT include two, 10-foot-wide travel lanes (i.e., one into the Site, one out of the Site) as well as a 12-foot-wide median that would be improved with grasscrete and low-rise, mountable curbs. The four-story, approximately 100,785 gross square feet (gsf), apartment building would be the southernmost situated building on the Project Site and would include 72 dwelling units (18 units per floor) (see Figure 1-6). The ground floor level of the apartment building would contain a covered parking area, and surface parking would be included around the apartment building as well. Dwelling units would be comprised either of one bedroom and one bathroom, or two bedrooms and two bathrooms. Approximately half of the dwelling units would include a balcony. As shown in Figure 1-5, the apartment building would incorporate varying materials, colors, and articulations, enhancing its appearance as the first residential structure that visitors to the Project Site would encounter. To the northwest of the apartment building there would be seven flats, each comprised of two floors, with an aggregate total of 32 dwelling units, totaling approximately 55,660 gsf (see Figure 1-7). The flats would be provided with approximately 50 enclosed parking spaces located underneath the buildings. As shown in Figure 1-5, the flats would include driveways for each unit, as well as sidewalks and landscaping along the street frontage. The flats would introduce a transitionary typology between the taller apartment building south of the flats and other proposed buildings to the north. The four villa buildings would be located to the north and east of the flats. Each villa building would contain four residential floors, and 24 units (six units per floor), for an aggregate total of 96 units, totaling approximately 208,160 gsf (see Figure 1-8). Each building would be served by 36 parking spaces at ground level, including both surface parking spaces, and garage spaces underneath the building. The units in the villas would be comprised of one or two bedrooms, and each unit would have a balcony. As shown in Figure 1-5, the villa buildings would have a prominent view of the community open space and pond water feature central to the Proposed Project. As part of the Proposed Project, an approximately 30,500 gsf clubhouse would be centrally located on the Project Site to serve as a gathering place for the community. The clubhouse would include dining areas, a lounge, coffee bar, activity space, an aerobics room, gym equipment, and a yoga studio (see Figure 1-9). Proximate to the clubhouse there would a small parking area, although it is anticipated that many residents would access the clubhouse by using the Proposed Project’s walking trails and internal circulation paths. As shown in Figure 1-5, the clubhouse would be surrounded by ample open space, as well as a pool. In the northernmost developed portion of the Project Site (to the north of the Clubhouse and associated recreational amenities), there would be twelve townhome buildings totaling approximately 374,688 gsf, offering an aggregate total of 50 for-sale units, served by 76 parking spaces in garages underneath the townhouse units (see Figure 1-10). Each townhome building would be two stories. The units would have a garage and kitchen on the first floor, and two bedrooms and two bathrooms on the second floor. There would also be a 1,500 gsf amenity building for use by the townhomes. There would be approximately 0.9 miles of walking trails and bicycle riding paths within the Project Site. As part of the Proposed Project, approximately 9.4 acres of the overall Chapter 1: Project Description DRAFT 1-5 07/10/2024 Project Site would be private common open space for residential use. Amenities in the common open space would include walking paths, areas for yoga and painting classes, picnic areas, a putting green, a centrally located water feature, a swimming pool, tennis courts, pickleball courts, an amphitheater, a gazebo, and areas for outdoor dining (see Figure 1-11). The Proposed Project would have full-time staff responsible for site management and maintenance, including leasing, building repairs and maintenance, and building operations, including solid waste management. The Applicant has developed a conceptual landscaping plan for the Proposed Project that divides the Site into five different zones (see Figure 1-12a), each of which complements the adjacent buildings and programmatic elements. The driveway and main roads within the Project Site would be lined with a variety of street trees and, at the main entrance to the Site, ornamental plantings would be used (see Figure 1-12b). The area around the villas and apartment building would be landscaped with small trees, shrubs, perennials, and ornamental grasses to enhance the building style and size, while providing a sense of home (see Figure 1-12c). Landscaping around the Flats and Townhomes would incorporate ornamental shrubs and evergreens for multi-season screening to match the architectural style and smaller scale of these buildings (see Figure 1-12d). The central open space and pond water feature would be landscaped with large native shade trees, creating a park-like atmosphere (see Figure 1-12f). A conceptual lighting plan for the Proposed Project has been prepared, which divides the Site into five different lighting zones (see Figure 1-13a). Proposed fixtures would utilize cut-off luminaires, be Dark-Sky compliant, adhere to Town guidelines on color temperature (e.g., avoid temperatures over 3000K, which tend to be brighter white), and the distribution patterns would prevent light spillover onto adjacent properties to the maximum extent practicable. In addition, Site lighting fixtures would utilize LED lighting to reduce energy usage and maintenance costs. The lighting design would be compliant with Chapter 200, “Outdoor Lighting,” of the Town Code and would adhere to the best current practice in specifying light sources, spectra, glare reduction, and cut-off fixtures in order to reduce adverse effects to on- and off-Site residences, while meeting safety, security, and energy efficiency requirements. The exact fixtures that would be used for the Proposed Project have not been finalized; however, Figure 1-13b illustrates the types of fixtures that are being considered for each lighting zone. The Proposed Project would redevelop the previously disturbed area of the Project Site (office building footprint and associated parking areas) and would extend to the north and south of that area, requiring clearing and grading. The driveway for the Proposed Project would be sited west of the existing driveway, resulting in the need for grading closer to the Project Site’s border with the Parkway than in the current condition (see Figure 1-14). Areas south of the Project Site’s existing parking lot would also be re-graded to accommodate the apartment building. In the northern, currently undeveloped, portion of the Project Site, grading would be required, including disturbance of areas of steep slopes (discussed more in Chapter 5, “Geology, Soils, and Topography”). In general, eastern portions of the Project Site would require a lowering in elevation (i.e., cut), while western portions of the Project Site would be raised in elevation (i.e., fill). Tiered grading would be required in certain portions of the Project Site, predominantly east of the proposed recreational areas of the Proposed Project. 800 East Main Street Redevelopment 07/10/2024 1-6 DRAFT PROPOSED ZONING AMENDMENTS The Project Site is within the Town’s OB District. The uses permitted in the OB District include research laboratories and office buildings. As discussed above, the Applicant has petitioned the Town Board to amend the Town Zoning Map and Zoning Code to permit an economically viable, age-restricted residential community on the Project Site. Specifically, the Applicant has petitioned the Town Board for an amendment to the Zoning Map to rezone the Project Site from the OB District to the RSP-2 District (see Appendix A-2). The Applicant has also petitioned the Town Board for amendments to the regulations of the RSP-2 District that would, for sites greater than 25 acres, increase the floor area ratio from 0.35 to 0.55 and increase the maximum building height from 45 to 55 feet. In the Applicant’s opinion that these amendments would facilitate the development of thoughtfully designed senior housing communities on larger sites, such as the Project Site. Existing RSP-2 District regulations, the Applicant’s proposed amendments thereto, and the compliance of the Proposed Project with the proposed amended RSP-2 District regulations, are detailed in Table 1-2. Table 1-2 Proposed Zoning Amendments RSP-2 District (Existing) RSP-2 District (As Amended for Lots 25 acres or greater) Compliance of Proposed Project Lot area per dwelling unit (square feet) Up to 3-room living unit (2-bedroom apts.) – 2,200; over 2-bedroom or over 4-room living units – 10,000 Unchanged Complies Floor Area Ratio, usable (with public sewers) (square feet) 0.35 0.55* 0.50 Minimum site area (acres) 5 Unchanged 35.5 Lot width at main building line (feet) 150 Unchanged 575.9 Lot depth (feet). 150 Unchanged 2,259 Front yard (feet) 50 Unchanged 454 Side yard (feet) -- -- 59 (west), 56 (east) Main or accessory building, minimum either side 50 Unchanged 50 Two combined 100 Unchanged 115 Accessory building if in rear yard, minimum either side 25 Unchanged N/A Rear yard (feet) -- -- -- Main Building 50 Unchanged 319 Accessory Building 25 Unchanged N/A Maximum height (feet) -- -- Main building 45 55* 55 Accessory building or structure 15 Unchanged N/A Minimum usable floor area of dwelling unit (square feet) Studio – 350 1-bedroom – 450 2 bedrooms or more - 550 Unchanged Studio – 350+ 1-bedroom – 450+ 2 bedrooms or more – 550+ Required off-street parking spaces per dwelling unit 0.5, plus a minimum of 10 additional for staff Unchanged 1.5+ per unit Note: * Only applicable to sites greater than 25 acres. Otherwise, existing regulation applies. Sources: Town of Yorktown Zoning Code, Appendix A (Residence Zone Standards) Chapter 1: Project Description DRAFT 1-7 07/10/2024 The proposed amendments to the RSP-2 District regulations would only apply to sites that are greater than 25 acres. Based on the Town’s Zoning Map,3 there are four parcels in the Town zoned RSP-2 District. The parcel located at 2000 Baldwin Road (SBL: 37.13-1-17) is 6.26 acres and is presently developed with an assisted living facility (The Country House in Westchester). The parcel located at 1965 Allan Avenue (SBL: 37.18-1-50) is 8.45 acres and is presently developed with a senior living apartment complex (Beaver Ridge Apartments). The parcel located at 1296 East Main Street (SBL: 16.09-2-16) is 5.96 acres and is presently developed with a senior living apartment complex (Wynwood Oaks Apartments). The parcel located at 3770 Barger Street (SBL: 5.19-1-14) is 50.41 acres and is presently developed with Trump Park Residences.4 Among the four parcels, the only one greater than 25 acres is 3770 Barger Street, and is, therefore, the only parcel in the Town, aside from the Project Site, to which the Proposed Zoning would apply. The Barger Street Parcel is currently developed with Trump Park Residences, a 4-story, multi-family, age-restricted building. In the Applicant’s opinion, it is highly unlikely that the 3770 Barger Street property would be redeveloped if the changes proposed by Applicant to the RSP-2 District for sites greater than 25 acres are adopted by the Town. C. PROJECT PURPOSE AND NEED Since its peak the 1980s, the demand for professional office space in a corporate park setting has declined substantially. The demand for campus office buildings in Westchester County is continuing to decline due to evolving market trends, office space needs, and work styles. The existing office buildings on the Project Site do not meet the needs of the current corporate office market, as evidenced by their continued vacancy. At the same time, the demand for housing types other than single-family detached houses remains strong within the region.5 It is the Applicant’s opinion that the Proposed Project is consistent with both the intent and strategies outlined in the Town of Yorktown Comprehensive Plan (2010) (the “Town Comprehensive Plan”). Consistent with the Town Comprehensive Plan, the Proposed Project would increase housing diversity in the Town by adding to the limited stock of age-restricted housing, providing a viable option for existing residents wishing to downsize and remain in the Town.6 The Proposed Project would be compatible with the surrounding neighborhood, introducing compatible residential use (in place of the existing commercial use) into an area that is primarily comprised of residential neighborhoods including the age-restricted Trump Park Residences community. Furthermore, the Proposed Project would preserve approximately 6.25 3 https://www.yorktownny.org/sites/default/files/fileattachments/building/page/208/officialzoningmap- revnov2018.pdf 4 https://www.trumpparkresidence.com/ 5 Land use trends are discussed in more detail in Chapter 2, “Land Use, Zoning, and Public Policy.” 6 It is noted that the 2010 Town Comprehensive Plan identified the Project Site in Policy 4-63, which suggested the Town “promote corporate or multi-tenant office development in select locations near major entrances to the Taconic Parkway and Route 6” (page 4-33). The economic realities of corporate office parks in the region have evolved dramatically since the Plan’s adoption approximately 15 years ago, such that the Project Site is no longer viable as an office campus. As such, the Applicant consulted other components of the Town Comprehensive Plan (as discussed above) to inform the Applicant’s redevelopment proposal for the Project Site. 800 East Main Street Redevelopment 07/10/2024 1-8 DRAFT acres of woodland areas on the northern portion of the Project Site, and would concentrate development, to the extent practicable, in the areas of the Project Site that are currently improved, further reducing the need for tree clearing, thereby retaining some of the wooded character of the Project Site. The Proposed Project also promotes sustainable development, as encouraged by the Town Comprehensive Plan, by repurposing an already commercially developed site as a residential community. As has been observed throughout the County, vacant and abandoned office parks are prime candidates for reuse. In alignment with the Town Comprehensive Plan goal of encouraging the Town to remain recreation-oriented, the Proposed Project would include approximately 9.4 acres of open space to encourage passive and active recreation on the Project Site by residents. The Proposed Project would replace underutilized office buildings with an active residential use, creating a development with minimal impact to adjacent residential neighborhoods. In addition, the Proposed Project would support the Town’s tax base by introducing new residents to support existing businesses and institutions. D. REVIEWS AND APPROVALS REQUIRED The approvals required to facilitate the Proposed Action, as well as the governmental agencies responsible for these approvals, are identified below. Zoning Map Amendment; RSP-2 District Amendments (Town of Yorktown Town Board) Site Plan Approval; Stormwater Permit; Tree Removal Permit; Municipal Separate Storm Sewer System (MS4) Approvals (Town of Yorktown Planning Board) Building Permit (Town of Yorktown Building Department) Water and Sewer Main Construction, Improvements, Connections (Westchester County Department of Health) Traffic Mitigation Measures along U.S. Route 6, if necessary (NYS Department of Transportation) State Pollution Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity; Stormwater Pollution Prevention Plan Approval; Potential 5-Acre Waiver (New York State Department of Environmental Conservation) Section 14.09 Review (New York State Office of Parks, Recreation, and Historic Preservation) In addition to the above approvals, pursuant to §277.61 of the Westchester County Administrative Code, the Proposed Zoning must be referred to the Westchester County Planning Board prior to final action by the Town Board and the site plan of the Proposed Project must be referred at least 30 days prior to final action by the Town Planning Board. Lastly, several “Interested Agencies” will be participating in review of the Proposed Action under SEQRA, including: Town of Yorktown Water Department Town of Yorktown Advisory Board on Architecture and Community Appearance (the ABACA) Town of Yorktown Conservation Board Town of Yorktown Tree Conservation Advisory Committee Town of Putnam Valley Westchester County Department of Planning Putnam County Department of Planning £¤6 In d i a n H i l l Rd Jeff e r son Valley Mall O l d J e f f e r s o n V a ll e y R dTrumpPark Alb y n P l Strang Blvd L a k e T r ail D r Lee B l v d B o n n i e w o o d Dr P erdue Ave Wren Pl VillageRd N e l s o n Ave H e r i t a g e C t Spillw ay Rd Parkway Pl M e a d o w L n BargerSt Robin Rd O ld Yorkto w n R d Union Rd Glen Rd B an k Rd F a w n C t Edg e h i llR d Overl o o k A v e S w ed C i r Da n e S t O r i o l e C t ServiceRd Hi l l B l v d W illia m s D r Su n c r e s t A v e P o s e yRd Ja m e s S t Fr o s t R d Bu c k h o r n S t Su n n y s i d e S t TaconicStPkwy Wildwood St E Main St G A R H wy P i n e C t Steph e n S m i t h D r Town of Putnam Valley Town of Yorktown 800 EAST MAIN STREET Project Location Figure 1-1 0 2,000 FEET Project Site Study Area (Half-mile perimeter) 3. 2 9 . 2 3 Putnam Westchester NY!\ Project Location UV132 £¤6 In d i a n H i l l R d JeffersonVall e y Mall O l d J e ff e r s o n V a ll e y R dTrumpPark Lake Trail D r Village Rd Lee B l v d Perdue Ave B o n n i e w o o dDr Wren Pl N e l s o n Ave H e r i t a g e C t SpillwayRd M e a d o w L n Barg e r S t Robin Rd Old Y o r k t o w n R d U n i o n R d Glen Rd BankRd F a w n Ct Ove r l o o k A v e E d g e hil l R d S wed C i r Da n e S t O r i o l e C t ServiceRd Hi l l B l v d W illiamsDr Suncrest Ave Po s e y R d Ja m e s S t Fr o s t R d Bu c k h o r n S t Su n n y s i d eSt TaconicStPkwy WildwoodSt E Main St G A R Hwy P i n e C t Steph e n S m i t h D r Town of Putnam Valley Town of Yorktown 800 EAST MAIN STREET Aerial Figure 1-2 0 1,000 FEETProject Site 1. 9 . 2 4 Da t a s o u r c e : O r t h o i m a g e r y v i a N e a r m a p £¤6 TaconicStPkwy IndianHillRd G A R Hwy EMainSt Town of Putnam Valley Town of Yorktown 800 EAST MAIN STREET Existing Conditions Figure 1-3 0 500 FEETProject Site 1. 9 . 2 4 Da t a s o u r c e : O r t h o i m a g e r y v i a N e a r m a p 1.9.24 800 EAST MAIN STREET Figure 1-4 Conceptual Site Plan AMS YORKTOWN | SITE CONCEPT 8/09/2022 14 SITE PLAN Re n t a l Fo r S a l e So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-5a Rendering AMS YORKTOWN | SITE CONCEPT 8/09/2022 24AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-5b Rendering AMS YORKTOWN | SITE CONCEPT 8/09/2022 28AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-5c Rendering AMS YORKTOWN | SITE CONCEPT 8/09/2022 32AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-6a Apartment Building So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-6b Apartment Building So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-6c Apartment Building So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-7a Flats So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-7b Flats So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-8a Villas So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-8b Villas So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-8c Villas So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-9a Clubhouse So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-9b Clubhouse So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-9c Clubhouse So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-10 Townhouses NOT TO SCALE So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-11a Recreational Amenities AMS YORKTOWN | SITE CONCEPT 8/09/2022 29 PEDESTRIAN CONNECTIVITY WWaallkkiinngg && BBiikkee RRiiddiinngg PPaatthhss •0.9 Miles of Walking Trails AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING Walkable environments encourage activity So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-11b Recreational Amenities AMS YORKTOWN | SITE CONCEPT 8/09/2022 30 WELLNESS | RECREATION SSppoorrttss CCoouurr ttss && PPaavviilliioonn AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING So u r c e : P e r k i n s E a s t m a n 6.11.24 800 EAST MAIN STREET Figure 1-11c Recreational Amenities AMS YORKTOWN | SITE CONCEPT 8/09/2022 31 SOCIAL CONFLUENCE WWaatteerr FFeeaattuurree OOuuttddoooorr AAccttiivviittiieess YYooggaa PPooooll AAccttiivviittyy LLaawwnn AAmmpphhiitthheeaatteerr OOuuttddoooorr DDiinniinngg AMS YORKTOWN | ACTIVE ADULT COMMUNITY CONCEPTUAL RENDERING So u r c e : P e r k i n s E a s t m a n 1.16.24 800 EAST MAIN STREET Figure 1-12a Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-12b Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-12c Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-12d Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-12e Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-12f Landscaping Plan So u r c e : A 2 L a n d C o n s u l t i n g , L L C 1.16.24 800 EAST MAIN STREET Figure 1-13a Lighting Plan So u r c e : P e r k i n s E a s t m a n 1.16.24 800 EAST MAIN STREET Figure 1-13b Lighting Plan So u r c e : P e r k i n s E a s t m a n 1.16.24 800 EAST MAIN STREET Figure 1-14 Grading Plan Sh e e t DA T E : SC A L E : DR A W N B Y : No . Re v i s i o n s : Da t e Co m m e n t s : Yo r k t o w n H e i g h t s , N Y 1 0 5 9 8 ww w . s i t e d e s i g n c o n s u l t a n t s . c o m F a x : ( 9 1 4 ) 9 6 2 - 7 3 8 6 L a n d P l a n n e r s En g i n e e r : N Y S L i c . N o . 6 4 4 3 1 Jo s e p h C . R i i n a , P . E . 25 1 - F U n d e r h i l l A v e n u e , Ci v i l E n g i n e e r s ( 9 1 4 ) 9 6 2 - 4 4 8 8 - No . Re v i s i o n s : Da t e Co m m e n t s : 0 5 10 20 SCALE: 1"=10'-0" NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. NOTE: 1.THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY NAME OF SURVEYOR, DATED XX/XX/XX, LAST REVISED XX/XX/XX. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. CO P Y R I G H T © 2 0 2 0 B Y S I T E D E S I G N C O N S U L T A N T S , A L L R I G H T S R E S E R V E D SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962NY Industrial Code Rule 753 requires no lessthan two working days notice, but not morethan ten days notice.www.digsafelynewyork.com C-103.1 PR O J E C T # 23 - 1 8 F: \ 2 0 2 3 \ 2 3 - 1 8 A M S - E M A I N S T R E E T , Y O R K T O W N \ E N G I N E E R I N G \ C A D \ C 3 D - 2 3 - 1 8 A M S M A I N S T R E E T Y O R K T O W N \ 2 3 - 1 8 A M S A P L I C A T I O N P L A N M A . 1 2 -5 - 2 0 2 3 . D W G 1/ 1 6 / 2 0 1 7 3 : 1 9 : 5 2 P M ## # # # # # # PR E L I M I N A R Y G R A D I N G PL A N - P R O P O S E D P R O J E C T PR E P A R E D F O R AM S Y O R K T O W N A C T I V E A D U L T CO M M U N I T Y CO N C E P T P L A N 80 0 E A S T M A I N S T R E E T We s t c h e s t e r C o u n t y , N Y To w n o f Y o r k t o w n 9/ 1 2 / 2 3 MA 1. 12 - 0 1 - 2 3 Dr a f t P r e f e r r e d 2. 12 - 1 1 - 2 3 Dr a f t U p d a t e NOTE: 1.THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY DYNAMIC SURVEY, LLC, DATED 02/15/22, LAST REVISED 10/11/23. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. So u r c e : S i t e D e s i g n C o n s u l t a n t s