HomeMy WebLinkAboutREV Permit #T-WP-FSWPPP-018-19 - Panbar Realty (Rev 9-23-27)Richard Fon Ed Lachtennan
Chainnan Town Supervisor
TOWN OF YORKTOWN
PLANNING BOARD
Town of Yorktown Planning Department, 1974 Commerce Street, Yorktown Heights, New York 10598, Phone (914) 962-6565
#T-WP-FSWPPP-018-19 — PanBar Realty Application Fee Paid: $3,300
Crystal Court Subdivision Permit Issued: 9/23/26
Permit Expiration Date: 9/23/27
MS4 STORMWATER MANAGEMENT PERMIT
Additional Conditions of Permit
Description of Permitted Activity
Land development associated with developing a three (3) lot subdivision which creates three (3)
new building lots improved with single-family residences.
Submitted Plans
Plan Set Entitled: Crystal Court Subdivision, prepared by Hudson Engineering & Consulting, P.C.,
dated 4/10/24 and last revised 8/27/25, 10 sheets.
Conditions that must be met prior to signing the plans:
• Footing drains shall be disconnected from infiltration system.
• An 8% Inspection Fee payable to the Town of Yorktown for Engineering Department
oversight of this project in the non-refundable amount of $20,476, which is based on a
sitework estimate of $255,951 for project work items that are under the inspection
jurisdiction of the Engineering Department.
• Post a $3,580 erosion control bond.
• Post a $252,101 performance bond. Posting the performance bond may be deferred if
applicant installs improvements prior to filing the plat.
Conditions that must be met prior to the commencement of work:
1. A pre -construction meeting must be held at the site. The applicant or a representative shall
contact the Engineering Department (914) 962-5722 x220 to arrange this meeting. All erosion
controls and limits of disturbance lines (such as silt fence and orange construction fencing) are
to be installed prior to this meeting.
Permit #FSWPPP-018-19 Page 4
2. The property lines and easements must be staked out by a licensed land surveyor prior to
construction to ensure the proposed work occurs entirely within the Applicant's property.
3. The entire scope of work is shown on the plan referenced above; no additional land disturbing
activity of any kind shall be permitted without the issuance of a new permit by the appropriate
approval authority. No further changes to the existing site topography shall be permitted and
no protected trees shall be cut.
4. Erosion control practices proposed on the approved plans shall be installed.
Conditions that must be met during construction:
1. The guidelines contained in the NYSDEC Standards and Specifications for Erosion &
Sediment Control, latest edition, shall be followed. At the end of each workday, soil stockpiles
shall be covered. If not worked on for more than seven (7) days, stockpiles shall be
seeded/mulched with a silt fence around the perimeter.
2. If any excess soil material is being removed from the site, copies of the waste manifest forms
shall be furnished to the Engineering Department.
3. All other required Town permits shall be obtained; water service connection (Water), and
sewer connection (Engineering).
4. Bi-weekly site inspections should be performed by a certified professional to ensure the erosion
and sediment control measures are functioning as intended. Inspections shall also be done
following storm events that are 1-inch or greater. Copies of inspection reports shall be prepared
by a licensed individual and sent to the Engineering Department and Planning Department for
our records.
5. No soil storage outside the limit of disturbance line is permitted. All existing paved surfaces shall
be kept broom clean at all times.
6. Road in front of property must be kept broom clean at all times.
Permit #FSWPPP-018-19 Page 5
When the Proiect Work is Complete:
1. The applicant shall notify the Engineering Department. The Engineering Department will then
perform a final inspection to confirm the required improvements have been satisfactorily
completed. Applicant will be notified of concurrence or if any work is not acceptable.
2. A final site survey showing as -built conditions shall be provided to the Engineering Department.
The survey must include all underground utilities and easements for the work performed. Provide
a printed copy and in pdf format.
3. Please call to set up a final inspection when the site is stable, no bare spots or signs of erosion.
rass needs to be fully grown. #914-962-5722, ext. 220. The Engineering Department will
p form a final inspection to confine the required improvements have been satisfactorily
col pleted. Applicant will be notified of concurrence or if any work is not acceptable.
by: Planning Board Resolution #21-19 dated September 13,2021, and reapproved by
#26-15,,da'ted May 18, 2026.
Rich, Chainnan
Approval Authority
Permit #FSWPPP-018-19
Page 6
/ 23 z0��
Date