HomeMy WebLinkAbout01_Introduction_02-25-25 1-1 02/25/2025
Chapter 1: Introduction
A. PROCEDURAL CONTEXT
800 E Main Yorktown Dev AMS LLC (the “Applicant”) proposes to construct an age-restricted
residential community (the “Proposed Project”) that would replace the existing, vacant, office
buildings at 800 East Main Street (Tax ID 5.19-1-15) (the “Project Site”). To effectuate its
proposal, the Applicant has petitioned the Town of Yorktown Town Board (the “Town Board” or
“Lead Agency”) to amend the Town Zoning Map to rezone the Project Site from OB Research
Laboratory and Office District (the “OB District”) to the RSP-2 Senior Citizens District (“RSP-2
District”) and for amendments to the regulations of the RSP-2 District. The Zoning Code and
Zoning Map amendments are referred to as the “Proposed Zoning.”
On October 24, 2022, the Applicant submitted its original zoning petition to the Lead Agency. On
March 7, 2023, the Lead Agency determined that the Proposed Action has the potential to result
in one or more significant adverse environmental impacts and directed the Applicant to prepare a
Draft Environmental Impact Statement (DEIS) pursuant to the rules and regulations of the New
York State Environmental Quality Review Act (“SEQRA,” Article 8 of the Environmental
Conservation Law and its implementing regulations at 6 NYCRR 617). A Scoping Document was
prepared as an initial step in the environmental review process to guide the preparation of the
DEIS.
As required by SEQRA regulations, and in order to allow the public sufficient opportunity to
comment on the draft Scoping Document, the Town Board accepted written comments on the draft
from March 24, 2023 through April 14, 2023. A public scoping session, for the purposes or
receiving oral comments, was held by the Town Board on April 4, 2023 and the draft Scoping
Document was reviewed at the April 10, 2023 meeting of the Planning Board and at the April 18,
2023 and April 19, 2023 meetings of the Yorktown Advisory Board on Architecture &
Community Appearance and Yorktown Conservation Board, respectively. On May 2, 2023, the
Town Board adopted the final Scoping Document, which identified the issues to be addressed in
the DEIS (see DEIS Appendix A-1).
On July 10, 2024, the Applicant submitted a preliminary DEIS to the Lead Agency, and on July
16, 2024, the Lead Agency accepted the DEIS as complete. Two duly noticed public hearings
were held on the DEIS by the Lead Agency on September 3, 2024, and October 8, 2024. During
the DEIS comment period, which was open through October 18, 2024, comments were received from
the public, Town staff and consultants, and other Involved and Interested Agencies.
This document is a Final Environmental Impact Statement (FEIS), which has been prepared
pursuant to the requirements of SEQRA. The purpose of this FEIS is to provide the Lead Agency’s
responses to the substantive comments (both written and verbal) on the DEIS received during the
public hearings and comment period. The DEIS is hereby incorporated by reference into this FEIS.
Capitalized terms not defined in this FEIS have the meaning given to them in the DEIS.
800 East Main Street Redevelopment
02/25/2025 1-2
B. REVISED PROPOSED PROJECT
DESCRIPTION
Based on input from the Lead Agency, various Involved and Interested Agencies, and the public,
and consistent with SEQRA regulations at 617.9(b)(8), the Applicant has explored the possibility
of further reducing disturbance on the Project Site compared to the Proposed Project and the
Alternative Site Layout set forth in the DEIS. As a result of its analysis, the Applicant has
developed a modified, alternative development plan (the “Revised Proposed Project”), The
Revised Proposed Project is similar to, and an evolution of, the Alternative Site Layout (see DEIS,
Chapter 17, “Alternatives,”) but would comparatively further reduce site disturbance, slope
disturbance, parking, impervious areas, tree removal quantities, and total number of units. The
Applicant’s preferred alternative is the Revised Proposed Project.
The Revised Proposed Project consists of 180-units of age-restricted multifamily housing
developed in two multifamily buildings, consisting of 60 one-bedroom units and 120 two-bedroom
units. Dwelling units in the multi-family building would range from approximately 845 sf to 1,369
sf. The average size of the one-bedroom units would be 860 sf and the average size of the two-
bedroom units would be 1,162 sf, and all dwelling units would include balconies. Interior
amenities for the multi-family buildings would include a clubhouse with club room, demonstration
kitchen, catering kitchen, fitness center, spa, screening room, sports lounge, reading room, and an
art studio. Exterior amenities would include a pool and barbeque area within the courtyard between
the multi-family buildings, as well as sports courts and natural walking trails.
The multifamily buildings of the Revised Proposed Project are in the same location, and are the
same height, as the multi-family buildings in the Alternative Site Layout. Each multi-family
building would be four stories and approximately 55-feet tall and would feature similar
architectural design to the building in the Alternative Site Layout. The residences would be
supported by 270 parking spaces, open spaces, walking trails, and other recreational amenities,
similar to the Alternative Site Layout (see Figure 1-1). The multifamily buildings would have a
total of approximately 246,000 gross sf, including approximately 12,000 sf of amenity space (see
Figure 1-2), resulting in a proposed site-wide FAR of 0.16. No cottages are proposed in the
Revised Proposed Project.
ENVIRONMENTAL ANALYSIS
The potential environmental impacts of the Revised Proposed Project, with the exception of
impacts to visual resources and natural resources, both of which are reduced, are materially the
same as those of the Alternative Site Layout. This is because most of the environmental analyses
of a proposed residential project (e.g., traffic, water and wastewater, etc.) are based on the number
of residential units. Given the similar unit count of the Revised Proposed Project (i.e., 180 units)
to the Alternative Site Layout (i.e., 185 units), the potential impacts from, and required mitigation
for, the two alternatives would be substantially similar.
The primary physical difference between the two alternatives is that the Revised Proposed Project
does not include the cottages, which, with the Alternative Site Layout, were proposed to be located
in an area of the Project Site that is currently forested. The Revised Proposed Project would disturb
6.29 acres of slopes, which is 2.36 acres less than the Alternative Site Layout (See Table 1-1).
The entirety of this reduction in disturbance results from the elimination of the cottages. Compared
to the Alternative Site Layout, the Revised Proposed Project would result in 0.07 more acres of
Chapter 1: Introduction
1-3 02/25/2025
disturbance to 0 percent to 10 percent slopes, but 1.63 less acres of disturbance to 10 to 15 percent
slopes, and 0.80 less acres of disturbance to slopes greater than 15 percent, as compared to the
Alternative Site Layout (see Table 1-1). The Revised Proposed Project would also result in 7.99
acres less disturbance to forested areas than the Alternative Site Layout (see Table 1-2). Similarly,
the number of trees required to be removed for the Revised Proposed Project is 301, which is 350
fewer than the Alternative Site Layout, and 1,019 fewer than the Proposed Project (See Table 1-
3). The Revised Proposed Project would require a net cut of 700 cubic yards, compared to a net
cut of 8,915 cubic yards for the Alternative Site Layout. The Revised Proposed Project would also
reduce impervious areas from 21.1 percent of the Site in the Alternative Site Layout to 16.0 percent
(see Table 1-4).
Table 1-1
Slope Disturbance
Slope Grade
Disturbance to Slopes (acres)
Proposed Project Alternative Site Layout Revised Proposed Project
0% to 10% 7.39 3.21 3.28
10% to 15% 4.35 2.35 0.72
Greater than
15% 8.55 3.09 2.29
Total 20.29 8.65 6.29
Source: Site Design Consultants
Table 1-2
Land Cover Impacts
Land Covertypes
Existing
Acreage
Acreage
with
Proposed
Project
Acreage with
Alternative Site
Layout
Acreage with
Revised
Proposed
Project
Roads, buildings, and
other paved or
impervious surfaces 5.20 9.3 7.5 6.18
Forested 26.85 15.2 18.86 26.85
Meadows, grasslands,
or brushlands 3.45 11.0 9.14 2.56
Source: Site Design Consultants
Table 1-3
Tree Removal Quantities
Tree Type or
Condition
Proposed
Project
Alternative Site
Layout
Revised
Proposed
Project
Protected 1,103 500 239
Specimen 162 87 35
Invasive 0 0 0
Dead/Dying 55 64 27
TOTAL 1,320 651 301
Sources: Site Design Consultants; Dynamic Survey
800 East Main Street Redevelopment
02/25/2025 1-4
Table 1-4
Project Site Coverage
Existing
Condition
Proposed
Project
Alternative Site
Layout
Revised Proposed
Project
Total Site Area
(acres) 35.5 35.5 35.5 35.5
Total Permeable
area (acres) 30.3 26.2 28.0 29.8
Total Impervious
Area (acres) 5.2 9.3 7.5 6.18
Percent
Impervious 14.6% 26.2% 21.1% 16.0%
Total Building
Area (acres) 0.7 3.7 2.0 1.6
Percent Building
Coverage 1.9% 10.5% 5.6% 4.5%
Note: Totals may not sum due to rounding.
Source: Site Design Consultants, Perkins Eastman
With respect to stormwater, the practices proposed for the cottages in the Alternative Site Layout
are eliminated with the Revised Proposed Project. The practices proposed for the multifamily
buildings are the same (see Appendix B for a Revised SWPPP).
With respect to visual resources, views of the Revised Proposed Project from vantage points south
of the Project Site would be the same as with the Alternative Site Layout. From west of the Project
Site, along the Taconic State Parkway, the views of the Revised Proposed Project would be
substantially similar to the Alternative Site Layout, with the major change being the elimination
of the cottages, which would have been closer to the Parkway.
C. FEIS STRUCTURE
The organization of the FEIS is as follows:
• FEIS Chapters
- Chapter 1, “Introduction.”
- Chapter 2, “Response to Comments.” This chapter provides responses to substantive
comments on the DEIS received during the public comment period.
• Appendices
- Appendix A, “Revised Proposed Project Site Plans”
- Appendix B, “Stormwater Pollution Protection Plan”
- Appendix C, “Correspondence”
- Appendix D, “Traffic”
- Appendix E, “DEIS Comments”
AMS Yorktown
25'50'0'N
DECEMBER 10, 2024
ALTERNATE: AGE RESTRICTIVE 55 PLUS, 180 UNITS
76 Spaces
19 Spaces
33 Spaces
78 Spaces
64 Spaces
Prop
o
s
e
d
F
o
u
r
S
t
o
r
y
Buil
d
i
n
g
Prop
o
s
e
d
F
o
u
r
S
t
o
r
y
Buil
d
i
n
g
F.F.
E
L
E
V
5
5
9
.
0
0
F.F.
E
L
E
V
5
4
7
.
6
3
L.F.
E
L
E
V
.
5
3
5
.
1
3
12.11.24
800 EAST MAIN STREET Figure 1-1
Conceptual Site Plan
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2a
Floorplans
D YH
UNEXCAVATED
UNEXCAVATED
LOBBY
UNITS
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILDING GROUND FLOOR PLAN
SOUTH BUILDING -GROUND FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2b
Floorplans
D YH
TRASH
UNITS
UNITS
AMENITYUNEXCAVATED
UNEXCAVATED
OPEN TO
BELOW
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILD FIRST FLOOR PLAN
SOUTH BUILDING -FIRST FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2c
Floorplans
0 .1 4 '
D YH
COURTYARD
POOL
AMENITY
UNITS
UNITS
UNITS
UNITS
TRASH
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -1ST AND 2ND FLOOR PLAN
NORTH BUILDING -FIRST FLOOR PLAN SOUTH BUILDING -SECOND FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2d
Floorplans
OPEN TO
BELOW
OPEN TO
BELOW
TRASH
UNITS
UNITS
UNITS
UNITS
BOH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -2ND AND 3RD FLOOR PLANS
NORTH BUILDING -SECOND FLOOR PLAN SOUTH BUILDING -THIRD FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2e
Floorplans
TRASH
BOH
UNITS
UNITS
UNITS
UNITS
UNITS
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -3RD AND 4TH FLOOR PLANS
NORTH BUILDING -THIRD FLOOR PLAN SOUTH BUILDING -FOURTH FLOOR PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n
11
.
2
6
.
2
4
800 EAST MAIN STREET Figure 1-2f
Floorplans
MECH
UNITS
UNITS
UNITS
BOH
TRASH
AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS - FOURTH FLOOR AND ROOF PLANS
NORTH BUILDING -FOURTH FLOOR PLAN SOUTH BUILDING -ROOF PLAN
So
u
r
c
e
:
P
e
r
k
i
n
s
E
a
s
t
m
a
n