HomeMy WebLinkAbout17_AlternativesDRAFT 17-1 07/10/2024
Chapter 17: Alternatives
A. INTRODUCTION
SEQRA requires a description and evaluation of a range of reasonable alternatives to the Proposed
Project that are feasible, considering the objectives and capabilities of the Applicant. This chapter
describes and analyzes the potential environmental impacts of the alternatives to the Proposed
Project that were identified in the DEIS Scoping Document (see Appendix A-1) and evaluates the
relevant potential environmental impacts of those alternatives. The alternatives studied are:
Alternative 1: No Action – Existing Site Conditions and Re-Occupancy of Office Buildings
Alternative 2: Development Under Existing OB District Zoning
Alternative 3: Non-Age-Restricted Development
Alternative 4: Alternative Site Layout (185 units)
Alternative 5: Development Under Existing RSP-2 District Regulations
- Option 1: Existing RSP-2 District Regulations with Fewer Residential Units (3-story
buildings with same building footprint as the Alternative Site Layout, yielding 142 units,
fewer than the Proposed Project)
- Option 2: Existing RSP-2 District Regulations with Larger Building Footprint (3-story
buildings with larger building footprint than the Alternative Site Layout, yielding 185
units, fewer than the Proposed Project)
Pursuant to SEQRA, the description and evaluation of the alternatives should be at a level of detail
sufficient to permit a comparative assessment of the alternatives and a comparison with the
Proposed Project. Quantitative analyses of each environmental impact category for each
alternative are not presented; rather, the level of analysis varies to allow for the relative differences
in environmental impact to be identified. Therefore, if the impacts of an alternative for a specific
environmental impact category are expected to be the same as, or less than, the Proposed Project,
a brief assessment is provided. For environmental categories where the potential impact of the
alternative is anticipated to be materially different from the Proposed Project, a more detailed
analysis is provided. Table 17-A, located at the end of this chapter, summarizes and compares the
environmental impacts of the Proposed Project and the various alternatives.
B. ALTERNATIVE 1: NO ACTION – EXISTING SITE CONDITIONS AND
RE-OCCUPANCY OF OFFICE BUILDINGS
DESCRIPTION OF ALTERNATIVE
Under this alternative (the “Re-Occupancy Alternative”) the Proposed Zoning would not
be adopted, the Project Site would continue to be zoned OB District, and no demolition
of existing improvements or new construction would occur at the Project Site. The Project
Site would continue to be improved with approximately 63,617 square feet (sf) of office
800 East Main Street Redevelopment
07/10/2024 17-2 DRAFT
space within the two existing office buildings, as well as the surface parking lots and
landscaping. This alternative assumes that absent the Proposed Project, the office
buildings would be fully re-occupied by office tenants, and that no new structures or site
improvements would be constructed.
Given market conditions and the limited occupancy of the Project Site’s office buildings
during the past several years (as discussed in Chapter 2, “Land Use, Zoning, and Public
Policy”) full occupancy of the office buildings in the future is unlikely.
POTENTIAL IMPACTS OF ALTERNATIVE
B.2.a. Land Use, Zoning and Public Policy
As discussed in Chapter 2, “Land Use, Zoning, and Public Policy,” as part of the
Town’s Comprehensive Plan, the Town established goals to support its land use
vision for the future, including promoting housing diversity, providing housing
for people in all stages of life, and encouraging sustainable development. This
alternative would not be consistent with that goal of the Town Comprehensive
Plan. By comparison, the Proposed Project would increase and diversity the
Town’s housing stock and would promote sustainable development by
repurposing an already developed site as a residential neighborhood.
B.2.b. Visual and Community Character
There would be no change to visual and community character as a result of this
alternative. The visual character of the Project Site would continue to be
characterized by two office buildings surrounded by surface parking.
B.2.c. Cultural Resources
There would be no impact to cultural resources with this alternative.
B.2.d. Ecological Resources
With this alternative, there would be no impacts to ecological resources as no tree
or site clearing would be required.
B.2.e. Geology, Soils, Topography
This alternative would not alter the existing condition of the Project Site’s
wetlands, geology, soils, or topography. There would be no ground disturbance,
no construction activities, and no increase in impervious surfaces. No changes to
the existing vegetation and wildlife composition of the Project Site would occur
under this alternative.
B.2.f. Socioeconomic and Fiscal Impacts
As discussed in Chapter 7, “Socioeconomic and Fiscal Impacts,” in 2023, the
Project Site and existing improvements had a taxable assessed value of $180,000
and total property taxes were $270,670. Given market conditions and trends, re-
use of the office buildings is not assured, and it is possible under this alternative
that the Project Site may generate less property tax revenue in the future than it
does in the current condition. Finally, as discussed above, this alternative would
not meet the Town’s current housing needs.
Chapter 17: Alternatives
DRAFT 17-3 07/10/2024
B.2.g. Community Facilities
Under this alternative, if the offices were fully re-occupied, demand for
community facilities and services, including police protection services, fire
protection services, emergency medical services, would be anticipated to increase
above current levels, but not above levels experienced when the offices were fully
operational.
B.2.h. Water and Wastewater
As this alternative involves no changes to the existing condition of the Project
Site, there would be no need to construct new water or sewer systems within the
Project Site. However, if the office buildings were fully re-occupied, it is
anticipated that that there would be an increase in water demands, and production
of wastewater, owing to the larger on-site population as compared to the current,
unoccupied, condition of the Project Site. However, given that the office buildings
were previously occupied, it is assumed that the existing systems would be able
to adequately serve the Project Site.
B.2.i. Stormwater Management
In this alternative, impervious surfaces on the Project Site would remain the same
as the existing condition, and stormwater runoff would continue to be collected
by existing storm water management infrastructure. This alternative would not
include the construction of modern stormwater management systems and
implementation of green infrastructure practices.
B.2.j. Use and Conservation of Energy
As this alternative involves no changes to the existing condition of the Project Site,
there would be no need to construct new electricity or gas infrastructure on the
Project Site. However, if the office buildings were fully re-occupied, it is anticipated
that that there would be an increase in electricity and gas demands compared to the
currently vacant Project Site, owing to the larger on-site population. However,
given that the office buildings were previously occupied, it is assumed that the
existing systems would be able to adequately serve the Project Site.
B.2.k. Traffic and Transportation
Full occupancy of the existing office buildings would generate 113 vehicle trips
in the Weekday AM peak hour, 114 vehicle trips in Weekday PM peak hour, and
34 vehicle trips in the Saturday peak hour (see Table 17-1).1 This is compared to
108 vehicle trips in the Weekday AM peak hour, 128 vehicle trips in the Weekday
PM peak hour, and 80 vehicle trips in the Saturday peak hour for the Proposed
Project. Although the traffic volumes generated by the Re-Occupancy Alternative
would meet or exceed the volume impact criteria at the U.S. Route 6 and East
Main Street intersection, the mitigation measures summarized in Chapter 19,
1 The approved site plan for the existing office buildings required employees to be divided into four
arrival/departure shifts to mitigate peak hour trips, as follows: (1) Shift 1, 7:45am-4:00pm, 30 percent of
employees; (2) Shift 2, 8:45am-5:00pm, 40 percent of employees; (3) Shift 3, 9:45am-6:00pm, 20 percent
of employees; and (4) Shift 4, 10:45am-7:00pm, 10 percent of employees.
800 East Main Street Redevelopment
07/10/2024 17-4 DRAFT
“Mitigation,” would not be implemented, and the intersection would continue to
operate at LOS F.
Table 17-1
Re-Occupancy Alternative – Trip Generation Summary
Building Component Size Peak Hour
Trips
In Out Total
Office 63,617 sf
AM 99 14 113
PM 19 95 114
Sat 18 16 34
Notes:
ITE Land Use Code 710 – General Office Building
AM peak hour of roadway equation: Ln(T)=0.86 Ln(X)+1.16, 88% entering, 12% exiting
PM peak hour of roadway equation: Ln(T)=0.83 Ln(X)+1.29, 17% entering, 83% exiting
Sat peak hour of generator rate: 0.53 trips per 1,000 sf, 54% entering, 46% exiting
B.2.l. Air Quality
If the office buildings were fully re-occupied, it is anticipated that there would be
more vehicle trips than under the existing condition. However, given that the
office buildings were previously occupied, it is assumed that emissions levels
would be comparable to those previously generated by the Project Site.
B.2.m. Noise
If the office buildings were fully re-occupied, it is anticipated that there would be
more vehicle trips than under existing conditions, However, given that the office
buildings were previously occupied, it is assumed that noise levels would be
comparable to those previously generated by the Project Site.
B.2.n. Hazardous Materials
As existing physical site conditions would remain the same with this alternative,
there would be no greater potential for hazardous materials impacts than
presented by the existing condition.
C. ALTERNATIVE 2: DEVELOPMENT UNDER EXISTING OB DISTRICT
ZONING
DESCRIPTION OF ALTERNATIVE
This alternative considers development of the Project Site to the maximum extent
permitted under the existing OB District regulations (the “Existing Zoning Alternative”).
A hypothetical site plan was developed for this analysis, in which the two existing office
buildings are retained, and three additional office buildings as well as additional parking
areas to serve those new buildings are constructed (see Figure 17-1). In total, this
alternative would result in 204,901 sf of office space, of which 141,284 sf would be newly
constructed space, and a total of 608 parking spaces, an increase of 320 spaces. One new
office building (see Figure 17-1) would be constructed to the south of the two existing
office buildings. This east building would be developed in an area with steep topography,
to the south of the existing parking lot. The other two new office buildings would be
constructed to the north of the existing site improvements (see Figure 17-1), in a currently
Chapter 17: Alternatives
DRAFT 17-5 07/10/2024
undisturbed (wooded) area of the Project Site. The new parking areas required for these
two buildings would cover approximately 7.9-acres of the Project Site.
It should be noted that the 2010 Town Comprehensive Plan identifies the Project Site in
Policy 4-63, which recommends that the Town “promote corporate or multi-tenant office
development in select locations near major entrances to the Taconic Parkway and Route
6” (page 4-33). The economic realities of corporate office parks in the region have evolved
dramatically since the Comprehensive Plan’s adoption approximately 15 years ago,
making re-use of existing office campus economically infeasible. Other components of
the Town Comprehensive Plan than Policy 4-63 inform the Applicant’s redevelopment
proposal for the Project Site.
As noted below, this alternative would not meet the needs and objectives of the Applicant,
and is not economically feasible. Additionally, given the marketplace and economic
changes since the Comprehensive Plan was adopted, it is the Applicant’s opinion that
Policy 4-63 is outdated, and that this alternative is not consistent with other relevant
policies of the Town Comprehensive Plan discussed in Section D.2.a below.
POTENTIAL IMPACTS
C.2.a. Land Use, Zoning, and Public Policy
Compliance of this alternative with existing OB District regulations is provided in Table
17-2.
Table 17-2
Compliance of Existing Zoning Alternative with OB District Regulations
OB District Regulations Existing Zoning Alternative
Floor Area Ratio, usable (with
public sewers) (square feet) 0.47 0.47
Minimum site area (acres) 20 35.5
Front yard (feet) 150 210
Side yard (feet) 100 210
Rear yard (feet) 100 500
Maximum height (feet) 45 45
Maximum building coverage of
actual lot area (all buildings) 10% 10%
Required off-street parking spaces
per dwelling unit
2 PS / 3 employees
1 PS / company vehicles 608
Source: Town of Yorktown Zoning Code, https://ecode360.com/6853812
This alternative would add additional commercial office space within the Town,
for which there is limited and declining demand, as discussed above. The Town
Comprehensive Plan encourages the Town to develop new housing stock of
varying typologies. Although the Town Comprehensive Plan identifies the
Project Site as a location for corporate or multi-tenant office development,
intervening changes in the market since that time have made that recommendation
and corresponding Policy 4-63 inviable. This alternative would not be consistent
with other relevant policies of the Town Comprehensive Plan and associated land
use goals.
800 East Main Street Redevelopment
07/10/2024 17-6 DRAFT
C.2.b. Visual and Community Character
This alternative, similar to the Proposed Project, would likely not be visible from
the vantage points analyzed in Chapter 3, “Visual and Community Character,”
and would not be anticipated to have a significant adverse impact on visual and
community character (see Figure 17-2). The two new office buildings on the
northern portion of the Project Site would be developed further east than the
buildings of the Proposed Project in the same area. The new office building
developed on the southern portion of the Project Site would be located in a similar
location as the Proposed Project’s apartment building and as such impacts would
be comparable (or potentially less, as the office building would be shorter than
the apartment building).
C.2.c. Geology, Soils, Topography
This alternative would result in less site disturbance (13.62 acres) than the
Proposed Project (20.29 acres), mainly due to the fact that the existing office
buildings and parking would not be disturbed with this alternative. The majority
of Site disturbance required for the Existing Zoning Alternative would be to
slopes greater than 15 percent and only 1.85-acres of Site disturbance would be
to land sloped zero to 10 percent (see Table 17-3).
Table 17-3
Existing Zoning Alternative – Slope Disturbance
Slope Grade
Disturbance Area of
Proposed Project (acres)
Disturbance Area of
Existing Zoning Alternative (acres)
0% to 10% 7.39 1.85
10% to 15% 4.35 3.61
Greater than 15% 8.55 8.16
Total 20.29 13.62
Source: Site Design Consultants
This alternative would result in approximately 18.2 acres of impervious surface,
nearly twice as much as the Proposed Project (see Table 17-4). Six acres of
maintained landscaped areas would be created with this alternative, which is five
acres fewer than with the Proposed Project, while approximately 11.3 acres of
forested areas would be maintained, which is approximately four acres less than
with the Proposed Project.
Table 17-4
Existing Zoning Alternative – Land Cover
Cover Type Proposed Project (acres) Existing Zoning Alternative (acres)
Impervious 9.3 18.2
Landscaped 11.0 6.0
Wooded 15.2 11.3
Total 35.5 35.5
Source: Site Design Consultants
C.2.d. Ecological Resources
The Existing Zoning alternative would reduce the amount of wooded areas on the
Project Site from 26.85 acres to 11.3 acres (as compared to 15.2 acres for the
Chapter 17: Alternatives
DRAFT 17-7 07/10/2024
Proposed Project). However, utilization of the same mitigation measures as the
Proposed Project (see Chapter 6, “Ecological Resources”) would be anticipated
to avoid and mitigate potential adverse impacts to ecological resources as a result
of this alternative.
C.2.e. Socioeconomic and Fiscal Impacts
If this alternative was developed and the office space was fully occupied, the tax
revenue generated by the Project Site would be greater than the current condition.
However, as discussed in detail in Chapter 2, “Land Use, Zoning, and Public
Policy” and elsewhere in this DEIS, demand for office space in a corporate park
setting has been declining throughout the County. As with the Re-Occupancy
Alternative, given market conditions and trends, full occupancy of the office
space of this alternative is not assured, and it is unlikely that this alternative would
be economically feasible.
C.2.f. Community Facilities
This alternative would result in an increased demand for emergency services
compared to the current condition. As this alternative would increase the tax
revenues generated by the Project Site as compared to the current condition,
incremental costs incurred by emergency service providers would be anticipated
to be offset by the increase in tax revenue to the various taxing jurisdictions.
C.2.g. Water and Wastewater
This alternative would result in increased water demand and wastewater
generation compared to existing levels. Development of this alternative would
result in a water demand of approximately 15,375 gallons per day (gpd).2 This
would be an increase of approximately 9,500 gpd from the Project Site’s previous
peak usage of approximately 5,875 gpd. It is anticipated that, as is the case with
the Proposed Project, the Water District would have adequate pressure and
capacity to serve this alternative. The increase in wastewater generated by this
alternative may require the replacement of the existing sanitary sewer pump
station.
C.2.h. Traffic and Transportation
Full build out of the Existing Zoning Alternative would generate 310 vehicle trips
in the Weekday AM peak hour, 301 vehicle trips in Weekday PM peak hour, and
109 vehicle trips in the Saturday peak hour (see Table 17-5). This is nearly three
times the number of weekday peak hour vehicle trips generated by the Proposed
Project (108 in the Weekday AM peak hour and 128 in the Weekday PM peak
hour). While a capacity analysis was not completed for this alternative, it is likely
that in addition to signalizing the East Main Street and U.S. Route 6 intersections,
improvements at other intersections would be required.
2 Per the New York State Design Standards For Intermediate Sized Wastewater Treatment Systems,
NYSDEC, March 4, 2014, each employee would use 15 gpd. Assumed maximum of approximately
1,025 employees, or, 1 per 200 sf of office space.
800 East Main Street Redevelopment
07/10/2024 17-8 DRAFT
Table 17-5
Existing Zoning Alternative – Trip Generation Summary
Use Size Peak Hour
Trips
In Out Total
Office 204,901 sf
Weekday AM 273 37 310
Weekday PM 51 250 301
Sat 59 50 109
Notes:
ITE Land Use Code 710 – General Office Building
AM peak hour of roadway equation: Ln(T)=0.86 Ln(X)+1.16, 88% entering, 12% exiting
PM peak hour of roadway equation: Ln(T)=0.83 Ln(X)+1.29, 17% entering, 83% exiting
Sat peak hour of generator rate: 0.53 trips per 1,000 sf, 54% entering, 46% exiting
C.2.i. Air Quality and Noise
Under the Existing Zoning Alternative, there would be more vehicle trips than the
Proposed Project and stationary sources of air emissions and noise (i.e., building
HVAC systems) would be in different locations on the Project Site. If this
alternative were pursued, an analysis would need to be conducted to confirm that
no significant adverse air quality or noise impacts would result.
D. ALTERNATIVE 3: NON-AGE-RESTRICTED DEVELOPMENT
DESCRIPTION OF ALTERNATIVE
Under this alternative, the Project Site would be developed with the same layout as the
Proposed Project (250 residential units, with 200 rental units located throughout 12
buildings (of varying building types), and 50 for-sale townhouses throughout 12
buildings), but without an age-restriction (the “Non-Age-Restricted Alternative”). This
section analyzes the potential impacts of the Non-Age-Restricted Alternative, as well as
the consistency of this alternative with the Town’s existing R-3 Multifamily Residential
District (the “R-3 District”).
Physical impacts of the Non-Age-Restricted Alternative would be the same as the
Proposed Project owing to the identical development program for the Project Site.
Specifically, only impacts related to land use and zoning, socioeconomics, fiscal and
community facilities, traffic and transportation, and mobile sources of air quality and
noise have the potential to be different than those of the Proposed Project. These potential
impacts are analyzed below.
POTENTIAL IMPACTS
D.2.a. Land Use and Zoning
As with the Proposed Project, this alternative would convert a vacant office
campus into a residential community, consistent with nearby residential uses,
consistent with the goals and policies of the Town Comprehensive Plan (as
discussed in Chapter 2, “Land Use, Zoning, and Public Policy”) to develop more
housing stock of varying typologies throughout the Town. As noted, those goals
and policies include:
Chapter 17: Alternatives
DRAFT 17-9 07/10/2024
“Promote housing for people in all stages of life, from young adults and
couples, to families with children, to seniors;” and
“Goal 5-C: In and around the five hamlet business centers, promote housing
diversity in a format compatible with both commercial uses and adjacent
single-family residential areas.”
The R-3 District of the Town permits multifamily development, such as the
Proposed Project or this alternative. While this alternative would comply with
most R-3 District regulations, including the maximum number of dwelling units
per acre, it would exceed the maximum FAR of 0.23 (with a FAR of 0.50), and
would exceed the maximum building height of 40 feet (with a building height of
55 feet) (see Table 17-6).
Table 17-6
Zoning Compliance of Non-Age-Restricted Alternative
with R-3 District Regulations
R-3 District Non-Age-Restricted Alternative
Lot area (square feet) 3,630 1,548,227
Floor Area Ratio, usable (with
public sewers)
0.20 for max. 12 units/acre
0.215 for max. 10 units/acre
0.23 for max. 9 units/acre 0.50 for 7.04 units/acre
Lot depth (feet) 150 2,259
Front yard (feet) 50 454
Side yard (feet) -- 59 (east), 56 (west)
Main or accessory building,
minimum either side 50 50
Two combined 100 115
Rear yard (feet) -- --
Main Building 50 319
Maximum height (feet) --
Main building 40 55
Maximum building coverage of
actual lot area (all buildings) 20 percent 16.2 percent
Required off-street parking spaces
per dwelling unit 1.5 383 Provided (1.5+ per unit)
Note:
Zoning regulations for the Non-Age-Restricted Alternative presented in bold do not comply with existing
zoning regulations for the R-3 District.
Sources:
Town of Yorktown Zoning Code, Appendix A (Residence Zone Standards), https://ecode360.com/6853812
D.2.b. Socioeconomic and Fiscal
This alternative would be anticipated to generate substantially similar property
tax revenues as the Proposed Project, including $1,083,969 per year to the
Lakeland Central School District, and slightly greater economic benefits in the
Town than the Proposed Project owing to the greater number of residents that
would occupy this alternative.
800 East Main Street Redevelopment
07/10/2024 17-10 DRAFT
D.2.c. Community Facilities
This alternative would be anticipated to increase the Town’s population by 521
persons, approximately 68 percent more residents than the Proposed Project (310
persons) (see Table 17-7).
Table 17-7
Non-Age-Restricted Alternative – Resident Population
Residence Type Number of Units Multiplier Projected Population
5-49 Units, 0-1BR (Rent) 49 1.734 85.0
5-49 Units, 2BR (Rent) 79 2.598 205.2
50+ Units, 0-1BR (Rent) 28 1.506 42.2
50+ Units, 2BR (Rent) 44 2.375 104.5
5-49 Units, 0-1BR (Own) 19 1.388 26.4
5-49 Units, 2BR (Own) 31 1.837 56.95
Total 250 -- 520.2
Sources: Who Lives in New Jersey Housing? Updated New Jersey Demographic Multipliers, The Profile
of Occupants of Residential Development in New Jersey, Rutgers University, Center for Urban Policy
Research, November 2018. Table II-B-1.
The Non-Age-Restricted Alternative would be anticipated to generate public
school aged children (“PSAC”) that would attend the Lakeland Central School
District (the “District”). It is anticipated that this alternative could generate
approximately 45 PSAC, as shown in Table 17-8. Based on the District’s average,
$17,911 per-pupil3 programmatic expense,4 which is supported by property tax
revenue,5 the additional cost of the 45 PSAC ($805,974) would be more than
covered by the approximately $1,083,969 in annual property tax revenue
generated by this alternative. It is noted, however, that with the Proposed Project,
approximately the same amount of annual property tax revenue would be
generated as this alternative, but no PSAC are anticipated, and therefore, there
would be no additional cost to the District.
3 K-12 enrollment of 5,342 in 2021–2022.
https://cms8.revize.com/revize/lakelandnyschools/2023%202024%20Budget%20Binder.%20Final.pdf
4 80 percent of total budget, or, $147,196,971.
https://cms8.revize.com/revize/lakelandnyschools/BOE%202023%2020224/LakelandFlyer_2023_10.pdf
5 65 percent of total budget funded by property tax revenue.
https://cms8.revize.com/revize/lakelandnyschools/BOE%202023%2020224/LakelandFlyer_2023_10.pdf
Chapter 17: Alternatives
DRAFT 17-11 07/10/2024
Table 17-8
Non-Age-Restricted Alternative – Public School Aged Children
Residence Type Number of Units Multiplier Projected Number of PSAC
5-49 Units, 0-1BR (Rent) 49 0.097 4.75
5-49 Units, 2BR (Rent) 79 0.363 28.68
50+ Units, 0-1BR (Rent) 28 0.040 1.12
50+ Units, 2BR (Rent) 44 0.148 6.51
5-49 Units, 0-1BR (Own) 19 0.037 0.70
5-49 Units, 2BR (Own) 31 0.086 2.67
Total 250 -- 44.43
Sources: Who Lives in New Jersey Housing? Updated New Jersey Demographic Multipliers, The Profile
of Occupants of Residential Development in New Jersey, Rutgers University, Center for Urban Policy
Research, November 2018. Table II-B-6.
Based on the greater residential population of this alternative as compared to the
Proposed Project, it would be anticipated that demand on emergency services
providers would be greater for this alternative than for the Proposed Project.
However, calls for EMS services would not be anticipated to occur at a higher
rate than at other non-age-restricted multi-family developments. As with the
Proposed Project, it is anticipated that increased property tax revenue from this
alternative would offset the additional costs to the various service providers,
though the School District would experience a smaller “surplus” of revenue
compared to the Proposed Project.
D.2.d. Traffic and Transportation
Development of this alternative would generate 122 vehicle trips in the Weekday
AM peak hour, 136 vehicle trips in Weekday PM peak hour, and 102 vehicle trips
in the Saturday peak hour (see Table 17-9). This is slightly more than the number
of vehicle trips generated by the Proposed Project (i.e., 108, 128, and 80,
respectively). As with the Proposed Project, this alternative would result in an
impact to the East Main Street intersections, which could be mitigated in the same
way as the proposed Project (i.e., signalization and implementation of the other
measures summarized in Chapter 19, “Mitigation”).
As this alternative would be anticipated to generate PSAC, a school bus stop
would be required at the Project Site to accommodate school bus pick-ups and
drop-offs.
800 East Main Street Redevelopment
07/10/2024 17-12 DRAFT
Table 17-9
Non-Age-Restricted Alternative – Trip Generation Summary
Use (Multifamily) Size
Peak
Hour
Trips
In Out Total
Apartments1 200 units
AM 17 59 76
PM 48 32 80
Sat 41 40 81
Townhomes2 50 Units
AM 11 35 46
PM 35 21 56
Sat 11 10 21
Total Weekday AM Peak Hour Trips 28 94 122
Total Weekday PM Peak Hour Trips 83 53 136
Total Saturday Midday Peak Hour Trips 52 50 102
Notes:
1 ITE Land Use Code 221 – Multifamily Housing (Mid-Rise)
AM peak hour of roadway equation: T=0.44(X)-11.61, 23% entering, 77% exiting
PM peak hour of generator equation: T=0.32(X)-15.57, 60% entering, 40% exiting
Sat peak hour of generator equation: Ln(T)=1.00 Ln(X)-0.91, 51% entering, 49% exiting
2 ITE Land Use Code 220 – Multifamily Housing (Low-Rise)
AM peak hour of generator equation: T=0.35(X)+28.13, 24% entering, 76% exiting
PM peak hour of generator equation: T=0.42(X)+34.78, 62% entering, 38% exiting
Sat peak hour of generator rate: 0.41 trips per unit, 51% entering, 49% exiting
D.2.e. Air Quality
As discussed in Chapter 13, “Air Quality,” the Proposed Project would not cause
significant adverse air quality impacts or significant adverse impacts to GHG
emissions, and therefore no mitigation measures would be warranted. Although
this alternative would result in slightly more vehicle trips than the Proposed
Project, it is not anticipated that the increase in vehicle trips would result in
significant adverse air quality impacts or adverse impacts to GHG emissions.
D.2.f. Noise
As discussed in Chapter 14, “Noise,” the Proposed Project would not result in a
significant adverse impact from noise. Although this alternative would result in
slightly more vehicle trips than the Proposed Project, noise levels attributable to
mobile sources (i.e., vehicles), would be substantially similar to the Proposed
Project and would not result in a significant adverse impact.
E. ALTERNATIVE 4: ALTERNATIVE SITE LAYOUT
The Applicant has developed an alternative that accommodates a development program similar to
the Proposed Project, but which reduces the potential for several potential adverse impacts of the
Proposed Project (the “Alternative Site Layout”). This section analyzes the potential
environmental impacts of redeveloping the Project Site with the Alternative Site Layout. The
Applicant’s preferred action is the Proposed Project. However, this alternative would also meet
the Applicant’s objectives. Given this, it is analyzed below in the same manner (i.e., with respect
to the same impact categories) as the Proposed Project.
Chapter 17: Alternatives
DRAFT 17-13 07/10/2024
DESCRIPTION OF ALTERNATIVE
The existing improvements at the Project Site would be removed and an age-restricted
(ages 55 and over) community consisting of 185 dwelling units (165 multi-family units in
two multi-family buildings, and 20 cottages each with two bedrooms), together with 278
parking spaces, open space, walking trails, and recreational amenities would be developed
(see Figure 17-3). In total, this alternative would have 71 one-bedroom units, and 114
two-bedroom units, and 349,036 sf of residential structures.
Much of the proposed development would take place within the previously developed
footprint of the existing office buildings and associated surface parking areas. This
alternative would require 8.65 acres of disturbance to the Project Site, as compared to
20.29 acres for the Proposed Project. The existing driveway and much of the existing
parking lots would remain with this alternative. Each multi-family building would be four
stories and approximately 55-feet tall (see Figure 17-4a-c and Figure 17-5 for elevations
and sections of the proposed multi-family buildings). Within the multi-family buildings,
there would be 71 one-bedroom units and 94 two-bedroom units (see Figure 17-6a-c for
floorplans of the proposed multi-family buildings). Dwelling units in the multi-family
building would range from approximately 885 sf to 1,570 sf. The average size of the one-
bedroom units would be 978 sf and the average size of the two-bedroom units would be
1,279 sf, and all dwelling units would include balconies.
Interior amenities for the multi-family buildings would include a clubhouse with club
room, demonstration kitchen, catering kitchen, fitness center, spa, screening room, sports
lounge, reading room, and an art studio. Exterior amenities would include a pool and
barbeque area within the courtyard between the multi-family buildings, as well as sports
courts and natural walking trails.
The 20 two-bedroom cottages would be developed to the north of the parking area for the
multi-family buildings. The cottages would be constructed in attached sets of two or four
cottages, along a roadway with a round-about at its northern terminus (see Figure 17-7a-b
for elevations of the proposed cottages). The cottages would range in size from 1,470 sf
to 2,100 sf and would have driveway and garage parking (see Figure 17-8 for floorplans
of the proposed cottages).
The architectural design of the buildings for this alternative emphasizes large windows
and outdoor spaces, evident through not only the shared program spaces, including the
courtyard between the two multi-family apartment buildings, but also at the individual
scale, as each unit would have its own balcony (see Figure 17-9a-b for renderings of the
multi-family buildings). The overall design aesthetic is transitional, embracing traditional
design with a minimalist flair both in massing and in finish choices. There are no flat
roofs. Instead, this alternative incorporates 4:12 roofs with dormers at 6:12. With a neutral
color palette, references to nature and surrounding colors are integrated into the buildings.
LAND USE, ZONING, AND PUBLIC POLICY
E.2.a. Existing Conditions
As detailed in Chapter 2, “Land Use, Zoning, and Public Policy,” within the Land
Use Study Area, the predominant land use is residential, followed by commercial,
parks and open space, community services, public services, recreation and
entertainment, and vacant land. To the north and northeast, the Project Site is
800 East Main Street Redevelopment
07/10/2024 17-14 DRAFT
bordered by Donald J. Trump State Park; to the west, it is bordered by the Taconic
State Parkway; to the southeast it is bordered by a few single-family homes; to
the south of the Project Site (south of U.S. Route 6), there is a neighborhood of
predominantly detached single-family dwellings. West of the Project Site (across
the Taconic State Parkway) is Trump Park Residences. Commercial land uses are
located to the south and southeast of the Project Site.
E.2.b. Potential Impacts – Land Use
With the Alternative Site Layout, the Project Site would be converted from a
vacant office campus into an age-restricted (55+) residential community. This use
is consistent with surrounding residential land uses, including Trump Park
Residences, a similarly age-restricted condominium development in the RSP-2
District west of the Project Site across the Taconic State Parkway. In addition, the
proposed age-restricted residential use is consistent with the residential
neighborhoods to the east and south of the Project Site and would not introduce
new land uses that do not presently exist within the surrounding area. As is the
case with the Proposed Project, the Alternative Site Layout would be consistent
with the overall residential land use character of the Land Use Study Area and
would be an appropriately scaled and sited residential community.
E.2.c. Potential Impacts – Zoning
Similar to the Proposed Project, development of the Alternative Site Layout
would require amendments to the Town Zoning Code. Specifically, the
Alternative Site Layout would require the Project Site to be remapped to the RSP-
2 District, which permits age-restricted multifamily developments. As is the case
with the Proposed Project, the Alternative Site Layout would also require text
amendments to the regulations of the RSP-2 District. However, unlike the
Proposed Project, which requires an amendment to the maximum building height
and maximum FAR, the Alternative Site Layout conforms to the existing
regulations for the RSP-2 District, except as to building height (see Table 17-10).
Chapter 17: Alternatives
DRAFT 17-15 07/10/2024
Table 17-10
Compliance of Alternative Site Layout with Existing RSP-2 District Regulations
RSP-2 Zoning Regulations
Alternative Site
Layout
Lot area (square feet)
Up to 3-room living unit (2-bedroom apts.) – 2,200;
over 2-bedroom or over 4-room living units – 10,000 1,548,227
Floor Area Ratio, usable (with
public sewers) (square feet) 0.35 0.23
Minimum site area (acres) 5 35.5
Lot width at main building line
(feet) 150 575.9
Lot depth (feet) 150 2,259
Front yard (feet) 50 454
Side yard (feet) --
209 (east), 57
(west)
Main or accessory building,
minimum either side 50 50
Two combined 100 266
Rear yard (feet) -- --
Main Building 50 626
Maximum height (feet) -- --
Main building 45 55*
Minimum usable floor area of
dwelling unit (square feet)
Studio – 350
1-bedroom – 450
2 bedrooms or more - 550
1-bedroom – 800
2 bedrooms or
more – 1,050
Required off-street parking
spaces per dwelling unit 0.5, plus a minimum of 10 additional for staff 278 provided
Note:
* Would require Zoning Text Amendment.
Sources:
Town of Yorktown Zoning Code, Appendix A (Residence Zone Standards), https://ecode360.com/6853812
E.2.d. Potential Impacts – Public Policy
As is the case for the Proposed Project, the Alternative Site Layout would be
consistent with relevant public policies.
Consistent with the recommendations of the Town Comprehensive Plan (as
identified in Section D.2.a, above), the Alternative Site Layout would increase
housing diversity in the Town by adding to the limited stock of age-restricted
housing, providing a viable option for existing residents wishing to downsize and
remain in the Town. The Alternative Site Layout would be compatible with the
surrounding neighborhood, introducing compatible residential use (in place of the
existing commercial use) into an area that is primarily comprised of residential
neighborhoods including the age-restricted Trump Park Residences community.
The Alternative Site Layout would be consistent with the policies Westchester
2025. Specifically, the Alternative Site Layout would improve the economic
climate in the County by replacing an underutilized, vacant office campus with a
residential community. Consistent with the policy to “define and protect
community character,” the Alternative Site Layout would promote housing
diversity in a format compatible with the character of surrounding land uses,
including adjacent residential areas. Furthermore, the Alternative Site Layout
800 East Main Street Redevelopment
07/10/2024 17-16 DRAFT
would protect and improve neighborhood quality of life by providing a housing
option for empty-nesters that want to downsize and remain in the Town.
Consistent with the policy goals of the Westchester County Housing Needs
Assessment, the Alternative Site Layout would increase housing stock in the
County, by adding to the limited supply of age-restricted (55+) housing, providing
a viable option for residents wishing to downsize and remain in the Town.
Increasing the housing supply would positively impact demand for existing
housing, potentially freeing up existing homes for younger generations.
E.2.e. Mitigation
As the Alternative Site Layout would create a residential community in an area
that is already predominantly residential, it would not result in any significant
adverse land use or zoning impacts, and no mitigation measures are required. The
Alternative Site Layout is also consistent with relevant public policy goals
advanced by the Town Comprehensive Plan, Westchester 2025, and the
Westchester County Housing Needs Assessment, and as such, no mitigation
measures are required.
VISUAL AND COMMUNITY CHARACTER
E.3.a. Existing Conditions
A detailed discussion of existing conditions on the Project Site and in the
surrounding area is provided in Chapter 3, “Visual and Community Character,”
and representative photographs are provided in Figure 3-1 and Figure 3-2.
E.3.b. Potential Impacts
Same as the Proposed Project, the views of the Alternative Site Layout were
analyzed from the following locations:
Vantage Point 1: Taconic State Parkway (traveling northbound)
Vantage Point 2: Taconic State Parkway (traveling southbound)
Vantage Point 3: U.S. Route 6 and East Main Street
Vantage Point 4: U.S. Route 6 between East Main Street and Lee Boulevard
Vantage Point 5: U.S. Route 6 between Taconic State Parkway and Barger
Street
Vantage Point 6: Service Road for Town Golf Course
Vantage Point 7: Donald J. Trump State Park (Indian Hill Section)
Photosimulations of the Alternative Site Layout from the vantage points are
provided in Figure 17-10a-g.
E.3.b.i Taconic State Parkway, Traveling Northbound (Vantage Point 1)
From this Vantage Point, a small portion of one of the Alternative Site
Layout’s buildings may be visible through the existing tree canopy in the
leaf-off condition (see Figure 17-10a). The remainder of the Alternative
Site Layout would not be visible, owing to intervening vegetation,
distance, and topography. For the Proposed Project, a portion of the roof
of one of the buildings would likely be visible at or above the tree line.
Chapter 17: Alternatives
DRAFT 17-17 07/10/2024
Given that only a small portion of the Alternative Site Layout may be
visible from this Vantage Point through the tree canopy and only in the
leaf-off conditions, and that this view is only available for a short distance
to motorists traveling at highway speeds, the change in views from this
Vantage Point as a result of the Alternative Site Layout would not be a
significant adverse impact.
E.3.b.ii Taconic State Parkway, Traveling Southbound (Vantage Point 2)
From this Vantage Point the northern multifamily building of the
Alternative Site Layout would be visible through the 150-foot-wide
vegetated buffer in the leaf-off condition (see Figure 17-10b), as well as
some of western most row of cottages. During the leaf-on condition,
visibility of the buildings would likely be obscured. This is a similar
condition to the existing condition, where one of the existing office
buildings is visible through the vegetation in the leaf-off condition. For
the Proposed Project, the western-most buildings would be visible
through the vegetated buffer in the leaf-off condition.
In addition to the visual simulations, the Applicant prepared sectional
diagrams that examine the potential for visibility of the Alternative Site
Layout from the Taconic State Parkway (see Figure 17-11). As shown in
those figures, the intervening wooded buffer between the Taconic State
Parkway and the Alternative Site Layout, as well as the change in grade,
significantly minimizes the potential visibility of the buildings from the
Parkway. As shown, the buildings would be well below the tree line.
Therefore, although portions of the Alternative Site Layout would be
visible from this Vantage Point, it would not be anticipated to
significantly change or impact the views from passing drivers (especially
at highway speeds). The Alternative Site Layout would therefore not have
a significant adverse impact viewed from this Vantage Point.
E.3.b.iii U.S. Route 6 and East Main Street (Vantage Point 3)
The intersection of U.S. Route 6 and East Main Street is located southeast
of the Project Site, at a lower elevation than the Project Site. Given the
intervening topography and dense tree cover between this Vantage Point
and the Project Site, there would be limited visibility of the Alternative
Site Layout from this intersection (see Figure 17-10c). Specifically, in
the leaf-off condition, a portion of the southernmost building may be
visible through the dense tree, bush and vine cover, but the buildings
would remain well below the tree line from this Vantage Point and, owing
to their height and site location, would be much less visible than the
buildings of the Proposed Project. In the leaf-on condition, the buildings
would not be visible. Therefore, the Alternative Site Layout would not
have a significant adverse impact viewed from this Vantage Point.
800 East Main Street Redevelopment
07/10/2024 17-18 DRAFT
E.3.b.iv U.S. Route 6, Between Main Street and Lee Boulevard (Vantage Point
4)
This Vantage Point is located southeast of the Project Site, at a greater
distance than Vantage Point 3, and is also at a lower elevation than that
of the Project Site. Given the intervening topography and the tree cover
on residential properties and the Project Site itself, together with the low-
rise nature of this alternative, the proposed buildings would not be visible
from this Vantage Point in the leaf-off condition (see Figure 17-10d).
For the Proposed Project, there would be limited, if any, visibility of the
buildings from this Vantage Point in the leaf-off condition. Therefore, the
Alternative Site Layout would not have a significant adverse impact
viewed from this Vantage Point.
E.3.b.v U.S. Route 6, Between Taconic State Parkway and Barger Street
(Vantage Point 5)
From this Vantage Point, located southwest of the Project Site and the
Taconic State Parkway, existing tree cover on the northern side of U.S.
Route 6, along the eastern side of the Taconic State Parkway, and on the
Project Site itself, would likely entirely occlude visibility of the buildings
(see Figure 17-10e). As with the Proposed Project, from this Vantage
Point, the top of the buildings would remain below the tree line and any
visibility from this location would occur only in leaf-off condition,
through dense vegetation. Therefore, the Alternative Site Layout would
not have a significant adverse impact viewed from this Vantage Point.
E.3.b.vi Service Road for Town Golf Course (Vantage Point 6)
Portions of the southern multi-family building may be visible through
intervening vegetation, in the leaf-off condition only, from this Vantage
Point (see Figure 17-10f). Any visibility of the building would be
minimal, and it would be less visible than the Proposed Project given that
the building in this alternative is set back (i.e., to the north) much more
than the Proposed Project. While this would raise the elevation of the
building, as shown in the photosimulations, the Proposed Project’s
buildings would appear “taller” than those of the Alternative Site Layout.
The top of the building would remain well below the tree line as viewed
from this Vantage Point. Therefore, the Alternative Site Layout would
not have a significant adverse impact viewed from this Vantage Point.
E.3.b.vii Donald J. Trump State Park (Indian Hill Section) (Vantage Point 7)
Donald J. Trump State Park is located to the east and northeast of the
Project Site. As shown in Figure 17-10g, from trails within the State
Park, the Alternative Site Layout would not be visible, owing to the thick
vegetation throughout the State Park, and the intervening distance and
topography. Therefore, the Alternative Site Layout would not have a
significant adverse impact viewed from this Vantage Point.
Chapter 17: Alternatives
DRAFT 17-19 07/10/2024
E.3.b.viii Alternative Site Layout Landscaping Plan
The Applicant has developed a conceptual landscaping plan for the
Alternative Site Layout (see Figure 17-12a-g), which would further
reduce the potential for visual impacts. The landscaping plan is divided
into seven different zones (see Figure 17-12a). As with the Proposed
Project, each of this alternative’s landscape zones seeks to complement
the adjacent buildings and programmatic elements. The main boulevard
and access drives throughout the Project Site would be lined with a
variety of street trees, and at the main entrance to the site ornamental
plantings would be used (see Figure 17-12b). Areas surrounding parking
lots would include trees to provide shade, and shrubs and perennials to
beautify and provide multi-season interest (see Figure 17-12c). The area
around the multi-family buildings would be landscaped with small trees,
shrubs, perennials and ornamental grasses, and plantings would enhance
the building style and size while providing a sense of home (see Figure
17-12d). The central courtyard between the two multi-family buildings
would have small ornamental trees that fit with the scale of the buildings
and the amenities (see Figure 17-12e). In the Single-Family Cottages
Zone there would be ornamental shrubs and evergreens to provide multi-
season interest and screening, and small ornamental trees and perennials
would be used as well (see Figure 17-12f). The bottom of the stormwater
management basins would be planted with a wet grass seed mix that can
be mowed, the sides would have shrubs, perennials, and ornamental
grasses, and to screen the development from the Taconic State Parkway,
evergreens, shade trees and large shrubs would be used (see Figure 17-12g).
As the landscaping plan would introduce various plantings throughout
the Project Site, including different varieties of trees, shrubs, perennials,
and grasses, and would enhance the vegetated buffer between the Project
Site and the Taconic State Parkway, any potential impacts to visual and
community character from the Alternative Site Layout would be further
mitigated.
E.3.b.ix Alternative Site Layout Lighting Plan
The Applicant has developed a conceptual lighting plan for the
Alternative Site Layout (see Figure 17-13a-b). For purpose of designing
the lighting for the Alternative Site Layout, the Project Site has been
divided into seven separate lighting zones, which align with the
landscaping zones discussed above (see Figure 17-12a). As with the
Proposed Project, lighting fixtures would utilize cut-off luminaires, be
Dark-Sky compliant, and the distribution patterns would prevent light
spillover onto adjacent properties to the maximum extent practicable. In
addition, fixtures would utilize LED lighting to reduce energy usage and
maintenance costs. The lighting design would be compliant with Chapter
200, “Outdoor Lighting,” of the Town Code. The final lighting design
would adhere to the best current practice in specifying light sources,
spectra, glare reduction, and cut-off fixtures in order to reduce the effect
800 East Main Street Redevelopment
07/10/2024 17-20 DRAFT
of lighting on residents and neighbors while meeting safety, security, and
energy efficiency requirements.
The exact fixtures that would be used for this alternative have not been
finalized; however, Figure 17-13b illustrates the types of fixtures that are
being considered for each lighting zone. The Project Site driveway would
feature architecturally distinct lighting to strengthen the boulevard
character of the driveway. The light would be pole mounted 16 feet above
the ground and placed every 50 to 60 feet. The multi-family buildings
would provide light within the driveway and parking areas at similar light
levels to the boulevard zone. However, the pole-mounted lights would be
shorter, 12 to 14 feet in height, and spaced every 50 to 55 feet. Both zones
would be controlled by a photocell that would activate the lights based
on ambient light levels. The Project Site’s walking paths, courtyard
between the multi-family buildings, and entry plaza to the multi-family
buildings would be lit with 12-foot-tall pole lights spaced 25 to 50 feet.
The maximum light level immediately under the fixture would be 4 fc,
with an average light level of 0.4 to 0.75 fc within this zone. Pathways
would be lit with bollards that are three to four feet tall and that produce
an average light level of 0.5 fc.
As the lighting plan would introduce Dark-Sky compliant lighting
fixtures throughout the Project Site, and would comply with Town Code
regulations relating to lighting, any potential impacts to visual and
community character from the Alternative Site Layout would be further
mitigated.
E.3.c. Mitigation
As with the Proposed Project, the Alternative Site Layout would result in a change
to the visual character of the Project Site. However, the Alternative Site Layout
would result in less development on the Project Site than the Proposed Project,
and the proposed multi-family buildings would be set back (i.e., to the north)
further than those of the Proposed Project. This alternative has been designed to
respect the community’s planning goals, be consistent with surrounding land uses,
and minimize adverse impacts to views of the Project Site from nearby
neighborhoods and public areas. With the inclusion of landscaping, and the
preservation of existing tree coverage, including the vegetated buffer between the
Taconic State Parkway and the Alternative Site Layout, as well as the installation
of Dark-Sky compliant lighting fixtures, tailored to different areas of the Project
Site, no additional mitigation measures are proposed.
CULTURAL RESOURCES
E.4.a. Existing Conditions
As detailed in Chapter 4, “Cultural Resources,” there are no properties that are
listed on or determined eligible for listing on the State or National Register of
Historic Places (S/NR) on the Project Site. Two historic properties were identified
in the vicinity of the Project Site (Hyatt House on Old Route 6 and the Taconic
State Parkway). Regarding archeological resources, a Phase 1A Archaeological
Documentary Study (“Phase 1A Study”) was prepared for the Project Site.
Chapter 17: Alternatives
DRAFT 17-21 07/10/2024
E.4.b. Potential Impacts
As is the case with the Proposed Project, the Alternative Site Layout would have
no adverse impacts on adjacent historic resources (i.e., the Hyatt House and the
Taconic State Parkway). The Alternative Site Layout would retain the vegetated
and wooded buffers between the developed portions of the Project Site and the
adjacent historic resources, and the proposed buildings would be well below the
tree line.
The Phase 1A Study recommended Phase 1B archaeological testing in certain
areas of the Project Site that would be disturbed with new development. While
the Alternative Site Layout would require less disturbance in the northern portion
of the Project Site than the Proposed Project, some disturbance to areas identified
in the Phase 1A Study would be required. Phase 1B archaeological testing
includes conducting test pits within areas of potential disturbance to determine
the presence or absence of significant archaeological resources. The testing would
be designed to confirm the presence or absence of precontact archaeological
resources within areas of the Project Site that would be disturbed by development.
E.4.c. Mitigation
The Alternative Site Layout would result in less disturbance in the northern
portion of the Project Site that the Proposed Project. With the completion of the
Phase 1B archaeological testing and any subsequent archaeological investigations
that may become necessary, and continued consultation and coordination with the
New York State Office of Parks, Recreation, and Historic Preservation during all
phases of archaeological work, the Alternative Site Layout would not result in an
adverse impact on archaeological resources.
GEOLOGY, SOILS, AND TOPOGRAPHY
E.5.a. Existing Conditions
The Project Site’s existing geology, soils, and slopes are described in detail in
Chapter 5, “Geology, Soils and Topography. Approximately 10.74 acres of the
Project Site have been previously disturbed to accommodate the current
commercial office use. Portions of areas that were previously disturbed (e.g.,
parking lots, roads) would be disturbed as part of this alternative.
E.5.b. Potential Impacts
Approximately 8.65 acres would be disturbed during construction of the
Alternative Site Layout, which is less than the 20.29 acres that would be disturbed
to develop the Proposed Project. Much of the disturbance would occur within the
area of the Project Site previously disturbed to construct the existing office
campus. Steep slope disturbance for the Alternative Site Layout would be less
than for the Proposed Project, as detailed in Table 17-11.
800 East Main Street Redevelopment
07/10/2024 17-22 DRAFT
Table 17-11
Alternative Site Layout – Slope Disturbance
Slope Grade
Disturbance Area –
Proposed Project (acres)
Disturbance Area –
Alternative Site Layout (acres)
0% to 10% 7.39 3.21
10% to 15% 4.35 2.35
Greater than 15% 8.55 3.09
Total 20.29 8.65
Source: Site Design Consultants
The estimated earthwork for the Alternative Site Layout would be approximately
28,770 cubic yards of material excavated from the Project Site (i.e., “cut”) with
approximately 19,855 cubic yards of fill material needed, resulting in a net cut of
8,915 cubic yards (significantly less than the net cut of 81,836 cubic yards
required for the Proposed Project). If all of the net cut material were removed
from the Project Site, approximately 496 truck trips would be required (compared
to 4,546 for the Proposed Project), based on 18 cubic yards per truck. These trips
would spread out over the Alternative Site Layout’s construction, such that the
number of truck trips per day would be reduced to a level that would not affect
traffic operations. Earthwork would be conducted pursuant to an excavation and
regrading permit pursuant to Chapter 248, “Stormwater Management and Erosion
and Sediment Control,” of the Town Code.
E.5.c. Mitigation
Measures to mitigate potential impacts to geology, soils, and topography are
included in the Alternative Site Layout. As with the Proposed Project, during the
construction phase, a Soil Erosion and Sediment Control Plan would be
implemented to mitigate potential soil erosion impacts. The Alternative Site
Layout would be anticipated to require the removal of approximately 8,915 cubic
yards of cut material from the Project Site. However, final grading of the
Alternative Site Layout, which would occur during the site plan review phase,
would be anticipated to reduce this amount by refining the grading and building
plans to better balance the cut and fill. Finally, a SWPPP would be prepared to
manage stormwater runoff after the Alternative Site Layout has been completed.
With the implementation of these measures, no significant adverse impacts to
geology, soils, or topography would be anticipated as a result of the Alternative
Site Layout.
ECOLOGICAL RESOURCES
E.6.a. Existing Conditions
A detailed discussion of existing ecological conditions on the Project Site and in
the surrounding area is provided in Chapter 6, “Ecological Resources,” and
representative photographs of existing conditions on the Project Site are provided
in Figures 6-3 and 6-4.
E.6.b. Potential Impacts
For the same reasons as discussed in Chapter 6, “Ecological Resources,” the
Alternative Site Layout would not result in impacts to groundwater resources,
Chapter 17: Alternatives
DRAFT 17-23 07/10/2024
would not result in significant changes to flood hazards within the ER Study Area,
would not result in significant adverse impacts to wetland and surface water
resources, and would not result in impacts to local wildlife populations.
The Alternative Site Layout would require the removal of trees that are protected
under Chapter 270 of the Town Code (see Sheets C-107.1B, C-107.2, and C-107.3
in Appendix I). This alternative would require the removal of 651 trees,
consisting of 500 Protected Trees, 87 Specimen Trees, and 64 dead or dying trees,
which would be less than half the number of trees that would be removed (1,320)
to develop the Proposed Project (see Table 17-12).
Table 17-12
Alternative Site Layout - Tree Removal Quantities
Tree Type or
Condition Total Diameter
Number of Trees
To Be Removed
Total Number of Regulated Trees To
Be Removed
Protected 6,059 500 587 Specimen 2,394 87
Invasive -- -- 64 Dead/Dying -- 64
651
Sources: Site Design Consultants; Dynamic Survey
The Alternative Site Layout would result in the clearing of approximately 7.79
acres of upland forest (less than the 11.65 acres that would be cleared for the
Proposed Project) (see Table 17-13). Approximately 18.86 acres of forest would
remain on the Project Site, which is 3.66 acres more than with the Proposed
Project. The Alternative Site Layout would result in approximately 7.5 acres of
impervious surfaces on the Project Site, which is nearly two acres less than with
the Proposed Project (i.e., 9.3 acres).
Table 17-13
Alternative Site Layout – Land Use Impacts
Land Use or Covertypes
Existing
Acreage
Change in
Acreage
Acreage with
Alternative Site Layout
Acreage with
Proposed Project
Roads, buildings, and other
paved or impervious surfaces 5.20 +2.3 7.5 9.3
Forested 26.85 -7.79 18.86 15.2
Meadows, grasslands, or
brushlands 3.45 +5.69 9.14 11.0
Source: Site Design Consultants
Construction activities would result in direct impacts through vegetation
clearance, and indirect impacts of increased noise and human activity to the area.
As with the Proposed Project, given there is abundant similar forested habitat in
the surrounding area, any temporary impacts to the Project Site would not
adversely affect the overall ecological communities of the region. While the
permanent loss of approximately 7.79 acres of forested habitat would
permanently alter the composition of ecological communities due to disruption of
the contiguous nature of the habitats, the ecological communities present within
the ER Study Area are not unique within the greater area. As with the Proposed
800 East Main Street Redevelopment
07/10/2024 17-24 DRAFT
Project, a loss of approximately 7.79 acres of edge habitat in an already developed
site is relatively minor considering there is more than 400 acres of comparable,
contiguous forest that will remain in the vicinity of the Project Site (in Donald J.
Trump State Park, proximate to the Project Site).
E.6.c. Mitigation
As development of the Alternative Site Layout would require the removal of
regulated trees on the Project Site, the following mitigation measures (in
compliance with Chapter 270 of the Town Code) would be implemented:
Throughout the Project Site there would be extensive native plantings of the
deciduous, conifers, shrubs, and herbaceous type. The quantities of the
various species to be planted would be confirmed during the site plan review
phase.
The Project would remove invasive species and vines, as well as tree litter
from dead and fallen limbs, trees, and roots within the area of the Project Site
to be disturbed.
A tree plan would be prepared. Protection of trees during construction using
methods identified in the final construction plan would be undertaken. Areas
of existing vegetation and tree buffers would be preserved.
As noted in the conceptual landscaping plan prepared for this alternative,
conifers would be planted to provide visual screening.
This alternative would implement stormwater management measures to
minimize erosion and flooding.
Trees would be donated to the Town nursery stock at Willow Park.
This alternative would implement Best Management Practices for the
protection of root zones of trees and shrubs on the fringe of the construction
disturbance.
SOCIOECONOMIC AND FISCAL IMPACTS
E.7.a. Existing Conditions
As detailed in Chapter 7, “Socioeconomic and Fiscal Impacts,” in 2023 the
Project Site generated approximately $270,670 dollars in property taxes,
including approximately $29,831 in annual property taxes for the Town, as well
as $24,149 for Westchester County and $189,718 for the Lakeland Central School
District.
E.7.b. Economic and Fiscal Benefits
E.7.b.i Construction Benefits
As discussed in Chapter 7, “Socioeconomic and Fiscal Impacts,” AKRF
modeled the construction expenditure by construction sector in the
IMPLAN model to estimate the direct, indirect, and induced economic
and fiscal benefits of construction by region. Construction of the
Alternative Site Layout would support approximately 367 person-years
of employment over the 30-month construction period (see Table 17-14).
Direct on-Site jobs would include construction managers and workers.
Chapter 17: Alternatives
DRAFT 17-25 07/10/2024
The construction phase would be anticipated to generate approximately
484 workers in New York State, including 44 indirect and 73 induced
workers. Indirect employment includes jobs in industries that would
support the construction, such as architecture, engineering, and legal
services, while induced employment includes jobs in industries supported
by increased worker spending, such as healthcare and personal care
services.
Table 17-14
Estimated Construction Benefits
Town of Yorktown1 Westchester County2 New York State2
Employment (Person-Years)3
Direct 367 367 367
Indirect 2 37 44
Induced 0 49 73
Total 369 453 484
Labor Income4 (millions of 2023 dollars)
Direct $38.41 $38.41 $38.41
Indirect $0.10 $2.82 $3.47
Induced $0.03 $4.51 $6.71
Total $38.54 $45.74 $48.59
Output5 (millions of 2023 dollars)
Direct $64.13 $64.13 $64.13
Indirect $0.27 $7.51 $9.65
Induced $0.08 $12.07 $18.05
Total $64.48 $83.71 $91.83
Notes:
1 For purposes of this analysis, the Town of Yorktown is comprised of four ZIP Codes: 10535, 10547,
10588, and 10598.
2 Westchester County estimates include the Town of Yorktown and New York State estimates include
Westchester County.
3 IMPLAN reports employment in full- and part-time jobs. AKRF converted employment to person-years.
One person-year is the equivalent of one person working full-time for a year, or the equivalent of
2,080 hours.
4 Labor income includes employee compensation and proprietor income.
5 Output is the total value of industry production and is inclusive of all taxes.
Sources: 2022 IMPLAN model and AKRF, January 2024.
The employment generated by construction of the Alternative Site Layout
would result in labor income for the Town, County, and State. Direct
labor income is estimated to be approximately $38.41 million. Including
indirect and induced employment activity, the total labor income
generated by construction of the Alternative Site Layout would be $38.54
million in the Town, $45.74 million in Westchester County, and $48.59
million in New York State.
Construction of the Alternative Site Layout would generate
approximately $64 million in direct economic output. Including indirect
and induced economic activity, the Alternative Site Layout’s construction
would generate approximately $64.58 million in total economic output
for the Town, $83.71 million for Westchester County, and $91.83 million
for New York State. The Proposed Project would contain more dwelling
800 East Main Street Redevelopment
07/10/2024 17-26 DRAFT
units and approximately two times the floor area of the Alternative Site
Layout, and the construction costs of the Proposed Project would be
greater than the Alternative Site Layout. Thus, the benefits associated
with the construction of the Proposed Project would be higher than those
of the Alternative Site Layout.
E.7.b.i Annual Operations Benefits
The Alternative Site Layout would support on-site residential building
service employment. AKRF used industry standard employment ratios to
estimate the number of jobs directly supported by the 185 units and
modeled the direct jobs through IMPLAN. Once completed and fully
tenanted, the Alternative Site Layout would support approximately 10
total jobs across New York State, including 9 full- and part-time jobs in
Westchester County, and 7 full- and part-time jobs in the Town (see
Table 17-15). The Alternative Site Layout’s employment would support
approximately $317,000 in total annual labor income in the Town,
ultimately producing a total of $507,300 in Westchester County and
$554,600 in New York State. Owing to the reduced size of the
development program, the annual economic impact of the Alternative
Site Layout would be less than that of the Proposed Project.
Table 17-15
Estimated Annual Operational Benefits
Town of Yorktown1 Westchester County2 New York State2
Employment (Full- and Part-Time Jobs)
Direct3 7 7 7
Indirect 0 1 2
Induced 0 1 1
Total 7 9 10
Labor Income4 (in 2023 dollars)
Direct $315,000 $315,000 $315,000
Indirect $2,200 $137,700 $157,400
Induced $200 $54,600 $82,200
Total $317,400 $507,300 $554,600
Output5 (in 2023 dollars)
Direct $861,800 $861,800 $861,800
Indirect $5,800 $325,300 $379,600
Induced $600 $145,900 $220,900
Total $868,200 $1,333,000 $1,462,300
Notes:
Totals may not sum due to rounding.
1 For the purposes of this analysis, the Town of Yorktown is comprised of four ZIP Codes: 10535, 10547,
10588, and 10598.
2 Westchester County estimates include the Town of Yorktown and New York State estimates include
Westchester County.
3 Direct jobs include all employment affiliated with on-site residential operations and management,
including parking operations.
4 Labor income includes employee compensation and proprietor income.
5 Output is the total value of industry production and is inclusive of all taxes.
Sources: 2022 IMPLAN model and AKRF, June 2024.
Chapter 17: Alternatives
DRAFT 17-27 07/10/2024
E.7.b.ii Residential Spending
As described in Chapter 7, “Socioeconomic and Fiscal Impacts,” AKRF
modeled the anticipated economic benefits from annual residential
spending. The Alternative Site Layout would support approximately two
additional jobs through induced residential spending, which in turn would
produce approximately $116,000 in labor income and approximately
$328,000 in economic output in the Town (see Table 17-16). The local
spending generated by the residents would provide economic activity and
support to local businesses in the area.
Table 17-16
Annual Economic Benefits of Resident Spending
Town of Yorktown1 Westchester County2 New York State2
Employment (Full- and Part-Time Jobs)
Induced 2 2 2
Total 2 2 2
Labor Income3 (2023 dollars)
Induced $116,157 $132,571 $138,532
Total $116,157 $132,571 $138,532
Output4 (2023 dollars)
Induced $327,688 $371,543 $387,756
Total $327,688 $371,543 $387,756
Notes:
1 For the purposes of this analysis, the Town of Yorktown is comprised of four ZIP Codes: 10535, 10547,
10588, and 10598.
2 Westchester County estimates include the Town of Yorktown and New York State estimates include
Westchester County.
3 Labor income includes employee compensation and proprietor income.
4 Output is the total value of industry production and is inclusive of all taxes. For service sector industries,
output is total sales; for retail industries, output is gross margin.
Sources: 2022 IMPLAN model and AKRF, January 2024.
E.7.c. Municipal Fiscal Assessment
The Town of Yorktown Tax Assessor, based on information provided by the
Applicant, estimated the taxable assessed value of the Alternative Site Layout
upon stabilization to be $894,250, which would equate to a full market value of
$51,990,000 (see Appendix D). Based on the assessed value, upon full
stabilization, the Alternative Site Layout would be anticipated to generate
approximately $1,344,634 in property tax revenue per year (see Table 17-17).
The Proposed Project would be anticipated to generate more property tax revenue
per year ($1,817,067) than the Alternative Site Layout (see Chapter 8, Table 7-18,
“Socioeconomic and Fiscal Impacts”).
800 East Main Street Redevelopment
07/10/2024 17-28 DRAFT
Table 17-17
Projected Annual Property Tax Revenues for Alternative Site Layout
Taxing Jurisdiction
Tax Rate per $1,000 of
Assessed Value
Taxable Assessed
Value
Property
Taxes
Westchester County 134.16
$894,250
$119,973
Town of Yorktown 165.73 $148,203
Advanced Life Support 5.46 $4,883
Lake Mohegan Fire District 81.22 $72,631
Westchester County Peekskill Sewer District 32.63 $29,179
Westchester County Garbage 16.30 $14,576
Yorktown Consolidated Water 14.14 $12,645
Osceola Lateral Sewage Operating 16.97 1.00 $17
Lakeland Central School District 1,053.99 $894,250 $942,528
Total Property Taxes $1,344,634
Note: Numbers may not add due to rounding.
Source: Tax rates from Westchestergov.com
E.7.d. Mitigation
The Alternative Site Layout would not result in a significant adverse
socioeconomic or fiscal impact. The Alternative Site Layout would provide much
needed age-restricted housing, and demographic and economic trends support the
development of the Alternative Site Layout. The Alternative Site Layout would
generate $1,073,965 more in property taxes per year, including an additional
$118,372 to the Town and an additional $752,810 to the School District, than
currently generated by the Project Site. It is noted that while the tax revenue
generated for the School District would increase, there would be no
accompanying increase in costs to the District as a result of the age-restricted
residence of the Alternative Site Layout.
COMMUNITY FACILITIES
E.8.a. Existing Conditions
As discussed in Chapter 8, “Community Facilities,” the Project Site is served by
the Town of Yorktown Police Department, the Lake Mohegan Fire District, and
the Mohegan Volunteer Ambulance Corps. There are a variety of recreational
facilities proximate to the Project Site, including Donald J. Trump State Park.
Presently, the Project Site uses private carting services.
E.8.b. Potential Impacts
The Alternative Site Layous is anticipated to increase the population of the Town
by approximately 226 residents (see Table 17-18). If all of these residents were
new to the Town, the population of the Town would increase by approximately
0.62 percent, based on the Town’s 2021 population of 36,424.6
6 U.S. Census American Community Survey, 2017–2021 ACS 5-Year Estimates.
Chapter 17: Alternatives
DRAFT 17-29 07/10/2024
Table 17-18
Alternative Site Layout – Resident Population Projections
Residence Type Number of Units Multiplier Projected Population
1-Bedroom Apartment (age-restricted) 71 1.20 85.2
2-Bedroom Apartment (age-restricted) 94 1.20 112.8
2-Bedroom Cottage (age-restricted) 20 1.39 27.8
Total 185 -- 225.8
Note: Rutgers multiplies for age-restricted housing do not differentiate based on bedroom count, thus the
multiplier is the same (1.20) for the 1-bedroom and 2-bedroom apartments in the multi-family building.
Sources: Who Lives in New Jersey Housing? New Jersey Demographic Multipliers, The Profile of
Occupants of Residential and Nonresidential Development, Rutgers University, Center for Urban
Policy Research, November 2006. Table II-F-1. Available at https://bloustein.rutgers.edu/wp-
content/uploads/2015/03/NJDM.pdf
As this alternative would generate a smaller population of new residents (226)
than the Proposed Project (310), it would be anticipated to have less impact on
the provision of emergency services than the Proposed Project.
The projected quantities of police personnel, equipment, and facilities attributable
to the Proposed Project’s population (conservatively not taking into account the
existing demand of the Project Site) are presented in Table 17-19. As discussed
in Chapter 8, “Community Facilities,” the Town Police Chief indicated that based
on his experience, age-restricted communities may generate a greater per capita
demand for police services, owing to the “aided type calls for service” received
from such developments. Therefore, the Alternative Site Layout’s demand for
police services would likely be slightly higher than the average residential
demand presented below. Even so, the marginal increase in the demand for police
services as a result of the Alternative Site Layout would not be anticipated to
require a significant increase in Police Department resources.
Table 17-19
Alternative Site Layout – Projected Police Service Level
Police Service Multiplier Estimated Population Projected Service Level
Personnel 2/1,000 population 226 0.45 police personnel
Vehicles 0.6/1,000 population 226 0.136 vehicles
Facilities 200 sf/1,000 population 226 45.2 sf of facility space
Sources: Model Factors for Social Impact Analysis (Police), Development Impact Assessment Handbook,
ULI, 1994.
Regarding fire protection services, based on the number of calls for service
generated by the Trump Park Residences of approximately 0.18 calls per unit per
year, and adjusting for the number of residential units of the Alternative Site
Layout (185), the Lake Mohegan Fire Department would likely respond to the
Alternative Site Layout approximately 33 times each year; or approximately two
to three calls per month.
As with police and fire services, this alternative would be anticipated to result in
an increased demand for EMS services as compared to the demand of the existing
office use. Similarly, given that this alternative is an age-restricted (55+)
residential community, it is likely that its demand, while less than a comparably
800 East Main Street Redevelopment
07/10/2024 17-30 DRAFT
sized assisted-living facility, would be higher than a non-age restricted residential
community. As the anticipated population of this alternative would be 226
residents (compared to 310 for the Proposed Project), this alternative would
generate less demand for EMS services than the Proposed Project.
This alternative is anticipated to have a population of approximately 226 residents
upon completion (less than under the Proposed Project), which is less than one
percent of the Town’s existing population. Therefore, as with the Proposed
Project, while some additional demand on the Town’s existing recreational
resources may result, it is anticipated that the small incremental demand
attributable to the Alternative Site Layout would be able to be accommodated
within the Town’s existing resources.
With an estimated population of 226 residents, it is anticipated the Alternative
Site Layout would generate approximately 1.92 tons of solid waste per week (less
than the 2.64 tons that would be generated by the Proposed Project).7 Waste and
recycling generated by this alternative would be collected by a private carting
company contracted directly with the property management. Residents would be
responsible for taking their solid waste and recycling to collection rooms within
the multi-family buildings, or, for those residing in the cottages, placing it outside
the building for curbside pick-up on collection days.
E.8.c. Mitigation Measures
The Alternative Site Layout would not be anticipated to have a significant adverse
impact on the provision of community services or on community facilities in the
Town. This alternative would not be anticipated to result in a significant increase
in demand for emergency services (e.g., police, fire, and EMS). This is true
despite the fact that this alternative’s demand for emergency services may be
somewhat greater than a comparably sized non-age restricted development. It is
anticipated that emergency service providers would be able to adequately serve
the residents and that any incremental costs incurred by the providers would be
offset by the anticipated increase in tax revenue to the various taxing jurisdictions
(which could be used to purchase new equipment or hire additional staff). In
addition, this alternative would not represent a unique construction or occupancy
type in the Town and measures to mitigate the increased demand for emergency
services, such as sprinklers throughout the buildings, fire hydrants, and on-site
security systems, would be included.
Furthermore, this alternative would set aside sufficient open and recreational
space on the Project Site to serve the needs of the residents, and solid waste and
recycling would be handled by private haulers and disposed of at appropriately
licensed facilities.
WATER AND WASTEWATER
The Alternative Site Layout would be anticipated to generate water demand of 32,890
gallons per day (gpd) (see Table 17-20), which is less than the 47,690 gpd estimated for
7 CEQR Technical Manual (https://www.nyc.gov/assets/oec/technical-manual/14_Solid_Waste_2021.pdf).
An individual resident would be anticipated to generate 17 pounds (0.0085 tons) of solid waste per week.
Chapter 17: Alternatives
DRAFT 17-31 07/10/2024
the Proposed Project. As is the case with the Proposed Project, the public water system
serving the Project Site would have adequate pressure and capacity to serve the
Alternative Site Layout. The sanitary pump station serving the Project Site would likely
need to be replaced to service the increased flow generated by the Alternative Site Layout,
as is the case with the Proposed Project.
Table 17-20
Estimated Water/Sanitary Generation
Unit Type Number of Units Water Usage in Gallons Per Day per Unit Total Gallons Per Day
1 Bedroom 71 110 7,810
2 Bedroom 114 220 25,080
Total -- -- 32,890
Sources: New York State Design Standards for Intermediate Sized Wastewater Treatment Systems, NYSDEC,
March 4, 2014
STORMWATER MANAGEMENT
E.10.a. Existing Conditions
Existing and proposed stormwater conditions and calculations have been
summarized based on data included within the “Preliminary Stormwater
Management Plan” (SWPPP) prepared by the Applicant’s engineer Site Design
Consultants and dated January 22, 2024 (see Appendix E).
The Project Site is presently developed with existing stormwater management
practices that serve the existing improvements on the Project Site. Surface runoff
from most of the existing impervious areas including the buildings, parking, and
roadways as well as adjoining areas is collected and transported to the existing
stormwater management basins where the runoff receives water quality treatment
and attenuation. For a more detailed discussing of existing conditions on the
Project Site, refer to Chapter 10, “Stormwater Management.”
E.10.b. Potential Impacts
A hydraulic analysis was conducted for the Alternative Site Layout to determine
the expected runoff depth for each storm event. The results of the analysis were
used to calculate the stormwater management practices sizes required for each
Drainage Area. The contributing watersheds are shown on Sheet WS-1 (see
Appendix I).
The analysis compares two drainage areas, P-DA-1 and P-DA-2, to their
condition in the pre-development condition. Surface runoff from P-DA-1 would
flow unhindered following the natural drainage patterns until it reaches the
development area and is piped to an infiltration basin that would provide for
Runoff Reduction volume, Water Quality treatment for the full 90 percent storm
event, and attenuation up to the 100-year storm event. P-DA-2 would be directed
to the stormwater management system which consists of Pocket Wetland basins
that would provide for Water Quality treatment and attenuation up to the 100-year
storm event. The hydrologic analysis assumes that full soil restoration as required
in Chapter 5 (Table 5.3) of SMDM would be implemented.
800 East Main Street Redevelopment
07/10/2024 17-32 DRAFT
With the implementation of the stormwater management practices proposed in
the SWPPP, the Alternative Site Layout would reduce the peak runoff rate for all
storms at both design points, with one exception (see Tables 17-21 and 17-22).
A slight increase for the 100-year storm event is shown, but this increase is
relatively insignificant, can be attributed to rounding in the analysis, and is well
within acceptable ranges.
For both the Alternative Site Layout and the Proposed Project, there would be a
reduction in peak runoff rates at Design Point 1. At Design Point 2, based on the
development of preliminary stormwater practices, and as described in further
detail in Chapter 10, “Stormwater Management,” while the Alternative Site
Layout would reduce runoff rates for all storms except the 100-year, the Proposed
Project would result in an increase in peak runoff rates for all storms, and would
not meet stormwater quality goals.
Table 17-21
Design Point 1 – Proposed Peak Runoff Rates
Storm Recurrence
Interval
Pre-Development
Peak Flow (cfs)
Post-Development
Peak Flow (cfs)
Net Change of Peak
Flow (cfs)
Percent
Reduction
1 5.81 2.28 -3.53 61%
2 7.94 4.09 -3.85 48%
10 15.86 11.8 -4.06 26%
25 22.78 18.81 -3.97 17%
100 36.52 31.81 -4.71 13%
Note: cfs = cubic feet per second
Source: SDC
Table 17-22
Design Point 2 – Proposed Peak Runoff Rates
Storm Recurrence
Interval
Pre-Development
Peak Flow (cfs)
Post-Development
Peak Flow (cfs)
Net Change of
Peak Flow (cfs) Percent Reduction
1 3.09 2.24 -0.85 28%
2 4.27 3.30 -0.97 23%
10 8.15 7.12 -1.03 13%
25 11.98 10.66 -1.32 11%
100 18.58 18.82 0.24 -1%*
Notes:
cfs = cubic feet per second
* A slight increase for the 100-year storm event is shown, but this is relatively insignificant, can be
attributed to rounding in the analysis, and is well within acceptable ranges.
Source: SDC
E.10.c. Mitigation
The Alternative Site Layout would use a variety of practices to enhance
stormwater quality and reduce peak rates of runoff associated with this
alternative. The SWPPP includes anticipated soil erosion and sediment controls
(SESCs), which would mitigate the potential adverse impact from stormwater
runoff during construction of the Alternative Site Layout. Temporary control
measures and facilities would include silt fences, interceptor swales, stabilized
construction entrances, temporary seeding, mulching, and sediment traps.
Chapter 17: Alternatives
DRAFT 17-33 07/10/2024
Throughout construction, temporary sediment and erosion control measures
would be inspected and maintained as appropriate. Toward the completion of
construction of, permanent sediment and erosion control measures would be
developed for long-term erosion protection.
With the implementation of the SWPPP and proposed stormwater management
facilities, as discussed above, runoff rates would be reduced in all the analyzed
storms compared to the existing condition, with the one exception described
above. As such, stormwater runoff from the Alternative Site Layout would not be
anticipated to result in a significant adverse impact.
USE AND CONSERVATION OF ENERGY
E.11.a. Existing Conditions
As discussed in Chapter 11, “Use and Conversation of Energy,” the Project Site
is currently supplied electricity from Consolidated Edison Company of New York
(Con Ed). There is no gas service on the Project Site, however, a Con Ed gas line
is located 800 feet from the southern portion of the Project Site, underneath East
Main Street.
E.11.b. Potential Impacts
As with the Proposed Project, the Alternative Site Layout would be served by a
new electric distribution system on the Project Site and may also be served by
natural gas.
The Alternative Site Layout would utilize the existing tap box on the Project Site
to supply electricity to pad-mounted transformers on the multi-family buildings,
and each of the six cottage buildings.8 The multi-family buildings would have the
main electrical service rooms on the basement or ground floor levels, with multi-
meter bank assemblies located in metering closets on each of the residential
floors. An emergency generator would supply each multifamily building’s
emergency/standby power. The generators could either be powered by natural gas
from Con Ed or by diesel fuel oil stored in sub-base fuel tanks beneath the
generators. Each cottage would have a multi-meter bank assembly on its exterior.
The electric loads estimated to serve this alternative are summarized in Table
17-23 and detailed in Appendix F.
The Applicant has not yet determined whether the buildings’ HVAC systems
would be electric- or natural gas-powered systems. Therefore, the Applicant
requested information from Con Ed regarding the on- and off-site improvements
that would be required in both an all-electric and a natural gas scenario. As noted
in Appendix F, Con Ed determined for the all-electric scenario, it would re-use
the existing pole and T-tap box on the Project Site to serve the new development,
and that there would be no off-site improvements required.
With respect to the scenario in which cooking and heating were fueled by natural
gas, Con Ed determined that the existing four-inch-high pressure polyethylene
8 While there will be 20 “cottage” dwelling units, they will be constructed in four groupings of four
dwelling units, and two groupings of two dwelling units. As a result, Stantec performed calculations for
the six groupings (buildings).
800 East Main Street Redevelopment
07/10/2024 17-34 DRAFT
(HPPE) gas main in East Main Street would need to be extended approximately
800 feet down East Main Street to the Project Site. From there, the Applicant
would need to install a two-inch HPPE gas service line from the property line into
the Project Site. The Applicant would be required to pay for all but 100 feet of
the gas main extension.
Table 17-23
Alternative Site Layout – Energy Loads
Building
Electrical Load (kW)
Gas Load (CFH) Connected NEC Demand
North 8,613.2 2,055.5 16,072
South 8,311.9 1,842.3 15,442
Cottages (x6) 1,199.6 455.8 4,560
Total 18,124.7 4,353.6 36,074
Source: Stantec Electric and Gas Load Summary (Appendix F)
E.11.c. Mitigation Measures
The Alternative Site Layout, as is the case with the Proposed Project, would
include various energy conservation measures, including the use of LED interior
and exterior lighting, right-sized HVAC systems, and the use of activity-sensing
and photovoltaic sensing lighting controls, where appropriate. The buildings
would be insulated in accordance with all applicable building and conservation
codes, including the use of insulated windows. The Applicant would also
undertake a post-approval feasibility study to determine if solar power could be
utilized. The Proposed Project would include Electric Vehicle (EV) chargers at
various locations within the Project Site.
With the inclusion of these measures, as well as the measures required by Con
Ed, the Alternative Site Layout would not be anticipated to have a significant
adverse impact on electric or natural gas services.
TRAFFIC AND TRANSPORTATION
A detailed analysis of the potential effects of the Alternative Site Layout on the
transportation system in the Traffic Study Area was undertaken for this alternative,
consistent with the methodology utilized for the Proposed Project.
E.12.a. Trip Generation
The number of trips that would be generated by the Alternative Site Layout was
estimated using data from the Institute of Transportation Engineers (ITE) Trip
Generation Manual, 11th Edition for the maximum of the roadway peak. The
Alternative Site Layout would result in 90, 111, and 60 total vehicle trips during
the Weekday AM, Weekday PM, and Saturday Midday peak hours, respectively,
as shown in Table 17-24, which is less than the 108, 128, and 80 respective peak
hour trips estimated for the Proposed Project.
Chapter 17: Alternatives
DRAFT 17-35 07/10/2024
Table 17-24
Alternative Site Layout – Trip Generation Summary
Building Component Size
Peak
Hour
Trips
In Out Total
Senior Adult Housing – Villas, Flats,
Apartments1 165 units
AM 22 26 48
PM 27 23 50
Sat 29 24 53
Senior Adult Housing – Townhomes2 20 Units
AM 18 24 42
PM 34 27 61
Sat 4 3 7
Total Weekday AM Peak Hour Trips 40 50 90
Total Weekday PM Peak Hour Trips 61 50 111
Total Saturday Midday Peak Hour Trips 33 27 60
Notes:
1 ITE Land Use Code 252 – Senior Adult Housing – Multifamily
AM peak hour of generator rate: 0.29 trips per unit, 45% entering, 55% exiting
PM peak hour of generator rate: 0.30 trips per unit, 54% entering, 46% exiting
Sat peak hour of generator rate: 0.32 trips per unit, 54% entering, 46% exiting
2 ITE Land Use Code 251 – Senior Adult Housing – Single-Family
AM peak hour of generator equation: T=0.26(X)+37.15, 43% entering, 57% exiting
PM peak hour of generator equation: T=0.26(X)+55.39, 56% entering, 44% exiting
Sat peak hour of generator equation: Ln(T)=0.90 Ln(X)-0.72, 50% entering, 50% exiting
E.12.b. Trip Distribution and Assignment
Vehicle trips generated by the Alternative Site Layout were distributed using the
same entering and exiting percentages used for the Proposed Project (see Figure
12-5). Figure 17-14 presents the trip assignments and project-generated trips for
the Alternative Site Layout.
E.12.c. Intersection Level of Service Conditions
Vehicle trips assignments for the Alternative Site Layout were added to the “No
Action” condition traffic volumes to estimate the “Alternative Site Layout
Condition” traffic volumes for the Weekday AM, Weekday PM, and Saturday
Midday peak hours (see Figure 17-15). LOS results for the Traffic Study Area
intersections, comparing the No Action condition to the Alternative Site Layout
Condition are detailed in Table 17-25, at the end of this chapter. Synchro 11
outputs for the Alternative Site Layout Condition are provided in Appendix G.
As described in Chapter 12, “Traffic and Transportation,” LOS D operations
during peak hours are generally considered to be acceptable operating conditions
for signalized and unsignalized intersections. For the analysis of this alternative,
traffic impacts are the same as defined in Chapter 12, “Traffic and
Transportation”: (1) a change in LOS D or better to LOS E or F; (2) a change
from LOS E to LOS F; or (3) an increase of 10 percent or greater in traffic
volumes for LOS F. The impact criteria are applied to the lane group LOS for
signalized intersections and approach/movement group LOS for unsignalized
intersections.
The Alternative Site Layout Condition would result in an impact at the following
location:
East Main Street and U.S. Route 6
800 East Main Street Redevelopment
07/10/2024 17-36 DRAFT
o Southbound left turn/through/right turn movement – Weekday AM
peak hour (increase of 10 percent or greater in traffic volumes for
LOS F).
The Proposed Project results in impacts to traffic during the Weekday AM,
Weekday PM, and Saturday Midday peak hours due to an increase of 10 percent
or greater in traffic volumes at the eastbound left turn movement. Because the
Alternative Site Layout generates fewer peak hour vehicle trips, this alternative
is projected to only have one impact during the Weekday AM peak hour compared
to the Proposed Project which is projected to have two impacts during the
Weekday AM peak hour, one impact during the Weekday PM peak hour, and one
impact during the Saturday Midday peak hour.
E.12.d. Mitigation Measures
The Alternative Site Layout would impact the East Main Street and U.S. Route 6
intersections during the Weekday AM and PM peak hours, whereas the Proposed
Project would have impacts to the intersection during all analyzed peak hours.
To mitigate the potential impacts of the Alternative Site Layout, the same
mitigation measures that are proposed for the Proposed Project would be
proposed. These mitigation measures are as follows:
Extend eastbound left turn lane to 300 feet.
Signalize East Main Street and U.S. Route 6 and East Main Street and Old
Route 6 intersections.
Add northbound right turn lane at the Old Route 6 and East Main St
intersection.
Restrict southbound left turn at East Main Street and U.S. Route 6
With the implementation of these mitigation measures, which are subject to
review and approval by the Town and NYSDOT, project-related significant
adverse traffic impacts would be fully mitigated and all lane groups for the
impacted intersection would operate an acceptable LOS D, or better. Table 17-26,
at the end of this chapter, presents a comparison of the No Action condition,
Alternative Site Layout Condition, and Alternative Site Layout Condition with
mitigation. Synchro 11 outputs for the Alternative Site Layout Condition with
mitigation are provided in Appendix G.
AIR QUALITY
E.13.a. Existing Conditions
A discussion of existing air quality conditions is provided in Chapter 13, “Air
Quality.”
E.13.b. Potential Impacts
As discussed above, the Alternative Site Layout would generate fewer vehicle
trips than the Proposed Project. As the traffic associated with the Proposed Project
would not have a significant adverse air quality impact, and the Alternative Site
Layout would generate fewer vehicle trips, the traffic associated with the
Alternative Site Layout would not have a significant air quality impact.
Chapter 17: Alternatives
DRAFT 17-37 07/10/2024
The Alternative Site Layout would also result in less overall development (less
residential square footage) on the Project Site when compared to the Proposed
Project. The Alternative Site Layout’s proposed multi-family buildings were
assessed using the screening procedures described the CEQR Technical Manual
and used in Chapter 13, “Air Quality.” Both buildings would be taller than the
existing buildings within 400 feet (the maximum screening distance). Therefore,
the screening analysis of this alternative conservatively analyzed the potential for
air quality impacts at a distance of 400 feet from the combined size of these
buildings, which totals approximately 312,076 sf. Based on Figure App 17-2 of
the CEQR Technical Manual, there would be no potential for air quality impacts
at distances greater than approximately 110 feet. Therefore, the combination of
the cottage and multifamily buildings would not result in a significant adverse air
quality impact.
Similarly, the nearest existing building of similar or greater height to the cottages
would be a residence located to the southeast. Each of the cottages would be
located greater than 400 feet from the edge of the Project Site between the
residence and the closest cottage. Additionally, each cottage would be located
greater than 320 feet from the multi-family building to the south. Therefore, the
analysis conservatively analyzed the potential for air quality impacts at a distance
of 320 feet. Based on Figure 17-2 of the CEQR Technical Manual, there would
be no potential for air quality impacts from the combination of all of the cottages
(a total of approximately 36,960 sf) at distances greater than approximately 55
feet. Therefore, the cottages would not result in a significant adverse air quality
impact. and the Alternative Site Layout as a whole would not have a significant
adverse air quality impact.
E.13.c. Mitigation
As no significant air quality impacts were identified, no mitigation measures
would be warranted.
NOISE
E.14.a. Existing Conditions
A detailed discussion of existing noise conditions is provided in Chapter 14,
“Noise.” A total of three receptor locations were selected for evaluation of
existing and future noise levels (see Figure 14-1). Roadway traffic on Old Route
6 and U.S. Route 6 was the dominant noise source at Site 1, and roadway traffic
on the Taconic State Parkway was the dominant noise source at Sites 2 and 3.
E.14.b. Potential Impacts
As the Proposed Project would not have a significant noise impact as a result of
project-generated traffic, the Alternative Site Layout, which would generate less
traffic, would similarly not have a significant adverse impact, from mobile
sources (traffic).
As with the Proposed Project, the Alternative Site Layout would include building
mechanical systems that would have the potential to generate noise. The building
mechanical systems would be located and designed to avoid producing significant
noise level increments at nearby receptors and would therefore not have the
800 East Main Street Redevelopment
07/10/2024 17-38 DRAFT
potential to result in significant adverse noise impacts. The final design of these
systems would be reviewed during the site plan review process.
E.14.c. Mitigation
The Alternative Site Layout would not result in a significant adverse impact from
noise, and therefore no mitigation measures are required.
HAZARDOUS MATERIALS
As with the Proposed Project, the greatest potential for exposure to contaminated
materials would occur during demolition and excavation. While disturbance from the
removal of the existing buildings would be the same as with the Proposed Project, the
Alternative Site Layout would require less on-site excavation. Therefore, the potential for
impacts to or from hazardous materials would be similar, or slightly less, with this
alternative as compared to the Proposed Project. With the implementation of the
recommendations in Chapter 15, “Hazardous Materials,” with respect to the proper
handling of potentially hazardous materials, there would not be a significant adverse
impact related to hazardous materials with this alternative.
CONSTRUCTION
Under this alternative, which would construct two multi-family buildings and 20 cottages,
it would be anticipated that the short-term impacts associated with construction, including
from traffic and from construction-generated noise, would be less than the Proposed
Project, as this alternative would result in less development than the Proposed Project. As
detailed in Table 17-11 above, while the Proposed Project would disturb 20.29 acres, the
Alternative Site Layout would only disturb 8.65 acres. Further, as detailed in Table 17-13
above, this alternative would leave more forested areas (18.86 acres) than the Proposed
Project (15.2 acres). Additionally, the Proposed Project would have approximately two
times the floor area of the Alternative Site Layout. Thus, disturbance to the Project Site,
in terms of excavation and grading, would be significantly less with this alternative than
with the Proposed Project, reducing the potential for impacts from these activities (e.g.,
noise from machinery, dust from earth moving, etc.)
F. ALTERNATIVE 5: DEVELOPMENT UNDER EXISTING RSP-2
DISTRICT REGULATIONS
DESCRIPTION OF ALTERNATIVE
This alternative is a variation of Alternative 4. It has been developed to analyze the
potential environmental impacts of redeveloping the Project Site pursuant to the existing
height and FAR requirements of the RSP-2 District. To evaluate this alternative, the
Applicant has developed two RSP-2 District compliant plans, and compared them to the
Alternative Site Layout:
RSP-2 District with Reduced Program: This option would develop the Project Site
with the same footprint of buildings as the Alternative Site Layout, but the multi-
family buildings would each be one story shorter so as to comply with the existing
RSP-2 District’s height requirements. This option would result in the development of
122 units in the multi-family buildings, together with 20 cottages, for a total of
278,680 square feet of development (see Figure 17-16).
Chapter 17: Alternatives
DRAFT 17-39 07/10/2024
RSP-2 District with Increased Footprint: This option would develop the Project
Site with the same number of units as the Alternative Site Layout. To achieve this
program in multi-family buildings that are one story shorter than the Alternative Site
Layout, the multi-family buildings would have a much larger footprint (see Figure
17-17). As shown, the multi-family buildings would take up much of the space within
the existing ring road and require the development of a large parking field to the south
and west of the buildings.
POTENTIAL IMPACTS WITH REDUCED PROGRAM
The difference between this option and the Alternative Site Layout is that the multifamily
buildings would be one less floor in height (and therefore would accommodate fewer
units). As such, the physical impacts of this option would be the same as the Alternative
Site Layout.
F.2.a. Visual and Community Character
This option would develop multi-family buildings that are 44.3 feet in height as
compared to the Alternative Site Layout, which would have buildings up to 55
feet in height. While the buildings in this option would be shorter than the
Alternative Site Layout, there would be little to no difference in the visibility of
this difference from the off-Site vantage points. As described in Section E.3,
above, the buildings of the Alternative Site Layout would be partially visible
through dense vegetation from the Taconic State Parkway (traveling southbound)
and could be visible through dense vegetation from vantage points directly south
of the Project Site (i.e., the entrance to the Town Golf Course). However, in both
cases, the buildings would be well below the tree line, visibility would be
obscured by existing vegetation, and in the leaf-on condition the buildings would
not be visible. As such, while this option would have shorter buildings, the change
in visibility from off-site vantage points would be minimal, if perceptible at all.
F.2.b. Socioeconomic and Fiscal
This option would develop a smaller program (142 dwelling units) than the
Alternative Site Layout, and accordingly, it would be anticipated to generate
lower tax revenues to the relevant taxing jurisdictions.
F.2.c. Community Facilities
This option would result in a smaller increase in the Town’s population than the
Alternative Site Layout (as it would develop 142 units instead of 185 units).
Therefore, it would be anticipated to have less of an impact on the provision of
community services than the Alternative Site Layout.
F.2.d. Water and Wastewater
This option would generate less demand for water and generate less wastewater
than the Alternative Site Layout, but the mitigation measures required (i.e., a new
sanitary pump station), would likely be the same.
F.2.e. Use and Conservation of Energy
This option would require slightly less energy than the Alternative Site Layout.
However, the measures required to bring electric, and potentially gas, service to
800 East Main Street Redevelopment
07/10/2024 17-40 DRAFT
the Project Site would be the same. Similarly, the sustainability measures
incorporated into this option would be the same as the Alternative Site Layout.
F.2.f. Traffic and Transportation
Development of this option would generate 77 vehicle trips in the Weekday AM
peak hour, 98 vehicle trips in Weekday PM peak hour, and 46 vehicle trips in the
Saturday peak hour. This is compared to 90 vehicle trips in the Weekday AM
peak hour, 111 vehicle trips in the Weekday PM peak hour, and 60 vehicle trips
in the Saturday peak hour for the Alternative Site Layout. The traffic volumes
generated by this option would result in an increase in traffic volumes of less than
10 percent at the individual turning movements, which does not meet the traffic
impact criteria for a movement operating at LOS F during the No Action
Condition at the U.S. Route 6 and East Main Street intersection. As a result, no
improvements would be made to this intersection and the intersection would
continue to operate at LOS F. The vehicle trips generated by the option are shown
in Table 17-27.
Table 17-27
Reduced Program Option – Trip Generation Summary
Use Size
Peak
Hour
Trips
In Out Total
Apartments1 122 units
AM 16 19 35
PM 20 17 37
Sat 21 18 39
Cottages 20 Units
AM 18 24 42
PM 34 27 61
Sat 4 3 7
Total Weekday AM Peak Hour Trips 34 43 77
Total Weekday PM Peak Hour Trips 54 44 98
Total Saturday Midday Peak Hour Trips 25 21 46
Notes:
1 ITE Land Use Code 252 – Senior Adult Housing – Multifamily
AM peak hour of generator rate: 0.29 trips per unit, 45% entering, 55% exiting
PM peak hour of generator rate: 0.30 trips per unit, 54% entering, 46% exiting
Sat peak hour of generator rate: 0.32 trips per unit, 54% entering, 46% exiting
2 ITE Land Use Code 251 – Senior Adult Housing – Single-Family
AM peak hour of generator equation: T=0.26(X)+37.15, 43% entering, 57% exiting
PM peak hour of generator equation: T=0.26(X)+55.39, 56% entering, 44% exiting
Sat peak hour of generator equation: Ln(T)=0.90 Ln(X)-0.72, 50% entering, 50% exiting
POTENTIAL IMPACTS OF INCREASED FOOTPRINT
The difference between this option and the Alternative Site Layout is that the multi-family
buildings would be one less floor in height, but would require an increased footprint. As
such, this option would have the potential for greater physical impacts than the Alternative
Site Layout, but would have the same programmatic impacts (e.g., community facilities,
traffic, etc.), which would still be less than for the Proposed Project.
F.3.a. Visual and Community Character
This option would develop multi-family buildings that are 44.3 feet in height as
compared to the Alternative Site Layout, which would have buildings up to 55
Chapter 17: Alternatives
DRAFT 17-41 07/10/2024
feet in height. While the buildings in this option would be shorter than the
Alternative Site Layout, there would be little to no difference in the visibility of
this difference from off-site vantage points. As described in Section E.3, above,
the buildings of the Alternative Site Layout would be partially visible through
dense vegetation from the Taconic State Parkway (traveling southbound) and may
be visible through dense vegetation from Vantage Points directly south of the
Project Site (i.e., the entrance to the Town Golf Course). However, in both cases,
the buildings would be well below the tree line, visibility would be obscured by
existing vegetation, and in the leaf-on condition the buildings would not be
visible. As such, while this option would have shorter buildings, the change in
visibility from off-site vantage points would be minimal, if perceptible at all.
F.3.b. Geology, Soils, and Topography
This option would require a larger building footprint for the multi-family
buildings and the development of a large parking field to the south and east of the
buildings. As a result, the total site disturbance and the disturbance to steep slopes
on the Project Site would be significantly greater under this option than under the
Alternative Site Layout, but would be less than the Proposed Project (see Table
17-28).
Table 17-28
Increased Footprint Option – Slope Disturbance
Slope Grade
Disturbance Area
Proposed Project
(acres)
Disturbance Area
Alternative Site Layout
(acres)
Disturbance Area
with Increased Footprint
(acres)
0% to 10% 7.39 3.21 6.65
10% to 15% 4.35 2.35 3.14
Greater than 15% 8.55 3.09 5.34
Total 20.29 8.65 15.13
Source: Site Design Consultants
F.3.c. Ecological Resources
This option would have the potential to result in more tree clearing than the
Alternative Site Layout, owning to the larger building footprint and concomitant
larger area of disturbance. Specifically, this option would require grading further
south than the Alternative Site Layout, into the steeply sloping hill at the southern
end of the Project Site. This option would also require the driveway to the Project
Site to be sited further west than in the Alternative Site Layout (see Appendix I,
Sheet C-101.3).
F.3.d. Stormwater Management
This option would require more land disturbance and result in more impervious
coverage than the Alternative Site Layout. Therefore, larger stormwater
management practices would be required as compared to the Alternative Site
Layout. These stormwater practices would still be smaller than those for the
Proposed Project.
800 East Main Street Redevelopment
07/10/2024 17-42 DRAFT
Table 17-A
Alternatives Impact Comparison
Proposed Project
No Action – Existing Site
Conditions and Re-
Occupancy of Office
Buildings Development Under Existing OB District Zoning
Non-Age-
Restricted
Development Alternative Site Layout (185 units)
Development Under Existing
RSP-2 District Regulations:
Fewer Residential Units (3-
story buildings with same
footprint as Alternative Site
Layout)
Development Under Existing
RSP-2 District Regulations:
Larger Building Footprint (3-story
buildings with larger building
footprint than Alternative Site
Layout)
Land Use,
Zoning, and
Public Policy
Change use of Site from vacant office
campus to age-restricted residential
development:
o 250 dwelling units
o 383 parking spaces
Requires zoning amendment to remap
Project Site to RSP-2 District, and text
amendment to Zoning Code allowing
for greater building height and FAR on
sites greater than 25 acres
Consistent with the Comprehensive
Plan, which encouraged housing
development and housing diversity
Continue use as office
campus (likely not
economically feasible)
No change to zoning
required
Inconsistent with
Comprehensive Plan
goal of increasing
housing diversity within
town
Expanded use as campus office
o 204,901 sf of office space (increase of 141,284 sf) in three new
buildings
o 608 total parking spaces
No change to zoning required
Inconsistent with Comprehensive Plan goal of increasing housing diversity
within town
Comprehensive Plan identified the Project Site in Policy 4-63, which
suggested the Town “promote corporate or multi-tenant office
development in select locations near major entrances to the Taconic
Parkway and Route 6” (page 4-33), however economic realities of
corporate office parks in the region have evolved dramatically since the
Plan’s adoption approximately 15 years ago, such that the Project Site is
no longer viable as an office campus.
Same as
Proposed
Project
Change use of Site from vacant
office campus to age-restricted
residential neighborhood:
o 185 dwelling units
o 278 parking spaces
Requires zoning amendment to
remap Project Site to RSP-2 District,
and text amendment to Zoning Code
allowing for greater building height
(No change to FAR required)
Consistent with the Comprehensive
Plan, which encouraged housing
development and housing diversity
142 dwelling units (122 units in
multi-family buildings, and 20
cottages)
No change to zoning required
Same program as Alternative Site
Layout
No change to zoning required
Visual and
Community
Character
Vegetated buffer between Project Site
and Taconic State Parkway would
remain
Minimal views of Proposed Project
buildings from off-site Vantage Points
Consistent with character of
surrounding residential areas
Site lighting to be Dark-Sky compliant
and compliant with Town Code,
Chapter 200, “Outdoor Lighting”
Site landscaping program that
complements proposed buildings and
adds screening
No change to visual and
community character
Likely similar to Proposed Project Same as
Proposed
Project
Vegetated buffer between Project
Site and Taconic State Parkway
would remain
Minimal views of Proposed Project
buildings from off-site Vantage
Points
o Buildings to be below tree line.
Site lighting to be Dark-Sky
compliant and compliant with Town
Code, Chapter 200, “Outdoor
Lighting.”
Site landscaping program that
complements proposed buildings
and adds screening
Development of buildings that
are 44.3 feet in height
(compared to 55 feet for
Alternative Site Layout)
Similar visibility to Alternative
Site Layout
Development of buildings that are
44.3 feet in height (compared to
55 feet for Alternative Site Layout)
Similar visibility to Alternative Site
Layout
Cultural
Resources
No structures listed or eligible for
listing on S/NR on Project Site
No adverse impacts on Hyatt House
and Taconic State Parkway
Phase 1B Archaeological Study
required in parts of the undeveloped
portion of the Project Site to confirm
no archaeological resources
No impact to cultural
resources
Same as Proposed Project Same as
Proposed
Project
Impacts to historic and architectural
resources are the same as the
Proposed Project
Less disturbance proposed in
undeveloped portion of Project Site
Same as the Alternative Site
Layout
Same as the Alternative Site
Layout
Geology, Soils,
and
Topography
20.29 acres of Site disturbance
9.3 acres of impervious areas
(buildings and parking/ driveways)
Net cut of 81,836 cubic yards of
material
Blasting not anticipated
No change from current
condition
13.62 acres of Site disturbance
18.2 acres of impervious areas
Blasting not anticipated
Same as
Proposed
Project
8.65 acres of Site disturbance
7.5 acres of impervious areas
Net cut of approximately 8,915 cubic
yards
Blasting not anticipated
Same as Alternative Site Layout Total site disturbance and
disturbance to slopes substantially
greater than Alternative Site
Layout, concentrated in southern
portion of Site
Chapter 17: Alternatives
DRAFT 17-43 07/10/2024
Table 17-A (cont’d)
Alternatives Impact Comparison
Proposed Project
No Action – Existing Site Conditions
and Re-Occupancy of Office Buildings
Development Under
Existing OB District
Zoning
Non-Age-Restricted
Development
Alternative Site Layout (185
units)
Development Under Existing RSP-
2 District Regulations: Fewer
Residential Units (3-story
buildings with same footprint as
Alternative Site Layout)
Development Under Existing RSP-
2 District Regulations: Larger
Building Footprint (3-story
buildings with larger building
footprint than Alternative Site
Layout)
Ecological
Resources
Clearing of 11.65 acres of forest
o 15.2 acres of forest to remain
Removal of 1,320 Town-regulated trees
Landscaping program includes planting of new native
trees
Clearing of forest would not represent a loss of rare or
unique ecological communities or vegetation; adjacent
areas contain similar tracts of forested habitat
Seasonally defined limits on tree clearing activities to
avoid potential impacts to threatened or endangered
species (TES) with a potential to occur on-Site
(Indiana Bat, Northern Long-Eared Bat, Red-
Shouldered Hawk, Eastern Box Turtle)
No tree removal or site clearing Clearing of 15.55 acres of
forest;
o 11.3 acres of forest to
remain
Number of trees to be
removed greater than for
the Proposed Project
Same seasonal limits on
clearing as Proposed
Project
Same as Proposed Project
Clearing of 7.79 acres of forest
o 18.86 acres of forest to
remain
Removal of 651 Town-
regulated trees
Landscaping program includes
planting of new native trees
Same seasonal limits on
clearing as Proposed Project
Same as Alternative Site Layout More tree clearing than Alternative
Site Layout
Requires grading further south on
the Project Site than Alternative Site
Layout
Same seasonal limits on clearing as
Proposed Project
Socioeconomic
and Fiscal
Impacts
Would generate $1,817,067 per year in property taxes
o Increase of $1,546,398 from existing condition
o $200,274 to Town (increase of $170,443)
o $1,273,687 to School District (increase of
$1,083,969)
o $98,150 to Fire District (increase of $83,530)
o $162,125 to County (increase of $137,976)
$270,670 per year in property taxes
Potential for to generate less tax revenue
in future than in existing condition due to
continue building underperformance
If fully occupied, increase
in tax revenue generated
by Project Site compared
to current condition
Likely not economically
feasible.
Similar to Proposed Project Would generate $1,344,634
per year in property taxes
o Increase of $1,073,965
from existing condition
o $148,203 to Town
(increase of $118,372)
o $942,528 to School District
(increase of $752,810)
o $72,631 to Fire District
(increase of $58,011)
o $119,973 to County
(increase of $95,824)
Lower tax revenue than Alternative
Site Layout
Same as Alternative Site Layout
Community
Facilities
On-site population of 310 residents (<1% of Town’s
population)
Increased demand for police, fire, EMS services, and
potential for calls for service at higher rate than for
non-age-restricted community
Increases in property taxes would cover cost of
increased demand
No school-age children
Project provides sufficient on-Site open space and
recreation areas to meet demand of Proposed Project
Private carter for solid waste and recycling
If offices were fully re-occupied, demand
for community facilities and services
would be anticipated to increase above
current levels
Increased demand for
emergency services
Increased property taxes
would pay for increased
service demand
No school-age children
Private carter for solid
waste and recycling
On-site population of 521
residents
45 school-age children
Increase in demand for
police, fire, EMS services
(but at comparable rates to
other residential
developments)
Increased property taxes
would pay for increased
service demand
Private carter for solid waste
and recycling
On-site population of 226
residents
Increase in demand for police,
fire, EMS services, and
potential for calls at higher rate
than for non-age-restricted
community
Increased property taxes would
pay for increased service
demand
No school-age children
Project provides sufficient on-
Site open space and
recreational areas to meet
demand of Proposed Project
Private carter for solid waste
and recycling
Less demand for community
services than Alternative Site
Layout
Same as Alternative Site Layout
Water and
Wastewater
47,690 gpd water/sewer demand
No off-site water system improvements required
Requires replacement of sanitary pump station
5,875 gpd water/sewer demand
Sewer infrastructure would not be
upgraded
15,375 gpd water/sewer
demand
Sanitary improvements
may be required
Same as Proposed Project 32,890 gpd water/sewer
demand
No off-site water system
improvements required
Requires replacement of
sanitary pump station
Less demand for water and
wastewater than Alternative Site
Layout, but same mitigation
measures required
Same as Alternative Site Layout
800 East Main Street Redevelopment
07/10/2024 17-44 DRAFT
Table 17-A (cont’d)
Alternatives Impact Comparison
Proposed Project
No Action – Existing Site Conditions
and Re-Occupancy of Office Buildings
Development Under
Existing OB District
Zoning
Non-Age-Restricted
Development
Alternative Site Layout (185
units)
Development Under Existing RSP-
2 District Regulations: Fewer
Residential Units (3-story
buildings with same footprint as
Alternative Site Layout)
Development Under Existing RSP-
2 District Regulations: Larger
Building Footprint (3-story
buildings with larger building
footprint than Alternative Site
Layout)
Stormwater
Management
9.3 acres of impervious coverage
Stormwater management program to reduce rate and
volume of runoff at northern design point in all storms
Further mitigation required for flows discharging at
southern design point
No change from current condition 18.2 acres of impervious
coverage
Same as Proposed Project 7.5 acres of impervious
coverage
Stormwater management
program to reduce rate and
volume of runoff at:
o Northern design point in all
storms
o Southern design point in all
but 100-year storm, which
would experience a de
minimis increase
Same as Alternative Site Layout More impervious coverage than
Alternative Site Layout
Would require larger stormwater
management practices than
Alternative Site Layout
Use and
Conservation of
Energy
New electric distribution system on Project Site;
Proposed Project may also be served by natural gas
Energy conservation measures include LED interior
and exterior lighting, right-sized HVAC systems,
activity-sensing and photovoltaic sensing lighting
controls, electric vehicle chargers
Feasibility study for solar power
No change to infrastructure from current
condition
If offices were fully re-occupied, demand
for electricity would be anticipated to
increase above current levels
No change to source of
energy for Project Site
Additional energy demand
compared to existing
condition
Same as Proposed Project Less demand for energy
compared to Proposed Project
Same energy conservation
measures as Proposed Project
Feasibility study for solar power
Less energy demand than
Alternative Site Layout
Same measures to bring service to
the Project Site as Alternative Site
Layout
Same as Alternative Site Layout
Traffic and
Transportation
Project-generated vehicular trips
o 108 in the Weekday AM peak hour
o 128 in the Weekday PM peak hour
o 80 in the Saturday peak hour
Project-generated impacts at the East Main Street and
U.S. Route 6 intersection:
o Eastbound left turn movement during Weekday
PM and Saturday Midday peak hours (increase of
10% or greater in traffic volumes for LOS F)
o Southbound left turn/through/right turn movement
in Weekday AM peak hour (increase of 10% or
greater in traffic volumes for LOS F)
Mitigation in the form of signalization for East Main
Street/U.S. Route 6 intersection, and East Main
Street/Old Route 6 intersection
o New traffic lights would improve LOS from existing
conditions to LOS C and mitigate project impacts
Re-occupancy-generated trips9
o 113 in Weekday AM peak hour
o 114 in Weekday PM peak hour
o 34 in Saturday peak hour
Similar traffic impacts anticipated
No mitigation measures required as no
discretionary action
Development under OB
Zoning trips
o 310 in Weekday AM
peak hour
o 301 in Weekday PM
peak hour
o 109 in Saturday peak
hour
Impact to same
intersection as Proposed
Project
o Same mitigation as
Proposed Project
Potential for impacts at
other intersections and
additional mitigation
measures
Non-age-restricted trips
o 122 in Weekday AM
peak hour
o 136 in Weekday PM
peak hour
o 102 in the Saturday
peak hour
Same impact and mitigation
as Proposed Project
Would require school bus
stop
Alternative Site Layout
vehicular trips
o 90 in Weekday AM peak
hour
o 111 in Weekday PM peak
hour
o 60 in the Saturday peak
hour
Impacts to same intersection
as Proposed Project
Same mitigation as Proposed
Project
Reduced program vehicular trips
o 77 in Weekday AM peak hour
o 98 in Weekday PM peak hour
o 46 in the Saturday peak hour
Does not meet standard for "impact"
at intersection of East Main St/ US 6
o Intersection would continue to
operate at LOS F
No signalization of East Main
Street/U.S. Route 6 intersection, or
East Main Street/Old Route 6
intersection
Same as Alternative Site Layout
Air Quality
No potential for significant adverse air quality impacts
from stationary sources at buildings
No significant adverse impact from mobile sources
(project-generated traffic)
Full re-occupancy would be anticipated
to result in more vehicle trips, but it is
assumed emissions levels would be
comparable to those previously
generated by Project Site
Stationary source impacts
unlikely; evaluation of
specific program would be
required
Mobile source impacts
unlikely; evaluation of
specific traffic impacts
would be required
Same as Proposed Project No impacts from stationary or
mobile sources
Same as Alternative Site Layout Same as Alternative Site Layout
9 The approved site plan for the existing office buildings required employees to be divided into four arrival/departure shifts to mitigate peak hours, as follows: Shift 1, 7:45 am–4:00 pm, 30 percent of employees; Shift 2, 8:45 am–5:00 pm, 40 percent of
employees; Shift 3, 9:45 am–6:00 pm, 20 percent of employees; and Shift 4, 10:45 am–7:00 pm, 10 percent of employees.
Chapter 17: Alternatives
DRAFT 17-45 07/10/2024
Table 17-A (cont’d)
Alternatives Impact Comparison
Proposed Project
No Action – Existing Site Conditions
and Re-Occupancy of Office Buildings
Development Under
Existing OB District
Zoning
Non-Age-Restricted
Development
Alternative Site Layout (185
units)
Development Under Existing RSP-
2 District Regulations: Fewer
Residential Units (3-story
buildings with same footprint as
Alternative Site Layout)
Development Under Existing RSP-
2 District Regulations: Larger
Building Footprint (3-story
buildings with larger building
footprint than Alternative Site
Layout)
Noise
No significant adverse noise impacts at nearby
sensitive receptors as a result of project-generated
traffic or building mechanical systems
Future noise levels within Project Site acceptable for
residential use
Full re-occupancy would be anticipated
to result in more vehicle trips, but it is
assumed noise levels would be
comparable to those previously
generated by Project Site
Mobile source impacts
unlikely; evaluation of
specific traffic impacts
would be required
Same as Proposed Project Same as Proposed Project Same as Alternative Site Layout Same as Alternative Site Layout
Hazardous
Materials
No recognized environmental conditions (RECs)
No significant adverse impacts related to hazardous
materials
No change from current condition Same as Proposed
Project
Same as Proposed Project Same as Proposed Project Same as Alternative Site Layout Same as Alternative Site Layout
Construction
Approximate 30-month construction timeline
Town approved Construction Management Plan
o Town-approved Erosion and Sediment Control
Plan to prevent off-Site stormwater impacts
o No off-site queuing, loading/unloading, or
construction worker parking
o Construction vehicles would be prohibited from
using the U.S. Route 6/East Main Street
intersection for access; instead, construction
vehicles would be required to access East Main
Street from the east – at Lee Boulevard or Hill
Boulevard
No significant adverse impacts on area intersections
from construction traffic
No significant adverse impacts to air quality from
mobile or stationary sources during construction
No significant adverse impact as a result of
construction noise; noise intermittent and of limited
duration
No new construction would occur Similar to Proposed
Project; more land
disturbance
Same as Proposed Project Similar construction duration,
impacts, and mitigation to
Proposed Project
Less physical disturbance of
Project Site, reducing potential
for impacts from these activities
compared to Proposed Project
Similar to Alternative Site Layout Similar to Alternative Site Layout
800 East Main Street Redevelopment
07/10/2024 17-46 DRAFT
Table 17-25
2026 No Action and 2026 Alternative Site Layout With Action Conditions
Level of Service Analysis
Approach
Weekday AM Weekday PM Saturday
2026 No Action 2026 With Action 2026 No Action 2026 With Action 2026 No Action 2026 With Action
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
1: Barger Street and U.S. Route 6 (Signalized)
U.S. Route 6
EB L 0.04 15.7 B L 0.04 15.7 B L 0.03 17.8 B L 0.03 17.8 B L 0.16 18.6 B L 0.16 18.6 B
TR 0.91 33.7 C TR 0.92 33.8 C TR 0.98 49.2 D TR 0.99 50.4 D TR 0.90 35.0 D TR 0.90 35.3 D
WB L 0.70 40.2 D L 0.70 39.6 D L 0.83 47.5 D L 0.83 46.9 D L 0.68 34.5 C L 0.68 34.3 C
TR 0.43 15.6 B TR 0.43 15.0 B TR 0.73 19.6 B TR 0.74 19.2 B TR 0.76 19.8 B TR 0.76 19.6 B
Barger Street
NB LT 0.69 52.1 D LT 0.69 52.1 D LT 1.16 132.6 F LT 1.16 132.6 F LT 0.82 54.7 D LT 0.82 54.7 D
R 0.49 8.5 A R 0.49 8.5 A R 0.60 13.6 B R 0.60 13.6 B R 0.52 6.8 A R 0.52 6.8 A
SB L 0.31 34.5 C L 0.31 34.5 C L 0.41 39.6 D L 0.41 39.6 D L 0.27 31.4 C L 0.27 31.4 C
TR 0.23 23.2 C TR 0.23 23.2 C TR 0.19 15.4 B TR 0.19 15.4 B TR 0.16 17.2 B TR 0.16 17.2 B
Intersection 28.6 C Intersection 28.5 C Intersection 43.6 D Intersection 43.9 D Intersection 28.1 C Intersection 28.1 C
2: Taconic State Parkway SB Ramps and U.S. Route 6 (Signalized)
U.S. Route 6
EB T 0.43 2.4 A T 0.44 2.3 A T 0.52 2.9 A T 0.54 3.0 A T 0.50 1.4 A T 0.50 1.5 A
R 0.39 0.9 A R 0.39 0.9 A R 0.15 0.1 A R 0.15 0.1 A R 0.18 0.1 A R 0.18 0.1 A
WB T 0.33 4.4 A T 0.33 4.7 A T 0.51 4.5 A T 0.52 5.1 A T 0.55 4.5 A T 0.55 4.8 A
R 0.70 4.7 A R 0.72 5.1 A R 0.36 1.1 A R 0.38 1.2 A R 0.43 1.1 A R 0.44 1.1 A
Taconic SB
Ramps SB L 0.67 47.9 D L 0.69 47.7 D L 0.62 48.0 D L 0.66 47.9 D L 0.61 48.1 D L 0.63 48.0 D
R 0.60 18.4 B R 0.58 17.6 B R 0.49 30.5 C R 0.45 28.1 C R 0.44 31.8 C R 0.42 30.7 C
Intersection 6.1 A Intersection 6.4 A Intersection 5.7 A Intersection 6.1 A Intersection 4.8 A Intersection 5.1 A
3: Taconic State Parkway NB Ramps and U.S. Route 6 (Signalized)
U.S. Route 6
EB T 0.49 9.1 A T 0.50 9.2 A T 0.79 19.8 B T 0.82 21.2 C T 0.64 13.5 B T 0.65 13.7 B
R 0.11 2.5 A R 0.11 2.4 A R 0.27 2.5 A R 0.27 2.5 A R 0.16 2.5 A R 0.16 2.4 A
WB L 0.21 3.4 A L 0.26 3.8 A L 0.38 12.8 B L 0.42 14.9 B L 0.36 6.2 A L 0.39 7.5 A
T 0.59 4.6 A T 0.60 4.7 A T 0.62 9.0 A T 0.63 9.2 A T 0.65 6.8 A T 0.65 6.8 A
Taconic NB
Ramps NB L 0.45 47.1 D L 0.45 47.1 D L 0.74 47.2 D L 0.74 47.2 D L 0.60 47.9 D L 0.60 47.9 D
R 0.55 34.8 C R 0.56 34.5 C R 0.83 29.6 C R 0.84 30.2 C R 0.65 28.9 C R 0.66 28.7 C
Intersection 9.8 A Intersection 9.9 A Intersection 18.7 B Intersection 19.4 B Intersection 13.4 B Intersection 13.5 B
4: E Main Street and U.S. Route 6 (Unsignalized)
U.S. Route 6
EB L 0.70 27.6 D L 0.78 33.8 D L 1.26 160.9 F L 1.40 214.4 F L 0.92 56.7 F L 0.99 72.7 F
TR - - - TR - - - TR - - - TR - - - TR - - - TR - - -
WB L 0.02 11.6 B L 0.02 11.6 B L 0.01 14.5 B L 0.01 14.5 B L 0.01 12.9 B L 0.01 12.9 B
TR - - - TR - - - TR - - - TR - - - TR - - - TR - - -
E Main Street NB LTR - - - LTR - - - LTR - - - LTR - - - LTR - - - LTR - - -
SB LTR 2.40 679.0 F LTR 5.79 2241.8 F LTR - - - LTR - - - LTR 2.40 688.6 F LTR 1.34 202.5 F
5: E Main Street and Old Route 6 (Unsignalized)
Old Route 6 EB TR 0.00 8.3 A TR 0.19 9.1 A TR 0.02 8.4 A TR 0.12 8.8 A TR 0.02 8.4 A TR 0.10 8.7 A
E Main Street WB LT - - - LT - - - LT - - - LT - - - LT - - - LT - - -
NB LR - - - LR - - - LR - - - LR - - - LR - - - LR - - -
Chapter 17: Alternatives
DRAFT 17-47 07/10/2024
Table 17-25 (cont’d)
2026 No Action and 2026 Alternative Site Layout With Action Conditions
Level of Service Analysis
Approach
Weekday AM Weekday PM Saturday
2026 No Action 2026 With Action 2026 No Action 2026 With Action 2026 No Action 2026 With Action
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group v/c Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
6: Lee Boulevard / Lee Road and U.S. Route 6 (Signalized)
U.S. Route 6
EB
L 0.45 17.4 B L 0.45 17.4 B L 0.75 34.9 C L 0.75 34.9 C L 0.78 39.5 D L 0.78 39.5 D
T 0.53 17.1 B T 0.53 17.1 B T 0.73 29.1 C T 0.73 29.1 C T 0.57 26.9 C T 0.57 26.9 C
R 0.24 3.7 A R 0.24 3.7 A R 0.45 4.4 A R 0.45 4.4 A R 0.61 5.2 A R 0.61 5.2 A
WB L 0.01 12.0 B L 0.01 12.0 B L 0.15 16.4 B L 0.15 16.4 B L 0.13 16.9 B L 0.13 16.9 B
TR 0.88 36.2 D TR 0.88 36.3 D TR 0.90 45.2 D TR 0.90 45.5 D TR 0.95 54.0 D TR 0.95 54.3 D
Lee Boulevard /
Lee Road
NB L 0.39 35.2 D L 0.39 35.2 D L 0.62 40.7 D L 0.62 40.7 D L 0.75 46.6 D L 0.75 46.6 D
TR 0.37 36.7 D TR 0.37 36.7 D TR 0.68 46.5 D TR 0.68 46.5 D TR 0.65 42.5 D TR 0.65 42.5 D
SB
L 0.24 34.1 C L 0.24 34.1 C L 0.36 40.4 D L 0.36 40.4 D L 0.31 38.7 D L 0.31 38.7 D
T 0.34 35.7 D T 0.34 35.7 D T 0.54 45.0 D T 0.54 45.0 D T 0.69 50.2 D T 0.69 50.2 D
R 0.63 12.0 B R 0.63 12.0 B R 0.59 11.5 B R 0.59 11.5 B R 0.81 30.2 C R 0.81 30.2 C
Intersection 25.2 C Intersection 25.3 C Intersection 32.4 C Intersection 32.5 C Intersection 35.5 D Intersection 35.6 D
7: Lee Boulevard / Lee Road and E Main Street (Unsignalized)
E Main Street EB LTR - - - LTR - - - LTR - - - LTR - - - LTR - - - LTR - - -
WB LTR 0.12 8.4 A LTR 0.12 8.4 A LTR 0.12 9.2 A LTR 0.12 9.2 A LTR 0.13 8.5 A LTR 0.13 8.5 A
Lee Boulevard /
Lee Road
NB LTR 0.20 15.4 C LTR 0.20 15.4 C LTR 0.62 25.7 D LTR 0.62 26.0 D LTR 0.64 24.4 C LTR 0.65 24.5 C
SB LTR 0.04 26.0 D LTR 0.04 26.2 D LTR 0.03 33.9 D LTR 0.03 34.1 D LTR 0.04 27.9 D LTR 0.04 28.0 D
8: Hill Boulevard and U.S. Route 6 (Signalized)
U.S. Route 6
EB L 0.07 10.0 B L 0.07 10.0 B L 0.35 15.1 B L 0.36 15.1 B L 0.36 15.8 B L 0.36 15.8 B
TR 0.49 18.5 B TR 0.49 18.5 B TR 0.89 35.5 D TR 0.89 35.7 D TR 0.80 31.3 C TR 0.80 31.4 C
WB L 0.15 10.4 B L 0.15 10.4 B L 0.45 18.1 B L 0.46 18.2 B L 0.52 19.4 B L 0.52 19.5 B
TR 0.50 16.6 B TR 0.50 16.6 B TR 0.62 24.3 C TR 0.63 24.3 C TR 0.66 25.7 C TR 0.67 25.8 C
Hill Boulevard
NB
L 0.27 34.4 C L 0.27 34.4 C L 0.35 38.8 D L 0.35 38.8 D L 0.45 42.7 D L 0.45 42.7 D
T 0.15 33.2 C T 0.15 33.2 C T 0.56 44.7 D T 0.56 44.7 D T 0.46 42.4 D T 0.46 42.4 D
R 0.25 1.8 A R 0.25 1.8 A R 0.39 6.0 A R 0.39 6.0 A R 0.64 12.9 B R 0.64 12.9 B
SB L 0.05 30.1 C L 0.05 30.1 C L 0.19 35.7 D L 0.19 35.7 D L 0.14 32.9 C L 0.14 32.9 C
TR 0.42 28.9 C TR 0.42 28.9 C TR 0.68 35.3 D TR 0.68 35.3 D TR 0.76 41.3 D TR 0.76 41.3 D
Intersection 17.9 B Intersection 17.9 B Intersection 29.7 C Intersection 29.8 C Intersection 28.2 C Intersection 28.2 C
9: Hill Boulevard/Old Jefferson Valley Road and E Main Street (Unsignalized)
E Main Street EB LTR - 0.00 A LTR - 0.00 A LTR - 0.00 A LTR - 0.00 A LTR - 0.00 A LTR - 0.00 A
WB LTR 0.07 7.9 A LTR 0.07 7.9 A LTR 0.08 9.4 A LTR 0.08 9.4 A LTR 0.08 8.5 A LTR 0.08 8.5 A
Hill Boulevard/Old
JV Road
NB LTR 0.08 11.9 B LTR 0.08 12.0 B LTR 0.57 28.9 D LTR 0.57 29.1 D LTR 0.57 25.6 D LTR 0.57 25.9 D
SB LTR - 0.0 A LTR - 0.0 A LTR - 0.0 A LTR - 0.0 A LTR - 0.0 A LTR - 0.0 A
Notes:
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound
v/c = volume to capacity, LOS = Level of Service
L = Left Turn, T = Through, R = Right Turn
AAA = LOS E, AAA = LOS F
Red bold text = Impact
800 East Main Street Redevelopment
07/10/2024 17-48 DRAFT
Table 17-26
2026 No Action, 2026 Alternative Site Layout With Action, and 2026 Alternative Site Layout Mitigation Conditions
Level of Service Analysis
Approach
Weekday AM Weekday PM Saturday
2026 No Action 2026 With Action 2026 Mitigation 2026 No Action 2026 With Action 2026 Mitigation 2026 No Action 2026 With Action 2026 Mitigation
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
Lane
Group
v/c
Ratio
Delay
(sec) LOS
4: E Main Street and U.S. Route 6 (Unsignalized)
U.S. Route 6
EB L 0.70 27.6 D L 0.78 33.8 D L 0.41 14.4 B L 1.26 160.9 F L 1.40 214.4 F L 0.7 20.2 C L 0.92 56.7 F L 0.99 72.7 F L 0.47 17.2 B
TR - - - TR - - - TR 0.44 4.4 A TR - - - TR - - - TR 0.64 6.9 A TR - - - TR - - - TR 0.56 5.1 A
WB L 0.02 11.6 B L 0.02 11.6 B L 0.07 18.6 B L 0.01 14.5 B L 0.01 14.5 B L 0.06 17.4 B L 0.01 12.9 B L 0.01 12.9 B L 0.04 15.8 B
TR - - - TR - - - TR 0.98 48.8 D TR - - - TR - - - TR 0.98 47.2 D TR - - - TR - - - TR 1.01 51.6 D
E Main
Street
NB LTR - - - LTR - - - LTR 0.24 2.1 A LTR - - - LTR - - - LTR 0.22 1.8 A LTR - - - LTR - - - LTR 0.07 0.5 A
SB LTR 2.40 679.0 F LTR 5.79 2241.8 F R 0.66 51.3 D LTR - - - LTR - - - R 0.5 14.5 B LTR 2.40 688.6 F LTR 1.34 202.5 F R 0.55 33.6 C
U.S. Route 6 Intersection 30.1 C Intersection 23.3 C Intersection 28 C
5: E Main Street and Old Route 6 (Unsignalized)
Old Route 6 EB TR 0.00 8.3 A TR 0.19 9.1 A TR 0.5 12.9 B TR 0.02 8.4 A TR 0.12 8.8 A TR 0.22 6.9 A TR 0.02 8.4 A TR 0.10 8.7 A TR 0.18 7 A
E Main
Street
WB LT - - - LT - - - LT 0.61 40.9 D LT - - - LT - - - LT 0.67 36.3 D LT - - - LT - - - LT 0.78 49 D
NB LR - - - LR - - - L 0.19 29.2 C LR - - - LR - - - L 0.3 27.6 C LR - - - LR - - - L 0.12 18.4 B
R 0.27 1.6 A R 0.32 2 A R 0.40 2.5 A
Intersection 22.8 C Intersection 15.6 B Intersection 23.7 C
Notes:
EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound
v/c = volume to capacity, LOS = Level of Service
L = Left Turn, T = Through, R = Right Turn
AAA = LOS E, AAA = LOS F
Red bold text = Significant Impact
1.25.24
800 EAST MAIN STREET Figure 17-1
Existing Zoning Alternative - Conceptual Site PlanAMS Yorktown JANUARY 9, 2024
25'50'0'NALTERNATE B: BUSINESS/RESEARCH, OB ZONE
Propose
d
N
o
r
t
h
Building
Proposed South Building
Proposed East Building
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-2
Existing Zoning Alternative - Sectional Diagram
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-3
Alternative Site Layout - Conceptual Site Plan
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
AMS Yorktown JANUARY 9, 2024
25'50'0'NALTERNATE: AGE RESTRICTIVE 55 PLUS, 165 UNITS + 20 COTTAGES
11
74 Spaces
19 Spaces
28 Spaces
78 Spaces
64 Spaces
Prop
o
s
e
d
S
o
u
t
h
Buil
d
i
n
g
Prop
o
s
e
d
N
o
r
t
h
Buil
d
i
n
g
10
17
4
12
9
18
3
13
8
19
2
14
7
20
1
15
6
16
5
1.25.24
800 EAST MAIN STREET Figure 17-4a
Multi-Family Buildings - Elevations
NORTH ELEVATION
SOUTH BLDG NORTH BLDG NORTHEAST ELEVATION
SOUTH BLDG NORTH BLDG EAST ELEVATION
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -NORTH BLDG OUTSIDE ELEVATIONS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-4b
Multi-Family Buildings - Elevations
SOUTH ELEVATION
SOUTH BLDGNORTH BLDG
SOUTHWEST ELEVATION
SOUTH BLDGNORTH BLDG
WEST ELEVATION
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BLDG OUTSIDE ELEVATIONS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-4c
Multi-Family Buildings - Elevations
NORTH ELEVATION NORTHEAST ELEVATION
EAST ELEVATION SOUTHEAST ELEVATION
SOUTH ELEVATION
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -EXTERIOR COURTYARD ELEVATIONS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-5
Multi-Family Buildings - Section
AVG. GRADE -N BLDG
552' -9 1/8"AVG. GRADE -S BLDG
543' -1 3/16"
NORTH BLDG SOUTH BLDG
COURTYARDBL
D
G
H
T
55
'
N
O
R
T
H
BL
D
G
H
T
55
'
S
O
U
T
H
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SECTION
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-6a
Multi-Family Buildings - Floorplans
D YH
UNEXCAVATED
SUPPORT
RESIDENT
STORAGE
UNEXCAVATED
UNEXCAVATED
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILDING GROUND FLOOR PLAN
SOUTH BUILDING -GROUND FLOOR PLAN
D YH
UNEXCAVATED
POOL
EQ
BOHBOH
TRASH
RES.
STORAGE
UNITS
UNITS
UNITS
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILD FIRST FLOOR PLAN
SOUTH BUILDING -FIRST FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-6b
Multi-Family Buildings - Floorplans
0.1 4 '
D YH
COURTYARD
POOL
AMENITY UNITS
UNITS
UNITS
UNITS
TRASH
BOH
BOH
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -1ST AND 2ND FLOOR PLAN
NORTH BUILDING -FIRST FLOOR PLAN SOUTH BUILDING -SECOND FLOOR PLAN
OPEN TO
BELOW
OPEN TO
BELOW
TRASH
UNITS
UNITS
UNITS
UNITS
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -2ND AND 3RD FLOOR PLANS
NORTH BUILDING -SECOND FLOOR PLAN SOUTH BUILDING -THIRD FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-6c
Multi-Family Buildings - Floorplans
TRASH
BOH
BOH
UNITS
UNITS
UNITS
UNITS
UNITS
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -3RD AND 4TH FLOOR PLANS
NORTH BUILDING -THIRD FLOOR PLAN SOUTH BUILDING -FOURTH FLOOR PLAN
MECH
UNITS
UNITS
UNITS
BOH
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS - FOURTH FLOOR AND ROOF PLANS
NORTH BUILDING -FOURTH FLOOR PLAN SOUTH BUILDING -ROOF PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-7a
Cottages - Elevations
AMS YORKTOWN 1" = 20'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -COTTAGE BUILDS A, C, D & F EXTERIOR ELEVATIONS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-7b
Cottages - Elevations
AMS YORKTOWN 1" = 20'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -COTTAGE BUILD B EXTERIOR ELEVATIONS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-8
Cottages - Floorplans
C2 C1 C1 C2
TYPE
TYPE
TYPE TYPE
AMS YORKTOWN 1" = 20'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -TYPICAL COTTAGE PLANS
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-9a
Multi-Family Buildings - Renderings
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.25.24
800 EAST MAIN STREET Figure 17-9b
Multi-Family Buildings - Renderings
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
2.16.24
800 EAST MAIN STREET Figure 17-10a
Existing Condition
SimulationProposed Simulation Building Height Outline 2b1a
View Location 1
Photo Simulations - Alternative Site Layout - View Location 1
2.16.24
800 EAST MAIN STREET Figure 17-10b
Existing Condition
SimulationProposed Simulation Building Height Outline 2b2a
View Location 2
Photo Simulations - Alternative Site Layout - View Location 2
2.16.24
800 EAST MAIN STREET Figure 17-10c
Existing Condition
SimulationProposed Simulation Building Height Outline 3b3a
Photo Simulations - Alternative Site Layout - View Location 3
View Location 3
2.16.24
800 EAST MAIN STREET Figure 17-10d
Existing Condition
SimulationProposed Simulation Building Height Outline
Photo Simulations - Alternative Site Layout - View Location 4
4b4a
View Location 4
2.16.24
800 EAST MAIN STREET Figure 17-10e
Existing Condition
SimulationProposed Simulation Building Height Outline
Photo Simulations - Alternative Site Layout - View Location 5
5b5a
View Location 5
2.16.24
800 EAST MAIN STREET Figure 17-10f
Existing Condition
SimulationProposed Simulation Building Height Outline
Photo Simulations - Alternative Site Layout - View Location 6
6b6a
View Location 6
2.16.24
800 EAST MAIN STREET Figure 17-10g
Existing Condition
SimulationProposed Simulation Building Height Outline
Photo Simulations - Alternative Site Layout - View Location 7
7b7a
View Location 7
1.25.24
800 EAST MAIN STREET Figure 17-11
Alternative Site Layout - Sectional Diagram
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.31.24
800 EAST MAIN STREET Figure 17-12a
Alternative Site Layout - Landscaping Plan
So
u
r
c
e
:
A
2
L
a
n
d
C
o
n
s
u
l
t
i
n
g
,
L
L
C
1.31.24
800 EAST MAIN STREET Figure 17-12b
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12c
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12d
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12e
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12f
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12g
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-12h
Alternative Site Layout - Landscaping Plan
1.31.24
800 EAST MAIN STREET Figure 17-13a
Alternative Site Layout - Lighting Plan
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.31.24
800 EAST MAIN STREET Figure 17-13b
Alternative Site Layout - Lighting Plan
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
1.31.24
800 EAST MAIN STREET Figure 17-16
RSP-2 Zoning With Reduced Program - Conceptual Site Plan
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
AMS Yorktown JANUARY 9, 2024
25'50'0'NALTERNATE C-1: 3 STORY AGE RESTRICTIVE 55 PLUS, 122 UNITS + 20 COTTAGES
11
74 Spaces
19 Spaces
28 Spaces
78 Spaces
64 Spaces
Prop
o
s
e
d
S
o
u
t
h
Buil
d
i
n
g
Prop
o
s
e
d
N
o
r
t
h
Buil
d
i
n
g
10
17
4
12
9
18
3
13
8
19
2
14
7
20
1
15
6
16
5
1.31.24
800 EAST MAIN STREET Figure 17-17
RSP-2 Zoning With Increased Building Footprint - Conceptual Site PlanAMS Yorktown JANUARY 9, 2024
25'50'0'NALTERNATE C-2: 3 STORY AGE RESTRICTIVE 55 PLUS, 165 UNITS + 20 COTTAGES
11
Prop
o
s
e
d
S
o
u
t
h
Buil
d
i
n
g
Prop
o
s
e
d
N
o
r
t
h
Buil
d
i
n
g
10
17
4
12
9
18
3
13
8
19
2
14
7
20
1
15
6
16
5
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n