A. INTRODUCTION AND SUMMARY OF FINDINGS
This chapter assesses the potential impacts of the Proposed Project with issues related to water
supply and sanitary wastewater generation. The Proposed Project is anticipated to generate
approximately 47,690 gallons per day (gpd) of water/sanitary demand, an increase of 41,815 gpd
from the condition when the existing office buildings were at peak usage. Correspondence with
the Assistant Superintendent of the Yorktown Consolidated Water District confirmed that there
is adequate pressure for water supply to the Proposed Project. New water and sewer lines would
be constructed within the Project Site and would connect to existing public mains in the cul-de-
sac at the end of East Main Street. The sanitary sewer pump station on East Main Street would
be replaced to accommodate the increased flow of the Proposed Project. The design of the water
and sewer system would be subject to the review and approval of the Town of Yorktown
Engineering and Sewer Department, Yorktown Consolidated Water District, and the
Westchester County Department of Health.
B. EXISTING CONDITIONS
B.1. WATER SUPPLY
The Project Site is served by the Yorktown Consolidated Water District, which is part of
the Northern Westchester Joint Water Works (NWJWW). The NWJWW obtains its
water supply from the Amawalk Reservoir in the Town of Somers, New York and the
Catskill Aqueduct in the Town of Cortlandt Manor, New York. The 2022 daily average
water treated and pumped into NWJWW distribution system was approximately 2.7
million gpd (MGD).
The Project Site is served by an 8-inch public water main within Old Route 6. Once on-
site, the water main is reduced in size to a 6-inch main, which provides service to the
two existing buildings. Water consumption at peak usage was approximately 5,875 gpd.
B.2. SANITARY SEWAGE
The Project Site is located within the Westchester County Peekskill Sanitary Sewer
District. The trunk sewer line for the district runs from the northernmost portion of New
York State Route 118 in Somers, New York, eastward through Jefferson Valley and the
northwestern portion of the Town of Cortlandt, and finally runs southward towards
Peekskill. Wastewater from the Project Site is conveyed to the Peekskill Wastewater
Treatment Disposal Plant located in Peekskill, New York, which is operated by
Westchester County.
800 East Main Street Redevelopment
07/10/2024 9-2 DRAFT
An 8-inch PVC pipe sanitary sewer main runs from the two existing office buildings to
the sewer in East Main Street. The existing sewer connects to a pump station, owned by
the Town, which is located on Old Route 6, before its intersection with East Main Street.
C. THE FUTURE WITHOUT THE PROPOSED PROJECT
In the Future without the Proposed Project, there are no known changes to the water supply or
sewage infrastructure serving the Project Site.
D. THE FUTURE WITH THE PROPOSED PROJECT
D.1. WATER SUPPLY
The Proposed Project is estimated to have a water demand of approximately 47,690 gpd
(see Table 9-1). During peak usage of the existing office buildings’ water demand was
approximately 5,875 gpd. Therefore, the Proposed Project would result in a net increase
in water demand of approximately 41,815 gpd.
Table 9-1
Estimated Water/Sanitary Generation
Unit Type Number of Units Water Usage in Gallons Per Day per Unit Total Gallons Per Day
1 Bedroom 96 110 10,560
2 Bedroom 154 220 33,880
Clubhouse 1 3,250* 3,250
Total -- -- 47,690
Note:
* The calculation for the clubhouse is based on the estimation of 50 patrons per day, multiplied by the
combined standard for the NYS DEC Design Standards for a health club, restaurant, and pool.
Source: New York State Design Standards For Intermediate Sized Wastewater Treatment Systems, NYSDEC,
March 4, 2014
Based on a meeting with the Assistant Superintendent of the Yorktown Consolidated
Water District, the water system has adequate pressure to serve the Proposed Project.
The Proposed Project would utilize two (2) water service connections, one along the
southwestern frontage of the property within the driveway, and one at the public water
main southeast of the Project Site near the existing cul de sac. This would allow for the
water service to be looped within the Project Site, providing continuous water supply in
the event of a disruption to one connection. The design and construction of any new
water supply systems will meet all applicable American Water Works Association,
Westchester County Health Department, and Town requirements. Pursuant to County
regulations, the water mains would be owned by the Town, which would be granted an
easement for access and maintenance. Fire hydrants would be placed throughout the
Project Site, which would meet the requirements of the NYS Building & Fire Code as
well as the Lake Mohegan Fire Department.
D.2. SANITARY SEWAGE
The anticipated sanitary wastewater generation for the Proposed Project would be
approximately 47,960 gpd, an increase of approximately 41,815 gpd from the condition
where the existing office buildings were fully occupied. The Proposed Project would
Chapter 9: Water and Wastewater
DRAFT 9-3 07/10/2024
utilize the Project Site’s existing 8-inch PVC sanitary sewer pipe. The design and
construction of any extensions to the sanitary system will meet all applicable Ten State
Standards, Westchester County Health Department, and Town requirements. Pursuant to
County regulations, the sewer mains would be owned by the Town, which would be
granted an easement for access and maintenance. Based on correspondence with the
Town Engineer Daniel P. Ciarcia, P.E., it was determined that the pump station that
serves the Project Site is not adequate to serve the increased flow generated by the
Proposed Project. Therefore, the Applicant would install a new sanitary sewer pump
station, adjacent to the existing station, that would be adequate to accommodate the
increased flows of the Proposed Project.
E. MITIGATION MEASURES
E.1. WATER SUPPLY
The Proposed Project would incorporate water-saving technologies, including the use of
low-flow plumbing fixtures. These measures would reduce the demand on the public
water supply. Additionally, all water mains serving the Proposed Project would be
owned by the Town, providing access for inspection, maintenance, and repair whenever
necessary. The design and construction of any new water supply systems will meet all
applicable American Water Works Association, Westchester County Health
Department, and Town requirements. Therefore, the Proposed Project would not result
in a significant adverse impact on the public water supply and additional mitigation
measures are not proposed.
E.2. SANITARY SEWAGE
All mains serving the Proposed Project would be owned and maintained by the Town,
allowing for access easements for the purpose of inspection, maintenance, and repair
whenever necessary. The design and construction of any extensions to the sanitary
system will meet all applicable Ten State Standards, Westchester County Health
Department, and Town requirements.
Additionally, the existing sanitary sewer pump station that serves the Project Site would
be replaced by the Applicant This would include a new pump pit, duplex pumps,
electrical controls, and a new generator. The new pump station would be installed in-
ground adjacent to the existing pump station. The existing pumps, controls, and
generator would be abandoned and removed as per the Town’s specifications.
With the implementation of this measure, the Proposed Project is not anticipated to have
a significant adverse impact on the sanitary sewage system, and additional mitigation
measures are not required.