HomeMy WebLinkAbout05_Geology, Soils, and TopographyDRAFT 5-1 07/10/2024 Chapter 5: Geology, Soils, and Topography A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes the Project Site’s existing geology, soils, and topography, and analyzes potential impacts to on-site surface and subsurface geologic resources as a result of the Proposed Project. Bedrock geology, surface soils, and steep slopes are described based on published data from the United States Department of Agriculture (USDA) Web Soil Survey, the New York State Geological Survey, New York State High Resolution Digital Elevation Model data, information available through Westchester County GIS, and a site-specific Phase I Environmental Site Assessment (“Phase I ESA”). The Proposed Action would disturb approximately 20.29 acres of the Project Site (inclusive of the 10.74 acres of the Project Site that were previously disturbed) to demolish the existing buildings and associated site improvements and construct the 250 new dwelling units, roadways and associated parking, landscaping, amenities, and stormwater management facilities. As detailed in the analyses below, the cut/fill activities associated with these improvements, inclusive of the measures included to avoid and mitigate adverse impacts, would not result in significant adverse impacts to on-site surface and subsurface geologic resources. B. EXISTING CONDITIONS SOILS Seven soil complexes are situated within or immediately adjacent to the Project Site. These soil types are described in greater detail in Table 5-1 and depicted on Figure 5-1. The mapped soils are consistent with areas characterized by hills and/or steep slopes. Nearly all of these soil complexes are associated with Charlton Fine Sandy Loam or Charlton Loam (ChB, ChC, ChD, ChE, and ClD). The Charlton soil series typically represent well-drained soils found on hills and ridges in areas with varying slopes that range between 3 to 8 percent (ChB); 8 to 15 percent (ChC); 15 to 25 percent (ChD and ClD); and 25 to 35 percent (ChE). In one area, soils are characterized as part of the Charlton-Chatfield Complex, where slopes range from 0 to 15 percent and soils are characterized as very rocky (CrC). These soil complexes and/or their component soil types are summarized in Table 5-1 and depicted on Figure 5-1. 800 East Main Street Redevelopment 07/10/2024 5-2 DRAFT Table 5-1 Study Area Soils Series Name (Map Symbol) Soil Horizon Depth (in) Soil Type Slope (%) Percentage of Project Site Drainage Landform Charlton- Chatfield, Very Rocky (CrC) Oe: 0 to 2 Moderately decomposed plant material 0 to 15 0.1% Well-drained Ridges and hills A: 2 to 4 Fine sandy loam Bw: 4 to 27 Gravelly fine sandy loam C: 27 to 65 Gravelly fine sandy loam Charlton Fine Sandy Loam (ChB, ChC, ChD and ClD) Ap: 0 to 7 Fine sandy loam ChB: 3 to 8 ChC: 8 to 15 ChD: 15 to 25 ChB: 49.3% ChC: 30.1% ChD: 19.6% Well-drained Ridges, ground moraines, and hills Bw: 7 to 22 Gravelly fine sandy loam C: 22 to 65 Gravelly fine sandy loam Charlton Loam (ChE, ClD) H1: 0 to 8 Loam ChE: 25 to 35 ClD: 15 to 25 ChE: 0.3% ClD: 0.01% Well-drained Till plains, ridges, and hills H2: 8 to 24 Sandy loam H3: 24 to 60 Sandy loam Note: See Figure 5-1. Source: Soil Survey Staff, Natural Resources Conservation Service, U.S. Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/. Accessed December 5, 2023. TOPOGRAPHY Approximately 10.74 acres of the Project Site have been previously disturbed to accommodate the current commercial office use. The undeveloped, northern, portion of the Project Site consists of forested land. The topography of the currently developed portion of the Project Site ranges from a low of approximately 456 feet above mean sea level at the entrance to the Project Site, to a high of approximately 565 feet above sea level in the northern parking area. The currently developed portion of the Project Site generally slopes from north to south. Among the undeveloped areas of the Project Site, the highest elevation is 701 feet. The areas and percentages of the Project Site within each slope category are quantified in Table 5-2. The Project Site features noticeable changes in topography, with areas of 15 percent or greater slopes comprising 52.4 percent of the Project Site (see Figure 5-2). Table 5-2 Existing Slopes Within the Project Site (Surveyed Area) Slope Grade Area (acres) Percent of Site 0% to 10% 9.67 27.2% 10% to 15% 7.22 20.4% Greater than 15% 18.61 52.4% Total 35.5 100% Sources: New York State High Resolution DEM data, Site Design Consultants GEOLOGY According to the Surficial Geologic Map of New York Lower Hudson Sheet, retrieved from the New York State Museum, the Project Site is underlain completely by till (see Figure 5-3). The Bedrock underlying the Project Site is Biotite-quartz-plagioclase paragneiss. This geology is derived from the Middle Proterozoic age, and is comprised mostly from metamorphic, Chapter 5: Geology, Soils, and Topography DRAFT 5-3 07/10/2024 metasedimentary and paragneiss constituents1 (see Figure 5-4). The Phase I ESA also indicated that groundwater is likely present within fractured bedrock at the Project Site and likely flows to the west towards a nearby stream located approximately 500 feet from the Project Site. C. THE FUTURE WITH THE PROPOSED PROJECT Approximately 20.29 acres of the Project Site would be disturbed during construction of the Proposed Project, including the approximately 10.74 acres previously disturbed to construct the Project Site’s current improvements (see Drawing C-104.2 in Appendix I). The existing and proposed lot and building coverage of the existing and proposed improvements is shown in Table 5-3. The Proposed Project would increase the building coverage from 1.9 percent to 10.5 percent and the total impervious coverage from 14.6 percent to 26.2 percent. Mitigation for the increase in impervious coverage would include the implementation of a comprehensive Stormwater Pollution Prevention Plan (“SWPPP”), which would outline methods to reduce the amount of stormwater runoff leaving the Project Site, as well as to improve the quality of the Project Site’s runoff. Preliminary stormwater management practices have been designed, and are discussed in Chapter 10, “Stormwater Management.” Table 5-3 Existing and Proposed Building and Impervious Surface Coverage Existing Condition Proposed Condition Total Site Area (acres) 35.5 35.5 Total Permeable area (acres) 30.3 26.2 Total Impervious Area (acres) 5.2 9.3 Percent Impervious 14.6% 26.2% Total Building Area (acres) 0.7 3.7 Percent Building Coverage 1.9% 10.5% Note: Totals may not sum due to rounding. Source: Site Design Consultants, Perkins Eastman Approximately 8.55 acres of the disturbance required to construct the Proposed Project would occur on slopes greater than 15 percent and approximately 4.35 acres would occur on slopes between 10 percent and 15 percent. The remaining 7.39 acres of disturbance would occur on slopes less than 10 percent. The Proposed Project would require excavation of approximately 90,155 cubic yards of material (i.e., “cut”) and would require approximately 8,319 cubic yards of fill material, resulting in a net cut of 81,836 cubic yards of earthen material. If all of the net cut material was removed from the Project Site, approximately 4,546 truck trips would be required, based on 18 cubic yards per truck. It is anticipated that these trips would be spread out over several months of the Proposed Project’s construction, such that the number of truck trips per day would be reduced to a level that would not affect traffic operations. Earthwork would be conducted pursuant to an excavation and regrading permit issued pursuant to Chapter 248, “Stormwater Management and Erosion and Sediment Control,” of the Town of Yorktown Code. Pursuant to that Chapter of the Town’s Code, as well as State requirements, a Soil Erosion and Sediment Control Plan has been developed as part of the SWPPP for the Proposed Project. The SESC, 1 Fisher, D.W., Isachsen, Y.W., and Rickard, L.V., 1970, Geologic Map of New York State, consisting of 5 sheets: Niagara, Finger Lakes, Hudson-Mohawk, Adirondack, and Lower Hudson, New York State Museum and Science Service, Map and Chart Series No. 15, scale 1:250,000. Accessed online at https://mrdata.usgs.gov/geology/state/sgmc-unit.php?unit=NYYbqpq%3B1 01/29/2024. 800 East Main Street Redevelopment 07/10/2024 5-4 DRAFT described in detail in Chapter 16, “Construction,” details the methods by which soil erosion and runoff would be minimized during construction. It is anticipated that rock removal will be required. Final determination of the need for rock removal would be determined as construction plans are advanced and additional data collected. If rock removal is necessary, hydraulic hammers could be used. While unlikely, any potential blasting would be conducted in accordance with Chapter 124, “Blasting and Explosives,” of the Town of Yorktown Code and pursuant to a blasting permit that would be obtained from the Town. As per the Town Code, a notice of intent to blast would be delivered to all required recipients 30 days to 72 hours prior to blasting and a notice of blasting would be served 72 to 24 hours prior to blasting. Finally, per Section 124-7 of the Town Code, blasting would only be conducted on Monday through Saturday between 8:00 am and 5:00 pm. D. MITIGATION MEASURES Measures to mitigate potential impacts to geology, soils, and topography are included as part of the Proposed Project. During the construction phase, a SESC Plan would be implemented to mitigate potential soil erosion impacts. The SESC Plan is summarized in Chapter 16, “Construction.” The Proposed Project would require the removal of approximately 81,836 cubic yards of earthen material from the Project Site. However, final grading of the Proposed Project, which would occur during the site plan approval phase of the Proposed Project, would be anticipated to reduce this amount by refining the grading and building plans to better balance the cut and fill. If a more balanced grading plan could not be achieved, and if all of the excess earthen material were removed from the Project Site, it would take approximately 4,546 truck trips. These trips would be spread throughout the duration of the Proposed Project’s construction, such that the number of truck trips on any given day would be reduced to a level that would not affect traffic operations. Finally, a SWPPP would be prepared to manage stormwater runoff after the Proposed Project has been completed (see Chapter 10, “Stormwater Management”). With the implementation of such measures, no significant adverse impacts to geology, soils, or topography are anticipated as a result of the Proposed Project.  £¤6 Alb y n Pl B a r g e r S t B a n k Rd LeeBlvd O l d J e ff e r s o n V a ll e y R d TaconicStPkwy ServiceRd Indian Hill R d Tru m pPark E M a i n S t G A R Hwy S t e p h e n S m i t h D r ChE ClC PnD CrC PnB ClCClD ClD ClB PoB CsD ClB PoD Sm Sh PnC PnB ChB ChC PnCSuBW LeB PnD ChB LeB Uf CrC ChDSuB ChC ChE ChC ClB ChD ChE ChB Sh Sm PnC PnB CrC ClD ChD CsD ClC ChBCrC ChB UbChBRdA ChC ChCFf ChB ChD Uc Uf Uc PnB LeB Ff WdB SuB Sh 800 EAST MAIN STREET NRCS Soils Figure 5-1 0 1,000 FEET Project Site Soils 1. 1 0 . 2 4 Da t a s o u r c e : N R S C U S D A S S U R G O . Soil Symbol - Soil Name ChB - Charlton fine sandy loam, 3 to 8 percent slopes ChC - Charlton fine sandy loam, 8 to 15 percent slopes ChD - Charlton fine sandy loam, 15 to 25 percent slopes ChE - Charlton loam, 25 to 35 percent slopes ClB - Charlton fine sandy loam, 3 to 8 percent slopes, very stony ClC - Charlton fine sandy loam, 8 to 15 percent slopes, very stony ClD - Charlton loam, 15 to 25 percent slopes, very stony CrC - Charlton-Chatfield complex, 0 to 15 percent slopes, very rocky CsD - Chatfield- Charlton complex, 15 to 35 percent slopes, very rocky Ff - Fluvaquents- Udifluvents complex, frequently flooded LeB - Leicester loam, 2 to 8 percent slopes, very stony PnB - Paxton fine sandy loam, 3 to 8 percent slopes PnC - Paxton fine sandy loam, 8 to 15 percent slopes PnD - Paxton fine sandy loam, 15 to 25 percent slopes PoB - Paxton fine sandy loam, 0 to 8 percent slopes, very stony PoD - Paxton fine sandy loam, 15 to 25 percent slopes, very stony RdA - Ridgebury complex, 0 to 3 percent slopes Sh - Sun loam Sm - Sun loam, extremely stony SuB - Sutton loam, 3 to 8 percent slopes Ub - Udorthents, smoothed Uc - Udorthents, wet substratum Uf - Urban land W - Water WdB - Woodbridge loam, 3 to 8 percent slopes 800 EAST MAIN STREET Topography Figure 5-2 0 500 FEET Project Site Project Site Slopes 0-10% 10-15% Greater than 15% 5. 1 5 . 2 4 Da t a s o u r c e : N Y S H i g h R e s o l u t i o n D E M s . t r k og 800 EAST MAIN STREET Surficial Geology Figure 5-3 0 1 Miles Project Site Surficial Geology k - Kame deposits og - Outwash sand and gravel r - Bedrock t - Till 1. 1 0 . 2 4 Da t a s o u r c e : N e w Y o r k S t a t e M u s e u m ; L o w e r H u d s o n S u r f i c i a l G e o l o g y £¤6 bg bqpc Cpg 800 EAST MAIN STREET Bedrock Geology Figure 5-4 0 1 Miles Project Site Bedrock Geology Cpg - Poughquag Quartzite bg - Biotite granite gneiss bqpc - Biotite-quartz-plagioclase paragneis 1. 1 0 . 2 4 Da t a S o u r c e : N e w Y o r k S t a t e M u s e u m ; L o w e r H u d s o n B e d r o c k G e o l o g y .