HomeMy WebLinkAboutAPPENDIX E_Comments on DEISAppendix E
Comments Received on DEIS
Christopher Taormina, RA Ed Lachterman
Chairman Town Supervisor
TOWN OF YORKTOWN
ADVISORY BOARD ON ARCHITECTURE & COMMUNITY APPEARANCE (ABACA)
Albert A. Cape l lini Community and Cultural Center, 1974 Commerce Street, Yorktown Heights, New York 10598, Phone (914) 962 -6565
Crompond / Croton Heights / Huntersville / Jefferson Valley / Kitchawan / Mohegan Lake / Shrub Oak / Sparkle Lake / Teatown / Yorktown / Yorktown Heights
To: Diana Quast, Town Clerk for the Town Board
From: ABACA
Date: August 7, 2024
Subject: Town Board Referral – AMS LLC - 800 E. Main Street; 5.19-1-15
DEIS referral for proposed rezone of 35.53 acres in the OB zone to RSP-2 for an active adult
residential community consisting of 250-units including a mix of rental and for-sale townhomes with
related infrastructure on a 35.53-acre parcel.
Documents Received and Reviewed:
Title: Produced By:
Town Board Referral dated 7/11/2024 with associated documents Diana Quast, Town Clerk
The Advisory Board on Architecture and Community Appearance reviewed the above referenced subject at their meeting
held on Tuesday, August 6, 2024. The ABACA has no comments.
Christopher Taormina
Christopher Taormina, RA
Chairman
/nc
cc: Planning Department
Planning Board
Supervisor Ed Lachterman
Town Board
Applicant
Diane Dreier, Co-Chair Ed Lachterman
Phyliss Bock, Co-Chair Town Supervisor TOWN OF YORKTOWN
CONSERVATION BOARD
Town of Yorktown Town Hall, Yorktown Heights, New York 10598, Phone (914) 962-5722
Crompond / Croton Heights / Huntersville / Jefferson Valley / Kitchawan / Mohegan Lake / Shrub Oak / Sparkle Lake / Teatown / Yorktown / Yorktown Heights
To: Town Board
From: Conservation Board
Date: August 9, 2024
Subject: AMS, LLC – 800 E. Main Street; 5.19-1-15
Town Board Referral – Petition for Rezone
At the August 7, 2024 Conservation Board meeting, Joseph Riina of Site Design Consultants; Diana Kolev, Esq. of
DelBello, Donnellan, Weingarten, Wise & Wiederkehr; and Peter Feroe of AKRF Inc. appeared before the Board to
discuss their petition for rezoning the former Contractor’s Register property from OB to RSP-2 zoning to accommodate an
active adult residential community. Aspects of the DEIS were discussed including traffic, stormwater, and tree removal.
Overall the Board is in favor of the rezone provided that a closer look at the alternate site layout is undertaken. The
proposed layout does not adequately address the stormwater and has a very large footprint on the mostly undisturbed site.
The Board is concerned that the four-story buildings will be visible from the Taconic State Parkway, a recognized scenic
byway. The alternate site layout reduces the number of proposed units, keeping more of the site in a natural state, leading
to overall less disturbance, and more adequately addresses the stormwater needs.
The Conservation Board continues to be concerned with the number of proposed developments along the East Main Street
(6N) and Route 6 corridor, which are being reviewed in a piecemeal fashion. The Board reiterates that the Jefferson
Valley Hamlet is experiencing development pressure from many sides. Taking each proposal independently without
considering the total impact of all the proposals combined does not allow for the overall environmental impacts to this area
to be considered.
Respectfully submitted,
Phyllis Bock
Phyllis Bock
Conservation Board Co-chair
cc: Conservation Board Members
Planning Department/Planning Board
Applicant
John A. Tegeder, R.A. Ed Lachterman Director of Planning Town Supervisor TOWN OF YORKTOWN
PLANNING DEPARTMENT
Albert A. Capellini Community and Cultural Center, 1974 Commerce Street, Yorktown Heights, New York 10598, Phone (914) 962-6565, Fax (914) 962-3986
Crompond / Croton Heights / Huntersville / Jefferson Valley / Kitchawan / Mohegan Lake / Shrub Oak / Sparkle Lake / Teatown / Yorktown / Yorktown Heights
To: Town Board
From: Planning Board
Date: August 30
Subject: AMS, LLC
SBL: 5.19-1-15
____________________________________________________________________________________
At its meeting on August 12, the Planning Board discussed the subject Town Board Referral. The Board had
the following Planning concerns that should be addressed prior to the Town Board’s decision. These concerns
are enumerated below:
1. The traffic and access location for the site are of the utmost importance. While the DEIS does a very
thorough review of the potential traffic impacts in the area, the entrance location should be discussed
thoroughly as egress and ingress on to East Main Street may carry significant impacts on the intersection
of Route 6 and East Main Street. While the DEIS presents a well-designed intersection improvement,
the Board should scrutinize it fully.
2. The Department of Transportation has yet to respond to the subject referral. The Planning Board
recommends that the Town Board wait for their response prior to making their final decision.
3. The Planning Board requests that the rezoning resolution written by the Town Board leave room for
the Planning Board to conduct their normal site plan review as to not hinder the review process.
Respectfully submitted,
Ian Richey
Assistant Planner
Comments on the DEIS for 800 East Main Street
From Councilwoman Susan Siegel
Submitted at the September 3, 2024 public hearing
Chapters 1 & 7: Project Description and Socioeconomic Impacts
1. Clarify certain terms
a. What is the difference between a “townhouse” and a “cottage.”
b. What is a “villa” and how do its rental units differ from non villa units.
2. Clarify 310 population projection
a. The projection is based on the 2006 Rutgers model, although in Chapter 17 the
DEIS uses the 2018 Rutgers model to calculate population for the non age
restricted alternative. Why the difference?
b. In Chapter 17, the population projection is based on 1 and 2 bedroom unit counts.
But the 310 projection doesn’t distinguish between 1 & 2 bedroom units. Why the
difference?
3. Demand for senior housing
a. The DEIS makes the assumption that there is a need for age restricted housing “in
the area.”
i. Based on what data?
ii. How is “in the area” defined?
1. Is there any data showing need for existing Yorktown seniors?
iii. The DEIS should differentiate between the housing needs of different
senior age categories, e.g., the Westchester County Housing Assessment
discusses the need for assisted living facilities, not rental housing, for the
growing 85+ senior age group.
b. What data shows the need for senior rental as opposed to senior purchase?
i. How many units in Jefferson Village are rented?
4. Why senior housing and not non age restricted multi-family housing
a. The DEIS states that the Westchester County Housing Needs Assessment says that
Yorktown needs 1,085 affordable units.
i. What is source of data?
ii. Does the 1,085 distinguish between senior and non age restricted or
between rental and purchase?
b. How does the development address that need?
c. How does your plan address the Comprehensive Plan goal for a diversity of
housing for all demographic groups?
5. Where will the seniors be coming from
a. The DEIS assumes that some will be current Yorktown seniors who are
downsizing and others who will find Yorktown desirable.
i. What is the basis for this assumption? What data?
ii. Quantify how many seniors are projected from each group
iii. For downsizing, provide data on number of annual sales in Jefferson
village and the number of rental units
6. Rents and for sale prices
a. What are projected rents and townhouse purchase prices
i. These figures must be known as rental income and townhouse values are
factored into DEIS tax revenue analysis
ii. Also, rents figure into income projections used to show overall economic
benefits
7. Affordability
a. Update the discussion of Yorktown’s past affordable housing initiatives to include
the 2010/2011 set aside law that was repealed in 2016 and repeated calls to adopt
a new set aside law that have been ignored.
b. The DEIS states that 49.9% of renters and 36.5% of homeowners in Yorktown are
cost burdened or extremely cost burdened. How does your plan address that?
c. Compare and contrast the development’s estimated rents and purchase price with
HUD’s 2024 median Westchester income guidelines for rental and
homeownership and how the rents and purchase price correlate with the 30%
housing cost standard.
d. How does your plan further the 2010 Comprehensive Plan goal of providing
affordable work force housing?
e. What is the median income of Yorktown seniors, using the same age categories
used in census?
f. How many Yorktown seniors have qualified for the RP-467 senior tax exemption?
g. Provide data on the waiting lists for affordable senior housing at Beaveridge and
Wynwood Oaks.
8. Ability to absorb 250 additional housing units
a. What is the basis for the DEIS assumption that the “’Low homeowner vacancy
rate” is an indication of town’s ability to absorb additional housing units?
b. What, if any, is the correlation between homeowner vacancy rates and the need
for rental units?
9. Municipal benefits
a. Clarify the total assessed value figure used to calculate future tax revenue
i. The letter from the town assessor in Appendix D estimates the total
assessed value at $894,250. But Table 7-18 in the DEIS shows a total
assessed value of $2,208,446.
1. The town assessor’s calculations should be included in the FEIS.
b. The DEIS projects an increase of $170,443 in revenue to the town over what the
site currently generates.
i. To put that number in perspective for the typical homeowner, the DEIS
should note that based on 2023 tax rates and with everything else
unchanged, that additional revenue would result in tax decrease of just
$12.99 for house with $10k assessed value
c. Provide a table showing the INCREASE in tax revenue over current revenue for
the 250, 185 and 142 (same footprint) unit plans that compares tax impact on
homeowner with a $10,000 assessed value.
d. Explain comment about stabilized value based on alternate site plan.
i. What does “stabilized value” mean?
ii. Is the $170,443 additional town tax revenue based in 250 or 185 units.
10. Lakeland School District
a. The DEIS makes many references to the proposed development being similar to
Trump Park, also zoned RSP-2.
b. According to anecdotal information, school buses from Lakeland School District
service Trump Park.
i. Confirm or deny the above, based on written data, from the school district
ii. If there are school aged children, explain how this is possible in an RSP-2
zone.
c. How would the additional assessed value for Yorktown impact the equalization
rate, which in turn, would impact the tax rate for Yorktown property owners in the
school district.
11. General economic benefits
a. The DEIS states that new residents will generate $442,854 in economic benefits.
i. How many of the 310 residents are “new” as opposed to existing
Yorktown residents who will be downsizing?
b. Does the annualized spending data include purchases from some of the 310
residents will be snowbirds?
c. What model was used to calculate projected spending by 310 seniors
i. IMPLAN or Bureau of Labor Statistics
ii. BLS shows that, with the exception of health care, spending by age group
in higher for non seniors.
iii. Show a revised economic benefit calculation based on BLS model and
reflecting a percentage of snowbirds.
12. The proposed 250 unit plan has a 0.50 FAR which is more than double the 0.23
maximum FAR for the town’s R-3 multi family zone and 30% more than the existing
FAR in the current RSP-2 zone.
a. Provide a table comparing the FAR and number of units for the three RSP-2 site
plans: 250, 185 and 142 and the R-3 multi family zone.
b. Other than generating more tax revenue, explain how the higher FAR benefits the
town and its residents.
13. Show how the density of 250 units was calculated
Chapter 17 – Alternatives
Non age restricted
1. Explain why the 310 population projection for the proposed development uses the 2006
Rutgers multiplier, but the 520 population projection for the non age restricted plan uses
the 2018 Rutgers multiplier.
2. Explain why the 310 population projection is not broken down into 1 & 2 bedroom units,
but the 530 non age restricted projection is.
3. For an equal comparison, discuss impacts for a 185 unit or 142 unit non age restricted
development,
4. As the absence of school children is a major reason for proposing an age restricted
development, explain in greater detail the following
a. How the 2018 Rutgers model differs from other school children projections done
for similar Westchester developments.
b. Does IMPLAN have a model for projecting school children that differs from the
Rutgers model?
c. Explain in Table 17-8 why there are two sets of multipliers for the one and two
bedroom rental units.
d. What are the Lakeland School District’s historic and current enrollment and
future enrollment projections?
i. When was the last enrollment projection study done?
ii. Are there any plans for an updated enrollment projection study?
e. Data from the most recent facilities utilization study.
i. If there was an increase in enrollment, would more classroom space be
needed?
f. Cost per child
i. Clarify what your $17,911 per student figure includes/excludes
ii. If no additional teachers will have to be hired due to the additional
students, why would each additional student cost district an extra $17,911?
g. Show the number of projected school children with a 142 unit non age restricted
plan, or, more appropriately, a density based on R-3 guidelines.
5. Explain in greater detail, and quantify citing methodologies, the statement in D.2b that a
non age restricted project would generate “slightly greater economic benefits to the
town.”
185 unit age restricted
1. Address how the above comments regarding the demand for senior housing, including
affordable senior housing, apply also to this reduced density alternative.
2. Explain if and how the 185 unit plan meets or does not meet the developer’s objectives.
142 age restricted units using same footprint
1. Address how the above comments regarding the demand for senior housing, including
affordable senior housing, apply also to this reduced density alternative.
2. Explain if and how the 142 unit plan, using the same footprint as the 185 unit plan, meets
or does not meet the developer’s objectives.
142 non age restricted plan
1. Discuss a straight R-3 alternative using the same footprint.
Chapter 12 – Traffic
1. The DEIS acknowledges a decrease in the level of service to F and lists potential
mitigation measures, including signalization and road widening.
a. Provide details on the estimated cost of these improvements and who would pay
for them
2. The DEIS states that although the 142 unit site plan would increase traffic, no
improvements would be made or required.
a. Explain why the Planning Board could not still require improvements as a
condition of site plan approval.
3. The DEIS acknowledges that there is no feasible second emergency access and that the
only way an emergency access can be provided is by widening the existing entrance
driveway.
a. Does this plan, even with the center divider strip, meet Fire Code requirements for
emergency access?
b. Does the traffic study include the traffic impact from the proposed
recycling/transfer station and 254 unit mixed use development, both accessing
Navajo Road from Route 6?
i. If not, will the FEIS update the traffic study?
Chapter 8 – Community facilities
Police
1. The DEIS acknowledges that senior developments make greater demands on police than
non senior developments. While the police chief stated that the proposed development
“will” increase demand, the DEIS states that the development “may” lead to an increase
in demand.
a. On what basis, and based on what data, was “will” changed to “may”?
b. DEIS minimizes the increase in the number of calls on the assumption that many
are from the town’s assisted living facilities.
i. What data supports that assumption?
ii. Do police records distinguish between assisting living facilities and age
restricted communities like Jefferson Village, Trump Park, Wynwood
Oaks and Beaveridge?
c. How does the DEIS justify the assumption that this increased demand will not
result in a need for increased staff, meaning, increased cost to taxpayers, given
that the police chief said additional staff would be needed for both emergency
calls and traffic control.
2. The DEIS states that the increased tax revenue from the site, e.g., $170,000, would
exceed any possible incremental cost in police services.
a. Explain what the cost of an additional police officer (not at starting salary) with
benefits, and car would be.
Fire/volunteer ambulance
1. Like the police department, the DEIS acknowledges there will be more calls for medical
emergencies for a senior development.
2. What is your response to the comment in the DEIS from the Mohegan Fire Chief that the
additional tax revenue to the fire district would cover only about half the added
anticipated additional expense.
EMS
1. The DEIS acknowledges an increase in calls for service but needs to provide data on the
location of the calls, e.g., age restricted or non age restricted developments or
neighborhoods, commercial properties, assisted living facilities, etc.
2. The DEIS needs to eliminate references that compare calls to assisted living facilities
with projected calls from its proposed development.
Chapter 19 – Water & Sewer
1. There is no discussion of mitigation that would be required to reduce I&I in the Peekskill
system despite the fact that since 2010, it has been the policy of the county’s Department
of Environmental Facilities that municipal governments require development applications
to identify mitigation measures that would offset the projected increase in flow at a three
for one ratio one for market rate units.
Westchester County Planning Board Referral Review
Pursuant to Section 239 L, M and N of the General Municipal Law and
Section 277.61 of the County Administrative Code
George Latimer
County Executive
432 Michaelian Office Building
148 Martine Avenue
White Plains, New York 10601 Telephone: (914) 995-4400 Website: westchestergov.com
September 3, 2024
Diana L. Quast, Town Clerk
Town of Yorktown
363 Underhill Avenue
Yorktown Heights, NY 10598
County Planning Board Referral File YTN 24-008 – 800 East Main Street
Site Plan Approval; Zoning Map and Zoning Text Amendments
Draft Environmental Impact Statement
Dear Ms. Quast:
The Westchester County Planning Board has received a Draft Environmental Impact Statement (DEIS)
for an application to amend the Yorktown Zoning Map to rezone a 35.5-acre site located at 800 East
Main Street (SBL 5.19-1-15) in the OB – Research Laboratory and Office zone to the RSP-2 – Senior
Citizens Development district. The site is located on the north side of East M ain Street (US Route 6)
near the Jefferson Valley hamlet center, between the Taconic State Parkway and Donald Trump State
Park. The northern boundary of the site is the Town and County municipal border. The site currently
hosts two vacant office buildings and associated parking lots, which would be demolished.
Should the rezoning be approved, the applicant proposes to construct 250 age-restricted (55+) housing
units (96 one-bedroom and 154 two-bedroom) contained within 24 buildings. Twelve townhouse
buildings of two stories would host a total of 50 units for sale. The remaining 200 residences would be
rental units, split amongst 12 buildings. Four four-story buildings of villa-style residences would host 96
units. Seven two-story buildings of flat-style residences would host 32 units. One four-story building
would host 72 apartment units. A clubhouse building would provide amenities for the community, and
various auxiliary structures would be placed around the site, such as a gazebo, an amph itheater, a pool,
and recreational facilities. Walking and biking paths would also be provided within the property. 6.25
acres of the northern portion of the site would remain undeveloped, and 9.4 acres of the site would remain
open space for resident usage. 383 parking spaces would be provided on the site, spread amongst various
parking lots around the site and within private garages. An interior street network would connect the
various parking lots and buildings, and lead to East Main Street following the existing entrance drive to
the site. New traffic signalization would be provided at the corners of East Main Street and Route 6, and
East Main Street and Old Route 6.
In addition to rezoning the site, the petitioner is also requesting amendments to the RSP-2 district
regulations to permit the development as proposed. Specifically, amendments are requested to increase
the permitted floor area ratio from 0.35 to 0.55 on sites greater than 25 acres, and to increase the
maximum building height from 45 feet to 55 feet on sites greater than 25 acres.
We have previously reviewed a preliminary petition and the EIS Draft Scope under the provisions of
Section 239 L, M and N of the General Municipal Law and Section 277.61 of the County Administrative
Referral File No. YTN 24-008 – 800 East Main Street – DEIS
September 3, 2024
Page 2
Code and responded in letters dated November 28, 2022 and April 14, 2023. We have now reviewed the
DEIS and offer the following comments:
1. Consistency with County Planning Board policies.
The County Planning Board’s long-range planning policies are set forth in Westchester 2025—Context
for County and Municipal Planning and Policies to Guide County Planning, adopted by the Board on
May 6, 2008, amended January 5, 2010, and its recommended strategies are set forth in Patterns for
Westchester: The Land and the People, adopted December 5, 1995. We appreciate that the proposed
development would align with aspects of these policies, as it would redevelop a vacant office site with
new multi-family housing that is within walking distance to public amenities and the Jefferson Valley
commercial center.
However, while the petition discusses a number of different housing types proposed for this site, the
requested zoning map amendment would only permit housing for seniors. We note that the Jefferson
Village development, across the Sprain Brook Parkway from the site, is also currently age restricted. As
is mentioned in the DEIS, a critical need for housing for all ages has been documented in the County’s
Housing Needs Assessment. We appreciate that an alternative in the DEIS analyzes a development that
is not age restricted. We recommend the Town consider this alternative where the site is rezoned to a
multi-family district that would permit residency for all household types, including seniors, to ensure
that sufficient housing is being provided within the town for all potential resident needs.
2. Affirmatively furthering fair housing (AFFH).
We note that the DEIS includes a discussion of the acute shortage of affordable housing in Westchester
County that has been documented in the County’s Housing Needs Assessment. It is critical for all of
Westchester’s municipalities to play a role in meeting this need, particularly since the economic and
social impacts of this affordable housing shortage are spread throughout the county. Due to this County-
wide need, the EIS should also include a discussion regarding Westchester County’s affordable housing
policies, and the Model Ordinance provision requiring:
Within all residential developments of 10 or more units created by subdivision or site plan
approval, no less than 10% of the total number of units must be created as affordable AFFH
units. In residential developments of five to nine units, at least one affordable AFFH unit shall
be created.
We continue to urge the Town to re-adopt this portion of the Model Ordinance to ensure that any
development on this site and elsewhere in Yorktown contributes towards meeting the need for affordable
AFFH as documented in the Housing Needs Assessment. Approving this development without including
a provision for a minimum set-aside of 10% for affordable affirmatively furthering fair housing would
run contrary to County affordable housing policies.
3. Pedestrian and bicycle infrastructure.
We appreciate that the applicant has proposed an internal pedestrian pathway system within the site to
connect the various residential buildings to each other and to the amenity areas. However, the DEIS
states that sidewalk and bicycle connections are not proposed due to the slope of the access driveway.
Referral File No. YTN 24-008 – 800 East Main Street – DEIS
September 3, 2024
Page 3
While terrain may be a factor in the usability of sidewalks and bike paths, we note that providing multiple
means of transportation is an important factor in balancing the needs of residents, employees, and
visitors. By requiring all persons to access the site via an automobile, those who do not own a car or
cannot drive are denied safe access or are excluded. As the site is to be age-restricted, providing multiple
means of access is of great importance, as many elderly residents either cannot or choose not to drive.
We recommend that the applicant considers alternative means of transportation, including the utilization
of a shuttle to access the Jefferson Valley hamlet center and mall, and perhaps including a means for
electric bicycle rental or storage, as these vehicles have become a popular mode of transportation for
older residents.
The Town of Yorktown Comprehensive Plan discusses the Jefferson Valley hamlet in detail, and notes
its “eclectic mix of retail, office (and) recreational” uses that are surrounded by residential areas. As part
of that discussion, Policy 5-47 states specifically: “provide sidewalk connections along East Main Street
to the shopping areas with crosswalks at Hill Boulevard and Lee Boulevard.” Since the redevelopment
of this site with residential uses would be the closest multifamily residential development to the hamlet
center constructed since the Comprehensive Plan was adopted in 2010, the EIS should include a
discussion on contributions the petitioner can include towards implementing the Town’s goal of making
the Jefferson Valley hamlet more walkable.
4. Transportation demand management.
Ensuring that the transportation needs of new residents are accommodated through means other than
private automobiles is an important factor in reducing the dependency on cars and encouraging dense
residential growth without overburdening the street network and existing parking supply. Furthermore,
the cost of constructing and maintaining parking in residential developments can add to housing costs,
resulting in fewer housing options that are affordable to people who live and work in Westchester. The
County’s Transportation Demand Management Toolkits provide strategies for municipalities,
employers, and developers to reduce the need for single-occupancy vehicle travel, which could help
future tenants avoid the need to park private vehicles.
We further encourage the Town to consider the TDM Toolkits in an effort to reduce the environmental
impacts of parking, which can include excessive land disturbance as well as increased stormwater
runoff and flooding. We encourage the Town to consider these impacts and implement TDM practices
that would help avoid the impacts of excessive parking. Such practices could include landbanking,
setting parking maximums (instead of minimums), unbundling the cost of parking from housing costs
(except for any affordable units), and other strategies included in the Toolkits.
5. NYS DOT review.
We note that the applicant intends to add a traffic signal to the intersections of Route 6 and East Main
Street, and Old Route 6 and East Main Street. As Route 6 is a State Highway, the Town and applicant
will need to coordinate with NYS DOT on design and permitting, as well as to evaluate potential traffic
impacts to Route 6. Due to the limited length of the connection between Route 6 and East Main Street,
the design and timing of these traffic signals is of great importance to ensure vehicles do not back up
onto Route 6.
Referral File No. YTN 24-008 – 800 East Main Street – DEIS
September 3, 2024
Page 4
6. County sewer impacts.
Since 2010, it has been the policy of the County Department of Environmental Facilities (WCDEF) that
municipal governments require development applicants to identify mitigation measures that will offset
the projected increase in sewer flows to County operated wastewater facilities. The best means to do so
is through the reduction of inflow and infiltration (I&I) at a ratio of three for one for market rate housing
units and at a ratio of one for one for affordable affirmatively furthering fair housing (AFFH) units.
We recommend this mitigation policy be discussed in the EIS, with specific details on how the
implementation of I&I mitigation is to be accomplished in response to the development. For example,
will the applicant be required to place funds into a dedicated account for I&I work based on a per gallon
cost of removal of flow through I&I? How will I&I projects be identified? Who will conduct the work
and in what timeframe?
7. Stormwater Management.
We note that the DEIS include a discussion regarding the use of aboveground stormwater management
solutions that treat runoff on-site, such as using pervious paving, green roofs, or rainwater harvesting.
We recommend that the EIS also include a discussion of vegetative rain gardens within the landscaped
areas. In regards to underground stormwater management systems, we point out that subsurface methods
of stormwater management can be of diminishing effectiveness over time if not properly cleaned and
maintained. To ensure the continued operability of underground stormwater management systems, the
applicant should include an enforceable maintenance program to prevent the system from being clogged
with sediment, and in turn force a higher amount of stormwater runoff offsite.
8. Recycling provisions.
We note that the DEIS indicates that private carting companies would collect solid waste from the
property. The Town should require the applicant to verify that there is sufficient space to accommodate
the storage needs for recyclables under the County’s recycling program. County regulations for
recycling may be found at: https://environment.westchestergov.com/recycling.
9. Green building technology.
We appreciate the applicant for proposing a mix of green building technologies throughout the
development, including electric vehicle charging stations, sustainable construction practices, and the
consideration of solar arrays. We encourage the applicant to include as much additional sustainable
building technology as possible within the proposed development.
10. Tree removal remediation.
While we appreciate that a portion of the property would be maintained as woodland under the proposed
plan, 1,320 trees would be removed from the heavily wooded site. The DEIS discusses the Town’s
requirements for tree removal mitigation. The applicant and the Town should work to ensure that the
greatest number of trees as possible are protected, and that new landscaping include a variety of native
plantings.
Referral File No. YTN 24-008 – 800 East Main Street – DEIS
September 3, 2024
Page 5
11. Universal Design.
As the proposed residences would be age-restricted, we encourage the applicant to review the principles
of universal design in this development. Universal Design standards allow all residents and visitors to
fully engage in our public and residential spaces. Universal Design is also an important means of
allowing household residents to age in place as well as to provide access for persons with mobility issues.
Thank you for calling this matter to our attention. The County Planning Board looks forward to
continuing our review of this matter as it moves forward.
Respectfully,
WESTCHESTER COUNTY PLANNING BOARD
Richard Hyman
Chair, Westchester County Planning Board
RH/mv
cc: Blanca Lopez, Commissioner, Westchester County Department of Planning
Anne Darelius, NYS Department of Transportation, Region 8
Christopher Lee, NYS Department of Transportation, Region 8
From:Diana Quast
To:Maura Weissleder
Subject:FW: AMS Proposal for 800 Main Street
Date:Tuesday, August 6, 2024 9:27:25 AM
From: Walt Daniels <wjd2802@gmail.com>
Sent: Tuesday, August 6, 2024 8:37 AM
To: Ed Lachterman <elachterman@yorktownny.org>; Diana Quast <dquast@yorktownny.org>
Subject: AMS Proposal for 800 Main Street
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
We would like AMS to consider making smaller units in their proposed development. There are many
retirees in Yorktown who do not want to live in a 2500-3000 square ft house with three or four
bedrooms now that their children have grown and left the area. One floor with two or maybe three
bedrooms with 1200-1500 square feet would suit them just fine. Purchasing a larger unit likely
means they are transferring the equity in their current home to a unit that is about the same value
but smaller.
Many of these retirees have enough income that they do not qualify for the Affordable Housing
units. These retirees want housing that they can afford and not compromise the equity that
they have accumulated.
Making smaller units means that instead of one unit of 3000 square feet, there would be two units
of 1500 square feet. We realize that there will be more cars and more traffic,which will impact the
surrounding area but a reasonable trade off for us, personally
Jane and Walt Daniels
2802 Deer Street, Mohegan Lake, NY 10547
From:Diana Quast
To:Maura Weissleder
Subject:FW: AMS plans for 800 East Main Street
Date:Tuesday, August 6, 2024 9:21:07 AM
From: Jane Daniels <wjdhikes@gmail.com>
Sent: Tuesday, August 6, 2024 8:01 AM
To: Ed Lachterman <elachterman@yorktownny.org>; Diana Quast <dquast@yorktownny.org>
Cc: Felicity Arengo <felarengo@gmail.com>; Michael MacDonald <mjmacdon@gmail.com>
Subject: AMS plans for 800 East Main Street
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Walt and I are away and unable to make comments at the Town Board meeting this evening.
As advocates of places to walk in Yorktown, we would encourage AMS to include at least one hiking
trail into the Indian Hill section of Trump State Park, just north of their proposed development. They
have included plans for sidewalks, but not nothing that goes into the woods.
I have corresponded with Linda Cooper, Regional Director of the Taconic Region of NY State Parks.
She approves the idea in hopes that illegal ATV use of the area will be curtailed.
If AMS approves the concept, volunteers from the NY-NJ Trail Conference can work with them to
design and build the trails. Both FDR and French Hill section of Trump State Park have neighborhood
entrances.
Having an amenity such as trails makes that development a desirable place to live.
Jane and Walt Daniels
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
CATHERINE ARMENTANO 914-588-3358
1
STATE OF NEW YORK
TOWN OF YORKTOWN
-------------------------------------------------X
TRANSCRIPT OF THE
PUBLIC HEARING FOR
800 MAIN STREET YORKTOWN DEV AMS, LLC
PETITION FOR AMENDMENTS TO THE ZONING CODE AND AN
AMENDMENT TO THE ZONING MAP FROM OB RESEARCH LABORATORY
AND OFFICE DISTRICT TO RSP-2 SENIOR CITIZENS DISTRICT
HELD BEFORE THE TOWN BOARD OF
THE TOWN OF YORKTOWN
SEPTEMBER 4, 2024 - 12:04 A.M.
at
ALBERT A. CAPELLINI COMMUNITY AND CULTURAL CENTER
1974 COMMERCE STREET
YORKTOWN, NEW YORK
--------------------------------------------------X
B E F O R E:
EDWARD A. LACHTERMAN, TOWN SUPERVISOR
SERGIO ESPOSITO, COUNCILMAN
LUCIANA HAUGHWOUT, COUNCILWOMAN
PATRICK J. MURPHY, COUNCILMAN
SUSAN SIEGEL, COUNCILWOMAN
P R E S E N T:
DAVID CHEN, ESQ., TOWN ATTORNEY
DIANA L. QUAST, TOWN CLERK
MAURA WEISSLEDER, DEPUTY TOWN CLERK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
2
MR. LACHTERMAN: All right, ladies and
gentlemen, we're going to get started now. We're
going to convene a public hearing for 800 East Main
Street, Yorktown Development AMS, LLC, petition for
amendments to the Zoning Code and an amendment to the
Zoning Map from OB, Research Laboratory and Office,
District, to RSP-2, Senior Citizens District.
Mark.
MR. WEINGARTEN: I will say that,
abnormally, I'm going to say good morning, Mr.
Supervisor and members of the Board. And we
appreciate everyone who is hanging in there with us.
My name is Mark Weingarten, I'm a partner
with the law firm DeBello Donnellan Weingarten Wise &
Wiederkehr. It is my pleasure to be here representing
AMS Acquisitions, LLC in connection with this proposal
to redevelop the 35-and-a-half acre site located at
800 East Main Street, Yorktown, New York formerly
known as the Contractors Register site.
We're joined tonight by the principal of
AMS, Michael Mitnick together with Ryan Sullivan, our
Director of Design and Development. You'll hear
shortly from our Planner from AKRF, Peter Feroe, who
is the author of the Draft Environmental Impact
Statement, which is the subject of tonight's public
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
3
hearing.
We have a proposed action for the 35-acre
site which consists of demolishing the office
buildings on the site, which are 63,000 square feet,
and replacing them with approximately 250 luxury
multifamily residences restricted to owners 55 years
of age and over, approximately 200 rental units and 50
for sale town homes. We seek to create a beautiful
new neighborhood with plenty of office space and
luxury amenities included.
Currently, the site is zoned OB, Research
Lab and Office, District. The vacant site, just
like numerous vacant, or partially occupied, office
parks in our region, is in the need of repurposing in
the face of a very weak office market.
This type of repurposing is happening
throughout Westchester County, and I have been
personally involved in the necessary repurposing of
millions of square feet of un-utilized commercial
space throughout Westchester.
Some may consider this unfortunate, but it
is a fact of the times. Moreover, as the Supervisor
mentioned this evening, and as you've been reading in
the newspapers repeatedly, our state and our region is
currently suffering from a critical housing shortage.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
4
We believe that this site on an isolated hilltop is an
excellent location that sorely needed housing could be
put in to fill in the need for the growing over 55
market.
This is especially in light of the fact that
our project is essentially a rental project. And
there is not, and we think this is the sweet spot,
rental 55 and over housing that's available in your
community. And we think that's a very important
differentiator from some of the other projects you
heard about this evening.
The good news is, also, that this site,
unlike some other sites that may have been before you,
is a site that's already been developed, it has office
space on there now and office buildings. And this
site primarily will be developed in the areas that are
already developed, which will allow us to lessen the
impacts of what we're doing, that we're not going into
a green site and cutting off trees to go ahead and
create it. We're putting it in an already developed
area for the roadway network that was there, you'll
see more when we go through it a little bit later, the
number of parking spaces, and I'm kind of cutting to
the chase because I'll get there in a moment.
When we met with you earlier and we had site
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
5
visits with you, and we had public discussions, I'll
go through a little bit of this process, it was
decided, or it was discussed, that we should even do
more to make the site more compact and get away from
our original proposal, which was to go on a certain
acreage. And we'll show it to you pictorially. We
now have a proposal that's an alternative that's being
studied, which is actually 185 units, or -- 185, I get
the numbers a little wrong, it's a little late, 185
units, so, it's a little bit smaller. But we
essentially located almost all of the housing now
where it's already been developed as office, so we
really cut down on the number of trees that have to
come out, the areas of the buffer, leaving
large buffer areas with the neighbors around the site,
etcetera.
And when you finish the project and you take
a look at it, for example, the number of parking
spaces that would be required by the zoning for the
alternative proposal that we have is less parking
spaces than for the office. And if you just think of
it intuitively with anything else, you have the
offices, and you have a certain number of parking
spaces. And those people came in, basically, all at
once, and they, basically, left all at once. Well,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
6
this is going to be a slightly less number of parking
spaces, and people are going to be coming in and out
during the day. So, it is a much less traffic impact.
More importantly, when you look at it, and
we'll go through a little bit, I'll talk process in a
moment, because traffic is so important to the people
who are here, we've heard it all evening, we also,
because we went through a Draft Environmental Impact
Statement and have our own traffic study, we are
proposing two traffic lights to help fix it.
So, we have significant traffic improvements
that are part of what this project, and we believe,
again, because we've studied our project as the last
one in with all of these other projects that you've
heard about, in our traffic study, the Trader Joe's,
all of the things that have happened in your
community, the Toll Brothers project, all of those
that have preceded us, they're in our traffic study,
we've considered them and, therefore, we recognize the
need for traffic mitigation measures, and it's part of
our plan that's in there. So, we like to believe we've
thought this through.
And one of the reasons we've done that is we
went from -- and our request from the zoning is to go
to RSP-2 to allow the senior housing. What we
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
7
currently have is office zoning, so that clearly
doesn't work for residential, we have to change it.
There are two other things that we asked for
in addition to the change of use, there were two
things in the zoning. The first one was that we asked
to change the FAR, essentially how many units you
could build, the amount of square footage, from point
35 to point 55.
If you don't go with our proposed action, we
don't even need that for the alternative proposal,
because the alternative proposal, because it's
less units, doesn't need that change. So, if we go
with the proposed ask of 250, we need that change. If
you go with the alternative proposal of 185 units, we
no longer need that change. So, I wanted to point
that out.
So, the one change at the end, which is
likely where we're turning out, that we will need your
help is that the height of the office buildings,
because of the floor, the ceiling heights, and the
things we need in the building, that we're asking to
go up 10 feet. We're asking the zone, which allows up
to 45 feet, to go up to 55 feet. We've limited that
to RSP-2 sites that are more than 25 acres, so it will
not have much of an impact anywhere else in the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
8
community because you have to have a very large track.
And we will also show you that in our Draft
Environmental Impact Statement, which is this thick
(Indicating), we have a chapter that's devoted to
visual impact. And the fact of the matter is that
because this is a very isolated site on a hilltop with
the Taconic Parkway out there that we had a study
from, and because of the tree canopy that goes all
through the site and all around the site, you really
won't be able to see it, very few times, and it won't
be much of a change at all. You don't see that office
park when you drive by unless you're really staring
and looking for it. It's the same thing here, we're
not changing anything.
So, changing the height to allow us,
essentially, what that's letting us do is create the
185 units on the already developed property so we
don't have to go cut down the trees and go onto the
other area, because we have a lot of open space on
this plan now, on the alternative plan.
Just briefly, for the record, we filed the
petition for these amendments on March 7th of this
year. The Town Board declared itself lead agency
for the environmental review process under SEQRA.
We've heard a lot of discussion about that tonight.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
9
We are under the most stringent standard of
environmental review permitted under New York State
law. You have a positive declaration, you're the lead
agency. We had to create a Draft Environmental Impact
Statement. Nobody can criticize you for the process
that you've followed here. There is no stronger
process than the one that we've gone through.
On May 2nd, 2024, after there were two
Town Board meetings, a Planning Board meeting, a
Yorktown Board on Architecture and Community
Appearance meeting, a Yorktown Conservation Board
meeting, and after the solicitation of public comments
in a public meeting, a scoping document for the DEIS
was drafted. Again, that is the most that can be
considered under New York State law.
The scope was adopted. We studied
everything that's in that scope, and you'll hear
briefly from Peter shortly as to how that's going to
work.
We'll also mention that we reached out to
the community, we met with Jefferson Village. I don't
think it was the Board, it was all of the presidents
of the individual we asked to meet, and we did. We
had a very good back and forth and we took their
comments. And I'm going to state publicly that we're
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
10
also willing to meet with whatever other neighbors
want to meet with us. We have nothing to hide in this
property. We are out there, we're telling you exactly
what we want to do, and we're willing to listen to
suggestions that the public has for us.
During the public comment period and
relating back to the site visit I mentioned to you, we
developed this alternative. And while it is a
significant change in the number of the units, we are
willing to go with that if that is what the Town is
looking for us to do.
I mentioned the spaces, I mentioned the
traffic lights. I'm going to try to go through this a
little more quickly today. So, before we move on to
the most important part of the evening, which is
actually what it's for, which is the public comments,
I want to mention, we also, because of New York State
law and because of the requirement of the process, we
have a Court Stenographer here with us taking down
every word tonight. So, it's very important if you do
get up, you must state your name, she may even ask you
to spell it. Because what we're required to do by law
is every comment and question that's asked tonight
gets recorded. And because we then get the
transcript, and we are required by law to answer in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
11
writing in a Final Environmental Impact Statement.
So, every question that gets asked this evening will
be answered by us, and the only way we can do that is
if we have a proper record.
So, I'm going to ask Peter Feroe to come up,
give you a little bit of the shortened version of our
presentation, considering the hour, but he'll just
walk you through a couple of the highlights and the
things, some of those that were raised.
We'll also mention that there's a sign-up
sheet here that if you do come up, please put your
name and spell your name properly so the Court
Stenographer spells your name properly in the
transcript.
Thank you.
MR. LACHTERMAN: Thank you.
MR. FEROE: Good morning. I'm will try not
to take the hour Mark said. I'm just kidding.
So, I would run through this a little more
quickly than I would have otherwise. Just to orient
everyone to the site, you can see the site outlined in
red: The Taconic State Parkway to the left, to the
west; the State Park to the north and east; to the
south, Route 6; and to the southeast, you can see the
mall. Just a quick orientation.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
12
This is the project site, it's about 35-and-
a-half acres. Approximately 27 of those acres are
currently forested. Most of that is in the north of
the site although, as you can see, there is some along
the east and west of the site, as well, currently
improved, as Mark said, with two three-story office
buildings, approximately 63,000 square feet.
And one of the important things to note, as
Mark said, is that the site is pretty secluded. And
we'll go into that in a little bit.
The proposed project Mark went through; age
restricted, residential community, one- and two-
bedroom units, a clubhouse, outdoor amenities, walking
paths. We mentioned the rezoning. And, as part of
the project, improvements at the intersection of Route
6 and East Main Street.
This is a site plan of the proposed project
flipped on its side, north is to the left in this.
So, it will maintain the existing alignment of the
entrance drive from East Main Street. You'd come up,
and this site would be improved with the residential
buildings in the north and the south of the site, and
the common facilities within the center of the site in
that light purple color.
As Mark said, we did develop an alternative
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
13
site layout for the project, one of the five or six
alternatives that were studied in the EIS. The
alternative site layout is also an age restricted
residential community, 185 dwelling units consisting
of 165 multifamily units and 20 cottages. It would
also have onsite amenities, which I'll go through in a
second.
The existing multifamily buildings would be
constructed within the existing ring road. So,
basically, in the place where the two existing office
buildings are. And this is a site plan, again,
showing the alternative site layout, north to the
left. It would, again, maintain the same alignment as
the current entry road. But what it wouldn't do is it
wouldn't cut off to the west, or page down, on this
site as the alternative would.
MR. ESPOSITO: What would be the ratio here
as to rental to sale?
MR. FEROE: This would likely be an all
rental product.
MR. ESPOSITO: Okay.
MR. MURPHY: How big are the cottages?
MR. FEROE: The cottages are approximately,
I want to say about 2,000 square feet.
MR. MURPHY: Okay.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
14
MR. FEROE: I can go back to my book.
Roughly.
The alternative site layout would also
contain amenities and landscaping, but it would be of
a slightly different variety than the proposed
project. We'd really work within the existing site to
create wooded landscaped walking trails. We'd improve
what is the existing kind of northern parking lot just
outside of the ring road with pickleball courts, a
gazebo, and those other types of uses. And then
within the quadrangle created by the two new
multifamily buildings, you would have your pool, your
outdoor seating, et cetera.
So, it would still have a lot of amenities
and site landscaping, but it would be, again, a
slightly different character.
This is a rendering looking south, so from
the northern most building looking south of the multi-
family building.
So, as Mark said, we prepared a Draft
Environmental Impact Statement, or DEIS. This is the
table of contents for the DEIS. I will not go through
every chapter tonight, but I do want to focus on a
couple of things that we've heard a lot of about
tonight and we've heard in previous meetings.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
15
So, first is the visual character of the
site. And, as Mark said, you know, the site is
relatively secluded. This is a topographical map with
the darker colors being higher elevations, and the
lighter greens being lower elevations.
The southern most building is approximately
100 feet taller in elevation -- I'm sorry -- the
ground floor of the southern most building is at
approximately 100 feet higher elevation than Route 6.
It then slopes down a little bit towards the Taconic
as you get towards the project site boundary. And
then it really slopes off as you get down to the
Taconic.
And what this really looks like is this, and
I think this really captures it really well. The site
is very visually secluded with all of the trees
basically surrounding the entire site.
We did a number of visual studies in the
DEIS. I will not run through them all. I'm going to
do it relatively quickly tonight, just a couple of
highlights. This is a section view with the Taconic
on the left working up the site with the proposed
project to the right. And what you can see is that
the existing vegetation, the existing topography
really limits views into the site and would
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
16
drastically minimize vies of the project.
Here's another section a little further
north where the Taconic kind of starts to gain
elevation. As you go to the north, again, even with
that gain in elevation, the existing topography, the
existing vegetation both on and off the site really
occludes views of the interior of the site.
We then did photo simulations from seven
different vantage points, as the DEIS required. What
you see on the left, there's a little white outline.
I'm sorry, it doesn't show up as well on this screen,
of where the proposed buildings would be. And on the
right are the actual buildings. And as you can see,
you can't see. You might see a tiny bit of the roof
of the proposed project poking out as you're driving
north on the Taconic just before the Route 6 exit.
This is if you're driving south on the
Taconic, the site is on the left. Again, you can see
in the existing condition, you can see the existing
office buildings right here, and the whiteout line
would be the roofs of the proposed project. And on
the right, you can see where the buildings would be
located.
Obviously, during the leaf-on condition, you
will not be able to see the buildings. During the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
17
leaf-off condition, if you slow down and look the
wrong way while you're going 70 around that curve, you
can see the buildings. I don't advise it.
This is a comparison between the proposed
project and the alternative site layout. And we have
these comparisons for all seven vantage points. So,
on the left, again, you can see the outline of the
roofs of the buildings of the proposed project. And
on the right, you can see the alternative site layout.
Again, not very visible.
Same thing, the left is the proposed
project. The right is the alternative site layout.
Same concept, you might be able to see it
through the trees, but you're not going to be able to
see it above the treeline.
There are five more vantage points, I won't
go through them all.
So, shifting to natural and ecological
resources. Again, I flipped the site, north is on the
left. This is the existing area of the site that's
disturbed, it's about 10.7 acres. About half of that,
so 5.2 acres is impervious, so buildings, parking
lots, roads, etcetera. And, as we said, 26, 27 acres
are forested. There are no wetlands, no flood plains
on the site.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
18
If we look at the proposed project, this is
the limit of the disturbance that would be with the
proposed project. It would disturb approximately 11.7
acres of land that is not currently disturb. And it
would re-disturb 8.65 acres. So, of the 10.7 acres,
we're going to re-disturb about 8.6 acres of that site
and add approximately four acres of impervious
surface. It would require the removal of
approximately 1,320 Town-regulated trees, obviously,
primarily in the northern area up here.
If we compare that to the alternative site
layout, that would have approximately 5.8 acres of
newly disturbed area, and about the same amount of re-
disturbed.
But what you'll see is that a good portion
of the site that's already disturbed including these
parking areas and roadway would not be disturbed.
That would be maintained and reused for the
alternative site layout. The grading would work in
that area, and it would accommodate the alternative
site layout.
It would also add, the alternative site
layout, would add approximately 2.3 acres of
impervious surface, so about half of what the proposed
project would. And it would require the removal of
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
19
approximately 650 Town-regulated trees.
Briefly on socioeconomics and community
services, we did do an analysis on the fiscal impacts,
the economic impacts of the project, as well as the
demands on community services including first
responders.
As has been mentioned, new residents of the
site would support local businesses. And this project
would reuse a previously developed site. The site
currently contributes approximately $270,000 a year in
property taxes, with about two-thirds of that going to
the School District.
When redeveloped, the proposed project would
generate approximately 1.82 million dollars per year
with more than 1.2 million dollars to the School
District.
The alternative site layout, obviously,
smaller, would generate less tax revenue than the
proposed project, but would still generate
approximately 1.3 million dollars a year in property
taxes with close to a million dollars a year to the
School District with very little, if any, impact to
the School District. The Town would also receive
approximately $150,000 per year. And the Fire
District, approximately $72,000 per year.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
20
Traffic. We looked at 11 different
intersections as required by the DEIS scope. Here
they are. As Mark said, our traffic study included,
specifically included, four other projects that are
proposed, but not yet all constructed; so, the 3000
Navajo project, the Rock Shrub Oak, 670 East Main
Street, and the Par 3.
In addition, we added background growth, as
Phil Greeley, had mentioned, we added background
growth to the network to our traffic counts that were
collected in 2023. The proposed project would
generate between 108 and 128 peak hour trips. And
that's the 250-unit project.
The alternative site layout, obviously,
fewer units, fewer peak hour traffic trips, we're
talking about between 90 and, let's say, 110 peak hour
traffic trips. Both of those are less than what the
office buildings would have generated.
Our project would have an impact at the East
Main Street and US Route 6 intersection. We all know
that intersection is not operating well today. It
currently experiences what's known as a Level of
Service F. And that would experience that today, it
would experience that in the future without the
project. Our project, obviously, if it adds that
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
21
traffic, 100 trips an hour, if not mitigated, it would
exacerbate that impact.
But we are proposing to mitigate it. We're
proposing to signalize the intersection with two
traffic signals, one at East Main Street and what
we'll call Old Route 6, and one on Route 6 at East
Main Street. They would operate together, they would
be one controller.
We would also extend the left-hand turning
lane within the existing right-of-way here to add
queuing capacity to this left-hand turn movement.
And, overall, this mitigation would improve
the intersection to a Level of Service C. So, it
would take today's existing Level of Service F
condition and it would improve it to Level C. It
would eliminate our impact and it would improve the
current substandard conditions, not to mention
drastically improved safety at this intersection.
And, finally, since we know that this
alternative site layout has been discussed and people
have requested more information on it, we generated
additional renderings of this alternative that are not
in the DEIS, but we wanted to share with you tonight.
So, this is that aerial view looking
southeast.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
22
This is the existing condition.
This is the proposed condition. You can see
the multifamily buildings and the cottages.
Looking north. Again, this is the existing
condition.
This is your proposed condition. The
cottages are back here, you can't see them in this
view.
And this is looking northeast. So, existing
conditions. And this is the proposed conditions.
MR. MURPHY: How many square feet are the
165 units?
MR. FEROE: Let me get that answer for you.
I don't want to be wrong.
MR. MURPHY: Okay, just ballpark.
MR. WEINGARTEN: I was just going to get up
and do that for you. The alternative project, which I
suspect is going to be the focus of the discussions
here because it's less units, we're talking about one-
and two-bedrooms only, we're talking about roughly
between the one-bedrooms, from like 850 square feet to
1,250 square feet for the two-bedrooms. And, so,
talking about rents, again, these are projections from
the high 2s to the high 3s.
So, again, I'm not saying, they're
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
23
beautiful, they're amenitized, but this is hitting a
sweet spot for rental, people selling their homes that
want to stay in your community that, you know, it's
certainly not affordable housing, but let's call it
moderately priced for what a lot of the things that
you're seeing in front of you with developments. So,
again, we think this is housing that is extremely
needed.
The only other thing I would add to what
Peter was mentioning, and, again, we know the hour is
late so we won't go through it too much, is that there
was talk about school children earlier today. And,
again, we're not saying there's none because somebody
55 years old could have a school child, so we're not
ever saying that you're not having any. But it could
turn out to be zero, in fact, it's likely, but there
could be a handful.
The point is, though, if you looked at the
numbers in the socioeconomic study, you're talking
about an increase, even if for only the alternative,
of more than $800,000 a year for the School District
than you're currently receiving. So, even a handful
of kids is a big surplus for the School District
coming out of an all rental project like this at 55
and older.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
24
The same, by the way, when we did the socio-
economics study, we had to study what were the
expenses that the Town would incur as a result,
additional expenses as a result, of this. Same thing
with all of the other tax and jurisdictions, we put
that against the increase of taxes, and there's a
surplus at every level of taxing authority for that.
So, the socioeconomic news here is good. We
think we've hit a sweet spot with what is needed here
for the community as far as the housing is concerned.
So, again, traffic, visual impact, those things are
studied, they're all in the Draft Environmental Impact
Statement that is required by the law.
We're here to listen to the public
comments, you're comments, and we will answer those in
writing as we're required to.
MR. ESPOSITO: So, I just wanted to make one
correction.
MR. WEINGARTEN: Sure.
MR. ESPOSITO: There was talk of the
children.
MR. WEINGARTEN: Yes.
MR. ESPOSITO: You said it was earlier
today. That was yesterday.
MR. WEINGARTEN: Yesterday. Actually, I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
25
think the Supervisor was younger when that comment was
made.
MR. ESPOSITO: No, I want to make sure we're
on the same page. Just a couple of quick questions
for you.
MR. WEINGARTEN: Sure.
MR. ESPOSITO: Just two quick questions.
So, I think what Councilman Murphy was asking you was
you're removing 67,000 square feet?
MR. WEINGARTEN: 63,000 square feet of two
office buildings.
MR. ESPOSITO: And what is the total number
of square footage after the 185-unit project?
MR. WEINGARTEN: Yeah, we did -- do we have
square footage?
MR. FEROE: Yes. So, the alternative layout
would be approximately 350,000.
MR. ESPOSITO: Okay. And the last question,
we want to get to the public comment, the last
question is the traffic mitigation that you're
proposing, because this is a heavy lift for me because
of that intersection, what is your investment in that,
what will that be costing?
MR. FEROE: We haven't priced it all out
yet, but it's probably seven figures at least.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
26
MR. ESPOSITO: Okay.
MR. WEINGARTEN: You have two, two traffic
lights themselves are, you know, significant, a half-
a-million dollars, at least, for the two traffic
signals.
MR. FEROE: Yeah. And then the design, it's
all got to be coordinated with the DOT signals. I
mean, DOT would, obviously, have to run it, it would
have to be coordinated with the signals at the
Taconic, as well.
And, Councilman Murphy, to answer your
question, the multifamily units in the alternative
plan would range from about 880 square feet to 1,570
square feet.
MR. WEINGARTEN: Well, those are the
cottages, right, the cottages would be the larger.
The apartments would from 850 to about 1,200 tops, and
the cottages are a little bit larger.
MR. FEROE: Yes. Thank you.
MR. ESPOSITO: Okay. Supervisor.
MR. LACHTERMAN: So, we will --
MS. HAUGHWOUT: Read it in?
MR. LACHTERMAN: Yeah, we have a memorandum
from Ken Belfer, as his hat of the Yorktown Community
Housing Board, talking, regarding the need for some
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
27
senior housing that is affordable. So, County
projection of 2,085 for affordable housing units for
renters and homeowners in Yorktown. So, he wants us
to have that as a consideration.
County Planning Board, April 14th, also,
made two significant points regarding the proposed
housing indicating that there's a critical need for
housing of all ages, not just seniors.
And I will say that some of the other
projects coming in are not just senior, if they end up
going through. Not all seniors wishing or needing to
downsize can afford luxury housing. And, you're
absolutely right, Ken. So, we're looking for some
type of mixture.
We also have from the County Planning Board
the referral that Ken spoke about looking, once again,
consistent with County Planning Board policies, and
looking for land and people for the patterns for
Westchester, looking for affirmatively further and
fair housing, pedestrian and bicycle infrastructure,
the transportation demand management, which I think we
we are looking at pretty heavily there, New York State
DOT review.
So, because of Route 6 being DOT, did they
already approve your traffic light scenario?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
28
MR. FEROE: We're still coordinating with
them, we haven't received their comments on the DEIS
yet.
MR. LACHTERMAN: Okay. County sewer
impacts we speak about. And they're looking at I&I
projects, as well. Stormwater management, which I
know Planning will discuss. Recycling provisions.
So, making sure that we have proper space for
sufficient recycling for the County. Green building
technology.
Are you planning on heat pumps and any type
of solarization?
MR. FEROE: It hasn't been determined yet,
we kind of studied both, kind of a natural gas
solution and an all electric solution. We haven't
made a decision yet.
MR. LACHTERMAN: Okay. Because you have
other renewables, such as heat pumps in the ground.
And I think they're actually doing that at Soundview.
So, there are some good options, so definitely
something to look at as we go further.
Tree removal remediation and the universal
design for age restriction.
We have comments from our Planning
Department for traffic access. While the DEIS does a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
29
very thorough review of the potential traffic impact
in the area, the entrance location should be discussed
thoroughly, as egress and ingress to East Main Street
may carry significant impacts on the intersection of
Route 6 and Main Street. While the DEIS presents a
well designed intersection improvement, the Board
should scrutinize it fully.
I believe there was some conversation about
maybe coming in off of Route 6. There used to be,
apparently, an entrance there. So, it would take
turning that signal into a four-way instead of three-
way.
MR. FEROE: Yeah, we evaluated that, and the
DEIS, it was added to the scope, came up with two
different, kind of graded out two different scenarios,
looked at it. One is if we came up straight up from
the exit ramp to the Taconic and just went straight up
the hill and met the road where it was. That would
require, I want to say it was 25 to 30 feet of cut.
And we couldn't actually meet the grades because the
Town Code, right, has limits on the grades for the
roads, we couldn't actually meet it.
The other would be to come part way up the
hill and kind of hang a hard right. That, we could,
basically in theory, meet the grades, but it would
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
30
require 15 to 20 feet of cut, and then we would be
heading the wrong way. So, we'd have to find a way to
loop back around, which would then require more of a
cut into the top of the hill, and it really just
doesn't work, it's not feasible.
We've also asked the DOT to opine on whether
they would even allow such an intersection. So, we're
waiting to hear back from them. But we did include an
engineering study of those two options in the DEIS,
and really the conclusion was it's not feasible.
So, instead, knowing that access is an
issue, we are expanding the existing driveway. So,
we're taking it from 24 feet to 32 feet wide. And
what that's going to allow us to do is have two 10-
foot travel lanes in and out, and have a 12-foot
median that will be grasscrete paver. So, it can take
a structural load, it can take the fire trucks, but it
will look like a grass plantar strip in the middle.
It will be raised with kind of those mountable curbs
so that people don't drive on it, but it will be
available for emergency vehicles.
So, we could pull off to make that work.
And we kind of go through that in the EIS, how that
would work, because we know that secondary access was
something that this Board wanted, the Planning Board
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
31
wanted, we'd love to have, but we can't make it work.
MR. LACHTERMAN: I will look through it
again. You're DEIS is longer than, I just shrugged,
which it was quite a large book to read.
MR. ESPOSITO: It's a good book though.
MR. LACHTERMAN: It's a great book, in my
opinion.
But DOT hasn't responded, as it says. And
Planning Board requested the rezoning resolution
written by the Town Board for the Planning Board to
conduct their normal site plan review as to not hinder
the review process.
John, is that on all of your emails?
MR. TEGEDER: Apparently
MR. LACHTERMAN: We have from ABACA with no
comments.
We have Conservation Board. They want to
make sure that we're looking at everything as a whole.
Overall, the Board is in favor of a rezone provided
that a closer look at the alternate site layout is
undertaken. I think you already understand that one
quite clearly.
We have, oh, from Jane and Walt. I guess
you were away last time.
AUDIENCE INDIVIDUAL: We were away the last
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
32
time.
MR. LACHTERMAN: Yes. Unable to make
comments at the Town Board meeting, but as advocates
of places to walk in Yorktown, they encourage AMS to
include at least one hiking trail, which they are
doing.
Into the Indian Hill section of Trump State
Park. I don't know if that's where the plan is for
that, but that can be looked at that.
And Linda Cooper, who's Regional Director of
Taconic Region, New York State Parks approves of the
idea. And if AMS improves the concept, volunteers
from the New York/New Jersey Trail Conference can work
with you to design and build the trails. Both FDR and
the French Hill section of Trump State Park have
neighborhood entrances.
We have similar from Walt. Making smaller
units in their proposed development. There are many
retirees in Yorktown who do not want to live in a
2,500- to 3,000-square foot house. But I think you
guys are below that.
MR. FEROE: We're significantly smaller.
MR. LACHTERMAN: Significantly, right.
MS. HAUGHWOUT: Yeah.
MR. LACHTERMAN: Okay. So, as a matter of
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
33
fact, 1,200 to 1,500, and you guys are in there.
Okay, so, many of these -- okay, so that's
addressed already, so those are for the record. And
that is it there.
MR. MURPHY: It just goes to show how much
work goes into this.
MR. LACHTERMAN: Yes.
MR. MURPHY: You know, look how many
different agencies and people, this is not something
we take lightly.
MR. LACHTERMAN: Not at all, there is a
process. Even when the Town goes through doing
things, there's a process. A lot of times we have to
get grants to just afford to do the studies.
All right, so we'll open to public comment.
MR. ESPOSITO: Let's do it.
MS. KEMPTER: My opinion won't make much
difference, but I live at 760 East Main Street.
MR. ESPOSITO: State your name, please.
MR. LACHTERMAN: State your name for the
record, please,
MS. KEMPTER: Sure, Jessie Kempter. I've
lived at this address 46 years. It's a designated
sign as you go up the street, dead end. There's a
group home, my property, and then Dr. Lois, and then
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
34
there's a cul-de-sac. And then if you look up the
hill, that's where Contractors Register was. On the
corner they added a stop sign, and they have a pump
house, I guess for the septics, or whatever.
Now, since our property, my property
especially, is down at the bottom, that road floods
from that beautiful hill, the water lays in the road.
So, and the traffic used to be 24 hours a day
Contractors Register, they were day and night.
If you go by that property at night, it's
like lightening bugs, you see all the lights from the
property, from the buildings that were there. You
know, you don't see the buildings, but you know
they're there.
So, it's progress, but, I mean, I couldn't
stop Blue Book, or whatever the heck you call it, you
know, and Dr. Lois couldn't either. And they not only
allowed them to build there once, they allowed them to
build there twice. So, it will be whatever it will
be, but, you know.
And it's a very dangerous intersection, the
lights are not going to help. There's one stop sign
to go out on Route 6. Across the street is a park and
drive, and the the par golf course. And Houlihan &
Lawrence is on the corner, real estate. And then you
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
35
have Indian Hill. And then you have the back part of
DiCicco's where all the trucks come to deliver to
them. So, the traffic is horrendous.
There's nothing you can do to Route 6 to
make it any better. You go there on a Saturday, it's
bumper to bumper, it takes you a half-hour to get to
down to Kohls if you want to. You know, so I don't
know how you can alleviate that.
So, that's it.
MS. HAUGHWOUT: Thanks, Jesse.
MS. KEMPTER: I was offered a million
dollars from Trump, and I turned it down because I
liked living where I lived.
MR. TANZMAN: Good evening again. I
promised I'm not going to stay after the midnight
hour. Once again, representing -- I'm Mel Tanzman,
Mohegan Lake, 33 years, member of the County's Housing
Opportunities Commission.
There are two issues that I think are
relevant to this project. One, we hear about a
housing crisis. I have never seen any evidence that
there is a housing crisis for luxury housing. There's
plenty of luxury housing around, and there are many
opportunities to do it in many communities, new luxury
housing in Peekskill. I don't believe that that
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
36
fulfills a need. I believe, like other people said
earlier about the other project, in a diversity of
housing.
So, I'm going to keep it real short. The
other issue for me, being in that part of the
community, Mohegan Lake and Shrub Oak are right next
to each other, I know that the traffic issue is not
going to be solved by having red lights put in. It's
going to create backups in both directions. That
road, East Main Street, was never meant to have that
kind of traffic on it.
I'm not saying I'm totally opposed to the
development. I am saying I think it should be a more
diverse development. And I would like to hear, I
heard some words about unfeasible, infeasible, but I
would really like to know if there are any
opportunities for a new ingress and egress other than
straight on to East Main Street.
There's another way that the developers can
handle this. Many senior communities now offer a down
service to shopping, to malls, to uncle Giuseppe's .
They can't mandate that their residents use these
things, but it would encourage less traffic if they
provided that in the community.
So, that's, I think those are practicable
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
37
things. I do believe something has to be done with
that property. I think that, you know, given some
proper planning, especially around the traffic, and
really needing a need for this community, which I
don't believe is only luxury senior rentals. There
have to be rentals that other people can afford.
That's where the real housing crisis is, for
affordable senior housing, affordable family housing.
We have to deal with the the affordability
issue. The County tried to deal with it a couple of
years ago, I made some presentations about, you know,
people in Yorktown, and how many are paying too much
for housing. So, there is clearly a need for housing,
I would question whether there is a need for senior
luxury housing.
Thank you.
MR. ESPOSITO: Thank you, Mr. Tanzman.
MR. BUCHANNAN: I came with visual aids.
The two traffic lights are going to cause a hell of a
backup.
MR. ESPOSITO: State your name, please.
MR. BUCHANAN: The two traffic lights --
MR. LACHTERMAN: No, state your name.
MR. BUCHANAN: I'm sorry?
MR. LACHTERMAN: State your name for the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
38
record.
MR. BUCHANAN: Robert Buchanan.
MR. ESPOSITO: Thank you.
MR. BUCHANAN: Sorry.
MR. LACHTERMAN: That's okay.
MR. BUCHANAN: I mean, I live there, okay?
MR. LACHTERMAN: It's okay.
MR. ESPOSITO: No, no, no, I understand.
MR. BUCHANAN: First off, when you're coming
off the Taconic State Parkway and you're going to make
a right on 6, sometimes there's so much traffic on
that road that you have to sit and wait for two
traffic lights before you get onto 6. The stacking
lane is already almost up to the parkway. So, the
expansion of that stacking lane isn't going do
anything but create more issues, okay?
People get to make that left because the
light down by the mall, when that turns red, it opens
up that area and everybody makes the left. So, a
traffic light there is not going to change anything,
it's just going to backup traffic that's going
straight up north up on 6, okay?
Now, this photograph is from my road, it's
Indian Hill Road -- if you want to pass that around --
looking towards that intersection. They're proposing
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
39
a light right here. There's a driveway here. Now, us
trying to get out of Indian Hill Road, and as I said
before, People from the fishbowl in Mahopac are using
Indian Hill Road. It's going to back up my road. I
live, you know where I live, Ed, it's going to back up
traffic right up to where I live, okay?
I mean, if you want to see this.
MR. ESPOSITO: Yes, pass that to Maura, I'd
love to see it.
MR. BUCHANAN: So, that's that. Now, here's
where the traffic light will actually be. I took this
from Houlihan Lawrence driveway, okay, it's going to
be right there. And then you can see a short distance
between that traffic light and Route 6 from this. And
then you can see what happens right now, if there's no
light, the backup that blocks that.
Now, I keep hearing about the housing
crisis. Has anyone been in New Rochelle and White
Plains? I'm in New Rochelle every day, they're
building more and more housing they cannot fill up.
As a matter of fact, people are outraged, they're
paying some outrageous number, like 10/12,000 dollars
a month, and they can't fill it up so they're putting
Section 8 into those apartments.
MS. HAUGHWOUT: Yeah, they're partnering
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
40
with the government to help them build.
MR. BUCHANAN: So, there's a lot of housing,
and they're not filling it up, okay. And people can't
afford it.
So, this two traffic lights, that's a
disaster, that's a joke. So, you guys got to really
reconsider this. I have no problem with the property,
I think it's nice, okay, but, like I said before, it's
the quality of life that's going to go down hill
really fast.
And like that woman said before me, when you
go to DeCicco's, they back up trucks, it really backs
up the road. It will back it all the way up passed 6,
and it backs it up all the way up pass the bowling
alley. So, you're going to have a hell of a disaster
there. There's no way, just no way.
Thank you.
MR. LACHTERMAN: Thank you, Bob.
MS. HAUGHWOUT: Thanks, Bob.
MS. KEMPTER: There's a traffic light at
Barger, and then there's a traffic light at the mall.
MR. ESPOSITO: Ma'am, you have to come to
the --
MS. KEMPTER: Sorry.
MR. LACHTERMAN: You'd wait.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
41
MR. ESPOSITO: No, no, there's other people
now so you have to wait again.
MS. KEMPTER: I'm sorry.
MR. ESPOSITO: We don't mind you talking
again, it's just there's other people.
MS. KEMPTER: Sorry.
MR. ESPOSITO: No problem. Thank you.
MS. DANIELS: Jane Daniels. I live on Deer
Street just off of Stony Street near 202. I've lived
there since 1971.
First of all, I have to say to you who have
sat here through someone else's hearing, you've got a
lot of patience.
I like the aspect that you're, you down-
sized your project. I like the aspect that you are
looking for housing that falls between these luxury
apartments and condos and the, capita A, affordable
ones. I think that this is missing in Yorktown, and
has been talked about time and time again. The
seniors who want to the stay there, which my husband
and I want to, we don't want to live in a large house,
these smaller units appeal. So, thank you on that.
I hear everything about the traffic
problems. That, I can't address. I don't live near
there, but I can see where it's a problem.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
42
I also want to the compliment you that
you're going to have some walking paths. You heard
the statement earlier that we, my husband and I, had
sent something in because if you didn't have someone
come in and help you build the trails and connect to
the Indian Hill section of the State Park, they're
going to build them anyway, and you might as well have
something built right and it' sustainable.
Thank you.
MS. HAUGHWOUT: Thank you, Jane.
MR. ESPOSITO: Thank you, Jane.
MR. DEE: Good morning.
MS. HAUGHWOUT: Good morning.
MR. DEE: I live in Shrub Oak about a mile
from where they want to put this. Lived in this town
for over 50 years. The traffic has been a problem for
the last 25. This development cannot go there and
have the quality of life that we're used to having.
It would just destroy our neighborhood.
So, one of the things we're talking about is
the impervious property that they're going to add to.
So, if they go with the larger plan, it's four acres
of impervious land. And then we have two acres of
impervious land on the smaller project, which hope-
fully they go that way if we end up allowing this.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
43
When you guys put up that solar field up the
street, my backyard is now gone, it's completely
water. When we get rain, I get 35, 40 feet of water
on my property since that field went in.
You're going to have runoff from this
property that's going to be more. You're also going
to have roots that catch water and run down. It's
going to be a different lay of the water.
I don't know what it's going to do to my
property and my neighbors, it's going to kill them.
The guy down the street from me had to have his house
pumped out three times already in the last year from
the fire department because the basement is flooded.
The water is ridiculous and, if you add
something this big, it's going to get worse. There's
no way around it. You're going to take away trees,
you're going to take away vegetation that takes in the
water. And the people in the neighborhood who have
lived here for 50 years are going to suffer. And
that's not right, all right?
Now let's go to the traffic. You can't fix
this intersection, I'm sorry, you can put two traffic
lights, you can put 11 traffic lights, it's not going
to matter, you can't fix this. The State has to come
and fix this intersection.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
44
You have to put a traffic circle here so the
traffic always flows because you can't stop the
traffic. You stop the traffic, it backs up, everyone
slams into each other. Now you can't have EMS
respond, or fire respond, to anything because the
traffic is stopped and they're all smashed into each
other. I see it all the time. I see it all the time,
all right? I live there, I hear it.
MS. HAUGHWOUT: It's your profession.
MR. DEE: Well, my son's profession. But I
do cars, so I understand cars, and I understand that.
I don't understand why this is going to be a
senior citizen's district. I don't understand how it
all lays out. Is it just pertaining to this one
property, or will the senior citizen district become
something in that whole area and then it's rezoning?
MR. LACHTERMAN: No, it's just
that property.
MR. DEE: It's just this one property,
right?
MR. LACHTERMAN: Yes.
MR. DEE: And it says 55 and older. So, I
thought senior citizens were 62 and older, but I guess
the law is written for 55 and older?
MS. HAUGHWOUT: I know I'm close.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
45
MR. LACHTERMAN: We're seniors, buddy.
MR. DEE: I'm over that, I'm 57 already.
Now, I have friends who are 55 years old and
have children. So, you can definitely have children
in here, which now brings buses going into play going
up into that development. And now we have the traffic
issue at the bottom of the hill with those lights.
Those lights are ridiculous. I don't care what you do
or how you set it up, when you come east and make the
left onto 6N, you're only going to be able to get two
cars at that one traffic light, okay, two going up 6N.
Now let's add a tractor trailer backing up
the street like the other gentleman was describing.
You're done, everybody is going to sit there for 10
minutes. It's horrifying.
If you drive on that road when they're
delivering mail, the people coming the other way, it
doesn't matter which direction, cross the double
yellow line and drive head on at you because you don't
have a breakdown lane to pull over to avoid them, you
have nothing. It's two lanes, one in each direction.
When those zoning laws were built, and when
they were designed, they were designed by people who
were looking at what the infrastructure was. And the
infrastructure is, basically, so outdated for what
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
46
you're trying to do now, there's no way to fix it.
You can't put this amount of people there.
I don't care if it's 185 units or 250 units,
you're going to punch all of these people up on the
top of the hill and nobody is going to be able to get
in and out of anywhere.
Who would want to the come here? You want
to go to the Tee Bar across the street, it's an
awesome little place, I've been there a bunch of
times, how are you going to get out of there? You
can't even get there if you want to go there at 6
o'clock at night because the traffic is so bad.
People are coming west on 6, turning in there. I
don't know how you can do it.
MR. LACHTERMAN: The second light would
actually signalize that, that's right at that
intersection.
MR. DEE: That might help a little bit
there, but it's not going to help on the other
side because your traffic is going to be so backed
up. You can't even turn out of that place, even when
you want to go right, you can't turn out of that
place. It's difficult. And to add another, let's
just figure 200 homes, 400 cars, on that end, forget
about the 100 garbage trucks that are going to be
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
47
coming in and out of the other plant, and then the
other 200 homes that might happen at the other end,
and then 150 homes down the street. You're adding
like 1,000 cars to a little tiny section of road that
can't handle what's there now.
He told you it's an F for the intersection,
it's a total failure. So, if it's totally failing
now, how do you think two traffic lights are going to
fix it? It's just not going to work.
Those are my points. I have more, but it's
too late.
MS. HAUGHWOUT: Are you giving it to us
then?
MR. DEE: No, you can't read my handwriting.
If you want it, it's --
MR. LACHTERMAN: If you decide to leave,
have a good trip.
MR. KNESS: Hello everyone. I will not keep
your time because I made my point on the last one
where we're at our maximum capacity. However, there
were a couple of points that I wanted to bring up that
I read in the EMS analysis.
First and foremost, I would like to request
an updated EMS assessment from this property being
that the numbers were ran from 2018 from the Trump
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
48
Park Residence community, which is what we feel is not
close to what this residence will be.
For reference, what we believe, and in
talking with my other line officers, is that we
believe that in -- I don't know if you guys can use
Cortland, but Jacob's Hill residential community,
which is going to be a similar type to what this is,
will be a very suitable study to be done.
We respond to roughly over 150 calls a year.
And, again, that's separate from fire response. So,
in this outline for the EMS and fire analysis, they
had coupled fire and EMS responses into one. That
does not, we do not have anything to do with the fire
department. The fire department runs their own calls,
I mean, we're all also firefighters with Mohegan Fire
District, but that is separate to structure fires,
alarms, whatnot. What we are doing is EMS.
With an added community like this, we are
going to see an increased call volume not related to
the Fire District, which then plays into my next
point, which is it's outlined in D3, the mitigation
measures, under our strain, is that there's going to
be an increase in tax revenue to the Lake Mohegan Fire
District, which is discussed in Section C3, and
through insurance reimbursements.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
49
We are absolutely separate from the Fire
District and we do not receive any funding from tax
revenue that the Fire District incurs. We are totally
self-funded based off of the insurance reimbursements
that we get, which is, again, at 33 percent. And we
are very burdened, we need ambulances, we need LUCAS
devices, we need to start getting our infrastructure.
And, again, I'm unbiased to this project.
The only bias that I have is providing comprehensive
and very good service to the community that we serve.
Thanks.
MS. HAUGHWOUT: What about ALS, do you guys
get a percentages of that?
MR. KNESS: For in terms of billing?
MS. HAUGHWOUT: Yeah.
MR. KNESS: So, the way it's split up for
the Yorktown Ambulance Corp, it's different for the
Yorktown Volunteer Corp, it's different --
MS. HAUGHWOUT: Yeah, that's why I was
asking.
MR. Kness: So, when we bill out off an ALS
call, after our BLS base fee, we reimburse the Town of
Yorktown and the Town of Cortland, as well, we're
under the same --
MS. HAUGHWOUT: There's like a split.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
50
MR. KNESS: It's 60 percent goes back to the
Town of Yorktown, and then 40 percent, we retain.
But, again, that's based off if we actually get the
money back.
MS. HAUGHWOUT: Oh, yeah, always, that's
true, they don't always pay.
MR. LACHTERMAN: Thanks, Matt.
MR. KNESS: Thank you.
MS. HAUGHWOUT: Thanks, Matt.
MR. KNESS: Oh, and if anybody has any
questions, my contact information, I'm going to run
out, it's mkness, K-N-E-S-S, @moheganvac.org. Send me
an e-mail.
Thank you.
MR. ESPOSITO: Thanks, Matt.
MR. LACHTERMAN: Thank you.
MS. HAUGHWOUT: Thanks, Matt.
MS. GREGORY: I can't believe I have to
follow that guy again. Thank you. Maura Gregory from
Mohegan Lake.
So, here's another opportunity for this
Board to do the right thing and address the twin
crisis of affordability and housing. Repurposing an
already developed area of town that is vacant is a
very appropriate use. It adds to diversity of types
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
51
of housing because there is rental, although it does
increase the amount of high-end luxury housing.
However, the Town should limit the developer to the
existing footprint nearly as much as possible in order
to limit the impact on the environment.
The DEIS says there are a limited number of
age-restricted senior developments in town. I think
we all know that this is inaccurate, especially with
all the projects now proposed in the pipeline for this
town are built. Most of them, including the nearby
Trump Park Residences, are at market rate, or even
luxury housing.
The alternative layout of 185 units better
preserves the environment by stopping excess runoff
and cutting less trees, but I didn't hear anything
about what the mitigation would be to compensate for
the trees cut under either scenario, which would be
required under the tree law. And I just wondered what
could possibly be done and what is planned. I didn't
hear the developer say anything about that.
As for traffic, I drive through that inter-
section every day. And even though I think that
housing is appropriate up there, I cannot imagine
what's going to happen once there are all those cars
coming through there. Other than Route 6, those roads
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
52
are rather small and narrow, and I just don't know how
they're going to handle the volume. I couldn't really
tell from what they presented what it was that they
intended to do, it was very difficult for me to read
from a distance, and this late at night, or early in
the morning, but I just can't imagine what they're
going to do.
One idea that I had, I don't know how much
this would affect it, but I think this is something
that this Town should consider in every development,
which is creating a walkability aspect to every
development if possible.
What consideration has been given by the
developers who are creating some kind of a sidewalk,
or other paved path, between the property and nearby
shops? Because this could ease traffic impacts.
Now, the applicant contends that this
project will free up homes in the community by
allowing seniors to downsize and move to this project.
But the developers admit that this is luxury housing.
So, I'm wondering what evidence do they have, or is
there at all, that Yorktown senior residents would be
able to afford to live there.
Also, the lights from the current Granite
Knolls Park create terrible light pollution at night.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
53
They're up high on a hill. I am, as well, I can see
them from my house. What kind of lighting is going to
be on this property? I didn't see that addressed, or
what kind of light pollution would be created there.
The developer's DEIS states that in Yorktown
about 45 percent of renters are cost burdened, or
extremely cost burdened, by their housing costs, and
about 36-and-a-half percent of homeowners are cost
burdened, or extremely cost burdened, by their housing
costs. How, if at all, does this proposal address the
high cost burden of housing in Yorktown? Does it make
it worse? Again, they talk about it in there, but
then they don't address what impact it will have. It
seems to me it will only make it worse.
New York State has the SEQRA law which
allows for an Environmental Impact Statement to
address the impact that a proposed development will
have on the affordability of housing in the area it is
located. However, although the DEIS discusses the
need for affordable housing in Yorktown, it doesn't
address the impact of this development on
affordability.
Since this is intended to be luxury housing,
the Town Board should reject this DEIS and require the
developer to revise it to address and mitigate the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
54
impact on housing affordability in town.
Now, all new housing developments impact
services such as police, fire, water, sewers, et-
cetera. Looking at recent housing proposals in this
town, developers seem to believe that Yorktown doesn't
want any impact on schools from having housing for
families, and it considers that to be a greater impact
than the other kinds of impacts, so they're proposing
senior housing. As I pointed out before, developers
seem to have gotten the message that we don't want
kids, that we don't want families.
The DEIS admits that Yorktown already has a
higher percentage of seniors in Westchester County or
New York State. It also admits that their proposal
would add around 1 or $1.2 million to the Lakeland
School District budget. So, therefore, any children
would be more than compensated for by the increase in
tax base.
I think it's terrible that Yorktown is
getting perceived to be taking an anti-family stance
on housing. I think it would be shameful if Yorktown
turns into a town that has few children and an over
abundance of seniors.
As I said before, I know it's hard to
believe, but I'm a senior citizen myself, but I want
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
55
to live in a town that has all ages and all kinds of
people in it. And there's already a higher percentage
of seniors in Yorktown than in the county or state.
So, I think this DEIS should be rejected
because it's not adequately considering this impact.
In other words, it's not considering how it is
reducing available space for housing for families, and
it is increasing the percentage of our population that
is senior citizens.
It is clear it's going to be having an
impact on what has become a loss of young people in
our town. The Town needs to make sure the developer
mitigates this impact. Again, this is an opportunity
for Yorktown government to address these crisis and do
the right thing.
Thank you.
MS. HAUGHWOUT: Thank you, Maura.
MR. LACHTERMAN: Thank you, Maura.
MS. WILSON: I think we're supposed to sign
in, right?
MR. ESPOSITO: I want to hear you introduce
yourself as the Chair of --
MS. WILSON: Sarah Wilson, S-A-R-A-H,
Wilson, Chair of the Community Housing Board.
MR. ESPOSITO: There you go, it has a good
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
56
ring to it, doesn't it?
MS. WILSON: For three whole days now.
MR. ESPOSITO: I know.
MS. WILSON: So, actually, I'm not going to
say much at all because Maura just covered a lot of
ground in her very well prepared statements and
touched on a lot of the things that I was going to
speak about.
You know, I think this makes a whole lot
more sense in context of what we heard about with Toll
Brothers and the 2,400 to 3,000 square-foot town
houses versus 800 to 1,200, 850 to, you know, this is
much more reasonable in terms of providing options.
And, again, rental versus ownership. So, I think this
does contribute towards housing diversity, which is
great.
I would just suggest that one additional
thing in this more moderately priced development is
requiring a small proportion of those units to be
affordable with a capital A, as Jane Daniels said, you
know, would something that the Town Board does have
the power to do and can do.
I would also like to speak in favor of the
smaller plan, the 185-unit plan, just makes so much
more sense in terms of doing it on the footprint
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
57
that's already cleared from a construction standpoint,
from an environmental standpoint, 651 trees taken
down, Town-regulated trees taken down, versus 1,320,
so less than half. Tree removal, the amount of -- I'm
not sure what net cut is, but a net cut at 81.8
thousand cubic yards of material in the existing plan
versus 8.9 thousand cubic yards in the alternative
plan. That's a huge difference in terms of the
material. And that would translate into, you know,
less construction, fewer trucks, fewer cars, lower
demand on water and sewer infracture.
So, I'd recommend that the Town Board, you
know, move forward with the smaller alternative plan,
and appreciate that being covered in the DEIS.
And I guess the information that we got
tonight about the size and potential market rate,
rates for the units, was really helpful, but if I can
ask that be included in the responses as that is a
question, so it does get documented in the response,
that would be great.
Thank you.
MS. HAUGHWOUT: Great, Sarah, thank you.
MR. GLASS: Stewart Glass, 45-year resident
of Yorktown. I would hope that the Board not take any
action tonight. It's not the fault of the developer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
58
but because of other events tonight, we are now at
1:16 in the morning. You had a full house here,
people came out in droves to attend and participate.
MR. LACHTERMAN: We don't intend on --
MR. GLASS: Okay, thank you.
MR. LACHTERMAN: No problem.
MR. BELFER: Ken Belfer from Mohegan Lake.
I'll be very brief. I submitted written comments with
my Community Housing Board hat on. Now I'll speak
with my own hat on. And just in full disclosure, I
was involved in my previous employment in a deal with
AMS. I was sitting on the opposite side of the table
from them negotiating something with them, and I
gained no personal benefit. But I just wanted to
disclose that nevertheless.
I, in terms of traffic, I usually don't
comment on that, but I'm a customer of Lois
Chiropractic, I love them. And, so, I come heading
east on Route 6 and make that left turn, two left
turns, you know, one from Route 6 and one immediately
afterwards. And it's challenging right now, and it's
challenging going back the other way, as well.
The idea of a light there, and of course DOT
has to allow it, but that's an intriguing idea. I
debate whether it would be safer for me just to go all
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
59
the way up to the light to make the left and come all
the way back around each time. So, whether it makes
technical sense or not, I don't know, but it sounds
good to me.
I also liked what I heard when they talked,
and I don't know if this was just the unit sizes for
the alternative proposal, but when they were talking
about 800 square feet, and I forgot what the larger
size was for the two-bedrooms, but they were talking
about reasonably sized units, and I think that's good,
because that's not what we heard about on the other
development and promoting diversity. You want to have
both sizes.
I have nothing against luxury for people who
can afford it, but I think it's great to have things
that are more moderate. I also think it would be
great to have things that could accommodate the
seniors that really truly need something a lot more
affordable than that.
Thank you.
MS. HAUGHWOUT: Thanks, Ken.
MR. LACHTERMAN: Thanks, Ken.
MS. CELIC: Good morning. And I'm not a
morning person. AMS came into Jefferson Village a
while ago, so this is the second presentation I'm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
60
seeing. Very briefly, I just have a couple of
concerns.
MS. HAUGHWOUT: Joanne, can you just tell
her your name.
MS. CELIC: I'm so sorry. Joanne Celic,
Yorktown Heights.
Yeah, the private price of the units, if
they're rentals, they're $3,000 to $4,000 per month.
I hope I'm correct. Okay, now, if it's going to be
the 250 units, that would be parking for 383-something
cars. So, let's add this, 383 cars -- and, by the
way, I am not opposed to the project. I just, my
question is how do we mitigate this? How do we do it
when we don't have lanes, we don't have space to build
for safety, for ambulance. We went through that.
So, 250 units, you have 383 cars. These
were not my numbers, this was AMS. Approximately, if
the winery, the project opposite the winery with the
144 units, approximately 250 cars.
Also if Navajo goes through and is allowed
to the go into the overlay, 254 units, approximately
500 cars. Are you kidding me? How can we handle
that?
Thank you. By the way, that would be
approximately 1,000 cars around on Route 6.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
61
Thank you.
MS. HAUGHWOUT: Thanks, Joanne.
MS. CELIC: Have a good morning.
MS. HAUGHWOUT: Have a wonderful morning.
MS. MIRCHANDANI: Good morning. Jann
Mirchandani, M-I-R-C-H-A-N-D-A-N-I, because, you know,
it's not Smith.
MR. LACHTERMAN: Two Ns also, two Ns for
Jann.
MS. MIRCHANDANI: Yes, thank you, J-A-N-N.
That's not my legal name, but that's a whole other
conversation.
So, anyway, I want to just say, actually, I
thought the presentation was terrific. I think
developing, redeveloping, on land that's already been
developed is a real plus. I think the diversity that
we're building into this project is a big plus.
My main concern aside from the traffic is
the runoff. We know that there's flooding already
along that corridor. We've got several other projects
that are coming along. I think that we need to really
think holistically about what this project, plus the
other projects, plus the existing flooding is going to
look like. And I think that we really have to think,
especially since we're building on top of a hill, news
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
62
flash, or science, water comes down. So, we really
need to think holistically about how all of that is
going to impact the residents that are already there,
the buildings and the structures that are already
there, and our infrastructure, which, again, news
flash, is not a spring chicken, much like me, I was
horrified when I realized oh, my God, I'm a senior
citizen, too.
Anyway, those are my comments, and thank you
for the great presentation.
MR. LACHTERMAN: Thank you, Jann.
MS. HAUGHWOUT: Thanks, Jann.
MR. LACHTERMAN: Sure.
MS. CELIC: I forgot one thing. When I
asked about the rental, the rental is $3,000 to $4,000
a month. What happens if you can't rent them at that
price, what happens to the units that were already
built?
Thank you.
MR. SIEGEL: Before you start, I have some
comments. Out of deference to all of the residents,
I've not only waited to the last, but I cut most of my
comments, but let me just give a few.
Tomorrow I will be submitting a six-page
letter listing dozens and dozens of questions that I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
63
want, that need to be addressed in the DEIS. And I
thank you, I really thank you for doing the DEIS and
for saying at the very beginning of this project that
you were going to do a pos dec. So, I appreciate that
and I wish more developers would do that because we
have this opportunity to actually get these written
responses.
Can you just clarify that when you went down
to the 185 units, you said that they were all rentals.
I thought that 20 of the units, the cottages, were
going to be purchased.
MR. WEINGARTEN: No. The original 250 had
50 of them as for sale. But this revised project will
be done as all rental.
MS. SIEGEL: Okay. My next comment is I
appreciate the drop-down from 250 to 185, but nobody,
you did not mention that you had an additional
alternative in the DEIS for 142 units. And if I'm
correct, it's the same footprint as the 185, but only
three stories.
MR. WEINGARTEN: We were requested to look
at it. We looked at it. It's not economically
feasible, it's not buildable. But we did --
MS. SIEGEL: Well, I'd like that addressed
in the --
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
64
MR. WEINGARTEN: Yes, it is in the DEIS.
And the 185 is something that we are willing to build
and able to finance and build. The 142 is not. But
we did study it because we were requested to study it.
MS. SIEGEL: Okay. So, that should be
addressed.
And the final comment is it was shown on the
screen, but nobody reacted to it, and I reacted when I
saw that in the DEIS, could somebody explain what's
called the Rock Shrub Oak proposal for multifamily
housing that you mentioned in your DEIS, which is the
first time that I ever heard that? And that would be
another multifamily development in the Route 6
corridor. That would be the parcel of land to the
east of Barger Street, between Barger and the Taconic
Parkway behind the new Cocoa Farms, that would be
there. So, could somebody talk about where that
development is because that's yet another potential
development?
MR. WEINGARTEN: I can't tell you where it
is, what I can tell you is we counted the traffic from
it.
MS. SIEGEL: Okay.
MR. WEINGARTEN: So, the only reason we
mention it is it's in our traffic study, we've taken
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
65
it into account if it ever gets built, that traffic is
in our study when you go through the intersection of
how many cars are going through.
MS. SIEGEL: Which I appreciate you doing.
MR. WEINGARTEN: That's the only purpose,
but I don't know what the --
MR. LACHTERMAN: I can address it, Mark.
MS. SIEGEL: If the Town could address that
additionally. Thank you. And you'll get my documents
tomorrow.
MR. WEINGARTEN: Thank you.
So, it's late and I won't go through
everything as I normally would, but there are a couple
of highlights that I would like to do before we call
it any evening because we know, we heard, you're not
taking action tonight, so we'll be back and we'll have
time.
Number one, there were a lot of questions
about stormwater. And, again, we had it in our
presentation, we shortened it a bit tonight. Joe is
here tonight, we'll let him do it next time, but I
can assure you that the stormwater is accounted for,
it's studied. We're obligated by law to make sure
that after we're finished building, it is not adding
anything to the stormwater. In fact, it will be
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
66
improved.
Similar to the traffic, again, I know it's
counterintuitive and it's hard to go through, and
we'll go through the study with you again, but the
fact is that you have a currently failing intersection
that you're all looking at. And with our proposed
mitigation, after we've built and added all the cars
for our traffic, and the traffic, we will be improving
that intersection by all standards and counts. So,
we'll go through that in more detail next time, but
that's what our DEIS proves out, and that's why we
believe one of the reasons why this should be there.
A couple of the smaller things, there was a
question about that there's no housing crisis. Luxury
housing, what that actually is is, there's no define
term to it, it depends on -- what we mean by luxury
housing is it's going to be beautiful. Is it less
expensive than the million-dollar town homes you heard
about tonight on some of the other projects? Yes, it
is, it's more reasonably priced because the units are
smaller. They're very high end, but the units are
smaller and, therefore, they're more reasonably
priced, and we think that does hit a sweet spot.
And diversity of housing doesn't mean that
your particular project has all of the different types
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
67
of housing in one project. It's adding to what's all
in the community. And, again, we think this is a
missing piece, and we are going on that.
I would like to clear up, as an attorney who
has been involved in thousands of units of affordable
housing in the Hudson Valley, I am very well
conversant in it, I have a project with Mr. Mitnick in
another part of the county that has 350 affordable
units as part of the project that's there. We know
how to do it, but when you do something like that, it
comes in at the beginning, there's a statute, there's
a requirement, and you bring a project in that's built
upon the financing that already considers that you
have to do this when you've started the project, you
can't do it later.
So, it's just something that to bring it
out, if you want to do this as a community, you have
the right to do this as a community. You don't have
to. They do it in some, they don't do it in others.
But if you did, it would be something that, in
fairness, should be told to the land owner before they
get started spending all sorts of money talking to
banks, trying to figure out how to get a project done.
Doing it at this point would be very difficulty after
someone has spent seven figures on developing a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
68
project, putting in a DEIS, paying for all the
consultants, and all the rest of it, to make that kind
of change would be an issue.
But I'll also mention that sometimes people
hear rumors and you like to clear them up. We are the
attorneys for the master developer in New Rochelle. I
think we have more than 4,000 of the apartments come
from my office. There's no Section 8 going into any
of those buildings. There are some issues with --
AUDIENCE INDIVIDUAL: There is. That's a
lie.
MR. WEINGARTEN: Well, I will be happy to go
through that with you, sir. It's just not accurate
that any of the new office buildings that are being
built in New Rochelle have Section 8 in them. So,
I'll go through it with you, I'd be happy to take you
down to New Rochelle City Hall and go through it and
have the conversations, I'm there all the time.
So, that's number two. I wanted to clear up
the record on that issue because that's not what's
going to be happening here.
A couple of other small things, on
the emergency, yes, we'll answer the question, Jacob's
Hill, we'll look into that, and we'll provide that in
the FEIS. There's no reason we can't do that.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
69
Again, and I guess it may be the last point
that I'll make tonight because it's getting late.
There was some criticism earlier of the Board because
when you do a zone change, the procedure is a little
different for the environmental review than when you
just go to site plan. When you go to site plan, you
go to your Planning Board and the Planning Board does
all the work.
New York State law says when you go through
a zoning change, which is the first action that
happens before the site plan, you have to do your
environmental review upfront, you're not allowed to
vote on anything until the environmental review is
completed. There can only be one lead agency. And
you have the decision. Some municipalities have the
Town Board do it, some municipalities have the
Planning Board do it. In this instance, you decided
to be the lead agency.
When you're the lead agency, you do all that
work. And, even though sometimes it may be that we're
used to the Planning Board doing it, when you've
decided to do the environmental review, you do all
those studies, you're looking at a DEIS. You don't
say no to the Planning Board. We went to them, we've
discussed the DEIS. We have a memo from them, we have
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
70
comments from them, but you're the ultimate decision-
makers on that.
But when you ask questions about well, I
didn't see a tree mitigation plan. That's the
Planning Board at site plan, you don't do that in your
DEIS. Yes, if we remove 600 trees, your statute
requires us to have a plan to go forward with putting
the trees on site, off site, that's exactly what the
Planning Board is going to do, and that's why it's not
in the DEIS.
So, I know the process is confusing to some
because it's a little different the way you would
normally do it, but I can assure you, I've done this
for 40 years, you're doing it exactly right. It's
just that in this instance, you're the lead in the
environmental review, but the site plan is still the
purview of the Planning Board. And the Planning Board
will be making those decisions. If we're fortunate
enough to get the rezoning from you, we will be in
front of them on all of those decisions.
So, with that, I'm just going to say, it's
been a long night, we know we're coming back again.
Hopefully, you'll tell us when the next meeting is so
we know when we're doing that.
And, I'm sorry, I'm going to take a personal
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
71
privilege, happy birthday, Mr. Supervisor. I'm going
to be the first one to say it.
MR. LACHTERMAN: Thank you. Someone sent
me a message.
MS. HAUGHWOUT: Happy birthday.
MR. LACHTERMAN: I literally got another
year older while we were in our meeting.
(Whereupon there was an applause.)
MS. HAUGHWOUT: But it's today?
MR. LACHTERMAN: Today.
MS. HAUGHWOUT: Okay, because I'm still on
yesterday.
MR. LACHTERMAN: I'd like to just hit a
couple of things, Mark.
MR. WEINGARTEN: Sure.
MR. LACHTERMAN: Well, one, because I know
Brian is on vacation already, but when you get back,
I'd like to sit down with you and talk about the
history of the traffic over there. There were a
couple of things that came out, like how is it with
contractors running, how was, you know, I'm a little
confused, although I'll go over there tomorrow
probably and watch with the tractor trailer traffic
and see how that's blocking. And I want to know about
some of the past mitigation on that stuff. So, I'd
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
72
love to sit down with that.
And, Maura, you will hear a little bit about
the lighting. Is Maura still here? She left. See,
she left before the resolutions. We're going to talk
about the lighting at Granite Knolls because the
meeting is not over yet.
But a lot on the flooding, a lot on the
traffic. I'd love to do one more site visit and go
through some of that traffic stuff just to cement down
where some of the issues are. And I do understand
that there may also be a sewer main running under that
hill now, as well.
So, there can definitely be a couple of
issues that need to be looked at, but let's do a
little more due diligence on that traffic.
MR. WEINGARTEN: Sure. But I think we'll
all say, we've been working together on this, when you
come up with the suggestions that make sense, we're
willing to incorporate them if it makes sense, and
that's the way AMS is. So, we're happy to do that and
work with you.
MR. LACHTERMAN: Thank you. And it's
been a pleasure working with you guys. You're very
professional, very on point, you're expertise have
been duly noted by me, as we talk about things, Mark,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
73
some really great things there. But we'll keep on.
And I want to talk with Mr. Tegeder about some of the
issues. And I'm sure our engineers have been
involved.
MR. WEINGARTEN: And I just want to say a
special thanks to the Stenographer who hung in here
all night with us. She doesn't normally do that, so I
just wanted to say that on the record.
Thank you.
MR. ESPOSITO: So, just really quick, I know
Contractor's Register has been there, but there hasn't
been any traffic generated by the Contractor's
Register in years. And that intersection is an F
today. So, I've got to tell you, it's a heavy lift
for me because I don't know how the two lights are
going to fix it. So, I would really like some
alternative plan that you can come up with by our next
meeting.
MR. WEINGARTEN: I'm not sure what the
alternative plan would be.
MR. ESPOSITO: I'm not sure of it either.
MR. WEINGARTEN: Because any use you have, I
mean, right now it's zoned commercial, you can have a
commercial use there and there's very little you can
do to stop somebody who came in with a commercial use.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
74
And, frankly, in my opinion, that would be a lot worse
for that area currently.
So, in my opinion, again, you guys make
these decisions, I think that property is going to get
used at some point. The office market will come back
at some point, it's zoned for a particular use that
can go. If you don't rezone it, eventually the land
owner, we'll walk away, the land owner is going to
have to do something with it. It's going to go to a
commercial use and they're going to have a right to
use it, and it's going to be worse. So, I think the
better idea is to work through this with us, make it
the best you can, and make it work.
My client would not be investing in this
property if it was the disaster that some of the
people think that it was. This is a rental. If
somebody goes in there for a year, rents the place and
it doesn't work, they're leaving it.
We have to believe, and our professionals
believe, that the traffic is going to work when we
make these improvements. Otherwise, it makes no sense
for us.
So, we'll walk through it, we'll bring our
traffic guy out with you, we'll talk it through. But
we think that this is going to be an improvement and
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
75
it's going to be a very livable environment.
MR. ESPOSITO: But even if someone comes in
with a commercial use that's as of right, they still
have to cross this Board and still have to come up
with a different alternative for that traffic circle.
MR. WEINGARTEN: No, they wouldn't -- no,
they'd just go to the Planning Board. They would go
to the Planning Board, there would be a site plan, and
if the Planning Board took a we're not approving
anything over there, you would have a lawsuit on your
hands. Again, not us, it's the land owner.
MR. ESPOSITO: Then let there be a lawsuit.
I'm just, I'm asking you to see if you can come up
with an alternative plan for that intersection.
Somebody mentioned a traffic circle. Maybe you do
some kind of a study that we can look at, see how we
can get something like that done.
MR. WEINGARTEN: So, you're not talking
about an alternative plan for the use, it's an
alternative plan for the section.
MR. ESPOSITO: I think the biggest concern
is the traffic.
MR. WEINGARTEN: I get that.
MR. ESPOSITO: I don't think the concern is
the use. And I'm not really terribly concerned with
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
76
the 250 units anyway. I like that property up there,
I did a site visit with you up there. I think it's
beautiful up there and I think your project is very
nice, I just can't get past the traffic situation.
MR. WEINGARTEN: Well, we're willing to
listen. We know your guys reviewed our study, they
did look at all sorts of alternatives. This is the
only one that seemed to work. And it did lower the
level of service, or increased the level of service,
however is the right way of putting it, over there.
MR. ESPOSITO: Right.
MR. WEINGARTEN: Again, I'm happy to bring
the traffic guy to have the longer conversation with
you on a site visit but, for now, I think he's telling
us this is the best we can do.
MR. LACHTERMAN: Can we, Diana --
MS. HAUGHWOUT: Jessie, you want to say
something?
MR. LACHTERMAN: Oh, yes, Jessie wanted to
say something, I'm sorry.
MS. KEMPTER: I just have a question. How
was Contractor's Register built on a dead-end
residential road? No one ever gave me an answer when
I came to meetings.
MR. LACHTERMAN: Way before my time but,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
77
from what I understand, it was zoned as office space.
It was a zoning for office space and that was an
as-of-right building.
MS. KEMPTER: The thing is from the
construction, my house, 760, 1732 house, progress and
preservation, Yorktown, got destroyed from the
contractors trucks going up when they were building
and doing things. We had an engineer come, and we
came to Town meetings and mentioned it to them.
Now, the same thing will happen again if
construction is allowed to go up that road, my house,
because it's a 1732 house on rock, it will get damaged
more. That was never taken into consideration at all,
you know. So, it will happen again with construction.
And that road is not wide enough. You cannot make the
road, Old Route 6, and 6, any wider, there's no
capability there, it's just a guardrail, my road and
then Route 6.
And, then, since that pump house that's on
my road for the septic, did that mean they had a
problem up the hill? And what will they have with all
these units they want to build?
MR. LACHTERMAN: That's a sewer pump
station, not a septic. And they've been in
conversations with our engineer about possibly running
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
78
a gravity fence sewer and being able to eliminate that
pump station altogether which would, in the long run,
save the Town a lot of money. So, they were going to
put some money into the pump house, but if we can
eliminate it, we don't have to worry about every 10
years redoing it. It would be a gravity feed coming
down the hill and going under Route 6, which they now
have the capability of boring a hole under Route 6.
So, that's something they're looking at but,
once again, that's sort of in the planning stage.
They're --
MS. KEMPTER: Yeah, I was shocked to see a
septic truck, Cook, you know, what's he doing here?
MR. LACHTERMAN: Well, sometimes they
come pump out if there's a problem.
MS. KEMPTER: And there is that light at
Barger, and then the light at Jefferson Valley Mall.
Another light in between is not going to help anybody
anywhere.
MR. LACHTERMAN: I'll go through it, we're
going to do an onsite visit with the traffic
consultants and see where --
MS. KEMPTER: All right. Thank you for your
time.
MR. LACHTERMAN: No problem, Jessie, thank
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
79
you.
MR. ESPOSITO: I just have two more things.
The suggestion, and it was brought up twice, and I'd
be remiss if I don't address it, that Yorktown is
against kids is absolutely, I just, I have some
colorful metaphors that I would like to use, but I
won't use them here. I think that's a ridiculous
notion that was brought up twice. And, you know, I
really wish people wouldn't extrapolate and suggest
that the Town of Yorktown doesn't like kids, first of
all.
Secondly, with the size of these units, you
can have seniors downsize, move into these units, and
then those houses would be available for families who
have kids. So, I really wish people would, you know,
choose their words more carefully because that's
ridiculous to suggest that, and it was suggested
twice.
MR. LACHTERMAN: But, in all fairness, you
had people come up here and say we don't want kids.
So, we used to have a Councilman who sat on the Board
who definitely would not approve a project that would
bring kids.
MR. ESPOSITO: That's not now.
MR. LACHTERMAN: It's an unfair
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
80
characteristic because Yorktown spends a lot of money
on activities for kids, our parks and recreation.
MR. ESPOSITO: That's absolutely correct.
MR. LACHTERMAN: You know, we keep Tim here
to make sure he listens to all of it all night long.
But, no, we do spend a lot of money and I think
that -- I don't think that's lost on the Town, but I'm
glad you're vocalizing it.
MR. ESPOSITO: And last thing is I know you
mentioned that we'd have a lawsuit on our hands. Then
let there be litigation. I'm just asking for some
alternatives.
MR. WEINGARTEN: So it's clear, it's not
litigation from me.
MR. LACHTERMAN: No, and I understand, Mark.
MR. WEINGARTEN: All I was saying is where
it would be going down the road, you know, where it
would go.
MR. LACHTERMAN: As a property owner, I
would do the same thing if I had the right and --
MR. WEINGARTEN: Right. So, I think we need
to find a solution for the property, something that
works.
MR. ESPOSITO: And that was exactly my
point.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
81
MR. WEINGARTEN: Yes, I agree.
MR. LACHTERMAN: And I will say, since
Sergio pointed it out, maybe everyone doesn't realize
it, we do have quite a bit of senior affordable
housing with Beaver Ridge and Wynwood Oaks, and I
believe there's one other senior -- Susan, is there
one other senior --
MS. SIEGEL: Those are --
MR. LACHTERMAN: That's not affordable --
MS. SIEGEL: Beaver Ridge and Wynwood Oaks
are very specific because they're very low income and
they're, a lot of them are Section 8, which is
separate from people, seniors, who need affordably
priced housing who are above that level.
MR. LACHTERMAN: Right, but it's not like
there's no affordable housing for seniors.
MS. SIEGEL: Depends on what you consider
affordable.
MR. LACHTERMAN: Right.
MS. SIEGEL: I mean, I live in Jefferson
Village, but I don't rent there, I bought it when I
downsized.
MR. LACHTERMAN: All right. So, Diana, can
we look at October 1st to bring them back? We need to
adjourn.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
82
MS. QUAST: We can just adjourn and we'll
find a date.
MS. HAUGHWOUT: Yeah, adjourn it with 10
day.
MR. WEINGARTEN: Is the likely date October
1st?
MR. LACHTERMAN: Yes. We already have, I
don't think you want to be here for the recycling.
MR. WEINGARTEN: I'm feeling a little
recycled tonight, but you'll let us know about the
site visit before then --
MS. HAUGHWOUT: Yes.
MR. WEINGARTEN: -- and we'll coordinate
that.
MS. HAUGHWOUT: Yes. So, by motion?
MR. LACHTERMAN: Motion to adjourn?
MR. ESPOSITO: Motion.
MR. LACHTERMAN: Second?
MR. MURPHY: Second.
MS. SIEGEL: Will you give us a very rough
idea from when the DEIS hearing is closed, how long
you anticipate it would take to get the FEIS?
MR. WEINGARTEN: It actually depends on how
many questions there are and how much of it
requires study. There's no way of knowing.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
September 4, 2024
CATHERINE ARMENTANO 914-588-3358
83
MS. SIEGEL: Thank you.
MR. LACHTERMAN: All in favor.
(A chorus of ayes.)
MR. LACHTERMAN: Opposed?
Okay, motion passes. Thank you.
MR. WEINGARTEN: Thank you very much.
(Meeting adjourned at 1:45 p.m.)
84
STATE OF NEW YORK
COUNTY OF WESTCHESTER
I, CATHERINE ARMENTANO, Notary Public within and for
the State of New York, do hereby certify that the within is a
true and accurate transcript of the meeting taken on September 3,
2024 .
I further certify that I am not related to any of
the parties to this action by blood or marriage and that I
am in no way interested in the outcome of this matter.
Dated, New York,
________________________
CATHERINE ARMENTANO,
OFFICIAL COURT REPORTER
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1
STATE OF NEW YORK
TOWN OF YORKTOWN
-------------------------------------------------X
TRANSCRIPT OF THE
PUBLIC HEARING FOR
800 MAIN STREET YORKTOWN DEV AMS, LLC
PETITION FOR AMENDMENTS TO THE ZONING CODE AND AN
AMENDMENT TO THE ZONING MAP FROM OB RESEARCH LABORATORY
AND OFFICE DISTRICT TO RSP-2 SENIOR CITIZENS DISTRICT
HELD BEFORE THE TOWN BOARD OF
THE TOWN OF YORKTOWN
OCTOBER 8, 2024 - 8:40 P.M.
at
TOWN OF YORKTOWN - TOWN HALL
363 UNDERHILL AVENUE
YORKTOWN, NEW YORK
--------------------------------------------------X
B E F O R E:
EDWARD A. LACHTERMAN, TOWN SUPERVISOR
SERGIO ESPOSITO, COUNCILMAN
LUCIANA HAUGHWOUT, COUNCILWOMAN
PATRICK J. MURPHY, COUNCILMAN
SUSAN SIEGEL, COUNCILWOMAN
P R E S E N T:
ADAM RODRIGUEZ, ESQ., TOWN ATTORNEY
DIANA L. QUAST, TOWN CLERK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 2
MR. LACHTERMAN: All right, so we're going
to reconvene the public hearing for 800 East Main
Yorktown Development AMS, LLC, petition for amendments
to the Zoning Code of an amendment to the Zoning Map
from OB Research Laboratory and Office District to
RSP-2 Senior Citizen District.
MR. WEINGARTEN: Good evening, Mr.
Supervisor, members of the Board. Your meetings are
very interesting, I have to tell you. I go all around
the county, these are -- I learned a little history.
I'm very impressed.
MS. HAUGHWOUT: I'm just grateful she's back
tonight. I see you.
MR. LACHTERMAN: We're an interesting town.
MR. WEINGARTEN: You certainly are.
MR. ESPOSITO: You can add a vowel at the
end of your name, we'll all be good.
MR. WEINGARTEN: I grew up in an all Italian
neighborhood in Yonkers, I'll talk to you about it
sometime.
MR. LACHTERMAN: Were you Crestwood or
Dunwoodie?
MR. WEINGARTEN: No, I'm Bronx River Road.
MR. LACHTERMAN: Oh, okay
MR. WEINGARTEN: Over by School 14, it was a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 3
very Italian neighborhood.
MR. LACHTERMAN: Sure. I grew up in the
Dunwoodie section which is very Italian, also.
MR. WEINGARTEN: Right.
My name is Mark Weingarten, I'm a partner in
the law firm of DelBello Donnellan Weingarten Wise &
Wiederkehr, and it's my pleasure to be here this
evening representing AMS Acquisitions, LLC in
connection with this proposal to redevelop the 35-and-
a-half acre site located at 800 East Main Street,
Yorktown, New York, formerly known as the Contractor's
Register site.
I'm joined tonight by our team that you're
familiar with, Ryan Sutherland from AMS, our AKRF
team, you'll hear in a bit from our Planner Peter
Feroe, and our Traffic Consultant Michael Beattie.
As you're all aware, and we've already had a
hearing, our proposed action for this 35-acre site
consists of demolishing 63,000 square foot vacant
office buildings and replacing them with approximately
250 luxury multifamily residences restricted to owners
55 years of age and older, approximately 200 rental
units and 54 sealed town homes. That's our proposed
action.
However, as we discussed at our prior
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 4
hearing, there appears to be a preferred alternative
which reduces the number of residences to 185 units,
and restricting them to rental units. So, there would
be 185 rental units, and none of those being for sale
but, again, restricted to 55 and older.
We will continue to try to improve our
project as we go through this hearing process, and we
will fully develop the alternative plan in the final
Environmental Impact Statement. And I'll go through
that procedure in a moment. Either way, we seek to
create a beautiful new neighborhood with plenty of
open space and luxury amenities included.
Currently the site is zoned OB, Research Lab
and Zoning District, and we are seeking to rezone the
property to RSP-2 so we can build the senior
neighborhood.
In order to accomplish our project, we have
put forth a petition to your Board to rezone the
site to RSP-2, Senior Citizens District, to facilitate
our vision for creating this new beautiful community.
And, as I said, what is now our preferred alternative
only requires one change to the zoning, that has to do
with the height. It's currently in the RSP-2, 45
feet, and we're seeking to increase it 10 feet to 55
feet. This small requested change to the height is
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 5
limited to tracks as large as this one, more than 25
acres or more.
During our prior presentation on September
3rd, we walked through our visual impact analysis,
which is contained in the DEIS, and showed why we
believe the change of height will have very limited
impact from the various viewpoints from around the
town that you asked us to analyze.
As I mentioned, this is our second hearing.
We presented the plan and had a lengthy and very late
discussion before you on September 3rd. We were asked
to concentrate tonight for our presentation to be
about the traffic, which was the subject of many of
the questions.
As a reminder of this process, we are now
before you on the zoning petition, you have accepted
our DEIS as complete, we are now in the public hearing
stage. We have a Stenographer here that will take
down all the words, questions, and comments that come
both at the last hearing and this hearing, and it will
be our job at the conclusion of the hearing to answer
every one of those questions and comments in writing
in a Final Environmental Impact Statement. So, that's
where we're getting to.
And, then, if we are successful and it comes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 6
back to the Town Board when that's done, the Town will
adopt findings. But that's still not the last stage,
that only puts the zoning in place, and then we will
be before your boards for a site plan approval going
over the very specifics of exactly what the buildings
will look like, how big they will be, how tall they
will be. This is the maximum envelope in the zoning
we're talking about, but then we would get to the
specifics in the site plan approval process.
Moreover, for those of you who were not here
the last time, as I mentioned, you know, if we are
successful in obtaining the zoning, there's a long
process ahead of us. So, we will continue to work
together, we think we are already improving this as
we've been talking to the residents and meeting with
the residents, and speaking with the Board, and we
hope to continue that.
So, what I'm going to do now is turn it over
to Peter Feroe and Michael Beattie. They're going to
take you through the traffic analysis, which we know
is the subject of much of the focus of the people in
the neighborhood, and explain to you not only what we
believe the current status is, what the issues that
you're dealing with that you already know that are
there and, then again, what our suggestions are for
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 7
how we might be able to help mitigate those impacts.
Thank you.
MR. LACHTERMAN: Thank you.
MR. FEROE: Good evening, Peter Feroe with
AKRF. We heard, obviously, at the prior hearing and
before, obviously, a lot of concerns about the
traffic, especially at East Main Street and Route 6.
So, what we wanted to do is go into a little bit more
detail about the study that was performed and also be
able to show you a traffic simulation that was done to
show kind of the, compare the current conditions to
what we think a future proposed condition with those
two traffic lights there would look like and how it
could work.
So, I'm joined by Michael Beattie who heads
up AKRF's Traffic and Transportation Department, who
was the author of the traffic study and the
simulation. And, so, we're just going to go into a
little more detail on just that topic and then,
obviously, we want to hear your comments and answer
questions, and the comments of the public, as well.
So, I'll turn it over to Mike.
MR. BEATTIE: Good evening. I think this is
my first time in front of you. Mike Beattie, Senior
Vice President at AKRF, about 20 years of traffic
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 8
planning, Traffic Engineer experience, Professional
Engineer in New York, and a Certified Professional
Traffic Operations Engineer.
As Peter said, we're going to focus tonight
on that US Route 6 East Main Street intersection.
We're going to go through what is experienced today,
what we anticipate in the future without the project,
and then show what we anticipate the intersection will
look like with the project with these improvements.
So, first, the intersection itself, we know
today that there's a lot of operational safety issues.
If you go out there, there is no control except for
the side street stops. We did look at crash history
based on what the State DOT has. Over the past three
years, there have been nine crashes, and those are
just reported crashes. Anything that's not reported
or goes to near misses, they don't make it into the
study, but at least there's been nine reported.
If you think about this road altogether, as
vehicles try to enter the road, there's five lanes of
traffic travelling at 45 miles per hour. Not really
the type of roadway that you want to try to take a
left onto. But what's really going on here is this
intersection is absorbing a lot of the regional
traffic cutting through to get to Mahopac and further
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 9
north. So, we're going to show you what those volumes
are to just give a sense of what's going on there
today.
In the mornings, so this is your a.m. peak,
you'll notice at the intersection, just to give
everyone some orientation, here is Hill Boulevard,
East Main, Lee Boulevard, and here's where East Main
comes in and meets Route 6. Today, there's close to
500 vehicles taking that right turn.
If you look at the traffic upstream, you can
tell that a lot of that traffic is coming from further
towards Mahopac. So, what we're talking about here is
really a cut-through route as opposed to using Hill
Boulevard that has a signal, or Lee Boulevard that has
a signal, what vehicles often do is to go to the un-
signalized intersection and take the right turn out.
What happens then is really you're waiting
for gaps in traffic caused by Lee Boulevard to make
your exit, but a lot of times this queue today can
slow back to Indian Hill Road.
In the p.m., it's like that reverse commute,
over 500 cars at that location is taking that left, to
then travel on East Main. And if you just track the
volumes, you'll see it's not local traffic, it's just
everyone traveling through. They're opting to,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 10
instead of going to a signal at Lee Boulevard or a
signal at Hill Boulevard, they're opting to get off US
Route 6 early. And if you travel along East Main
Street, there is no control here, nothing stops you,
there's no signals, it really is a straight shot.
So, what happens then is not only does this,
in our terms, fail, it's an unacceptable condition.
Sometimes these queues, so the number of vehicles
lined up, will backup towards the Taconic. And the
problem is there's a short pocket there, when they
backup to that thru lane, people are now trying to
change lanes to get around that queue. So, today, not
a great situation.
So, what we want to do when we do these
traffic analyses is the first thing we do is we want
to establish a future no-build condition. What we do
there is we take the volumes that you see here, we
grow them by a certain percent per year, and then any
sort of approved projects in the area, we'll
discreetly add those trips on top of it. So, what
we're going to show you is a simulation of that future
no-build condition.
Before it plays, just a little bit about
this model, this is a traffic simulation model. It's
called Vissim, it is an approved software by State
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 11
DOT, they use it on projects. It produces Level of
Service, delays, kind of what you typically would see.
The great thing about this model is it then can
actually show what that looks like. So, as opposed to
me saying this is a Level of Service C to a Level of
Service D, what does that mean? You actually are able
to see what it looks like.
When we run the simulation, you'll see two
types of colored cars. There's a purple car, those
are the existing volumes that you guys saw on that
previous map, grown three years. And any car that's
orange are cars that are associated with other planned
developments in the area.
So, I'm going to start playing this. This
is the p.m. peak hour. And it will zoom in for you
soon, so it might be hard to see to start with but,
again, just for orientation, here's the Taconic
northbound, here's Main Street, and here's Lee
Boulevard.
And things I'll point out is you'll notice
the queue here. So, you see this left-turn queue, and
it will zoom in, is extending back past that left-turn
pocket towards the Taconic. So, whatever you guys are
experiencing today, which we can anticipate it's going
to get slightly worse with the growth, you'll notice
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 12
that vehicles, when it zooms in, especially if you're
coming up from the Park-and-Ride, or trying to enter
into US Route 6, they're trying to manage or find a
gap of five lanes of traffic, again, travelling at 40
miles per hour, and this queue will continue to extend
to the Taconic, and the only time they get to go is
when Lee Boulevard stops traffic and they find that
gap.
So, you'll see here the queue of cars. When
Lee Boulevard does have a red light, you'll see some
cars being able to be processed. In the future, based
on the future volumes, you see vehicles that would
have to then get out of the travel lane to go to the
other lane. That's what causes accidents. And this
will backup to the Taconic.
Again, you'll see cars trying to navigate a
gap to get through the five lanes of traffic. And,
again, this is without the project, this is just what
you see there today with some growth. And there's one
of our no-build projects, that orange car, and you can
see where the queues are heading. And I'll just zoom
out for a second.
And, again, this represents the p.m. peak
hour. We do these models for an hour, just for size
of file, we pick a five-minute period. So, this is
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 13
what's represented there.
And you also see the cars backing up along
East Main Street. Again, you see the queue of cars
pass the queue, pass the storage length, blocking
traffic. So, that's our no-built condition, that's
what we want to compare our project to.
When I then look at the project, what I do
is I take these volumes you see and I add our
anticipated volumes on top of it. So, actually, you
can see here the queue of cars as it backed up towards
the Taconic, and you can see the queue, so it's not
processing the vehicles.
When we talk about with project, when we
look at the with-project, I take those volumes you
just saw and I add what we're projecting our project
will generate. So, what we've done here is we put
together tables to give you guys a sense of volumes at
the Route 6/East Main intersection. Just to walk you
through what you're seeing, I'll just go to the p.m.
peak hour. Today in the p.m. peak hour, there's
almost 3,500 vehicles travelling through the inter-
section.
Just if you did nothing, no approved
projects, you're anticipate to add another 100
vehicles.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 14
If you add the projects that are approved,
or are being planned, for this area, not our project,
but other projects, it's another 243 trips.
And then for the the 250 residential units,
that's what we studied in the report, another 122
total trips going through this intersection. And when
I say total trips, when we talk about the eastbound
left, there's actually 63 project trips in the
eastbound left, the 122 represents any of the
movements of that intersection. So, the project is
only adding about three percent to the total traffic
in this area.
That being said, I think it's recognized
that it's a problem. Our trips are going to go
through this intersection, so the project team wants
to take on how do we resolve this. It's not just
resolving it for our 63 trips taking that left, but
today 3,500 trips are going through this intersection
that really isn't set up properly.
So, we went through a couple of different
options. One option that we looked at is what if we
created a whole new access point. The map you see
here is the Taconic northbound off-ramp. We looked at
what if we were to punch through to East Main Street,
completely avoid the intersection. The problem here
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 15
is you'll see some images of if you went straight
through, or if you tried to do kind of like a switch-
back, the grades are so steep today, the amount of
blasting you would have to go through to get those
grades to be acceptable would be pretty extensive.
You could have operational impacts at the Taconic off-
ramp because now you're adding another lane to that
which you have to then accommodate. You, obviously,
have to go through State DOT to actually get this new
land across from the ramps.
MS. HAUGHWOUT: Yeah, that's what I was
going to say.
MR. BEATTIE: There's that. But, also,
let's just say somehow we were able to do this, it
doesn't solve the issue that occurs today because
there's still 3,500 trips going through the
intersection. So, we, at this point right now, are
saying this is a feasible option. It is in the
report, we did show it to DOT, but you can see just
based on the grading, it's a tough solution.
We next looked at a roundabout. Personally,
as a Traffic Engineer, I do love roundabouts. They're
safe, they process vehicles. However, in this case,
Route 6, you have four lanes, it's a high-speed
roadway, you do have large trucks. Just to give you a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 16
sense, you need a roundabout that's close to 180 to
230 feet for people to navigate.
I didn't center the roundabout exactly in
the middle because, obviously, you can see where
you're limited by this Park-and-Ride. So, this is
just the size of the circle, let alone how do you
approach the circle, the way you have to navigate the
road. Again, as someone who likes roundabouts, it's a
difficult location to put a roundabout given the size
you need and your constraints both north and south.
MS. HAUGHWOUT: And that also has to do
with the width of the existing road?
MR. BEATTIE: It's the width, the number of
vehicles.
MS. HAUGHWOUT: Because if you go up by
Lagrange, they have them all over, but I think that
the widths are somewhat smaller.
MR. BEATTIE: That's what it is. And the
type of vehicles that are travelling through here, we
did notice some big trucks.
MS. HAUGHWOUT: Yeah, they're big trucks,
yeah.
MR. BEATTIE: You have to accommodate that
turning. So, again, as someone who likes roundabouts,
it's a large roundabout. And you can see the amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 17
of space. The blue is the 180 feet, the yellow is 230
feet. And it doesn't account for any of the approach
lanes. So, it's actually, it's more extensive than --
MS. HAUGHWOUT: Yeah, because those are the
going turn-off lanes, as well.
MR. BEATTIE: So, again, another option we
looked at, but we dismissed just based on the size.
So, the solution we came up with was
actually creating a signal system here. There would
be two signals; one at Route 6 and one really where it
meets East Main right here. These signals would
actually operate as one controller. It's called a
clustered intersection, which means it's different
than where you see a lot of signals along a corridor
that talk to each other. These operate as one signal,
so it's not talking, they actually know, they work as
one unit.
MS. HAUGHWOUT: Meaning they're
automatically in sync?
MR. BEATTIE: They're automatically in sync.
MS. HAUGHWOUT: Okay.
MR. BEATTIE: There's no, like we call,
offsets, there's no talking --
MS. HAUGHWOUT: Yeah, there's no talking,
now you go to --
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 18
MR. BEATTIE: It's a controller that
controls this. As I said, it's called a clustered
intersection, they view it as one signal.
MS. HAUGHWOUT: Okay.
MR. ESPOSITO: So, the light on 6 would be
talking to the light on Lee Boulevard, at that
intersection?
MR. BEATTIE: The idea would be, I'm going
to show you a simulation, these two work as one, and
then you would coordinate them with Lee and the
Taconic. And there's even more stuff you can do
beyond that, like while we would be funding this
million dollar build to build this, the two signals,
there are other improvements that can be done along
the corridor.
I'm not sure if you're familiar with what
they did in Cortland, they did this adaptive traffic
control system by Cortland Crossing. That's something
that could be implemented for a lower cost in the
future when it's stabilized as something that makes
this signal even smarter. But at least the single
system and the equipment is there and you could tie it
in to actually make a corridor that flows nicely.
What you would have here then is you would
actually have a left turn that's protected so you're
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 19
not waiting for the gap in traffic. So, you get a
left turn green arrow. And when you can't go, you get
a red arrow. There is no I'll wait for a gap. So,
you would actually stop or get the green arrow.
As a side street approach, you'd actually
have stopped traffic so you can get out of the side
street going north or south. You'll see, just for
context, we are extending this pocket past where it is
today.
MR. MURPHY: Michael, how many cars can
queue up in that now?
MR. BEATTIE: You'll see the simulation of
now --
MR. MURPHY: Now there's five or six.
MR. BEATTIE: -- it's five or six before it
starts backing up, and they kind of use some of it.
MR. MURPHY: What's the new one?
MR. BEATTIE: I think this will extend it by
twice the amount. So, you're probably looking at 15,
depending --
MR. MURPHY: So, you'll get 12 to 15.
MR. BEATTIE: -- depending on where people
start coming back. So, you'll see the simulation. It
might be hard to see on the screen now, you can see
where we're pulling it back compared to today. You
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 20
kind of stop right here. And now you can pull it back
further.
MR. ESPOSITO: So, you're narrowing the --
MR. BEATTIE: The median.
MR. ESPOSITO: -- the center island, or
whatever you want to call it.
MR. BEATTIE: Yeah, that's exactly what
you're doing, you're eating, what we call, you're
eating into that to create this longer pocket, because
we are now going to stop traffic with that red arrow,
so we want to make sure you have the proper storage
for that.
MR. ESPOSITO: You also make it easier for
cars that are travelling straight to go around you.
MR. MURPHY: Correct.
MR. BEATTIE: Absolutely, it just gets them
out of that travel way.
What's nice about this is we like platoons
in traffic. Platoons is you have a set of vehicles at
a light, they move as a unit. Today when Lee
Boulevard gets the green, because the next signal is
so far away at the Taconic, you get an accordion. So,
now when they arrive at the Taconic and they get that
green light, they're not as efficient because some of
the stragglers from behind might not get there in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 21
time. So, what we're doing is platooning it because
we created the signal in between the two, not as it
exists today. Your queues, and we have the simulation
in a second, do not back up to the Taconic under this
situation.
In terms of Level of Service, you want that
technical term, everything operates acceptably under
this situation. So, today while you have failures in
movements, everything operates at an acceptable Level
of Service.
And the other thing that's something we
might potentially do, and we didn't account for this
in the model, is today, people are using this as a
cut-through because they're avoiding signals. They
now will have a signal where they might get a red
light, you may start reducing some of that cut-
through to actually go to Lee, or to go to Hill, and
stay along Route 6, which they should do. We
still assume the full amount of traffic is taking that
left, but it could be a nice byproduct of this that
you're reducing the cut-through for regional traffic.
MR. LACHTERMAN: Quick question, Michael.
MR. BEATTIE: Yes.
MR. LACHTERMAN: And I thank some members
of the team who met me up on the site and we looked at
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 22
some traffic, I think they met some of the other
council people up there, as well, but we discussed
maybe adding three-way stops on Hill and on Lee.
MR. BEATTIE: Yep.
MR. LACHTERMAN: Would that also, do you
think that would be a good deterrent?
MR. BEATTIE: Potentially. Personally, we
don't like to use stop signs as a traffic calming
measure. The reason we don't like using stop signs is
because if a stop sign isn't warranted, you become
numb to it and, eventually when you should stop and
you don't, there's an accident.
So, we would look at warrants, it's a tool
in the tool box if it warrants it. And there could be
other things that you can do to slow down that
traffic. So, there are options there. I don't
like to say that a stop sign is used to control cut-
through or slow-down trips, but if it's warranted --
MR. LACHTERMAN: Well, I worry about the
safety at those intersections in particular.
MR. BEATTIE: Absolutely, absolutely. So,
there are warrants for that which you could look at,
and that would help. Because, again, today, once you
take that left, there is nothing stopping you as you
go, it's just a straightaway.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 23
MR. ESPOSITO: Yeah, people blow down that
street all the time.
MR. BEATTIE: Absolutely.
So, I'm going to show now the simulation
that you saw earlier. The third color vehicles you're
going to see now are green cars, those are just the
project trips. There's not a lot of them because,
again, compared to the purple trips, but you'll see
the green color. And you'll see this, again, same
time period, it's going to do the same kind of camera
flow. But you'll immediately notice where it would
start, that queue you saw earlier is not there.
A queue does form when you wait, it does
clear. You see now, the new queue you'll see is when
vehicles travelling westbound stop at Lee. So, that's
a new delay, or a new place where people have to wait
where normally they would just go through. But in the
future, as you create this better adaptive system, we
like having the control of having those platoons.
So, I'm going to hit play. Oh, one other
color you see, because we always highlight it, a blue,
it's a truck, just it's a larger vehicle, so if you
see a blue vehicle, it's a truck.
MS. HAUGHWOUT: It's got a lot of wheels?
MR. BEATTIE: It's got a lot of wheels, it
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 24
looks like a truck.
Again, this is a model where --
MS. HAUGHWOUT: The little blue truck.
MR. BEATTIE: The blue truck is there.
Again, I input the information, I can't make this
look --
MS. HAUGHWOUT: Different.
MR. BEATTIE: This is not Pixar where I say
you do this. There's a modelling behind it, I put the
inputs, and then I'm kind of hands off. So, if it's
working better, it's showing that it's working better.
So, you can see the queue that you saw
before is not there. A queue does form but, again, it
dissipates. And we'll zoom in soon. You'll see that
also now those side street vehicles that want to come
out, they actually have a green light. You see the
light green car that shows, again, we do have our
project vehicles coming to the site.
MR. MURPHY: So, Michael, when you say that,
just to clarify for everybody, those are the cars
coming out of your AMS project?
MR. BEATTIE: Exactly.
MR. MURPHY: I just wanted to clarify that
for everybody.
MR. BEATTIE: Well, in this case, they're
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 25
going in. You see some coming out.
MR. MURPHY: I got it.
MR. BEATTIE: The 102 we talked about
earlier.
MR. MURPHY: Just for people watching,
that's all.
MR. BEATTIE: Yeah, those are our project
trips generated by the 250 units. But you'll see,
again, this is the new queue you'll see which clears,
you don't wait through cycles, it does clear.
MR. ESPOSITO: Can you pause it right there
because here's my concern.
MR. BEATTIE: Yes.
MR. ESPOSITO: So, you see the queue --
MR. BEATTIE: This here?
MR. ESPOSITO: Yeah, you see all that queue?
So, those people are going to be coming back, right?
They're going somewhere now, the assumption is they're
going to be coming back. That queue is going to be
flipped, it's going to be on this side of the road.
And I don't know if you have -- I know for a fact you
don't have the same distance between this new light
and the Taconic entrance where there's a light that
you do from this light and the Lee Boulevard light
going back.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 26
MR. BEATTIE: That's a good question. This
is p.m. peak hour, most of the vehicles, this is
the one that's actually travelling in the opposite
direction you're talking about. So, while you would
think, you know, this would come back the other way,
this is actually the heavy movement right now. So,
that concern you'd have, it would be different if this
was the morning one I'm showing you, it's coming back.
This is the p.m. where this actually is --
MR. MURPHY: So, you're saying those people
are going home.
MR. BEATTIE: They're already going home
right now. That's why we looked at the p.m. peak
hour.
MR. ESPOSITO: All right, we can look at the
p.m. So, that means that the queue up on the top part
of where all those purple cars are now, that's p.m.?
MR. BEATTIE: That's the p.m.
MR. ESPOSITO: So, a.m., they would be on
this side, it's the same problem.
MR. BEATTIE: No, because what would happen
is in the a.m., they would be on this side, but you
change your signal time to coordinate for the a.m.
So, for instance, this is the p.m. peak
hour. We want to make sure we give enough time for
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 27
this left turn, right, because there's a lot of
vehicles there today. So, you stop this for a long
amount of time so it's less vehicles.
In the a.m., the number of people taking
that left is a lot less, you don't need as long of a
green light. This opposing movement gets more green
time, they flow through.
So, in our EIS, we've done for the a.m./
p.m. Saturday, they all work. We're showing this p.m.
because of that left turn. But, again, the signals
now are smarter. And this doesn't even account for
the fact that when you have the system, you can
upgrade it to that adaptive traffic control which
improves it even greater. This is just the basic
signal let alone we can do beyond that through
software.
So, this right here is only this long
because of the amount of people taking this left. In
the morning, that left doesn't occur so you don't hold
these people as long, that queue doesn't exist. So,
that's why we showed the p.m. because this is the
worst case scenario for number of volumes.
MR. MURPHY: I think what Sergio is saying
is those cars are going to be where it says 1312 down
here, he said they're going to be queued up going out.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 28
MR. BEATTIE: But they're not because that's
what this is showing.
MR. LACHTERMAN: You can adjust the timing
on the light.
MR. BEATTIE: Yeah, on the light.
MR. ESPOSITO: The reason why they're being
queued there is because the light is being adjusted so
this way people can make the left turn.
MR. BEATTIE: And from us, we can always get
those queue lines so you can see, for those other time
periods. But, again, I'll play it a little further,
this all clears.
MR. ESPOSITO: I do love the software, by
the way.
MR. BEATTIE: It's a powerful software tool.
And it also takes it out of the realm of Level of
Service. You can visually see it. I'll pause it
again real quick. Again, remember the queue that was
extended all the way back, we're giving that
protective left to get em out, get em out, get em out.
We stop them, they start queueing up, give them the
green turn, get them out.
And, again, it's coordinated where what you
don't want is people taking a left and hitting a red
light. That's why this is one unit where when you get
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 29
the left, you also get a green light to keep going
forward.
MR. ESPOSITO: Yeah, keep going.
MR. MURPHY: Michael, in your modelling,
what's the furthest queue? Right now, it queues up
into the left lane.
MR. BEATTIE: Yep.
MR. MURPHY: In your modelling, what does it
queue up to? I've only seen six cars. Is that
because --
MR. BEATTIE: It's operating.
MR. MURPHY: Okay, it's operating what it's
supposed to be?
MR. BEATTIE: It's the same volumes you saw
on the previous one with the long queues, plus our
project trips. The queues aren't forming because
we're giving them a long chunk of dedicated time
instead of them waiting and Lee Boulevard clears and
they find the gaps. We're clearing them. Even though
we do stop them for a period of time, we then have the
ability to clear them out real quick.
And you can see when we went to the
no-build, we can always go back, that queue for that
no-build was going back to the Taconic. Here, it's
not. And this is slightly higher volumes because it
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 30
includes our project trips on top of it.
MR. ESPOSITO: So, currently that
intersection, what is it rated as?
MR. BEATTIE: The movements are F.
MR. ESPOSITO: And after your improvements
with the two lights --
MR. BEATTIE: All approaches are better with
overall Level of Service C. We as Traffic Engineers
try to achieve Level of Service D. I know it sounds
bad but, in our world, that's acceptable, the Level of
Service D. In this case, the whole intersection
operates as C, and just certain movements operate as
D. So, we would say, and State DOT, it's acceptable,
especially during a peak hour, that's an
acceptable condition. So, we like D better in the
traffic world.
MS. SIEGEL: Question. With the signal,
which obviously has the light for the left turn, what
about people exiting the golf course who want to make
a left, would there be an additional --
MR. BEATTIE: They get a signal.
MS. SIEGEL: -- left turn for them?
MR. BEATTIE: Yes.
MS. SIEGEL: And that would be an
independent left turn from the other left turn?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 31
MR. BEATTIE: Yes. I'll try to go back to
where it zooms in.
MR. MURPHY: They're not going to get a left
signal, I'm assuming.
MS. SIEGEL: No, he's saying they will get a
left signal.
MR. BEATTIE: So, in this case right here,
because this movement was getting the green, you'll
see these bars, if a car was there, they would also
have a green light.
MR. MURPHY: They're not getting a green
arrow, they're just getting a green light?
MR. BEATTIE: Yes. It's not a protective
left, it's a green, you get a green ball.
MS. SIEGEL: You would get a green light to
make the left, but you would still be stopping the
cars coming from Lee?
MR. BEATTIE: Yes. The other thing I'll
point out is to make this work, we are prohibiting the
left turn from East Main to Route 6. Today there was
like three vehicles that do it, so it's not really a
lot of vehicles doing it. When you can close off that
turn, it allows me to run this right with this left
concurrently. So, that's why we close it off. There
wasn't a lot of vehicles.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 32
MR. ESPOSITO: You really would only affect
the people coming down from your project, I mean,
nobody's going to come all the way down that street
and then make the left to go back.
MR. LACHTERMAN: Maybe someone from
Indian Hill.
MR. ESPOSITO: Or somebody lost.
MR. BEATTIE: Today's counts, again, it was
three vehicles. We thought to take that away to
benefit, benefit, well, to cater to the 500 cars that
are there today.
MR. ESPOSITO: So, people coming down from
your project -- I'm sorry to cut you off.
MR. BEATTIE: No, go ahead.
MR. ESPOSITO: So, people coming down from
your project --
MR. BEATTIE: Yes, I'll try to zoom out so
you can see it a little easier.
MR. ESPOSITO: People coming down from your
project where that green car --
MR. BEATTIE: Yep, so, our project would be
up here. Down the road to here, they would meet a
signal here to stop them because at this point, it's a
shared through right turn lane. If you have the green
ball, or green arrow, for this right turn, you want to
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 33
stop them. So, they wait here, and then when this
gets a green, this also has a green, and they can
continue on their way.
MR. ESPOSITO: So, you wouldn't be able to
go left. So, if they wanted to go left --
MS. SIEGEL: How would you stop them from
going left, how would you stop them?
MR. BEATTIE: This right here is striped and
designed to only be a right turn.
MS. SIEGEL: Stripe and design means nothing
to some drivers. I've seen drivers where even the
acces coming out of the Lowe's shopping center where
it absolutely angles to only go right, I saw someone
go left.
MR. BEATTIE: Well, in this case, again, for
this signal, you only get a green arrow, so
it's really illegal to actually take that left with
the green arrow. But on top of a that, even today, no
one is doing it, so we won't anticipate. And if you
were coming from the project and you want to go left,
you would actually travel up East Main and go down to
Lee or Hill. But the majority of traffic are really
going towards the Taconic.
So, yeah, they would come here. If they
want to continue east, they would go up East Main and
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 34
then either go down Lee or Hill. And then if they're
going west, they would take the turn and then have the
green light and continue on, again, stopping traffic
from Lee so you don't wait for Lee, it's platooned.
MR. LACHTERMAN: And I don't think you can
program in people who don't obey traffic laws.
MR. BEATTIE: No. Some software, you can
do some odd things, but you really can't, you would
anticipate adherence.
MR. LACHTERMAN: Yeah. And, I mean,
solving the problem when I say programming it in.
MR. BEATTIE: Yes.
MS. SIEGEL: I have some other questions.
MR. BEATTIE: What's that?
MR. WEINGARTEN: We can put a no left turn
sign.
MR. BEATTIE: Yes, a no left turn sign.
MS. HAUGHWOUT: That's what I was going to
ask.
MR. BEATTIE: Yeah, there's stuff we can do,
there's signage. Again, instead of a green ball, it's
a green arrow, so there is no left, it's showing that,
there's striping, there's a no left turn signage. So,
there's a lot of stuff to at least try to enforce it.
MS. HAUGHWOUT: Minimize it.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 35
MR. BEATTIE: Someone could do something
illegal but, actually, when that is a green ball, your
left turn is going, so they're not going to have a gap
to go out anyway. So, it benefits them to go to the
other signal.
And, again, there is the potential that when
you put that signal in there, it doesn't feel like
that quick I'm avoiding the signals, some of that
traffic may actually stop going through East Main,
stay on Route 6 where they should.
MR. ESPOSITO: They'll get sick of it.
MR. BEATTIE: They might get sick of it and
do that. But if they didn't, this still accommodates
that high volume of cut-through traffic like the 500
cars.
MS. SIEGEL: Question. Can you talk about
what you calculated in, the background traffic where
you had the increase, specifically what was added in
in terms of specific projects, or was it just a
general calculation of --
MR. BEATTIE: Both. So, what we do is the
background growth based on historical data, we worked
with your staff here, we did a one percent growth per
year of just existing traffic. And then there were
four projects that we added traffic from, just so I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 36
don't get them wrong, we added the Rock Shrub Oak
Associates, 3000 Navajo Road, 670 East Main Street,
and The Links at Valley Fields. Some of those had
traffic studies, and so we took their traffic studies
and plugged those volumes in. Two of them did not
have studies so we generated trips, as we typically
would. But those are the four, like those orange
cars, those are the four projects that generated that.
But we did a one percent per year for those existing
volumes if nothing was happening.
MR. LACHTERMAN: Which was the first one,
Rock --
MS. HAUGHWOUT: You mean Rock --
MR. FEROE: No.
MS. SIEGEL: That potential multifamily
there. So, the East Main Street and East Main --
MR. BEATTIE: 600 East Main.
MR. FEROE: 670.
MS. SIEGEL: 670 East Main and the Valley
Fields.
MR. BEATTIE: And then a one percent per
year growth rate.
MS. SIEGEL: So, those are your four --
MR. BEATTIE: Yes.
MS. SIEGEL: Thank you. Are there any DOT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 37
requirements in terms of the distance between traffic
lights?
MR. BEATTIE: There's no specific
requirement because of the clustered intersection.
MS. SIEGEL: Well, you have the Taconic,
and then you have this one, then you have Lee.
MR. BEATTIE: No, there's no requirement.
Sometimes to realize the benefit of platooning, you
want to try to have signals within a thousand feet.
Even if you had signals further apart than that, you
get that accordion, so while it's not a detailed
requirement, we try to get those very evenly spaced
intersections to get that platoon before it starts
doing it the accordion. So, it's not a requirement,
you just see benefits if they're spaced properly.
MS. SIEGEL: Okay. And can you explain,
you mentioned something about something in Cortland?
MR. BEATTIE: Yes.
MS. SIEGEL: If you can explain what that
is.
MR. BEATTIE: If you're familiar with
Cortland Crossing, there's a mall, Baker Street I
think is one of the cross streets. So, it's a section
of Route 6 that was operating extremely poorly today.
They went out, and there are signals there today, they
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 38
implemented the software called ATCS, it's called
Adaptive Traffic Control. Adaptive means it actually
monitors, there's cameras that monitor trips and in
realtime adjust the signal, as opposed to today, it's
very like no matter how many cars, you're going to get
30 seconds of green. It could be one car, it could be
100 cars, 30 seconds.
Technology is now being able to adapt to
this. So, when they implemented the system on Route
6, they saw like a 20 percent improvement in travel
times, reduction in stops, because it now is
constantly looking at traffic. So, the historical
data, and in realtime, it's saying all right, we've
got to shift some green time to this movement because
maybe the shopping mall is getting out, and it's
constantly evaluating the system.
These signals, it's a software upgrade that
DOT has been implementing, and at least in this local
area, Route 6. And Cortland has it along a four or
five intersection stretch. But you can imagine if you
put the signal here, it helps because today if we were
to put the system on the Taconic and at Lee, it's too
far away to actually mean anything. These adaptive
systems really work as a system, and by putting this
in there, you at least set yourself up for that next
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 39
step of we have a signal in place, the hardware is
there, it becomes a software really issue of upgrading
it at that point.
MR. LACHTERMAN: Now, is that the traffic
lights at the bottom of the hill over by the Cortland
Town Center, ShopRite?
MR. BEATTIE: Past Lexington and you keep
going down, towards there.
MS. HAUGHWOUT: By Kohl's, yeah, where they
have the Greek place.
MR. BEATTIE: Yeah. And, so, we did
pre- and post-monitoring of like, we can actually
track vehicles, what's going there. I mean, it's
still a congested area but we see remarkable
improvements.
MR. LACHTERMAN: It has. I used to work in
the Cortland Town Center many moons ago, and there
were times it would take you 40 minutes to get up the
hill. I actually mentioned it to my wife the other
day because we had gone to the ShopRite and I was like
wow, the traffic is moving, and they just put that big
development right there.
MR. BEATTIE: Yeah. And as an AKRF plug, we
developed that system. So, AKRF is actually one of
the experts in New York State for the adaptive
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 40
control. Not saying we're the only ones that do it,
but we did that one, so that's why we're familiar with
that Route 6, and it's been very successful.
MS. HAUGHWOUT: And especially with the
high traffic items that are there, that's some real
tickets.
MR. BEATTIE: Yeah, we did it there.
Woodbury Commons, we just implemented that with their
new interchange because all towards fluctuating
schools there, and so we did test there, and that's
working out well.
Again, you would have the hardware in place,
the signal poles, etcetera, and really you could go to
the cabinet and you could adjust them to create this
other software. And we've done with DOT a lot of
other places beyond Route 6. And they're liking it,
they've seen a lot of success.
MR. ESPOSITO: So, what's the additional
cost of the software?
MR. BEATTIE: Off the top of my head, I
don't know, but it's relatively minor compared to --
MR. ESPOSITO: Relatively minor is not a
number.
MR. BEATTIE: It's like $5,000 to $10,000
for software versus -- the signal is where the cost
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 41
is. Each signal you put in could be $350,000 to
$500,000, and here we're putting in two.
The software, as long as the cabinet can
handle it, and the new signal would, and I think the
cabinets on the other ones can handle it.
MR. ESPOSITO: And you need cameras then,
right?
MR. BEATTIE: Yeah, if you see now, there
are new cameras now. If you drive around, it looks
like a bell above the intersection. It's called a
grid smart, it looks like a bell. 360 degree cameras.
They stop at the loops in the road because when you
repave, you cut them, it ruins the loop. So, if you
drive around, you'll see, it looks like a bell.
That's a camera that helps with pre-emption for
emergency vehicles, you can have that in there, if a
fire truck is coming through, they get the green. But
it's a way of tracking vehicles. Again, that's part
of that $10,000, that software upgrade. The real cost
is the signal itself.
MR. LACHTERMAN: Is it possible to upgrade
an older signal? Because we want to look at town line
to town line on Route 6, because there are definitely
issues.
MR. BEATTIE: It all depends on the cabinet.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 42
So, you would do an inventory. They open up the
cabinet and they can tell you pretty quickly if you
need a whole new cabinet, or can you upgrade it. So,
you have to go to each signal and see what's been the
latest, in terms of the signal itself, and the
cabinet, because you have to have a certain type
of cabinet to have it.
All new construction has the new cabinet.
Some of the DOT has been updating their cabinets for
this, we'd have to see --
MR. LACHTERMAN: Really?
MR. BEATTIE: -- did they update it.
MR. MURPHY: Who owns those cabinets, is
that DOT?
MR. BEATTIE: DOT. It's DOT signals. I
mean, there are some towns that will do themselves and
then they have their own system, but DOT likes to
control their system, they have a central management.
It's pretty remarkable what it's doing now.
MR. ESPOSITO: So, the lights cost between
$350,000 and $500,000?
MR. BEATTIE: A signal, depending on the
complexity of it, do you need different foundations,
the span of it. That's why it's a range, and then
whatever the cost of materials at that time.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 43
MS. HAUGHWOUT: Maintenance. Yeah, I was
going to say.
MR. BEATTIE: Well, it doesn't mean, it's
just like if steel increases.
MS. HAUGHWOUT: No, no, what the metal is.
MR. ESPOSITO: Your ball park on the
signals is what, $350,000 or $500,000, or 450?
MR. BEATTIE: I would say for this whole
system, probably close to a million given you have
to connect these two to act as one. So, it's not a
standard signal, it's a little more complex. And
because of the length, the width, of the roadway, you
have those longer spans.
MS. HAUGHWOUT: It's not a simple junction
box?
MR. ESPOSITO: It's not a simple junction
box. So, that's why like without --
MR. ESPOSITO: Plus the light has a left
arrow, it's a four-way light.
MR. BEATTIE: I mean, that's why it gets
that million dollar range between the design of it,
the purchase of materials, constructing it, MPT plans
to construct it, you have to manage traffic during
construction time.
MR. LACHTERMAN: And you still need DOT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 44
approval on all that.
MR. BEATTIE: Absolutely. DOT has the
study. I don't think we've seen comments from the
study, but they have the study, they're familiar with
the system. But this is a State road, so you would
need their blessing on it.
MR. LACHTERMAN: If you can do me a favor,
can you share the study on down by Cortland Crossing.
MR. BEATTIE: Yes.
MR. LACHTERMAN: No-build, build, I'd like
to see what the affects were there.
MR. BEATTIE: Yes. We actually have a nice
presentation that lays it out so we can probably get
that to you pretty easily.
MR. LACHTERMAN: That would be great. If
you want to share it through Planning, they'll make
sure we get it, I hope.
MR. ESPOSITO: Would it be prudent to put
the software in now and just get it all done so this
way if we wanted to move ahead, we'd have to do the
light on Lee and the light at the Taconic?
MR. BEATTIE: Not really, not really because
DOT would wants their system set up. So, the
software, you kind of put it in as a package with
everything else together. It doesn't really do
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 45
anything to put the software in now. All they want is
the infrastructure in place.
MR. MURPHY: DOT doesn't work that way.
MR. BEATTIE: Right. If there's software
there that's not running something, it has to be
tied to their system, and it would just be standing
alone. So, as along as your signal is in place that
can handle it, when it's time, they come out, they
make sure the other cabinets are sufficient, they tie
it to their system, and then manage the system. So,
they track it that way. So, there's nothing really
advanced except for, again, it's the infrastructure
they want. And then they just release the software on
top of it.
MR. ESPOSITO: But it's not just software,
it's cameras, you have to have that camera on.
MR. BEATTIE: Yeah, but the camera is --
MR. ESPOSITO: Expensive.
MR. BEATTIE: No. It's relatively minor
compared to --
MR. ESPOSITO: Minor is not a number,
relatively minor. I'm not hearing numbers, I'm a
numbers guy.
MR. BEATTIE: $10,000 to $20,000 versus the
million, that's what we call minor.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 46
MR. ESPOSITO: Wait, did I just say I'm a
numbers guy? I'm not a numbers guy.
MR. LACHTERMAN: Let me say, Sergio, that if
we move to that system because of increased
projects --
MR. ESPOSITO: We'll stand on the poles?
MR. LACHTERMAN: No, those projects will be
the ones that will be paying for it.
MR. ESPOSITO: Got you. Understood.
MS. SIEGEL: Another question. Will this
impact in any way the pedestrian light at Lee?
MR. BEATTIE: No.
MS. SIEGEL: It will coordinate with it?
MR. BEATTIE: So, anything, because there's
a signal there that if someone hits that ped signal,
it gives them a longer amount of time to cross because
it is a long crossing. And if no one is there, the
time is allocated better. This doesn't impact that.
It's tied together where in the future if someone hit
the ped there, that's still, I call it the master
controller, everything else adapts to that, but you
don't reduce, we never reduce, the ped crossing
because of other stuff. If someone hits it, the ped
gets to cross.
MS. SIEGEL: So, all the other things will
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 47
change?
MR. BEATTIE: Yeah.
All right, thank you.
MR. LACHTERMAN: Thank you, Mike.
MR. WEINGARTEN: So, again, we were asked to
put on the traffic presentation tonight. We did. I
want to make it clear to everyone who's here, the
hearing is open on all issues, not just traffic
tonight because, you know, we had our one meeting, but
you're allowed to come up. There is a Stenographer
here, if you do come up, please say you're name and
your address. There's a place to sign in here so she
can make sure that you're recorded properly.
And, again, as I mentioned, we will have to
respond in writing to any of those questions or
comments that come up.
Thank you.
MS. SIEGEL: Can you give us an estimated
time if the hearing gets closed tonight, the estimated
time for the FEIS? It's ball park.
MR. WEINGARTEN: Well, that depends --
MR. LACHTERMAN: I think they have 45 days.
MR. WEINGARTEN: -- are you going to send us
another memo that we have to --
MS. SIEGEL: No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 48
MR. WEINGARTEN: I'm just kidding.
MR. LACHTERMAN: 45 days is what you have
by law.
MR. WEINGARTEN: On our end? Do you have a
sense?
MR. FEROE: No. I mean, I don't think, you
know, hopefully a month or two months we should be
able to --
MR. LACHTERMAN: I thought it was 45 days.
MR. RODRIGUEZ: I don't think you have two
months. It has to be 45 days.
MR. FEROE: There's a 45 days if --
MR. RODRIGUEZ: If the hearing closes, it
has to be within 45 days.
MR. FEROE: Right, which can be mutually
extended by the applicant and the lead agency.
MR. WEINGARTEN: But we don't have any
reason to think it wouldn't be done within that time-
frame, again, unless there's an avalanche of questions
that come in.
MR. LACHTERMAN: Okay.
MR. WEINGARTEN: Thank you.
MR. LACHTERMAN: You know what, I'm going to
start with a question. I know we had discussed less
disturbance on the site. Were you able to look into
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 49
that at all?
MR. WEINGARTEN: We are, and we're designing
to it. So, what we're looking at, so it's very clear,
firstly, I have to at least try because you're talking
about the traffic, I just want to put a little frame-
work on it because you're asking about the software
and all the rest of it. We have taken the project
from 250 to 185. That is going to eliminate the town
homes that we had outside the area. And if you
remember the site plan, we had the existing office
buildings. Now we're basically going to be putting
almost all of our structure within what's already
developed and really leaving the forest area
untouched.
There's a little bit more that we might be
able to do to move all the units inside and remove
those town homes and move the units into the building.
We think we can design it that way. So, in the FEIS,
we may even come back with another alternative. The
one we're looking at may even be slightly less, around
180 units, as opposed to 185. That's as low as we can
go. But it will all be within the buildings where the
office buildings are, and we would not be removing any
of that open area for where the town homes were
planned. So, we are looking at that.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 50
We got a memo from the Planning Department
on that, we're responding to it, we'll have it in the
FEIS. But we're very optimistic that we'll be able to
do that. And that's something we're doing.
I'll also mention on the numbers piece that
you're looking at, as we go from 250 to 185 to 180,
there's a certain number what that does to the revenue
on your project. To make it clear again, from what
your heard, there's approximately 3,500 cars at the
busiest time of the day, the a.m. peak, that go
through that intersection at East Main and 6, we're
talking about adding from ours 60. So, we're a small
percentage of what is really the existing problem, and
we are offering to mitigate that by making a payment
of close to a million dollars for those two signals.
So, I just wanted to point that out. I think we're
being very reasonable in our offer of what we had in
our DEIS to do that.
And, as the Supervisor pointed out, there is
a time when everybody else is saying there are other
projects that are out there. You're right. And
when they come in, these other things that need to get
done certainly can get done as they add their traffic
in past us. So, I just wanted to mention that.
MR. ESPOSITO: I know, and we've had this
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 51
conversation, you and I.
MR. WEINGARTEN: Yes.
MR. ESPOSITO: You know, I know you know
the number is 60 or 70 cars that you're adding, either
in the daytime or the nighttime, to the intersection
which is already, you know, has some issues. But, you
know, it's not the number, the small number, the
relatively small number, that you're adding. That, I
think, is kind of like the straw that breaks the
camel's back on that intersection. It just cannot
tolerate not even one more, forget 60 or 70. So, the
mitigation that you're proposing, I think is necessary
for the project to move forward.
MR. WEINGARTEN: We're not disagreeing, and
I'll even turn you around on it. Of course there's
always self-interest involved, we need it for our own
residents. Who's going to want to live there,
remember, we're renting, these are not people buying.
They're renting, they've got to rent every year from
us, right? They want to live in a place that's going
to be comfortable to drive in and out of, and all the
rest of it.
So, we recognize that that investment on our
behalf is important. And we hope you work with the
other people that come in in the future to continue to
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 52
improve that area. So, it's going to be good for our
residents, as well, because these are long-term owners
of that property as we go forward.
MR. ESPOSITO: Now, that's reasonable.
MR. MURPHY: So, just to clarify, so you
guys are using the same footprint of the building
pretty much?
MR. WEINGARTEN: We think this alternative
that will develop in the FEIS will limit the new
neighborhood to where the office buildings are.
MR. MURPHY: Footprint plus 10 percent, or
something like that?
MR. WEINGARTEN: Roughly, roughly the same.
We're going to almost be adding almost no impervious
surface to what's already there.
MR. MURPHY: Good.
MS. SIEGEL: To pursue that point, if you
didn't ask for the additional height, I think it was
142 units, again, the same footprint that you're
talking about?
MR. WEINGARTEN: Honestly, if we couldn't
get the additional height, we would probably make the
buildings larger and we would extend out farther.
That's why we want the additional height, so we can
limit it to the area that's already disturbed.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 53
MS. SIEGEL: Why can't you just reduce
the number of units --
MR. WEINGARTEN: Because, at this point, it
wouldn't be economical. If you get down to 140 units,
we can't pay for what we have to do. There's a lot of
infrastructure, not just the traffic, but there's a
lot of infrastructure that's got to be built to
repurpose this from office to residential, and all the
things that we have to do, it just wouldn't be
economically feasible to do that, at that number.
We already started at 250, we came down, and
we're looking at 180 to 185, and we think that's what
we can build and have a project that would be
successful for us and for the community.
MS. SIEGEL: You're going to address that in
the FEIS, I guess.
MR. WEINGARTEN: Yes, yes.
MS. SIEGEL: Okay. Also, I think there has
been some discussion about doing your sewer line under
Route 6, is that going to be explained, I don't know,
it's not a topic, it's not traffic, but is that going
to be detailed in your FEIS?
MR. FEROE: It was actually in the DEIS. We
did look at it. And, Joe, correct me if I'm wrong,
but that's not going to be feasible. I think the Town
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 54
even said, right, that wasn't feasible, I believe
that's what he said. But yes, we're happy to explain
it further in the FEIS.
MS. SIEGEL: So, you're --
MR. LACHTERMAN: Yeah, I haven't had that
feedback from Dan.
MR. FEROE: All right, so we'll go back and
double check. I think that's what he said.
MR. LACHTERMAN: I'll double check in the
morning.
MR. ESPOSITO: It's not feasible on the
side of our Town Engineer, or it's not feasible for
your project?
MR. FEROE: I had understood that we
couldn't go under the ground because it wasn't as
simple as going under, we then had to go through the
golf course I thought.
MR. LACHTERMAN: There was an understanding
that they wanted to hook up the sewer as well, and
might be able to tie them together, because they were
trying to do a sewer project also.
MS. SIEGEL: But if you don't go through
the golf course, forget about the golf course for the
time being, if you just do your project, is it
feasible?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 55
MR. FEROE: I didn't think so. My
understanding was it was not, I believe that's what we
said in the DEIS.
MR. ESPOSITO: Your understanding based on
Dan's feedback, based on the Town Engineer's feedback?
MR. FEROE: That's what I assume, but I'll
go back and look, and maybe Joe can address it.
MR. ESPOSITO: I'm just trying to pinpoint
where the non-feasibility, unfeasibility, whatever,
where it came from.
MR. RIINA: Exuse me, Joseph Riina, I'm the
Principal of Site Design Consultants, Project
Engineer. So, the discussion up to this point has
been upgrading the pump station that's there and we
were going to tie into, we were going to create a new
pump station essentially next to the existing one and
tie into that. I'm hearing that that's possibly
changing.
MR. LACHTERMAN: So, Dan was looking into
the feasibility of running a gravity fence sewer
across pushing under Route 6, which he thought would
be a comparable price to updating the sewer pump
station, but then letting us off the hook of having to
revisit the sewer pump station every 10 years, and
also the actual maintenance of running that pump
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 56
station.
MR. ESPOSITO: From the Town's perspective,
the Supervisor makes a good point, that would be a
home run for the residents of our town.
MS. HAUGHWOUT: I thought I read that there
was a line on the opposite side. Let me look.
MR. WEINGARTEN: The answer is we can
certainly look into that. That's why we have an EIS,
and we have an FEIS that comes. We'll get you an
answer.
MR. LACHTERMAN: Thank you.
MR. WEINGARTEN: We'll talk to your people
and do that, especially if it's roughly the same
expense to do that.
MR. LACHTERMAN: Right. And, look, there
was definitely some engineering that had feasibility
to make sure it could happen, and that's, you know,
maybe that has changed. I hadn't heard that update.
MR. WEINGARTEN: And, by the way, can I
change my answer to how long it will take us to do the
FEIS? It may have to change.
MR. LACHTERMAN: If that's the case, yes,
we'll --
MR. ESPOSITO: So, just so we're on the
same page, the idea would be to eventually eliminate
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 57
that pump station?
MR. LACHTERMAN: Yeah.
MR. ESPOSITO: I just want to be perfectly
clear.
MR. FEROE: Okay.
MS. SIEGEL: And that would be irrespective
of the golf course, that's a separate issue.
MR. WEINGARTEN: Yes, we will look into it
and we will talk to your departments.
MR. LACHTERMAN: Appreciate it, thank you.
MR. ESPOSITO: Thank you.
MR. LACHTERMAN: Any comments from the
public? You can step right up, introduce yourself.
MS. O'NEIL: Ann O'Neil, Jefferson Village.
MS. HAUGHWOUT: Hi, Ann.
MS. O'NEIL: I think that the rentals are a
great idea. Jefferson Village, we do not have that
many rentals, so I think that will accommodate our
community.
I'm just confused, maybe you had mentioned
it, what are the times of the day are peak hours?
That, I don't know, I don't know what you're
considering that.
Also, what month did you do the study?
Because I'm concerned about did you include the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 58
school buses, because I know that Lakeland has early
pickup. So, was that included?
Also, how many, you said there's going to be
185 units in your community, or 180. And you're only
saying 60 cars, so I find that hard to believe.
MR. ESPOSITO: I think it's 120.
MR. LACHTERMAN: 60 per hour.
MS. O'NEIL: No, in his community.
MR. TEGEDER: 122 in the p.m. peak hour, 60
going into and causing that backup.
MR. LACHTERMAN: 122 in the p.m. peak hour.
MR. TEGEDER: 60 going into and causing the
backup.
MR. LACHTERMAN: 60 going into and causing
the backup. I'm just repeating because I don't want
Tom to blow a gasket in the back. You will be shortly
though, John.
MS. O'NEIL: So, I was very concerned about
the school buses, were they included in your study,
what times of the day was it done? And, also, because
you do have Lakeland and you have Yorktown, their
buses run after school activities, so I'm concerned
about that.
Also, you said 185, 180 units. How many
cars are going to be in your community? That's what
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 59
I'm asking.
Other than that, I think it's great.
MR. WEINGARTEN: Thank you. If we could,
there are a couple that are easy to just answer. We
will answer them in the FEIS.
MR. LACHTERMAN: Sure.
MR. WEINGARTEN: The p.m. peak hour that we
studied was from 4:00 p.m. to 5:00 p.m. is when it was
studied. And the information was collected between
May and June of 2023 while schools were open.
MS. HAUGHWOUT: Good. Come back up, Ann.
MR. WEINGARTEN: And just so you know for
the others, the a.m. peak hour was 7:15 to 8:15, and
the Saturday midday peak hour was from 12:00 noon to
1:00 p.m. And, again, we showed the a.m. peak hour
because that's busier than the other two times at that
intersection.
MR. BEATTIE: Can I clarify just one quick
thing? We actually collect data for longer than that
period, we collect for a two-hour period. Of that
two-hour period, the times that Mark said, was the
peak of that two hours. So, we if we collect 4:00 to
6:00.
MR. ESPOSITO: 4:00 to 5:00 was --
MR. BEATTIE: 4:00 to 5:00. In the morning,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 60
we collect from 7:00 to 9:00, the highest was 7:15 to
8:15.
And, then, while you're out there, you may
sometimes see tube on the road. That's our daily
traffic to make sure that, for instance, we don't do
an afternoon, let's say when the schools were in
session, but our p.m. volumes are higher. So,
therefore, we justify that. If we can make the p.m.
work, it kind of covers those other shoulder hours.
But the hours that you see in the report was what we
identify as the peak, but we collect from more hours
than that.
MR. ESPOSITO: That makes more sense
because I'm like why would they pick 7:15 to 8:15?
7:09 to, you know.
MS. HAUGHWOUT: You don't have any friends
that are like I'll meet you at 6:42?
MR. LACHTERMAN: Ann.
MS. O'NEIL: I don't have to say my name
again, do I?
MR. LACHTERMAN: No, we know who you are.
MS. O'NEIL: So, the study was from May to
June. So, May to June, I know that the schools have
tests and the kids are not in school full term every
day, they're in probably taking a test from 9:00 to
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 61
10:00, 11:00 to 12:00, whatever. And, then, was it
going to be the end of June? Because Lakeland
graduates, what, the 16th or 17th, and so does
Yorktown. So, is it really an accurate study?
I'm just concerned about the school kids.
And is this an accurate study for the school buses? I
want it to be safe for the kids.
MR. LACHTERMAN: Thanks, Ann.
MR. WEINGARTEN: So, two things. One, we
will answer in the FEIS in detail showing that the
school and the school buses, and how we ensured they
were part of this study, and they are accounted with
it.
As far as the number of cars, if you think
of it, so you understand, we're only doing one and two
bedrooms. So, if you're down to, use round figures,
180 units, at most, you're talking about two cars for
a two-bedroom or a one-bedroom, maybe even less. But
even if you say 360 cars. So, it would make a lot of
sense if you have 360 cars in a neighborhood and
you're looking at the busy intersection down below
that 120 of those cars were coming during one hour,
not everything is coming all at once. And that's why
we're saying 60 we're going in one direction, and the
rest, we're going off in another direction. So, just
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 62
to get a general sense of how the numbers work.
MR. ESPOSITO: I don't think it will even
be that much.
MR. WEINGARTEN: And, by the way, that's
underestimating it because the study is for 250 units
of traffic that you saw in there, and that's going to
be decreased to 180. But the traffic number study
that you look at is based on our original proposal.
MR. LACHTERMAN: Interesting to know. Thank
you.
MR. O'NEIL: Charles O'Neil, Jefferson
Village. I know my colleagues in golf and everything
else come down from Mahopac, but what's going to
happen now to Hill and Lee Boulevard? Because if I
know there's a light down at the end, I'm going to go
down Lee or Hill Boulevard. And them lights are not
synced to what they're talking about. Is it possible,
I don't know, to get all the lights synced once you
get on 6, you can just sail through?
That's my concern, is that if I have to go
to the doctor up on Hill Boulevard, I wouldn't be able
to get back down home. It's going to be a lot of
people coming down both of them streets to avoid that
light that they're projecting. That's my concern.
MS. KEMPTER: Good evening. I'm Jessie
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 63
Kempter. I live at 760 East Main Street, otherwise
known as Old Route 6. I'm there 46 years, and I was
there when Contractor's Register was being built. I
didn't understand how it got built because I thought
that we were residential.
There's four driveways as you come up that
road where they want to build. There's a group home
driveway, I have two driveways, and my neighbor has
two driveways, and then we have a dead end. That's
all the activity that should be on that road.
I never saw a traffic study being done on
Old Route 6 where the stoplight is. When I moved
there, they put a stop sign on the road to make it
easier.
The other thing, the pump station had a lot
of activity, I saw the Cook truck there numerous
times. So, I don't know how you deal with that.
Yorktown designated my house a landmark
house, it's 1732. When Contractor's Register was
being built, trucks caused damage because of the
weight of the -- what is the weight limit on my road?
You know, different things like that.
I remember when they were dynamiting near
the bottom of the hill. I went and said how come I
wasn't told? They said we don't have to tell you
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 64
because you're not the house that's adjacent, Dr. Lois
was told.
The other thing, the speed on the road, when
Contractor's Register was there, it was 24 hours they
worked. They didn't work in housing, just because you
live in an apartment doesn't mean you go in and out,
in and out, I don't know what kind of activity.
You know, I still don't know how a dead end
became so popular. What was the zoning at that time?
I'm worried about the traffic with additional housing
there.
Now, at Barger Street, there's a light at
Barger, in between they're going to put two more
lights, and then you have the light at Hill Boulevard
and the other. Buses that come out from Barger for
Lakeland High School are numerous. Those buses, they
can't be held up, you know, the kids have to get to
wherever they're going. You know, I mean they're just
some of the things that I question. You know, so,
that's my opinion. But what will be will be.
MR. ESPOSITO: Thank you.
MR. MURPHY: Thank you.
MR. LACHTERMAN: Thanks, Jessie.
MS. CELIC: Good evening. Joanne Celic,
Jefferson Village. I had the pleasure of hearing from
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 65
these developers, they came and spoke to the JOC a
couple of months ago. Correct me if I'm wrong, I
just, I have a couple of questions, it started out at
250 units, now it's lowered to 185. You're not
selling, you're only renting. These were your numbers
at that time when you spoke to us.
185 units, you would have outdoor parking
for 278 cars. I'm sorry, I don't quite understand how
does 278 cars, only 60 cars during the peak hours?
I'm sorry, I didn't get that. That's one question.
The other, one-bedroom unit is $3,000 per
month. Two-bedroom units, $4,000 per month. I don't
remember the title of Mr. Mitnick.
MR. WEINGARTEN: He's the owner.
MS. CELIC: He's the owner, okay. What will
Mr. Mitnick do if he can't rent them at that price?
Thank you.
MR. WEINGARTEN: Again, just to try to
clarify, we'll answer the questions in the FEIS, but
to clarify, the 60 out of the 270, or so, what that is
is during one particular hour of the day, that's the
estimate of how many cars are taking one turn on one
street through one intersection.
They're saying there's approximately 120 of
the cars from the development that will come down
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 66
during the peak hour will be going through that area,
and 60 will be making one particular turn. That's why
those numbers are there.
MR. ESPOSITO: I think Dan wants to speak.
MR. LACHTERMAN: Yes.
MR. STRAUSS: Do I have to sign? Dan
Strauss, 58 year resident. Okay, I'm going to start
just with a little humor. It's amazing that no one
comes to these things and wants the project, not one
person.
MS. HAUGHWOUT: I know, I say that all the
time.
MR. STRAUSS: Except over here, you had 50
people every night, every meeting, that wanted the
project. But this one, no one comes and wants it.
I'm on the record that -- that was my humor. It's
pretty sad, actually, if you're developing the town
supposedly. But I understand what the deal is.
MS. HAUGHWOUT: Yeah, the only people that
come usually don't like something.
MR. STRAUSS: I was on the record when this
Mr. Weingarten, is that correct?
MR. WEINGARTEN: Yes.
MR. STRAUSS: When he made this first
proposal. And I listened to what he said at the time.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 67
I said that I thought it was pretty good. I'm on the
record. He's cut it down to 180 units. It's changed
a lot, there's no ownership. So, I'm thinking to
myself the Registry, they had cars. I'm just kind of
absorbing some of this stuff about the traffic and
school buses. I don't understand what the school
buses have any relationship to this, this specific
project.
I do understand, though, that you haven't
taken into account Amazon trucks, that hasn't been
mentioned. There are probably going to be more Amazon
trucks going in and out of that entrance. And there's
only one entrance, is that correct, one entrance?
MR. ESPOSITO: Correct.
MR. STRAUSS: Then there are, again, I know
school buses are in the periphery of the project, but
there's going to be trucks going in there a lot.
So, the Registry, just as far as traffic,
the Registry had traffic. So, that impacted the area.
And I'm not quite sure if I understand with the
traffic lights, and I think it's a great presentation,
I wish they would have done one here at Underhill when
that was being done over here like that. Great
presentation, but I don't follow the whole thing with
the traffic as it -- are they looking to improve the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 68
traffic on Route 6? Is that -- I'm being dead
serious. Are they looking to improve traffic on Route
6 or mitigate the impact of this development? That's
what I'm asking.
I don't know that you need traffic lights
there. I get around Yorktown, you know that.. I've
got around it for the last 58 years, and I don't know
that you need traffic lights. The only thing, as far
as this project is concerned, to me, is how going in
and out of their development impacts the traffic. And
I'm not so sure that it's going to impact it a lot.
There's 180 units now, 185, whatever it is,
and they're rentals, and it's age restricted. But
that doesn't mean they're not going to go to work, the
People.
MS. HAUGHWOUT: Of course not.
MR. STRAUSS: Right. Some of them may be 80
years old, I don't know, but a lot of them will be 55,
60, and they'll still be going into the city. And I
think that's a great location. To me, this is the
only good project, the only good project, that's come
around because it's right near the parkway, right by
the parkway.
So, the fact that they have cars going in
and out of there and Amazon trucks going in and out of
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 69
there, is that really going to impact the traffic? I'm
not so sure it is. They had traffic when the Registry
was there, it was different traffic.
MS. HAUGHWOUT: Yeah, it was morning and
night.
MR. STRAUSS: It was different. It was 24
hours a day, but people were coming in in the morning
probably and going out at night.
MS. HAUGHWOUT: But, Dan, I'm hearing that
you're saying --
MR. STRAUSS: No, let me finish, please, let
me finish. So, the deal is how much of an impact is
it going to make without putting a traffic light in?
That's the question to me.
This project, I'm not worried about any
other projects that come along. And you heard me say
a couple of weeks ago, the traffic studies, to me, a
lot of it is kind of hogwash, it doesn't make sense,
all these, you know, that you want to do a traffic
study, the whole Route 6. What is this project going
to do to impact Yorktown as far as traffic?
And I'm not going into -- I think the other
part of it is great. Do you want me to talk, I'll
talk a little bit about the project itself, I think
it's fine.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 70
MS. HAUGHWOUT: Well, can you pause for a
second so I can just --
MR. STRAUSS: Oh, sure, now you want to ask
me a question.
MS. HAUGHWOUT: I don't want to ask you a
question. What I just want to clarify is every
project is going to have an impact --
MR. STRAUSS: Absolutely.
MS. HAUGHWOUT: -- on the entire community
for multiple reasons. Good impacts, negative impacts,
all of it. I think what we're proposing here is to
hear how they're trying to mitigate any source of
impact so things don't drastically change for what
action is actually happening around that actual
Taconic entrance. So, I just want to be clear here
because every project has an impact.
MR. STRAUSS: I understand that.
MS. HAUGHWOUT: Okay.
MR. STRAUSS: I'm not looking holistically.
MS. HAUGHWOUT: Okay. And I do understand
that it's also different traffic.
MR. STRAUSS: I'm not looking holistically.
MS. HAUGHWOUT: Oh, trust me, I'm not being
holistic with you. What I'm just trying to say is use
your words carefully. So, I'm just letting you know
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 71
that when you mention that, I just want to be clear
everything has an impact, and that's why we have to
vet it with this traffic study.
MR. STRAUSS: I understand that.
MS. HAUGHWOUT: Well, that's not exactly
what you're saying. You're pretty much saying that it
will --
MR. STRAUSS: I feel, my opinion is, that
they're a lot of hogwash, a lot of the traffic
studies.
MS. HAUGHWOUT: We're talking about this
one, though.
MR. STRAUSS: I understand that fully.
MS. HAUGHWOUT: There's a lot of hogwash,
holistic hogwash, too.
MR. STRAUSS: I fully understand what's
going on. That's why I'm up here.
MS. HAUGHWOUT: Okay.
MR. STRAUSS: I'm not with Jefferson Village
on this, I'm not.
MS. HAUGHWOUT: They're listening, as well.
MR. STRAUSS: That's all I'm saying. They
have their thoughts, I have thoughts. I understand
that they are worried about getting to a doctor.
Okay, Route 6N, you put stop signs there, you're
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 72
looking for accidents. No one has told me how many
accidents have happened at this intersection of 6 and
6N. You talked about accidents. How many accidents
have happened there in the last five years, how many?
Over here at Underhill, that was all they were talking
about, how many accidents, how many accidents.
MR. LACHTERMAN: Nine in three years. They
gave that number.
MR. STRAUSS: How many?
MR. WEINGARTEN: Our intersection was nine
in three years.
MR. STRAUSS: Nine in three years. That's
not too bad. The way people drive, do you think the
traffic lights are going to do any good? Do you think
stop signs on 6N are going to change anything?
Absolutely make it worse.
London Road and Quinlan, they have
accidents, a serious accident, with stop signs. So,
I'm not in favor of that. I don't know that you need
traffic lights. That's all I'm saying.
MR. LACHTERMAN: Thank you, Dan.
MR. STRAUSS: I do not know that you need
need traffic lights. And I think that you should
take, as far as traffic is concerned, everything
impacts the whole town, I understand. Those people
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 73
could drive over right downtown to Uncle G's, sure
they're going to impact things. But the main focus is
what is the impact of this project on that corner,
otherwise you would not be talking about it.
And my feeling is that if there was no left
turn coming out of their driveway going back up 6N,
that there is not necessarily that much of an impact
as far as traffic is concerned.
Thank you.
MR. LACHTERMAN: Thank you, Dan.
MS. WILSON: Hi. Sarah Wilson. I spoke at
the last meeting, you know, in favor of the reduced
footprint from the 250 to 185, so I think that's
great, minimizing the disturbance of the forested area
that's currently not disturbed. So, that's great
news.
The only two things that I wanted to
address, you know, tonight is, obviously, it makes
perfect sense to fix the zoning, right, move it from
office park to residential. Housing up there makes
perfect sense, as many people have said. But I
question, again, why it needs to be zoned for senior
because we have residents in all age groups that are
in need of housing. I think it's wonderful that it's
a rental housing development because we certainly have
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 74
a need for that. We have a lot of proposals that are
luxury town homes, and things, you know, three
bedrooms, huge properties.
You know, we talked about Toll Brothers
proposal at that last meeting, as well, right? This
is much different than that, which is great. It
addresses a need in our community. So, I would only
ask that we consider perhaps maybe there's a different
zoning that would make sense, as well, that would open
it up to a broader demographic in the community.
And, then, also, as Mrs. Celic said, if
you're looking at one- and two-bedroom apartments at
$3,000 to $4,000, you know, is there any possibility
to look at a small number of smaller units that,
again, would help to address, from an income
standpoint, people in our community that might not be
able to afford that level?
But those are my comments. Thank you very
much.
MR. LACHTERMAN: Thank you, Sarah.
MS. HAUGHWOUT: Thank you, Sarah.
MR. O'NEIL: I just want to -- Charles
O'Neil again.
MS. HAUGHWOUT: Hi, Charles.
MR. O'NEIL: I just want to go back on the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 75
record, from day one we were in favor of this project.
We said it when this young gentleman came.
MR. WEINGARTEN: I love that.
MR. O'NEIL: And he explained the project.
We said great, but how are you going to get off the
hill? That's our main concern, was the traffic
lights. I don't know, it would be the O.K. Corral if
we didn't have traffic lights. You put stop signs up,
people slow down, they don't stop. So, stop signs, to
me, is another waste of time and energy.
MS. HAUGHWOUT: Thanks, Charlie.
MR. BELFER: Ken Belfer from Mohegan Lake.
I'll first of all just echo what Sarah said, I think
the project would be more beneficial if there was more
diversity in unit size and unit price. Some smaller
units and lower priced units I think would serve the
needs of Yorktown more.
I want to agree with Dan Strauss, I don't
know, maybe I'm not feeling well tonight, this is
unusual. I do think that that I agree that the
overall traffic impact, given the volume of what we're
talking about there, is extremely minimal for this
particular project.
However, I do disagree about his comments on
the need for a light or improvement of the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 76
intersection. I happen to be a user of that
intersection, so I know it very well. And many many
moons ago, I was a New York City taxi driver, and I
consider myself pretty good still at finding the gaps
and making that left turn, but I can see that that's
not the safest intersection. And I get nervous when
I'm queueing up and I can't fit in the left-turn lane
and I'm blocking the lane of passage because I'm
afraid somebody is not going to be paying attention
and is going to come down and slam me from behind.
So, making improvements there I think would
be a very valuable and beneficial thing and more than
mitigate the traffic impact of that project but be a
benefit for the town of Yorktown.
One more thing related to traffic, something
that came up at the last public hearing, there was a
resident that mentioned traffic getting backed up
there because of trucks related to whether it's
DeCicco's or the other commercial businesses. And I
had never seen that. And then sure enough, a week
later, I make my left turn, and then I couldn't make
the next left. I happened to be going to Lois
Chiropractic then, because the cars were backed up,
and looked up ahead and there was a truck straight
across 6N that was backing into the area, the delivery
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 77
area, to the rear of all those commercial stores.
That's the only time I ever experienced that.
MS. HAUGHWOUT: So, you experienced it.
MR. BELFER: I did see that, so whoever made
that comment.
MR. LACHTERMAN: Brian Dean(ph) made the
comment. I've been looking for it. I haven't seen it
myself yet.
MR. BELFER: Thank you.
MS. HAUGHWOUT: Was it a Wednesday?
MR. BELFER: I don't know.
MS. HAUGHWOUT: I think deliveries come on a
Wednesday.
MR. LACHTERMAN: Thank you, Ken.
MR. ESPOSITO: Thanks, Ken.
MR. MURPHY: So, Ken, the issues you're
saying, that's the sentiment, safety is number one for
us, you know, and that's the queueing up and making
that left.
MR. PICHETT: Anthony Pichett. Sarah, you
had a lot of the same things, I had a lot of the same
questions you were going to ask.
So, who specifically, and this might have
been answered already, who specifically dictates
whether or not that area is age restricted, is that a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 78
Town issue, is it a developer issue, somewhere in
between? If that could be answered, I'm just curious.
I'm probably the minority, but let me talk
about this, would there be a way to put more units in
that same section and make them smaller like Ken and
Sarah were speaking to?
Is there a requirement that each place has
to have a certain amount of parking spots? Is that,
would that be possible to reduce that?
Also, I know in my area, you know, if there
were only one or two cars in each lot, that would be a
nice thing, but we walk by and we see sometimes seven,
eight, nine cars in parking lots, or on the street, or
whatever. So, is there anything to mitigate that to,
once again, going back to possibly reducing the
parking spaces?
Also, I keep going back to this because I
love, Sergio, your idea when you were talking about
shuttles and buses. Is there any plan, you might
have talked about this already, I know there have been
multiple discussions about this, so I apologize again
if that's something you addressed, are there alternate
ways to get people in and out? Are there sidewalks in
this place, once again?
I think that's it. Yeah, I think just my
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 79
overall point is, you know, the only real way to
reduce traffic is to get cars off the road. That is
the only proven way to have traffic reduced. So, if
there are other ways to get people around it.
Also, if you do reduce the age restriction,
I think it would be advantageous, younger folks would
want to move in. If there, you know, a lot of people
don't like driving, a lot of people like getting
around alternate ways. So, that would be a way to
increase that, if there are shuttles to the train
station, if there are shuttles to other, just in town,
or maybe at a bus stop to that location too.
All right, thanks.
MS. HAUGHWOUT: Thanks, Anthony.
MR. STRAUSS: I'm back. I gather I misspoke
before. The people from the Jefferson Village,
obviously, were for this project. So, I must have
missed a meeting, or whatever. Maybe they weren't at
that first meeting that I attended. In fact, thinking
back, very possibly they weren't. So, I misspoke, and
if they're for the project, that's wonderful.
Also, the attorney, I believe the last
meeting, or at some point, said that there were no
people, that basically, people weren't going to be
walking out of there, they're going to be driving out
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 80
of there. I remember he said that, or someone on
their team said that. So, it's not like they're going
to make it walkable, so-to-speak, into other parts of
town.
Another point that I want to make is from
the golf course, if there's any place in that area
when you drive that -- I'm fearful when I have been
over there occasionally coming out of there, I think
is very very stressful. And anyone who would attempt
to make a left turn out of there, I think would be
kind of not all there. So, I do though think that
that should be taken into account for sure in any
plans that are made to make this a better situation
all over.
Okay, thank you.
MR. MURPHY: Dan, the lights take care of
that.
MR. STRAUSS: Sorry?
MR. MURPHY: The lights take care of that,
that's part of the plan.
MR. LACHTERMAN: They have that in their
plan, with the traffic plan.
MR. STRAUSS: Okay, good.
MS. CELIC: Yes, just as a reminder, on
September 3rd, perhaps, Dan, you didn't stay until the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 81
end. I stayed until 2:00 a.m. I'm not sure if you
were still there. But when I got up, I said very
clearly I am not opposed to this project. So, we
didn't change our minds.
Thank you.
MR. STRAUSS: No, I'm not saying you did.
MR. BELFER: Ken Belfer again. I don't
usually comment so much about traffic, but I just
remembered something that happened about a month ago.
A contractor who was proposing a dock in Mohegan
wanted to show a committee of people docks he had
built in Lake Mahopac. So, he took us for a drive,
and when we get to that intersection, he makes a left
turn. I said oh, which way are you going? He said,
oh, this is a much quicker way to get into Mahopac.
So, sure enough, he took 6N all the way in, and then
eventually cut back out to Route 6 right in the
village of Mahopac.
I don't think it's a very good route. It
may be quicker. I don't think it's the safest route
for through traffic. 6 is much safer, but people
avoid it because of the number of the lights,
particularly Baldwin Place, getting through that area,
and afterwards.
Anything that can be done to discourage that
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 82
more, or cut down on that through traffic, I think
would be beneficial. It would be beneficial to
everyone who lives along the 6N corridor in Yorktown.
MR. LACHTERMAN: Agreed.
MS. HAUGHWOUT: I agree with you.
MR. ESPOSITO: Thanks, Ken.
MS. SIEGEL: I'd like to answer Anthony's
question about the zoning and the change from senior
to straight multifamily for any age group. That's up
to the Town Board. That's strictly their -- and one
of the questions I asked, which will be answered in
the FEIS, is if it was straight multifamily, what
would the school impact be? Because that would be the
concern. I think that's why they're going for senior,
because they want to avoid having children. So, I
asked, that's the information that I asked for, which
they should be able to get more enrollment figures
from the Lakeland School District.
MR. LACHTERMAN: Well, they also look at the
viability of their project, Susan, and the amenities
that are offered that are geared towards specific age
groups to make the project more attractive. So, the
true answer is the contractor will come up with a
recommendation of what they would like to do, and it's
up to the Town Board to decide if that works when they
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 83
look at the zoning. But in reality, it's a
recommendation that they're coming in saying this is
the project that we would like to build. And then we
look at it, you know, listening to the Senior Advisory
Committee and different senior groups on the fact that
we are, we don't have an adequate inventory of housing
for seniors here that comes into play.
MS. SIEGEL: Well, if it's multifamily,
seniors can rent all the units if they want to, it's
not restricted.
MR. WEINGARTEN: But the Supervisor's
remarks, which is why I got up, are absolutely
accurate. While the school impacts were concerns of
the Town, and that would be a concern of people in the
town, what are the school impacts if you were not
restricting it to a senior facility.
From our standpoint, this is the type of
project that we see a market for. It's a particular
type of housing that you build, it's a particular type
of amenity, it's at a particular level that you do it.
There are lots of projects that are out there, and you
can do other types. This is the kind we want to do.
They're very good at it. They're actually just
under construction now in Buchanan with another
project of 135 -- 148 apartments, better than I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 84
thought, 148 apartments that we got approved in
Buchanan that's being built for 55 and older.
There's a type of housing that you build,
and that's the kind that we've designed and we think
is going to work here. If we wanted to do multifamily
that was unrestricted and was for families, we would
be building different size units, different types,
there would be playground equipment, there would be
all sorts of different things that you would wind up
doing.
This is the project that we've asked for,
and we've asked for the zoning to support it. So,
it's not the school impact piece that you put in that
stopped us from proposing it, that would have been up
to you, it's this is the project that we want to
build.
MS. SIEGEL: Have you as the builder done
any straight multifamily?
MR. WEINGARTEN: Much. And it's not that we
can't. It's particular projects, where they're
located, how they're done. But, frankly, the fastest
growing market right now in Westchester is absolutely
55 and older, that's the demographic that's out there.
MR. MURPHY: People are living longer.
MR. WEINGARTEN: People are desperately
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 85
looking to sell their homes, downsize, and stay in the
community. It's a very, it's just a market that's out
there, and it needs to get filled quickly. That's not
to say there aren't other markets that need to be
filled, as well.
And again, this is just one project. There
are lots of other projects out there where you can
satisfy the other markets. But that's what we're
looking to do. Thank you.
MR. ESPOSITO: Thank you.
MR. O'NEIL: Just to clarify something.
Jefferson Village, we have a 10 percent cap on
rentals. Some condos, some of the different condos,
have five percent. So, there isn't a big market. I
don't know how many times I'm sitting in the office
and someone will knock on the door and say do you have
any rentals, and we say no. It's very rare in
Jefferson Village.
I think this is a great market because I
don't know if I would want to spend $4,000 but, again,
to me, it's a perfect thing for the seniors if they
are downsizing and would like to do that. So,
congratulations.
MR. LACHTERMAN: Thank you for the
clarification, Charlie
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 86
MS. HAUGHWOUT: And it also doesn't mean
that we don't have another need for diverse housing
stock, as well, because as much as you described,
like, you know, the playground and different layouts
for families, not every family can have a bedroom for
every single child and a two-car garage.
And I think that, what I gathered from what
Ken was saying and what Sarah were saying, like, is
there a possibility, just like a senior who might not
want to spend $4,000, maybe there's a junior one
bedroom, like I used to have in the city where it's
kind of a studio with a wall but, at the end of the
day, it's more affordable. Because, as much as I
don't believe in strict affordable housing, which I've
had many discussions about, affordability is a
struggle, like, there are so many people working and
making good livings, but when eggs are $5 and milk is
$7, it's hard to get out of the store.
So, I hear what you're saying that you guys
would have proposed a different project for that
market, but I think I just want to comment that that
market also has different needs.
MR. WEINGARTEN: If you know AMS and you've
watched them in other places, I can assure you they
will be back with other projects and other types. And
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 87
in most of the communities they're in, they build more
than one project, and not all the same project.
MS. HAUGHWOUT: No, I'm aware.
MR. WEINGARTEN: Again, if this investment
works, and it's a development that works, my guess is
they'll be back, and then we'll talk more about what
the traffic is and whether they want more housing,
etcetera.
MS. HAUGHWOUT: No, I'm just clarifying
that not every item has to look with a picket fence.
MR. WEINARTEN: Understood.
MS. HAUGHWOUT: I mean, I have a very nice
blended family, so I'm aware that things can look
different.
MR. PICHETT: Anthony Pichett again. That's
what I was going to ask, too. I mean, the developer
can make their decision on what they want to do.
MS. HAUGHWOUT: Of course.
MR. PICHETT: And, obviously, they want to
do 55-plus, but I kind of was going to say similar to
what you're saying, there's 55-plus, and there's also
people that might not have a family, just a couple of
friends, roommates, there are roommates that live
together, whatever. So, it doesn't, I think the idea
that it's 55-plus and then just families, I think
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 88
there is, like, folks in the middle that, you know,
wouldn't need five bedrooms, and just need space. But
if it's 55-plus, it was when the gentleman said, like,
it's seems to be more advantageous if you widened and
opened up the pool to more people who would want to
come in, competition for -- the price, unfortunately,
might go up a little bit, but if you widen the pool of
potential renters, that seems to be more advantageous
to a developer.
But if that's specifically what they're
looking for for any other reason, I understand that.
But it's not just families, I mean, there are other
people besides families and seniors that want housing.
That's all I was going to say.
MS. HAUGHWOUT: No, Anthony, I agree with
you. I just also want to mention, Charlie made a good
point, like, we have a lot of seniors that Jefferson
Village has to turn away. So, having this market
would be a good way to guide it, however it doesn't
take away, and it doesn't take away that there are
other individuals --
MR. PICHETT: Yeah, there are so many people
that want houses.
MS. HAUGHWOUT: Exactly.
MR. PICHETT: I mean, seniors, yes, I'll be
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 89
there soon.
MS. HAUGHWOUT: I'm almost there.
MR. STRAUSS: I'm just going to, based on
what has now transpired, I just want to make one
other comment then. Underhill Farm is not restricted.
Two people can move over there, there's going to be
rentals over there. So, it's available right now. I
mean, it's not just family and seniors. All of those,
that's not age restricted, anyone can move into Under-
hill Farm. That's all I'm saying. It's market, I
know I'm a proponent of that.
MS. HAUGHWOUT: Market value.
MR. STRAUSS: It's market rate, that's it.
MR. LACHTERMAN: Thank you, Dan.
MR. STRAUSS: Thank you.
MR. LACHTERMAN: Any other comments?
Mark, do you want to address anything now,
or in the --
MR. WEINGARTEN: No, I think we've had an
opportunity. Obviously, we're going to answer
everything in writing. We appreciate very much the
opportunity. A lot of things came up today that we
have to look into. But at this stage, again, I want
to point out that the Board is taking us through the
most stringent environmental review process permitted
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 90
under the New York State law. So, we've gotten
through the DEIS. We would appreciate that we would
close the hearing. There would be a written comment
period that would be there. And then we would provide
an FEIS and go through all of that before there would
be a final decision made.
So, I think we've had a very good back and
forth. You've given us some good ideas, and hopefully
we'll continue to improve the project. We look
forward to asking you to close the hearing tonight and
let us move on to next stops.
MR. LACHTERMAN: Sure. I'd like to do one
other thing before we close, Dr. John, as he was
promoted a couple of meetings ago, and Robin, did you
guys have any input that you wanted to address?
DR. TEGEDER: No. We're going to have a
memo just asking a few questions. I don't have
anything for the Board.
MS. KEMPTER: I just have one more question.
MR. LACHTERMAN: Sure, Jessie.
MS. KEMPTER: If the area gets rezoned, does
my house get rezoned? If I wanted to sell it, it's
still a residential house?
MR. LACHTERMAN: Yes.
MS. KEMPTER: Thank you.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 91
MR. LACHTERMAN: All right, a motion to
close the public hearing.
MS. CELIC: Excuse me.
MR. LACHTERMAN: Go on, Joanne.
MS. CELIC: Sorry. I just wanted to know if
my question will be answered about if Mr. Mitnick
cannot rent them at $3,000 or $4,000 a month, what
will he do? It's important.
MR. WEINGARTEN: We will answer the
question. He's not here, so we'll answer it in
writing.
MR. LACHTERMAN: Okay. So, a motion to
close the public hearing?
MR. ESPOSITO: Motion.
MR. LACHTERMAN: Second?
MS. SIEGEL: Second.
MR. LACHTERMAN: Thank you, Susan. All in
favor.
(A chorus of ayes.)
MR. WEINGARTEN: Can I suggest that you have
a written comment period for 10 days, which we're
required --
MS. HAUGHWOUT: So Mr. Mitnick can answer?
MR. WEINGARTEN: No, that will go in the
FEIS. To give people another 10 days to put in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
October 8, 2024 92
written questions.
MR. LACHTERMAN: Correct.
MS. HAUGHWOUT: Yes, if anyone has any
other questions.
MS. SIEGEL: I'll give you another six
pages if you want.
MR. WEINGARTEN: Thank you.
MR. LACHTERMAN: So, a motion to have
written comment for ten days.
MR. ESPOSITO: Motion.
MR. MURPHY: Second.
MR. LACHTERMAN: All in favor.
(A chorus of ayes.)
MR. WEINGARTEN: Thank you very much. See
you soon.
MR. LACHTERMAN: Thank you.
(Meeting adjourned at 10:19 p.m.)
93
STATE OF NEW YORK
COUNTY OF WESTCHESTER
I, CATHERINE ARMENTANO, Notary Public within and for
the State of New York, do hereby certify that the within is a
true and accurate transcript of the meeting held on
October 8, 2024.
I further certify that I am not related to any of
the parties to this action by blood or marriage and that I
am in no way interested in the outcome of this matter.
Dated, New York,
________________________
CATHERINE ARMENTANO,
OFFICIAL COURT REPORTER
John A. Tegeder, R.A. Edward Lachterman Director of Planning Town Supervisor TOWN OF YORKTOWN
PLANNING DEPARTMENT
Albert A. Capellini Community and Cultural Center, 1974 Commerce Street, Yorktown Heights, New York 10598, Phone (914) 962-6565, Fax (914) 962-3986
Crompond / Croton Heights / Huntersville / Jefferson Valley / Kitchawan / Mohegan Lake / Shrub Oak / Sparkle Lake / Teatown / Yorktown / Yorktown Heights
To: Town Board
From: Planning Department
Date: October 4, 2024
Subject: AMS Yorktown Development – 800 East Main Street
SBL: 5.19-1-15
____________________________________________________________________________________
This memo is a follow-up to the public hearing on the subject matter on September 3rd, 2024. We suggest that
given the comments received during the hearing that the proposed traffic mitigation measures should be
elaborated upon further, including reasonable alternatives to same. We also suggest that, pursuant to comment
at the hearing and our continued evaluation of the site plans, that the applicant evaluate whether further
reduction in site disturbance and/or a reduction of the proposed developed area can be achieved. Such
reductions will lessen the potential negative effects of the proposed development and contribute to its overall
sustainability.
Respectfully submitted
John A. Tegeder, RA
Director of Planning
Cc: Planning Board
Town Engineer
Town Attorney
Applicant
FF:\Office\WordPerfect\Town Board\REZONES\AMS LLC fka Contractors Register 800 E Main St -\00 - Correspondence\Word Docs\PD
Memo - 2024-10-04.docx
Region No.:
BIN No.:
DU:
CRF NO.:
W. Cheung, J.Chiou, S. Rubinstein, C. Spahn
10/25/24
RESPONSE CODES:
No Document/ Drawing Number Comment Comment
By Response Response By Open-Closed
(By Reviewer)
1 DEIS_Chapter 12_pg. 12-21
A traffic signal warrant analysis, based on the Manual on Uniform Traffic Control Devices (11th Edition), should be
prepared for the intersections of East Main Street with US Route 6 and Old Route 6 to demonstrate that a signal is
warranted at each location, as stated in the report. The signal warrant analysis should analyze the volumes at the
intersections in the existing condition and the proposed condition.
SR
2 GENERAL
If the results of the signal warrant analysis show that only a signal is warranted at the US Route 6 and East Main
Street intersection, include an analysis of an alternative where only the intersection of US Route 6 and East Main
Street is signalized and the Old Route 6 and East Main Street intersection remains unsignalized.
SR
3 DEIS_Chapter 12_pg. 12-21
The "Traffic Mitigation" section should explain the decision to restrict the southbound left-turn movement from East
Main Street to US Route 6. The report should explore providing two southbound approach lanes and one
northbound receiving lane, or whether there is available right-of-way to provide two lanes in each direction. Figure
12-5 shows site-generated traffic volumes making a southbound left-turn movement at the subject intersection.
Describe within the report the assignment to the roadway network of these trips if the movement is restricted.
SR
4 DEIS_APPENDIX G_Traffic The appendix should include the raw 2019 traffic counts that were provided by the Town. SR
5 DEIS_Chapter 12_pg. 12-18
The report should include direct reference to the studies used for the trip distributions. Consider including the
relevant pages from the referenced reports in the appendix. Based on the traffic volumes along US Route 6, it is
likely that more than 5-10% of the site generated traffic will use this major roadway.
SR
6 DEIS_Chapter 12_Table 12-4
There are movements in the existing condition that are shown to operate with a greater than 1.00 volume-to-
capacity ratio. As this analysis is based on observed volumes, the as-counted volumes exceeding the capacity does
not make sense. The report should explain how this is possible and detail any calibrations to the model to make it
more realistic for the observed field condition.
SR
7 DEIS_Chapter 12_Table 12-4
The results summarized for the northbound and southbound approaches of East Main Street at the intersection with
US Route 6 are misleading. The analysis results in the Synchro files show errors in multiple time periods, however
the report shows no delay, as if no volume is present at these approaches. Revise the analysis method or the table
to show delay results for all movements that have conflicting flow.
SR
8 DEIS_Chapter 12_Table 12-18 The capacity analysis should include a summary of the average and 95th percentile queues. These values should
be compared to the available or proposed storage distances. SR
9 DEIS_Chapter 12_pg. 12-21 Include calculations of all yellow and red clearance times for each phase of the proposed signalized intersections at
East Main Street with US Route 6 and Old Route 6. SR
TRAFFIC IMPACT STUDY
REVIEW DATE:
DOCUMENT NAME:
REVIEWER:
Submission: SEQR 24-179 800 E. Main Street Yorktown
New York State Department of Transportation
SEQR 24-179 800 E. Main Street Yorktown
Comment / Response Form (CRF)
PIN 8815.25 Term Agreement for Traffic Eng. & Planning Services, Region 8
Contract D900051 1 of 4
Region No.:
BIN No.:
DU:
CRF NO.:
W. Cheung, J.Chiou, S. Rubinstein, C. Spahn
10/25/24
RESPONSE CODES:
No Document/ Drawing Number Comment Comment
By Response Response By Open-Closed
(By Reviewer)
REVIEW DATE:
DOCUMENT NAME:
REVIEWER:
Submission: SEQR 24-179 800 E. Main Street Yorktown
New York State Department of Transportation
SEQR 24-179 800 E. Main Street Yorktown
Comment / Response Form (CRF)
PIN 8815.25 Term Agreement for Traffic Eng. & Planning Services, Region 8
10 DEIS_Chapter 12_fig. 12-1
Per the figure, sidewalk is proposed along East Main Street proximate to Lee Road. However, the report makes no
mention of this improvement. The report should detail the reasoning for pedestrian improvements only in this
location. As part of the intersection improvements at US Route 6 and East Main Street, a crosswalk and pedestrian
ramps should be included.
SR
11 DEIS_Chapter 17_GENERAL It is noted that a smaller alternative development was assessed. Should the applicant pursue a different
development, the report should be updated, proposed mitigations and roadway improvements should be revisited. SR
12 Preliminary Traffic Improvement
Plan_Figure 12-8
Provide traffic signal plans that include grading, signing/pavement marking plans, and NYSDOT Standard Details
for all modifications to the intersections at US Route 6 and East Main Street. Plans should include WZTC/MOT
plans with hours of closures, roadway profiles, existing guiderail, curb lines, and any utilities. Truck turning diagrams
should be provided for firetrucks and emergency response vehicles to show access from US Route 6 is feasible.
MPT signs must be clean and meet reflective requirements. Plans should be stamped by NY PE, include NYSDOT
reference markers, route numbers, and direction of travel. PE stamp also required for any work related to design for
trenches, drainage studies, retaining walls, structures, etc.
SR
13 Preliminary Traffic Improvement
Plan_Figure 12-8
Roadway improvement plans should include reference markers, route numbers, direction of travel, grading
contours, roadway profiles, roadway AADT's, and stationing. All existing utilities should be shown. SR
14 Preliminary Traffic Improvement
Plan_Figure 12-8
A subsequent submission of traffic signal plans should include a phasing diagram, NYSDOT Standard Details,
NYSDOT Item Numbers, signal face layouts, table of signal operations, and details regarding conduits, wiring,
signal poles, and vehicle detection.
SR
15 Preliminary Traffic Improvement
Plan_Figure 12-8
Sight distance diagrams should be prepared for both intersections with proposed improvements to verify whether
left-turns should be permitted/protected and whether to allow right-turn on red movements. Sight distance diagrams
should be prepared for the Old Route 6 approach for a potential unsignalized scenario to verify the safety of
unsignalized movements.
SR
16 Preliminary Traffic Improvement
Plan_Figure 12-8
Mast arms should be considered for the construction of the new traffic signal to avoid conflict with existing overhead
utilities. If a spanwire is selected for the installation of the traffic signal, calculations using the Traffic Signal Support
Structural Analysis Program should be prepared and included to verify the design of the supports.
SR
17 Preliminary Traffic Improvement
Plan_Figure 12-8
Storage distances should be based on the results of the capacity analysis, specifically for the eastbound left-turn
lane on US Route 6 at East Main Street. SR
18 Preliminary Traffic Improvement
Plan_Figure 12-8
Consider including "Do Not Block the Box" signage and striping at the intersection of East Main Street and Old
Route 6.SR
SITE PLAN/CONCEPT PLANS
Contract D900051 2 of 4
Region No.:
BIN No.:
DU:
CRF NO.:
W. Cheung, J.Chiou, S. Rubinstein, C. Spahn
10/25/24
RESPONSE CODES:
No Document/ Drawing Number Comment Comment
By Response Response By Open-Closed
(By Reviewer)
REVIEW DATE:
DOCUMENT NAME:
REVIEWER:
Submission: SEQR 24-179 800 E. Main Street Yorktown
New York State Department of Transportation
SEQR 24-179 800 E. Main Street Yorktown
Comment / Response Form (CRF)
PIN 8815.25 Term Agreement for Traffic Eng. & Planning Services, Region 8
19 APPENDIX I_Site Plan Set_C-
106.1 through 106.3 The prepared turning diagrams show conflicts with the curbs during internal circulation. SR
20 GENERAL
Please provide a Drainage Study Report including all the required calculations discussed in NYSDOT's Highway
Design Manual Section 8.9 and demonstrate the erosion control and runoff requirements are satisfied for both post-
construction and during each construction phase for potential impacts to State highways. Drainage design
requirements include minimum 18 inch for longitudinal pipes, 24 inch for transvers pipes, and 15 inch for driveway
pipes. Driveway design should include trench drains, proper cross slopes, and drain inlets to minimize runoff to the
State Highway.
SR
21 Existing_Combined_Balanced At the intersection of Taconic State Parkway NB Ramps and US Route 6, the coordination should be referenced to
the beginning of the yellow time on phase 2. Please update accordingly throughout the analysis. SR
22 Existing_Combined_Balanced
At the intersection of Barger Street and US Route 6, the all-red time for all phases should be set to 2 seconds. The
coordination should be referenced to the beginning of the yellow time on phase 5. The phase split for phase 1
should be 20 seconds. The phase split for phase 2 should be 40 seconds and the phase should precede phase 1.
Phases 2 and 5 should be set to minimum recall. Please update accordingly throughout the analysis.
SR
23 Existing_Combined_Balanced At the intersection of Lee Boulevard and US Route 6, the all-red time for all phases should be set to 2 seconds. The
total phase split for phase 5 should be 22 seconds. Please update accordingly throughout the analysis. SR
24 Existing_Combined_Balanced At the intersection of Hill Boulevard and US Route 6, the northbound right-turn has a permitted overlap phase during
phase 5. Please update accordingly throughout the analysis. SR
25 Existing_Combined_Balanced At the intersection of Taconic State Parkway SB Ramps and US Route 6, the coordination should be referenced to
the beginning of the yellow time on phase 1. Please update accordingly throughout the analysis. SR
CRASH ANALYSIS
SYNCHRO ANALYSIS
Contract D900051 3 of 4
Region No.:
BIN No.:
DU:
CRF NO.:
W. Cheung, J.Chiou, S. Rubinstein, C. Spahn
10/25/24
RESPONSE CODES:
No Document/ Drawing Number Comment Comment
By Response Response By Open-Closed
(By Reviewer)
REVIEW DATE:
DOCUMENT NAME:
REVIEWER:
Submission: SEQR 24-179 800 E. Main Street Yorktown
New York State Department of Transportation
SEQR 24-179 800 E. Main Street Yorktown
Comment / Response Form (CRF)
PIN 8815.25 Term Agreement for Traffic Eng. & Planning Services, Region 8
26 DEIS_Chapter 12_pg. 12-7
The Crash History and Safety Assessment section should include a calculation of crash rates at each intersection.
Within the report, the crash rates should be compared to the statewide average rates and the report should assess
the impact of the development on crash patterns, in accordance with the NYSDOT Highway Design Manual Chapter
5.
SR
27 APPENDIX G-4 It is noted that a collision diagram is included for the intersection of US Route 6 and East Main Street. The report
should explain why collision diagrams were not prepared at more locations. SR
28 General
Applicants for Highway Work Permits must complete Permit Applicant Certification Regarding Labor Law Section
224-f. To comply with the provisions of §224-f of the NYS Labor Law, NYSDOT must start requiring all permit
applicants to complete and submit a certification form (enclosed) with all highway work permit applications. Please
complete the Labor Law Section 224 Certification form and upload so that we may finalize the review of this
proposed project.
HIGHWAY WORK PERMITS
Contract D900051 4 of 4