Loading...
HomeMy WebLinkAbout01_Introduction_02-25-25 1-1 02/25/2025 Chapter 1: Introduction A. PROCEDURAL CONTEXT 800 E Main Yorktown Dev AMS LLC (the “Applicant”) proposes to construct an age-restricted residential community (the “Proposed Project”) that would replace the existing, vacant, office buildings at 800 East Main Street (Tax ID 5.19-1-15) (the “Project Site”). To effectuate its proposal, the Applicant has petitioned the Town of Yorktown Town Board (the “Town Board” or “Lead Agency”) to amend the Town Zoning Map to rezone the Project Site from OB Research Laboratory and Office District (the “OB District”) to the RSP-2 Senior Citizens District (“RSP-2 District”) and for amendments to the regulations of the RSP-2 District. The Zoning Code and Zoning Map amendments are referred to as the “Proposed Zoning.” On October 24, 2022, the Applicant submitted its original zoning petition to the Lead Agency. On March 7, 2023, the Lead Agency determined that the Proposed Action has the potential to result in one or more significant adverse environmental impacts and directed the Applicant to prepare a Draft Environmental Impact Statement (DEIS) pursuant to the rules and regulations of the New York State Environmental Quality Review Act (“SEQRA,” Article 8 of the Environmental Conservation Law and its implementing regulations at 6 NYCRR 617). A Scoping Document was prepared as an initial step in the environmental review process to guide the preparation of the DEIS. As required by SEQRA regulations, and in order to allow the public sufficient opportunity to comment on the draft Scoping Document, the Town Board accepted written comments on the draft from March 24, 2023 through April 14, 2023. A public scoping session, for the purposes or receiving oral comments, was held by the Town Board on April 4, 2023 and the draft Scoping Document was reviewed at the April 10, 2023 meeting of the Planning Board and at the April 18, 2023 and April 19, 2023 meetings of the Yorktown Advisory Board on Architecture & Community Appearance and Yorktown Conservation Board, respectively. On May 2, 2023, the Town Board adopted the final Scoping Document, which identified the issues to be addressed in the DEIS (see DEIS Appendix A-1). On July 10, 2024, the Applicant submitted a preliminary DEIS to the Lead Agency, and on July 16, 2024, the Lead Agency accepted the DEIS as complete. Two duly noticed public hearings were held on the DEIS by the Lead Agency on September 3, 2024, and October 8, 2024. During the DEIS comment period, which was open through October 18, 2024, comments were received from the public, Town staff and consultants, and other Involved and Interested Agencies. This document is a Final Environmental Impact Statement (FEIS), which has been prepared pursuant to the requirements of SEQRA. The purpose of this FEIS is to provide the Lead Agency’s responses to the substantive comments (both written and verbal) on the DEIS received during the public hearings and comment period. The DEIS is hereby incorporated by reference into this FEIS. Capitalized terms not defined in this FEIS have the meaning given to them in the DEIS. 800 East Main Street Redevelopment 02/25/2025 1-2 B. REVISED PROPOSED PROJECT DESCRIPTION Based on input from the Lead Agency, various Involved and Interested Agencies, and the public, and consistent with SEQRA regulations at 617.9(b)(8), the Applicant has explored the possibility of further reducing disturbance on the Project Site compared to the Proposed Project and the Alternative Site Layout set forth in the DEIS. As a result of its analysis, the Applicant has developed a modified, alternative development plan (the “Revised Proposed Project”), The Revised Proposed Project is similar to, and an evolution of, the Alternative Site Layout (see DEIS, Chapter 17, “Alternatives,”) but would comparatively further reduce site disturbance, slope disturbance, parking, impervious areas, tree removal quantities, and total number of units. The Applicant’s preferred alternative is the Revised Proposed Project. The Revised Proposed Project consists of 180-units of age-restricted multifamily housing developed in two multifamily buildings, consisting of 60 one-bedroom units and 120 two-bedroom units. Dwelling units in the multi-family building would range from approximately 845 sf to 1,369 sf. The average size of the one-bedroom units would be 860 sf and the average size of the two- bedroom units would be 1,162 sf, and all dwelling units would include balconies. Interior amenities for the multi-family buildings would include a clubhouse with club room, demonstration kitchen, catering kitchen, fitness center, spa, screening room, sports lounge, reading room, and an art studio. Exterior amenities would include a pool and barbeque area within the courtyard between the multi-family buildings, as well as sports courts and natural walking trails. The multifamily buildings of the Revised Proposed Project are in the same location, and are the same height, as the multi-family buildings in the Alternative Site Layout. Each multi-family building would be four stories and approximately 55-feet tall and would feature similar architectural design to the building in the Alternative Site Layout. The residences would be supported by 270 parking spaces, open spaces, walking trails, and other recreational amenities, similar to the Alternative Site Layout (see Figure 1-1). The multifamily buildings would have a total of approximately 246,000 gross sf, including approximately 12,000 sf of amenity space (see Figure 1-2), resulting in a proposed site-wide FAR of 0.16. No cottages are proposed in the Revised Proposed Project. ENVIRONMENTAL ANALYSIS The potential environmental impacts of the Revised Proposed Project, with the exception of impacts to visual resources and natural resources, both of which are reduced, are materially the same as those of the Alternative Site Layout. This is because most of the environmental analyses of a proposed residential project (e.g., traffic, water and wastewater, etc.) are based on the number of residential units. Given the similar unit count of the Revised Proposed Project (i.e., 180 units) to the Alternative Site Layout (i.e., 185 units), the potential impacts from, and required mitigation for, the two alternatives would be substantially similar. The primary physical difference between the two alternatives is that the Revised Proposed Project does not include the cottages, which, with the Alternative Site Layout, were proposed to be located in an area of the Project Site that is currently forested. The Revised Proposed Project would disturb 6.29 acres of slopes, which is 2.36 acres less than the Alternative Site Layout (See Table 1-1). The entirety of this reduction in disturbance results from the elimination of the cottages. Compared to the Alternative Site Layout, the Revised Proposed Project would result in 0.07 more acres of Chapter 1: Introduction 1-3 02/25/2025 disturbance to 0 percent to 10 percent slopes, but 1.63 less acres of disturbance to 10 to 15 percent slopes, and 0.80 less acres of disturbance to slopes greater than 15 percent, as compared to the Alternative Site Layout (see Table 1-1). The Revised Proposed Project would also result in 7.99 acres less disturbance to forested areas than the Alternative Site Layout (see Table 1-2). Similarly, the number of trees required to be removed for the Revised Proposed Project is 301, which is 350 fewer than the Alternative Site Layout, and 1,019 fewer than the Proposed Project (See Table 1- 3). The Revised Proposed Project would require a net cut of 700 cubic yards, compared to a net cut of 8,915 cubic yards for the Alternative Site Layout. The Revised Proposed Project would also reduce impervious areas from 21.1 percent of the Site in the Alternative Site Layout to 16.0 percent (see Table 1-4). Table 1-1 Slope Disturbance Slope Grade Disturbance to Slopes (acres) Proposed Project Alternative Site Layout Revised Proposed Project 0% to 10% 7.39 3.21 3.28 10% to 15% 4.35 2.35 0.72 Greater than 15% 8.55 3.09 2.29 Total 20.29 8.65 6.29 Source: Site Design Consultants Table 1-2 Land Cover Impacts Land Covertypes Existing Acreage Acreage with Proposed Project Acreage with Alternative Site Layout Acreage with Revised Proposed Project Roads, buildings, and other paved or impervious surfaces 5.20 9.3 7.5 6.18 Forested 26.85 15.2 18.86 26.85 Meadows, grasslands, or brushlands 3.45 11.0 9.14 2.56 Source: Site Design Consultants Table 1-3 Tree Removal Quantities Tree Type or Condition Proposed Project Alternative Site Layout Revised Proposed Project Protected 1,103 500 239 Specimen 162 87 35 Invasive 0 0 0 Dead/Dying 55 64 27 TOTAL 1,320 651 301 Sources: Site Design Consultants; Dynamic Survey 800 East Main Street Redevelopment 02/25/2025 1-4 Table 1-4 Project Site Coverage Existing Condition Proposed Project Alternative Site Layout Revised Proposed Project Total Site Area (acres) 35.5 35.5 35.5 35.5 Total Permeable area (acres) 30.3 26.2 28.0 29.8 Total Impervious Area (acres) 5.2 9.3 7.5 6.18 Percent Impervious 14.6% 26.2% 21.1% 16.0% Total Building Area (acres) 0.7 3.7 2.0 1.6 Percent Building Coverage 1.9% 10.5% 5.6% 4.5% Note: Totals may not sum due to rounding. Source: Site Design Consultants, Perkins Eastman With respect to stormwater, the practices proposed for the cottages in the Alternative Site Layout are eliminated with the Revised Proposed Project. The practices proposed for the multifamily buildings are the same (see Appendix B for a Revised SWPPP). With respect to visual resources, views of the Revised Proposed Project from vantage points south of the Project Site would be the same as with the Alternative Site Layout. From west of the Project Site, along the Taconic State Parkway, the views of the Revised Proposed Project would be substantially similar to the Alternative Site Layout, with the major change being the elimination of the cottages, which would have been closer to the Parkway. C. FEIS STRUCTURE The organization of the FEIS is as follows: • FEIS Chapters - Chapter 1, “Introduction.” - Chapter 2, “Response to Comments.” This chapter provides responses to substantive comments on the DEIS received during the public comment period. • Appendices - Appendix A, “Revised Proposed Project Site Plans” - Appendix B, “Stormwater Pollution Protection Plan” - Appendix C, “Correspondence” - Appendix D, “Traffic” - Appendix E, “DEIS Comments” AMS Yorktown 25'50'0'N DECEMBER 10, 2024 ALTERNATE: AGE RESTRICTIVE 55 PLUS, 180 UNITS 76 Spaces 19 Spaces 33 Spaces 78 Spaces 64 Spaces Prop o s e d F o u r S t o r y Buil d i n g Prop o s e d F o u r S t o r y Buil d i n g F.F. E L E V 5 5 9 . 0 0 F.F. E L E V 5 4 7 . 6 3 L.F. E L E V . 5 3 5 . 1 3 12.11.24 800 EAST MAIN STREET Figure 1-1 Conceptual Site Plan So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2a Floorplans D YH UNEXCAVATED UNEXCAVATED LOBBY UNITS BOH AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILDING GROUND FLOOR PLAN SOUTH BUILDING -GROUND FLOOR PLAN So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2b Floorplans D YH TRASH UNITS UNITS AMENITYUNEXCAVATED UNEXCAVATED OPEN TO BELOW AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -SOUTH BUILD FIRST FLOOR PLAN SOUTH BUILDING -FIRST FLOOR PLAN So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2c Floorplans 0 .1 4 ' D YH COURTYARD POOL AMENITY UNITS UNITS UNITS UNITS TRASH BOH AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -1ST AND 2ND FLOOR PLAN NORTH BUILDING -FIRST FLOOR PLAN SOUTH BUILDING -SECOND FLOOR PLAN So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2d Floorplans OPEN TO BELOW OPEN TO BELOW TRASH UNITS UNITS UNITS UNITS BOH AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -2ND AND 3RD FLOOR PLANS NORTH BUILDING -SECOND FLOOR PLAN SOUTH BUILDING -THIRD FLOOR PLAN So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2e Floorplans TRASH BOH UNITS UNITS UNITS UNITS UNITS AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS -3RD AND 4TH FLOOR PLANS NORTH BUILDING -THIRD FLOOR PLAN SOUTH BUILDING -FOURTH FLOOR PLAN So u r c e : P e r k i n s E a s t m a n 11 . 2 6 . 2 4 800 EAST MAIN STREET Figure 1-2f Floorplans MECH UNITS UNITS UNITS BOH TRASH AMS YORKTOWN 1" = 60'-0"ALTERNATE AGE RESTRICTIVE 55 PLUS - FOURTH FLOOR AND ROOF PLANS NORTH BUILDING -FOURTH FLOOR PLAN SOUTH BUILDING -ROOF PLAN So u r c e : P e r k i n s E a s t m a n