This is a resolution adopted by the Town Board of the Town of Yorktown at its regular meeting held
on May 13, 2025.
Whereas, on October 24, 2022, 800 E Main Yorktown Dev AMS LLC submitted to the Town Board
a petition for amendments to the Zoning Code of the Town of Yorktown modifying provisions of the
RSP-2 Senior Citizens District of the Town and an amendment to the zoning map of the Town of
Yorktown to rezone the parcel of land located at 800 East Main Street and known on the Tax Map of
the Town of Yorktown as Tax ID# 5.19-1-15 from OB-1 Research Laboratory and Office District to
RSP-2 Senior Citizens District to accommodate a proposed age-restricted residential redevelopment
project(the"Petition"); and
Whereas, on November 28, 2022, the Town Board circulated a Notice of Intent to assume the role of
lead agency in connection with the environmental review of the Petition and related actions
collectively, the "Proposed Action") pursuant the State Environmental Quality Review Act
SEQRA") and the regulation Part 617 of the New York Code Rules and Regulations(the"SEQRA
Regulations"); and
Whereas, on March 7, 2023, the Town Board issued a Positive Declaration of Environmental
Significance with respect to the Proposed Action pursuant to Section 617.7 of the SEQRA
Regulations; and
Whereas, the Town Board produced and circulated a scoping document and considered public
comment on the draft scope of the Draft Environmental Impact Statement for the Proposed Action
the "DEIS") at a public hearing held on April 4, 2024; and
Whereas, on May 2, 2023, the Town Board adopted the final scoping document and directed the
Applicant to prepare and submit the DEIS in accordance with the adopted scoping document; and
Whereas, on July 16, 2024,the Town Board accepted the DEIS as complete and adequate for public
review and scheduled a public hearing on the Petition and the DEIS (the "Public Hearing") for
September 3, 2024; and
Whereas, on September 3, 2024 and October 8, 2024, the Town Board held the duly noticed Public
Hearing; and
Whereas, on February 25, 2025, the Town Board adopted and filed a Final Environmental Impact
Statement for the Proposed Action; now
Therefore Be It Resolved, that pursuant to Section 617.11 of the SEQRA Regulations, the Town
Board hereby issues as its written findings statement with respect to the Proposed Action the Lead
Agency Findings Statement dated May 8, 2025, attached to this resolution.
Diana L. Quast, Town Clerk
Master Municipal Clerk
Date: May 14, 2025
To: Edward A. Lachterman, Town Supervisor
cc: John Tegeder, Director of Planning
Janet J. Giris, Esq.
Peter Feroe, AKRF, Inc.
Gennelle MacNeil, Town Comptroller
Adam Rodriguez, Town Attorney
file
FINAL 1 05/13/2025
LEAD AGENCY FINDINGS STATEMENT
State Environmental Quality Review Act
This Findings Statement has been prepared in accordance with Article 8 of the
Environmental Conservation Law, the State Environmental Quality Review Act (SEQRA),
and its implementing regulations promulgated at 6 NYCRR Part 617.
Lead Agency: Town of Yorktown Town Board
Address: Town Hall
363 Underhill Avenue
Yorktown Heights, New York 10598
Contact: John A. Tegeder, Director of Planning
914-962-6565
Name of Proposed Action: 800 East Main Street Redevelopment
SEQRA Classification: Type I Action
Project Location: 800 East Main Street, Yorktown, New York, 10588
Tax Map: 5.19-1-15
Summary of Proposed
Action: 800 East Main Street Dev AMS LLC (“Applicant”) is seeking
amendments to the Town of Yorktown Zoning Map and the
Town of Yorktown Zoning Ordinance (together, the “Proposed
Zoning”), from the Town Board of the Town of Yorktown (the
“Town Board” or “Lead Agency”) in order to redevelop the
approximately 35.5-acre property located at 800 East Main
Street, Town of Yorktown, Westchester County, New York (the
“Project Site” or “Site”). The Applicant proposes to remove the
Project Site’s two existing office buildings and develop the
Project Site with 180 units of age-restricted (55+) housing in two
multifamily buildings, consisting of 60 one-bedroom units and
120 two-bedroom units, along with site amenities, internal
roadways, and stormwater management features (the “Revised
Proposed Project”). The Revised Proposed Project, together with
the Proposed Zoning, is referred to as the Revised Proposed
Action.
800 East Main Street Redevelopment
05/13/2025 2 FINAL
A. SEQRA PROCESS
800 E Main Yorktown Dev AMS LLC (the “Applicant”) proposes to construct the Revised
Proposed Project that would replace the existing, vacant, office buildings at the Project Site. To
effectuate the Revised Proposed Project, the Applicant has petitioned the Town Board to amend
the Town Zoning Map (the “Zoning Map”) to rezone the Project Site from OB Research
Laboratory and Office District (the “OB District”) to the RSP-2 Senior Citizens District (“RSP-2
District”) and for amendments to the Town of Yorktown Zoning Ordinance (the “Zoning
Ordinance”) to modify the regulations of the RSP-2 District.
On October 24, 2022, the Applicant submitted its original zoning petition to the Town Board. On
March 7, 2023, the Town Board, as the designated Lead Agency, determined that the Proposed
Action has the potential to result in one or more significant adverse environmental impacts and
directed the Applicant to prepare a Draft Environmental Impact Statement (DEIS) pursuant to the
rules and regulations of the New York State Environmental Quality Review Act (“SEQRA,”
Article 8 of the Environmental Conservation Law and its implementing regulations at 6 NYCRR
Part 617). A Scoping Document was prepared to guide the preparation of the DEIS.
As required by SEQRA regulations, and in order to allow the public sufficient opportunity to
comment on the draft Scoping Document, the Town Board accepted written comments on the
document from March 24, 2023 through April 14, 2023. A public scoping session, for the purposes
or receiving oral comments, was held by the Town Board on April 4, 2023 and the draft Scoping
Document was reviewed at the April 10, 2023 meeting of the Planning Board and at the April 18,
2023 and April 19, 2023 meetings of the Yorktown Advisory Board on Architecture and
Community Appearance (“ABACA”) and Yorktown Conservation Board, respectively. On May
2, 2023, the Town Board adopted the final Scoping Document, which identifies the issues to be
addressed in the DEIS.
On July 10, 2024, the Applicant submitted a preliminary DEIS to the Town Board, and on July
16, 2024, the Town Board accepted the DEIS as complete. Two duly noticed public hearings were
held on the DEIS by the Town Board on September 3, 2024, and October 8, 2024. During the DEIS
comment period, which was open through October 18, 2024, comments were received from the
public, Town staff and consultants, and other Involved and Interested Agencies.
A Final Environmental Impact Statement (FEIS) was prepared by the Applicant pursuant to SEQRA
and submitted to the Town Board for its completeness review. As required by SEQRA, the FEIS
responds to all substantive comments received on the DEIS. On February 25, 2025, the Town Board
accepted the FEIS as complete and filed the FEIS.
Table 1 identifies Involved and Interested Agencies that participated in the SEQRA review of the
Revised Proposed Action, as well as the approvals/reviews required for the Revised Proposed
Action.
Findings Statement
FINAL 3 05/13/2025
Table 1
Involved and Interested Agencies
Involved Agencies Approval/Review
Town of Yorktown Town Board Zoning Map Amendment;
Zoning Ordinance Amendment
Town of Yorktown Planning Board
Site Plan Approval;
Stormwater Permit;
Tree Removal;
MS4 Approvals
Westchester County Department of Health Water Main Construction, Improvements, Connection
New York State Department of Transportation Traffic Mitigation Measures along U.S. Route 6
New York State Department of Environmental
Conservation [NYSDEC]
State Pollution Discharge Elimination System (SPDES)
General Permit for Stormwater Discharges from
Construction Activity;
Stormwater Pollution Prevention Plan Approval;
Potential 5-Acre Waiver
New York State Office of Parks, Recreation, and
Historic Preservation Section 14.09 Review
Interested Agencies
Town of Yorktown Building Department Building Permit
Town of Yorktown Water Department
Town of Yorktown Advisory Board on Architecture
and Community Appearance (the ABACA)
Town of Yorktown Conservation Board
Town of Yorktown Tree Conservation Advisory
Committee
Town of Putnam Valley
Westchester County Department of Planning
Putnam County Department of Planning
B. DESCRIPTION OF REVISED PROPOSED ACTION
A description of the initially proposed Revised Proposed Action without the project modifications
and mitigation measures the Town Board, acting as Lead Agency, imposes under this Statement
of Findings (which are discussed in Section C of this Statement of Findings) is presented below.
PROJECT SITE
The Project Site is a 35.5-acre parcel situated at 800 East Main Street in the Town (Tax
Parcel 5.19-1-15), located along the northern boundary of the Town within the hamlet of
Jefferson Valley, the largest of the Town’s five hamlets. The Project Site is presently
zoned OB District. The Project Site is situated east of the Taconic State Parkway (the
“Parkway”) and north of U.S. Route 6. The Project Site is presently owned by Contractors
Register, Inc., and the Applicant is the contract-vendee.
The central portion of the Project Site is developed with two, three-story office buildings,
comprising approximately 63,617 square feet (sf), and approximately 288 surface parking
spaces, as well as driveways, landscaping, and associated infrastructure. The elevation of
the developed portion of the Project Site in the vicinity of the existing office buildings is
approximately 70 feet higher than the elevation of the Project Site’s entrance from Old
Route 6.
800 East Main Street Redevelopment
05/13/2025 4 FINAL
The office buildings on the Project Site are currently vacant and have been for several
years. Approximately 30 percent of the Project Site (10.74 acres) is currently developed,
with the northern 70 percent of the Project Site (approximately 24.79 acres) undeveloped
and in a forested state. The Project Site is accessed by a single driveway that enters the
Project Site at its southeastern corner, where it connects to Old Route 6. The Project Site
generally slopes north to south. There is a steep drop in elevation between the two existing
office buildings, such that the first floor of the northern office building is approximately
25 feet higher than the first floor of the southern office building.
To the north and northeast, the Project Site is bordered by the Donald J. Trump State Park,
a 436-acre State Park that spans the Towns of Yorktown and Putnam Valley. To the west,
the Project Site is bordered by the Parkway, a New York State Scenic Byway, which runs
north-south within the Town. There is an approximately 150-foot-wide vegetative buffer
between the Parkway and the Project Site, which provides a natural visual screen between
the Parkway and Project Site. This buffer would remain as part of the Revised Proposed
Project. The Project Site is bordered to the southeast by several single-family homes, and
to the south by East Main Street and U.S. Route 6. Further west of the Project Site (on the
western side of the Parkway) is Trump Park Residences, a senior residential community
located in the RSP-2 District.
PROPOSED ZONING
The Applicant has petitioned the Town Board for an amendment to the Zoning Map to
rezone the Project Site from the OB District to the RSP-2 District. The Applicant has also
petitioned the Town Board for amendments to the regulations of the RSP-2 District that
will, for sites greater than 25 acres, increase the permitted floor area ratio (FAR) from
0.35 to 0.55 and increase the maximum main building height from 45 to 55 feet, and
accessory building height from 15 to 45 feet.
REVISED PROPOSED PROJECT
SEQRA permits and encourages applicants to modify proposed projects in response to
public and agency comment. Consistent with this, the redevelopment project proposed by
the Applicant evolved throughout the SEQRA review process, in response to input from
the Lead Agency, various Involved and Interested Agencies, and the public. The
Applicant’s petition to the Town Board originally sought amendment to the Zoning Map
and Zoning Ordinance to accommodate a 250-unit age-restricted community (55+),
consisting of 200 rental units located in 12 buildings (of varying building types), and 50
for-sale townhouses located in 12 buildings. This development would have 96 one-
bedroom units and 154 two-bedroom units (this alternative is referred to as the “Original
Project” in this Findings Statement and was called the “Proposed Project” in the DEIS).
In the DEIS, the Applicant also analyzed a 185-unit age-restricted community (55+),
consisting of 165 dwelling units in two multifamily buildings, and 20 cottages. This
development would have 71 one-bedroom units and 114 two-bedroom units (this
alternative is referred to as the “Alternative Site Layout”). At the time the DEIS was
completed, the Alternative Site Layout was the Applicant’s preferred alternative. The
Alternative Site Layout would require significantly less site disturbance than the Original
Project, result in less impervious surfaces and more manageable stormwater flows,
generate less traffic, and, overall, is a less intense redevelopment of the Project Site than
the Original Project.
Findings Statement
FINAL 5 05/13/2025
Consistent with SEQRA regulations (6 NYCRR section 617.9(b)(8)) and based on
comments received on the DEIS, the Applicant developed the “Revised Proposed
Project,” which the Applicant identified in the FEIS as its current preferred alternative.
The Revised Proposed Project is similar to, and an evolution of, the Alternative Site
Layout but has fewer residential units, and comparatively further reduces site disturbance,
slope disturbance, parking, impervious areas, and tree removal quantities compared to
both the Original Project and the Alternative Site Layout. The Revised Proposed Project
consists of 180-units of age-restricted multifamily housing in two buildings, consisting of
60 one-bedroom units and 120 two-bedroom units. Dwelling units in the multi-family
buildings would range from approximately 845 sf to 1,369 sf. The average size of the one-
bedroom units would be 860 sf and the average size of the two-bedroom units would be
1,162 sf, and all dwelling units would include balconies. Interior amenities for the multi-
family buildings would include a clubhouse with club room, demonstration kitchen,
catering kitchen, fitness center, spa, screening room, sports lounge, reading room, and an
art studio. Exterior amenities would include a pool and barbeque area within the courtyard
between the multi-family buildings, as well as sports courts and natural walking trails.
The multifamily buildings of the Revised Proposed Project are in the same location, and
are the same height, as the multi-family buildings in the Alternative Site Layout. Each
multi-family building would be four stories and approximately 55-feet tall and would
feature similar architectural design to the building in the Alternative Site Layout. The
architectural design of the buildings would emphasize large windows and outdoor spaces,
evident through the shared program spaces, including the courtyard between the two
multi-family buildings, and also at the individual scale, as each unit would have its own
balcony. The overall design aesthetic would be transitional, embracing traditional design
with a minimalist focus both in massing and in finish choices, similar to the Alternative
Site Layout. The residences would be served by 270 parking spaces, open spaces, walking
trails, and other recreational amenities. The multifamily buildings would have a total of
approximately 246,000 gross sf, including approximately 12,000 sf of amenity space,
resulting in a proposed site-wide FAR of 0.16. No cottages are proposed in the Revised
Proposed Project.
The Proposed Zoning would permit the Original Project, the Alternative Site Layout, and
the Revised Proposed Project.
PURPOSE AND NEED
Since its peak the 1980s, the demand for professional office space in a corporate park
setting has declined substantially. The demand for campus office buildings in Westchester
County is continuing to decline due to evolving market trends, office space needs, and
work styles. The Town Board finds that the existing office buildings on the Project Site
are no different, and do not meet the needs of the current corporate office market, as
evidenced by their continued vacancy. At the same time, the demand for housing types
other than single-family detached houses remains strong within the region, including
within the Town.
The Revised Proposed Project would replace underutilized office buildings with an active
residential use, creating a development with minimal impact to adjacent residential
neighborhoods. In addition, the Revised Proposed Project would support the Town’s tax
base by introducing new residents to support existing businesses and institutions.
800 East Main Street Redevelopment
05/13/2025 6 FINAL
C. ENVIRONMENTAL FINDINGS AND MITIGATION MEASURES
The Town Board finds that among all the alternatives studied, the Revised Proposed Action,
consisting of the Proposed Zoning and Revised Proposed Project, and as modified by this
Statement of Findings, avoids or mitigates significant adverse impacts to the maximum extent
practicable.
The Lead Agency has made modifications to the Revised Proposed Action and to certain
Applicant-proposed mitigation measures, and has added additional mitigation measures, in order
to avoid or mitigate significant adverse impacts. These modifications and additional mitigation
measures are based on the entire record of the application including, but not limited to, the
Applicant’s petition, the DEIS, the FEIS, and the comments from the public and Involved and
Interested Agencies.
The following sections address the Revised Proposed Action and set forth the Town Board’s
findings and determinations regarding benefits and impacts of the Revised Proposed Action, and
the modifications to the Revised Proposed Action and mitigation measures that the Town Board
determines to be necessary to avoid or mitigate significant adverse impacts to the maximum extent
practicable. The impacts of the Revised Proposed Project are compared below to those of the
Original Project and Alternative Site Layout, as appropriate.
LAND USE, ZONING, AND PUBLIC POLICY
Land Use
The Project Site is approximately 35.5 acres and is currently improved with two
office buildings that, combined, have approximately 63,617 sf of space, as well
as related surface parking, infrastructure, lighting, and landscaping.
Approximately 30 percent of the Project Site (±10.74 acres) is currently
developed, with the northern 70 percent of the Project Site (approximately 24.79
acres) in a forested state.
The predominant land use within ½-mile of the Project Site is residential,
followed by commercial, parks and open space, community services, public
services, recreation and entertainment, and vacant land. To the north and
northeast, the Project Site is bordered by the Donald J. Trump State Park, a 436-
acre state park that spans the towns of Yorktown and Putnam Valley. To the west,
the Project Site is bordered by the Parkway, which runs north-south within the
Town. There is an approximately 150-foot-wide vegetative buffer between the
Parkway and the Project Site, which provides a natural visual screen between the
Parkway and Project Site, and which would remain as part of the Revised Proposed
Project. The Project Site is bordered to the southeast by a few single-family
homes, and to the south by East Main Street and U.S. Route 6. Further west of the
Project Site (on the western side of the Parkway) is Trump Park Residences, a
senior residential community located in the RSP-2 District. Commercial land uses
are located to the southeast and southwest of the Project Site.
The Town Board finds that the proposed age-restricted (55+) residential
community is consistent with surrounding residential land uses, including Trump
Park Residences, and with the commercial uses within ½-mile of the Project Site.
Moreover, it is the Town Board’s finding that the Revised Proposed Project,
Findings Statement
FINAL 7 05/13/2025
owing to its lesser density (fewer units) and the significantly lesser amount of site
disturbance, would have less impact on proximate land uses than the Original
Project or the Alternative Site Layout.
Zoning
The Project Site is within the Town’s OB District. Principal permitted uses in the
OB District include laboratories devoted exclusively to research, product
development and testing, engineering development and sales development, as
well as offices for professional or business use (including executive, engineering,
accounting, scientific, research and development, educational, statistical and
financial purposes).1 The OB District has a minimum lot area of 20 acres and a
permitted FAR of 0.10. Maximum allowable main building height in the OB
District is three stories or 45 feet.
Within ½-mile of the Project Site there are 13 other residential and commercial
zoning districts. Among them, the Town’s RSP-2 District is a senior citizens
district with a minimum lot area of five acres. This zoning district permits one
residential unit per 2,200 sf of lot area, provided the dwelling unit is no larger
than a “3-room living unit” or “2-bedroom apartment,” and one unit per 10,000
sf of lot area, if the dwelling unit is a “4-room living unit” or larger, or a unit with
more than two bedrooms. The maximum permitted FAR is 0.35 and the maximum
height is 45 feet. The RSP-2 District is mapped directly to the west of the Project
Site, on the western side of the Parkway, where the Trump Park Residences
development is located. Additionally, several smaller parcels throughout the
Town are mapped RSP-2 District.
To facilitate the Revised Proposed Project, the Applicant petitioned the Town
Board for an amendment to the Zoning Map to rezone the Project Site from the
OB District to the RSP-2 District. The Town Board finds that the rezoning of the
Project Site to RSP-2 District to permit the development of a residential
community in an area with adjacent residential development, including the Trump
Park Residences (also zoned RSP-2 District), would not result in any significant
adverse impacts related to zoning.
The Applicant has also petitioned the Town Board for amendments to the
regulations of the RSP-2 District that would, solely for sites greater than 25 acres,
increase the maximum FAR from 0.35 to 0.55 and increase the maximum main
building height from 45 to 55 feet, and accessory building height from 15 to 45
feet.
As described in more detail below, the Town Board carefully reviewed the visual
impact analysis, including photosimulations, in the DEIS and finds that the
proposed increase in building height in the RSP-2 District would not result in
adverse impacts.
The Applicant’s Original Project would have had a FAR of 0.50, and therefore
would have necessitated the increase in the permitted FAR of the RSP-2 District
that is requested in its petition. However, neither the Alternative Site Layout (0.23
1 Town Code §§ 300-21(C)(14), and 300-105.
800 East Main Street Redevelopment
05/13/2025 8 FINAL
FAR) nor the Revised Proposed Project (0.16 FAR) require the current maximum
FAR permitted in the RSP-2 District (0.35 FAR) to be increased. Similarly, the
Revised Proposed Project does not require a change to the maximum height of
accessory buildings.
Because both the Applicant and, as discussed in this Statement of Findings, the
Town Board, prefer the Revised Proposed Project, the Town Board determines
that FAR in the RSP-2 District does not need to be increased from 0.35 to 0.55,
as requested in the petition. The Town Board notes that any future proposed
development at the Project Site that would have a FAR greater than .23 (as is
studied in the DEIS for the Alternative Site Layout) would require additional
review under SEQRA. The Town Board also finds that no change to the maximum
height of accessory structures in the RSP-2 district is required.
Public Policy
C.1.c.i Town of Yorktown Comprehensive Plan (2010)
The Town of Yorktown Comprehensive Plan (the “Comprehensive
Plan”) was adopted by the Town Board on June 15, 2010, and presents
the Town’s land use vision for its future. The Town Board finds that the
Revised Proposed Project, on balance, is consistent with the
Comprehensive Plan. Below is a discussion of the relevant policies,
including those with which the Revised Proposed Project is not fully
consistent:
“Goal 5-C: In and around the five hamlet business centers, promote
housing diversity in a format compatible with both commercial uses
and adjacent single-family residential areas.” The Town Board finds
that the Revised Proposed Project would be compatible with the
surrounding neighborhood, introducing compatible residential use (in
place of the existing commercial use) into an area that includes
various residential neighborhoods, such as the age-restricted Trump
Park Residences community, a commercial center (The Jefferson
Valley Mall), and the hamlet center of Jefferson Valley.
In support of Goal 5-C, the Comprehensive Plan advocates that
“Yorktown should also strive for housing diversity throughout the
Town [and] balance the need for housing with the community’s
desire to limit and better manage the negative impacts of
development.” The Town Board finds that the Revised Proposed
Project would increase housing diversity in the Town by adding to
the limited stock of age-restricted rental housing, providing an option
for existing residents wishing to downsize and remain in the Town.
The Town Board notes that the Comprehensive Plan observes that
“the supply of townhouse units, condos, apartments, and senior living
is limited, some of the demand goes unmet, [and] empty-nesters often
want to downsize, but have limited options for housing in Town,” and
finds that the Revised Proposed Project directly addresses this by
increasing the supply of housing for residents 55 years of age and
older. The Town Board notes that no individual project can meet all
Findings Statement
FINAL 9 05/13/2025
of any municipality’s housing needs, and that the Revised Proposed
Project cannot address housing needs for all demographic and
socioeconomic groups. However, the Town Board finds that the
Revised Proposed Project would meet an existing market need for
senior rental housing and assist the Town in meeting its overall
housing goals.
“Goal 5-E: Ensure that new homes are compatible with the character
of their neighborhoods.” The Town Board finds that the Revised
Proposed Project would transform the visual character of the Project
Site from primarily a large surface parking area and two commercial
office buildings, to a landscaped residential neighborhood. The
multi-family buildings would incorporate local vernacular
architectural design against a backdrop of rolling hills and natural
landscape, with emphasis on large windows and outdoor spaces. As
the Project Site is currently improved with office buildings, and
would be redeveloped with residential housing consistent with
neighboring styles, the Town Board finds that the character of the
Revised Proposed Project is consistent with the surrounding area.
“Goal 5-H: Protect street trees and woodland areas, particularly
significant trees, in residential areas where they contributed to the
character of the community.” The Revised Proposed Project would
retain nearly all of the forested areas of the Project Site, as it would
be developed almost entirely within the footprint of the existing
office buildings and associated parking lots. The Town Board finds
that, compared to the tree removal required to facilitate the Original
Project and the Alternative Site Layout, the Revised Proposed Project
would further reduce the number of trees to be removed, thereby
retaining the wooded character of the Project Site.
“Goal 7-C: promote sustainable development patterns, which
consume less open space,” and “Goal 7-E: limit development on
steep slopes and reduce the potential for soil erosion.” The Town
Board finds that the Revised Proposed Project would promote
sustainable development, as encouraged by the Town
Comprehensive Plan, by repurposing an already commercially
developed site as a residential neighborhood. The Town Board also
finds that the Revised Proposed Project would be sited to minimize
development on steep slopes, thereby reducing the potential for soil
erosion and runoff to adjacent properties.
“Goal 9-B: Provide a diverse range of park and recreational facilities
that serve residents of all ages and physical abilities” and “Goal 9-C:
Provide plentiful opportunities for both active and passive recreation
in Yorktown.” In alignment with these goals, the Revised Proposed
Project would include large areas of open space, some programmed,
to encourage passive and active recreation on the Project Site.
800 East Main Street Redevelopment
05/13/2025 10 FINAL
Recreational amenities would include walking trails, a swimming
pool, pickleball courts, and an exercise room. If trails are constructed
in the adjacent Donald J. Trump State Park in the future, the
Applicant shall consider connecting its walking paths to those trails,
subject to Planning Board review and approval.
Policy 4-63, which identifies the Project Site, recommends that the
Town “promote corporate or multi-tenant office development in
select locations near major entrances to the Taconic Parkway and
Route 6” (page 4-33). While the Revised Proposed Project would not
align with Policy 4-63, the Town Board acknowledges that the
economic realities of corporate office parks in the region have
evolved since the Comprehensive Plan’s adoption, and that the
current trend throughout the region is re-use or redevelopment of
existing office campuses for residential and other uses. The Town
Board finds that the Revised Proposed Project responds to this trend,
replacing an underutilized, vacant office campus ripe for adaptive
reuse with a residential community Accordingly, the Town Board
finds that inconsistency with Policy 4-63 is not an adverse impact of
the Revised Proposed Project.
Policy 5-47, which discusses the Jefferson Valley hamlet in detail,
notes its “eclectic mix of retail, office (and) recreational” uses that
are surrounded by residential areas. As part of that discussion, Policy
5-47 suggests “provid[ing] sidewalk connections along East Main
Street to the shopping areas with crosswalks at Hill Boulevard and
Lee Boulevard.” The Lead Agency re-affirms that providing
sidewalk connections along East Main Street is a goal of the Town
Board and that sidewalks, in general, are a benefit to the community.
At the same time, the Town Board notes that this policy does not
specifically refer to the Project Site and, further, notes that the
provision of sidewalks is not necessarily the responsibility of private
property owners. Further, as discussed below, walkability from the
Project Site to nearby commercial areas and the Jefferson Valley
hamlet is constrained based on the difference in elevation between
the Project Site and surrounding areas. Nevertheless, consistent with
the Town’s comprehensive planning and community goals, the
Applicant and the Town shall investigate the possibility of adding
sidewalks along East Main Street and the feasibility of new sidewalks
at the newly constructed signals during the traffic signal design phase
of the Revised Proposed Project. The responsibility for constructing
and maintaining potential new sidewalks (e.g., Applicant, Town,
other parties) will be determined during this investigation. .
Goal 5-D: “Continue to support affordable workforce housing (as
defined by the Community Housing Board) and workforce housing
for people in all stages of life, from young adults and couples, to
families with children, to seniors.” The Town Board finds that the
Findings Statement
FINAL 11 05/13/2025
Revised Proposed Project does not meet the Town’s goal of providing
affordable workforce housing. The Town Board also finds that not
every project can respond to every need of a community, but that
adding to the supply of housing in the Town and region can help slow
the increase in housing costs, and that the Revised Proposed Project
would meet the need in the Town and region for additional senior
rental housing.
C.1.c.ii Westchester County’s Patterns for Westchester and Westchester 2025
The Town Board finds that the Revised Proposed Project is consistent
with Westchester County’s Patterns for Westchester and Westchester
2025 (the “County Plan”). The relevant policies are addressed below.
Enhance transportation corridors – U.S. Route 6 is an important
transportation corridor that generally runs east/west through the
northern portion of the Town. As part of the Revised Proposed
Project, improvements would be made to the E. Main Street & U.S.
Route 6 intersection and the adjacent East Main Street & Old Route
6 intersection. Both intersections would be signalized, the eastbound
turning lane would be extended to 300 feet, a northbound right turn
lane would be added at the East Main Street & Old Route 6
intersection, and the southbound left turn at East Main Street & U.S.
Route 6 would be restricted. These improvements are subject to
review and approval by the New York State Department of
Transportation (NYSDOT).
Nurture economic climate / Track and respond to trends – The Town
Board notes that the County has recognized that there is decreased
demand for corporate office park development and increased demand
for mixed-use infill development, including a diverse housing stock.
The Town Board finds that the Revised Proposed Project responds to
this trend, replacing an underutilized, vacant office campus ripe for
adaptive reuse with a residential community.
Preserve natural resources – The large size of the Project Site, and
proximity to natural resources, including Donald J. Trump State Park,
provide opportunities for preservation of natural resources. The
Town Board finds that the Revised Proposed Project would preserve
nearly all of the remaining forested areas on the Project Site, and
provide common open space for residents of the community to use at
their leisure. Additionally, by concentrating development almost
entirely within the footprint of the existing office buildings and
improvements, disturbance to currently unimproved areas on the
Project Site would be minimal.
Provide recreational opportunities to serve residents – The Revised
Proposed Project would include recreational amenities for residents.
800 East Main Street Redevelopment
05/13/2025 12 FINAL
Interior amenities for the multi-family buildings would include a
clubhouse with club room, demonstration kitchen, catering kitchen,
fitness center, spa, screening room, sports lounge, reading room, and
an art studio. Exterior amenities would include a pool and barbeque
area within the courtyard between the multi-family buildings, as well
as sports courts and natural walking trails. The Town Board finds that
the proposed amenities are consistent with this goal of the County
Plan.
Maintain utility infrastructure – To accommodate development of the
Revised Proposed Project, the Applicant would retain the existing
water and sewer connections that serve the Project Site, and make
any necessary upgrades. The Revised Proposed Project would utilize
two water service connections, allowing water service to be looped
within the Project Site, and providing continuous water supply in the
event of a disruption. The Town Board finds that the Revised
Proposed Project would maintain utility infrastructure consistent with
the County Plan.
Define and protect community character – Consistent with the
County Plan, the Revised Proposed Project would promote housing
diversity (by introducing age-restricted rental units) in a format
compatible with the character of the area, including adjacent
residential areas. The Revised Proposed Project would make use of
the already developed portions of the Site, consistent with the County
Plan’s goal of enhancing character through focus on location, setting,
aesthetic design and scale of development. The height and size of the
buildings of the Revised Proposed Project would align with the
County Plan’s goal of encouraging scenic preservation, as the new
residential buildings would be of limited visibility from the Parkway
because of the existing vegetative barrier which would remain, and
also because the buildings would generally be below the tree line.
Furthermore, the Revised Proposed Project would protect and
improve neighborhood quality of life by providing a housing option
for empty-nesters that want to downsize and remain in the Town.
Promote sustainable technology – The Revised Proposed Project
would incorporate sustainable building practices and green
technologies, including LED interior and exterior lighting, “right-
sized” HVAC systems, and the use of activity-sensing and
photovoltaic sensing lighting controls, where appropriate. The
Revised Proposed Project would include Electric Vehicle chargers at
various locations within the Project Site. Incorporation of these
practices and technologies would be consistent with the County
Plan’s promotion of reliable, sustainable energy and conservation
practices to create a sustainable County.
Findings Statement
FINAL 13 05/13/2025
C.1.c.iii 2019 Westchester County Housing Needs Assessment (including
Appendix B, the Town of Yorktown Municipal Housing Snapshot)
The Westchester County Housing Needs Assessment offers observations
applicable to the Revised Proposed Project, including that since 2000, the
Town has experienced growth in older population cohorts (at an even
greater pace than the County), that there is a further need for senior
housing throughout the County, and that vacant and abandoned office
parks are prime candidates for reuse.
The Town Board finds that consistent with the Westchester County
Housing Needs Assessment, the Revised Proposed Project would
increase housing stock in the County, by adding to the Town’s limited
supply of age-restricted (55+) housing, and in turn provide a viable option
for residents wishing to downsize and remain in the Town. Adding senior
housing would positively impact demand for existing housing by
potentially freeing up existing homes for younger generations. Town
residents downsizing but remaining in the Town would be able to
maintain their support network of family, friends, churches, civic
associations, and services, such as doctors and pharmacists. The Revised
Proposed Project is anticipated to meet current demand for market-rate
senior housing.
VISUAL AND COMMUNITY CHARACTER
The Town Board assessed the potential for impacts on visual resources and community
character from the development of the Revised Proposed Project.
On-Site Visual Character
The southern portion of the Project Site is improved with an existing office
campus, consisting of two office buildings that are surrounded by surface parking
lots. The Project Site is accessed by a single driveway that connects to Old Route
6 and East Main Street, with nearby access from there to U.S. Route 6. The
driveway into the Project Site is relatively steeply sloping, connecting Old Route
6, at a lower elevation, with the developed portion of the Project Site, at a higher
elevation. The western portion of the Project Site slopes steeply down to its border
with the Parkway. Given the topography of the Project Site, with the developed
portion of the Project Site sitting at a significantly higher elevation than Route 6,
Old Route 6 and East Main Street, the interior of the Project Site is, for the most
part, visually screened from the adjacent roadways and neighborhoods.
Much of the developed portion of the Project Site is devoted to surface parking
that is interspersed with landscaped medians, manicured plantings, and mature
trees. The Project Site is illuminated by light poles on the drive aisles and parking
lots, and by short, pedestrian-scaled bollards along sidewalks closer to the
buildings. The perimeter of the Project Site is wooded, which visually buffers the
interior of the Project Site from the Parkway and proximate residential uses. One
neighboring property, 764-768 East Main Street, is partially visible from the
Project Site through a wooded buffer in the leaf-off condition. The Project Site is
contiguous, or nearly contiguous, with hundreds of acres of woodland to the north
and east, including State parklands.
800 East Main Street Redevelopment
05/13/2025 14 FINAL
Off-Site Visual Character
North and northeast of the Project Site are forested areas comprising Donald J.
Trump State Park. West of the Project Site is the Taconic State Parkway, a NYS
Scenic Byway, beyond which are forested areas and the Trump Park Residences,
an age-restricted community set on approximately 50 acres.
South of the Project Site is U.S Route 6, beyond which is a Town-owned Par 3
golf course and single-family residential neighborhoods. The streets and
residential lots in these neighborhoods feature manicured landscaping and lawns,
and tree plantings. The houses are generally one- to two-stories tall and set on
roughly ¼- to ½-acre lots. To the east and southeast of the Project Site is a mix of
one- to two-and-one-half-story single-family homes, set on larger lots. Many of
the properties are dense with tree cover and the structures are set back from the
road. To the east of the Project Site are several townhouse communities, featuring
buildings that are two- to three-stories in height and that are landscaped with
flowers, bushes, and trees throughout. Southeast of the Project Site is a mix of
commercial developments, including a DeCicco’s grocery store, gas station, strip
malls, small office buildings, a self-storage facility, and the Jefferson Valley Mall.
Visibility of the Project Site
The Town Board considered the visual analyses in the DEIS, including
photosimulations, line of sight profiles, renderings, and photographs of the
Project Site and surrounding areas. The Town Board required visual analysis from
seven vantage points identified in the final Scoping Document:
Vantage Point 1: Taconic State Parkway (traveling northbound)
Vantage Point 2: Taconic State Parkway (traveling southbound)
Vantage Point 3: U.S. Route 6 and East Main Street
Vantage Point 4: U.S. Route 6 between East Main Street and Lee Boulevard
Vantage Point 5: U.S. Route 6 between Taconic State Parkway and Barger
Street
Vantage Point 6: Service Road for Town Golf Course
Vantage Point 7: Donald J. Trump State Park (Indian Hill Section)
Photosimulations were prepared for the Original Project and Alternative Site
Layout. Because the multifamily buildings of the Alternative Site Layout and the
Revised Proposed Project would be in the same location and of the same height,
the views of the Alternative Site Layout are used to evaluate the visibility of the
Revised Proposed Project.
Based on the photosimulations, the Town Board finds that the buildings of the
Revised Proposed Project would not be visible from Vantage Point 7 and would
have minimal, if any, visibility from Vantage Point 3, Vantage Point 4, or Vantage
Point 5. Any visibility from these locations would occur only in the leaf-off
condition and would be through dense, existing vegetation.
From Vantage Point 6, the Service Road for the Town Golf Course, there may be
limited visibility of the Revised Proposed Project through intervening vegetation
in the leaf-off condition. The Revised Proposed Project would be less visible than
Findings Statement
FINAL 15 05/13/2025
the Original Project from this location because the buildings proposed are farther
away (i.e., set back to the north). The tops of the buildings of the Revised
Proposed would be below the tree line.
From Vantage Point 2, west of the Site along the Parkway traveling southbound,
portions of the buildings of the Original Project and the Revised Proposed Project
would be visible through the 150-foot wide vegetated buffer in the leaf-off
condition. During the leaf-on condition, the buildings would be obscured. The
buildings of the Original Project would be slightly more visible than those of the
Revised Proposed Project. As shown by the photosimulations and the sectional
diagrams, the buildings of the Revised Proposed Project would be well below the
tree line.
From Vantage Point 1, south of the Site along the Parkway traveling northbound,
a small portion of the roof of one of the buildings of the Revised Proposed Project
would likely be visible at or above the tree line. The balance of the buildings
would be obscured by intervening vegetation. A small portion of one of the
Revised Proposed Project’s buildings may be visible through the existing tree
canopy in the leaf-off condition, but likely completely obscured during leaf-on
condition. It is noted that this view is only available to motorists traveling at
highway speeds, and only for a short distance.
Based on the above, the Town Board finds that the Revised Proposed Project
would have less visibility than the Original Project from offsite vantage points.
Further, the Town Board finds that the minimal visibility of the buildings of the
Revised Proposed Project would be insignificant. The Town Board finds that
preservation of the 150-foot-wide vegetative buffer between the Parkway and the
Project Site would help maintain the character of the Project Site as visually
disconnected from the adjacent roadways and neighborhoods. In addition, siting
the new residential buildings in the same area of the Project Site as the existing
office buildings and maintaining the Project Site’s existing topography and
wooded buffers would be largely maintained.
The Town Board finds that views of the Revised Proposed Project would be
consistent with the visual character of the existing residential uses to the east and
west of the Project Site and that the Revised Proposed Project would not interfere
with the public’s enjoyment of parks and other public community assets in the
Town.
The Applicant presented conceptual landscaping and lighting plans in the DEIS.
The conceptual landscaping plan would introduce various plantings throughout
the Site, including different varieties of trees, shrubs, perennials, and grasses. The
conceptual lighting plan would utilize cut-off luminaires that are Dark-Sky
compliant. Both plans would be refined and finalized during the site plan review
process.
In addition to the Planning Board’s code-required review of these plans (e.g., of
the lighting plan under Chapter 200 of the Town Code), the Town Board requires
the plans to meet the following goals:
800 East Main Street Redevelopment
05/13/2025 16 FINAL
Landscaping shall serve to define and compliment, and be appropriate to, the
specific areas of the Site in which they are located (e.g., driveways, parking
areas, residential areas, amenity areas, buffer areas).
Landscaping shall be designed and constructed in such a manner that the
plantings will be sustainable and appropriate for the climate.
Lighting fixtures shall feature LED sources to minimize energy usage.
Light spillover off the Site shall be avoided.
Building architectural details including color schemes and building elevations
shall be reviewed by the Planning Board and the ABACA.
The Town Board finds that with the above mitigation measures, conditions and
requirements, the Revised Proposed Project would not result in a significant
adverse impact to visual resources or community character and that such impacts
have been minimized and mitigated to the maximum extent practicable.
CULTURAL RESOURCES
Archaeological Resources
The Project Site is located in an area indicated as potentially sensitive for
archaeological resources by the New York State Office of Parks, Recreation, and
Historic Preservation (“OPRHP”). Pursuant to Section 14.09 of the New York
State Historic Preservation Act, the Applicant initiated consultation with OPRHP.
OPRHP determined that a Phase 1A/1B Archaeological Survey (“Phase 1A
Study”) should be completed for those portions of the Project Site that would
experience ground disturbance as a result of the Original Project unless prior
disturbance could be documented. The Phase 1A Study in turn recommends Phase
1B archaeological testing in the northern portion of the Project Site that would be
disturbed by the Original Project. In a comment letter dated January 19, 2024,
OPRHP concurred with the conclusions and recommendations of the Phase 1A
Study.
The Revised Proposed Project eliminates ground disturbing activities in the
northern portion of the Site determined to have archaeological sensitivity.
The Applicant shall continue to consult with OPRHP regarding the Revised
Proposed Project. If OPRHP finds that the Revised Proposed Project would occur
wholly within areas deemed not sensitive for archaeological resources, then no
further testing is required. If disturbance is required in areas of the Site determined
to be archaeologically sensitive, then further investigations (i.e., a Phase 1B
Archaeological Survey) and continued consultations with OPRHP would be
required.
The Town Board finds that the Revised Proposed Project, through avoidance of
the archaeologically sensitive area in the northern portion of the Site and
compliance with OPRHP requirements, would not have an adverse impact on
archaeological resources.
Historic Resources
There are no improvements on the Project Site that are listed on or determined
eligible for listing on the State or National Register of Historic Places (the
Findings Statement
FINAL 17 05/13/2025
“S/NR”), as determined by OPRHP in a letter dated November 2, 2023. In that
letter, OPRHP also determined that they do not have any architectural or above-
ground concerns about the Original Project (see November 2, 2023 letter from
OPRHP, included in DEIS Appendix B).
Two historic properties were identified in the vicinity of the Project Site: the Hyatt
House on Old Route 6, and the Taconic State Parkway. The Town Board finds
that the Revised Proposed Project would have no adverse impacts on the Hyatt
House or the Parkway. (See Section C.15, “Construction,” for a discussion of
potential impacts to the Hyatt House as a result of construction.) These historic
resources are sufficiently buffered from the Project Site by vegetated and wooded
areas, and these vegetative buffers would be retained with the Revised Proposed
Project. Views along the Parkway would continue to include the dense vegetated
areas on either side of it, including the large rock outcroppings that line the east
side of the Parkway in the vicinity of the Project Site. The Revised Proposed
Project is designed so that the two new buildings would be below the height of
the tree line along the Parkway and would therefore not project above the existing
vegetative buffer on the east side of the Parkway.
As discussed below, the Applicant shall take certain measures to mitigate
potential construction-period impacts on the Hyatt House.
The Town Board finds that, with the mitigation measures identified above, the
Revised Proposed Project would not have an adverse impact on historic resources.
GEOLOGY, SOILS, AND TOPOGRAPHY
Seven soil complexes are situated within or immediately adjacent to the Project Site. The
mapped soils are consistent with areas characterized by hills and/or steep slopes.
Approximately 10.74 acres of the Project Site have been previously disturbed to
accommodate the current commercial office use. The undeveloped northern portion of the
Project Site consists of forested land.
The Town Board finds that compared to the Original Project and the Alternative Site
Layout, the Revised Proposed Project would further reduce disturbance to steep slopes,
require less cut and fill, remove fewer trees, and result in less impervious surfaces (See
Table 1 through Table 4, below).
Approximately 6.29 acres would be disturbed during construction of the Revised
Proposed Project, which is less than the 8.65 acres would be disturbed during construction
of the Alternative Site Layout, and less than the 20.29 acres that would be disturbed to
develop the Original Project. With the Revised Proposed Project, almost all (98 percent)
of the disturbance would occur within the area of the Project Site previously disturbed to
construct the existing office campus, which the Town Board finds is a significant benefit
of the Revised Proposed Project as compared to the Original Project and Alternative Site
Layout.
The earthwork for the Revised Proposed Project would result in a net cut of approximately
700 cubic yards, significantly less than the net cut of 8,915 cubic yards required for the
Alternative Site Layout and 81,836 cubic yards required for the Original Project. If all of
the net cut material is removed from the Project Site, approximately 39 truck trips would
be required for the Revised Proposed Project, compared to 496 for the Alternative Site
800 East Main Street Redevelopment
05/13/2025 18 FINAL
Layout and 4,546 for the Original Project, based on 18 cubic yards per truck. These trips
would be spread out over the Revised Proposed Project’s construction, such that the
number of truck trips per day would be reduced to a level that would not affect traffic
operations. Earthwork would be conducted pursuant to an excavation and regrading
permit issued pursuant to Chapter 248, “Stormwater Management and Erosion and
Sediment Control,” of the Town Code. Pursuant to that Chapter of the Town Code, as well
as State requirements, a Soil Erosion and Sediment Control Plan has been developed as
part of the stormwater pollution prevention plan (SWPPP) for the Revised Proposed
Project.
Rock removal is likely to be required. The Applicant and its geotechnical engineer would
determine the need for rock removal as construction plans are advanced and additional
data collected. If rock removal is necessary, hydraulic hammers would be used. While
unlikely, if blasting is required it shall be conducted in accordance with Chapter 124,
“Blasting and Explosives,” of the Town Code and pursuant to a blasting permit that would
be obtained from the Town.
Table 1
Slope Disturbance
Slope Grade
Disturbance Area –
Original Project
(acres)
Disturbance Area –
Alternative Site Layout
(acres)
Disturbance Area –
Revised Proposed Project
(acres)
0% to 10% 7.39 3.21 3.28
10% to 15% 4.35 2.35 0.72
Greater than 15% 8.55 3.09 2.29
Total 20.29 8.65 6.29
Source: Site Design Consultants
Table 2
Land Use Impacts
Land Use or Covertypes
Existing
Acreage
Acreage with
Original
Project
Acreage with
Alternative Site
Layout
Acreage with
Revised Proposed
Project
Roads, buildings, and other
paved or impervious surfaces 5.20 9.3 7.5 6.18
Forested 26.85 15.2 18.86 26.85
Meadows, grasslands, or
brushlands 3.45 11.0 9.14 2.56
Source: Site Design Consultants
Findings Statement
FINAL 19 05/13/2025
Table 3
Revised Proposed Project - Tree Removal Quantities
Tree Type or
Condition Total Diameter
Number of Trees
To Be Removed
Total Number of Regulated Trees To
Be Removed
Protected 2626 239 274 Specimen 960 35
Invasive - - 27 Dead/Dying 410 27
301
Sources: Site Design Consultants; Dynamic Survey
Table 4
Existing and Proposed Building and Impervious Surface Coverage
Existing Condition Original Project Revised Proposed Project
Total Site Area (acres) 35.5 35.5 35.5
Total Permeable Area (acres) 30.3 26.2 29.8
Total Impervious Area (acres) 5.2 9.3 6.18
Percent Impervious 14.6% 26.2% 16.0%
Total Building Area (acres) 0.7 3.7 1.6
Percent Building Coverage 1.9% 10.5% 4.5%
Note: Totals may not sum due to rounding.
Source: Site Design Consultants, Perkins Eastman
During construction, the Soil Erosion and Sediment Control Plan shall be implemented to
mitigate potential soil erosion impacts. The SWPPP shall be implemented to manage
stormwater runoff after the Revised Proposed Project is completed. Both plans shall be
subject to the review and approval of the Town Engineer and Planning Board.
With the implementation of these mitigation measures, the Town Board finds that the
Revised Proposed Project would not have a significant adverse impact on geology, soils,
or topography and that potential impacts have been mitigated to the maximum extent
practicable.
ECOLOGICAL RESOURCES
Based on a review of State and federal databases, as well as a site reconnaissance, federal
and State-listed threatened, endangered, and special concern species that have the
potential to occur on or adjacent to the Project Site include Indiana bat (Myotis sodalis),
northern long-eared bat (Myotis septentrionalis), red-shouldered hawk (Buteo lineatus),
and eastern box turtle (Terrapene Carolina). The Town Board determines that tree
clearing activities shall be limited to the period between November 1 and March 31, to
avoid impacts to potentially nesting birds and roosting bats within the Project Site. The
Revised Proposed Project would not impact the eastern box turtle as there would be little,
if any, removal of forested edge habitat. Therefore, the Revised Proposed Project would
not adversely impact threatened, endangered, or special concern species, or critical habitat
for these species.
The Original Project would require the removal of 1,320 trees, the Alternative Site Layout
would require the removal of 651 trees, and the Revised Proposed Project would require
the removal of approximately 301 Town-regulated trees, 274 of which are in good to fair
800 East Main Street Redevelopment
05/13/2025 20 FINAL
health. The Town Board finds that the reduction in tree removal, as compared to the
Original Project and Alternative Site Layout, is a positive change in the development
program.
The Applicant shall be required to mitigate the impacts of the tree removal in accordance
with Chapter 270 of the Town Code. A Tree Mitigation Plan shall be submitted during the
site plan review process and shall be subject to the review and approval of the Planning
Board, and review and comment by the Conservation Board and Tree Conservation
Advisory Commission. The Tree Mitigation Plan shall include:
Extensive on-Site plantings of native deciduous, conifer, shrub, and herbaceous
species.
Removal of invasive species and vines, as well as tree litter from dead and fallen
limbs, trees, and roots within the area of the Project Site to be disturbed.
A tree protection plan, which shall require implementation of Best Management
Practices for the protection of root zones of trees and shrubs on the fringe of the
construction disturbance.
Preservation of existing vegetation and tree buffers.
Planting of conifers in strategic locations to augment visual screening.
If determined by the Planning Board to be required, the donation of trees to the Town
nursery stock at Willow Park in quantities to be determined as part of site plan
approval.
The Town Board finds that with the mitigation measures identified above, the Revised
Proposed Project would not have a significant adverse impact on ecological resources and
that adverse impacts have been mitigated to the maximum extent practicable.
SOCIOECONOMIC AND FISCAL IMPACTS
The DEIS analyzes the socioeconomic and fiscal impacts of the Original Project and
Alternative Site Layout. As the Revised Proposed Project would develop approximately
the same number of units as the Alternative Site Layout, quantified impacts presented in
this section C.6, unless otherwise noted, are from the analysis of the Alternative Site
Layout. It can reasonably be assumed that the impacts of the Revised Proposed Project
would be slightly less than the impacts of the Alternative Site Layout, presented below.
Population
The Revised Proposed Project (180 dwelling units) would increase the population
of the Town by approximately 216 residents. If all of these residents were new to
Yorktown, the population of the Town would increase by approximately 0.59
percent based on the Town’s 2021 population of 36,424.
Construction Benefits
The employment generated by construction would result in labor income for the
Town, County, and State. Direct labor income is estimated to be approximately
$38.41 million. Including indirect and induced employment activity, the total
labor income generated by construction is estimated to be $38.54 million in the
Town, $45.74 million in Westchester County, and $48.59 million in New York
State.
Findings Statement
FINAL 21 05/13/2025
Construction is anticipated to generate approximately $64 million in direct
economic output. Including indirect and induced economic activity, construction
is anticipated to generate approximately $64.58 million in total economic output
for the Town, $83.71 million for Westchester County, and $91.83 million for New
York State.
The Town Board finds that the similar construction benefits of the Revised
Proposed Project would be a beneficial impact of the Revised Proposed Project.
Annual Operational Benefits
Once completed and fully tenanted, the facility is anticipated to support
approximately 10 total jobs in New York State, including 9 full- and part-time
jobs in Westchester County, and 7 full- and part-time jobs in the Town.
Employment is anticipated to support approximately $317,000 in total annual
labor income in the Town, ultimately producing a total of $507,300 in
Westchester County and $554,600 in New York State.
The Town Board finds that the similar annual operational revenues of the Revised
Proposed Project would be a beneficial impact of the Revised Proposed Project.
Residential Spending
The facility is anticipated to support approximately two additional jobs through
induced residential spending, which in turn is anticipated to produce
approximately $116,000 in labor income and approximately $328,000 in
economic output in the Town. The local spending generated by the residents
would provide economic activity and support to local businesses in the area.
The Town Board finds that residential spending is a benefit of the Revised
Proposed Project.
Municipal Fiscal Impacts
In 2023, the Project Site generated approximately $270,670 dollars in property
taxes, including approximately $29,831 in annual property taxes for the Town, as
well as $24,149 for Westchester County. In addition, benefit assessments are paid
to an EMS service, and a fire district, refuse district, water district, and two sewer
districts. The Project Site generated approximately $26,972 in assessment
revenue for these local jurisdictions in 2023. In addition, the Project Site
generated approximately $189,718 per year in tax revenue for the Lakeland
Central School District (the “School District” or “District”) in 2023 (see Table
5).
800 East Main Street Redevelopment
05/13/2025 22 FINAL
Table 5
2023 Annual Property Tax Revenues for Project Site
Taxing Jurisdiction
Tax Rate per $1,000 of
Assessed Value
Taxable Assessed
Value Property Taxes
Westchester County 134.16
$180,000.00
$24,149
Town of Yorktown 165.73 $29,831
EMS – Advanced Life Support 5.46 $982
Lake Mohegan Fire District 81.22 $14,620
Westchester County Peekskill Sewer 32.63 $5,873
Westchester County Garbage 16.30 $2,935
Yorktown Consolidated Water 14.14 $2,545
Osceola Lateral Sewage Operating 16.97 1.00 $17
Lakeland Central School District 1,053.99 $180,000.00 $189,718
Total Property Taxes $270,670
Note: Numbers may not add due to rounding.
Source: 2023 Final Assessment Roll; tax rates from Westchestergov.com
The Town Board finds that if it is not redeveloped, the Project Site would continue
to generate limited taxes, as the buildings are not occupied, and are anticipated to
be in the near future, given market conditions and office campus trends in the
County and region. Therefore, in the future without the Revised Proposed Project,
the tax revenue generated by the Project Site is anticipated to be similar to the
existing condition.
The Town of Yorktown Tax Assessor estimated the taxable assessed value of the
Alternative Site Layout, upon stabilization of the facility, to be $894,250, which
equates to a full market value of $51,990,000. Based on this estimate, the
Alternative Site Layout would generate approximately $1,344,634 in property tax
revenue per year (see Table 6).
Table 6
Projected Annual Property Tax Revenues for Alternartive Site Layout
Taxing Jurisdiction
Tax Rate per $1,000 of
Assessed Value
Taxable Assessed
Value
Property
Taxes
Westchester County 134.16
$894,250
$119,973
Town of Yorktown 165.73 $148,203
Advanced Life Support 5.46 $4,883
Lake Mohegan Fire District 81.22 $72,631
Westchester County Peekskill Sewer District 32.63 $29,179
Westchester County Garbage 16.30 $14,576
Yorktown Consolidated Water 14.14 $12,645
Osceola Lateral Sewage Operating 16.97 1.00 $17
Lakeland Central School District 1,053.99 $894,250 $942,528
Total Property Taxes $1,344,634
Note: Numbers may not add due to rounding.
Source: Tax rates from Westchestergov.com
The Town Board finds that the Revised Proposed Project would generate similar property
tax revenue as the Alternative Site Layout: approximately $1,073,965 more in property
taxes per year than is currently generated by the Project Site, including an additional
$118,372 to the Town and an additional $752,810 to the Lakeland Central School District.
For the reasons set forth below, the Town Board finds that the increase in property taxes
Findings Statement
FINAL 23 05/13/2025
is sufficient to offset any potential fiscal impacts to the Town from the provision of
community services, particularly since no additional children are anticipated to reside in
the age-restricted Revised Proposed Project, as discussed in section C.7.f, below.
The Town Board finds that the Revised Proposed Project would not have a significant
adverse fiscal or socioeconomic impact, and to the extent there are any impacts, they
would be avoided or minimized to the maximum extent practicable through the generation
of tax revenue to the Town. The Town Board finds that the increase in tax revenue that
would be generated by the Revised Proposed Project is a benefit to the Town.
COMMUNITY FACILITIES
Police
The Project Site is served by the Town of Yorktown Police Department. In
correspondence dated October 10, 2023, Police Chief Robert Noble indicated that
the Police Department’s authorized staffing level is 63 police officers, ten of
whom are full time school resource officers and do not respond to calls for service.
Chief Noble estimated that response time to the Project Site would range from
five to ten minutes. The projected quantities of police personnel, equipment, and
facilities attributable to the Revised Proposed Project’s estimated population are
below (see Table 7).
Table 7
Revised Proposed Project – Projected Police Service Level
Police Service Multiplier Estimated Population Projected Service Level
Personnel 2/1,000 population 216 0.43 police personnel
Vehicles 0.6/1,000 population 216 0.129 vehicles
Facilities 200 sf/1,000 population 216 43.2 sf of facility space
Sources: Model Factors for Social Impact Analysis (Police), Development Impact Assessment Handbook,
ULI, 1994.
In his correspondence, the Town Police Chief indicated that based on his
experience, age-restricted communities may generate a greater per capita demand
for police services, owing to the “aided type calls for service” received from such
developments. Therefore, the Town Board finds that the Revised Proposed
Project’s demand for police services would likely be slightly higher than the
average residential demand, as set forth above. However, The Town Board also
finds that the marginal increase in the demand for police services as a result of the
Revised Proposed Project is not anticipated to require a significant increase in
Police Department resources. The Alternative Site Layout, which has only 5 more
units than the Revised Proposed Project, would have a population of
approximately 226 residents and could result in the need for an additional 0.45
police personnel. Like Fire Department calls for service (discussed below) Police
Department calls would be anticipated to be less than one per week, which would
not require the Town to hire another police officer. The Town Board also notes
that, the potential additional demand for police services would not all be new as
the Project Site currently (and previously, during period of greater occupancy)
has some level of demand for police services.
800 East Main Street Redevelopment
05/13/2025 24 FINAL
The Revised Proposed Project is anticipated to generate approximately $148,203
per year in tax revenue to the Town. That tax revenue can be utilized to offset any
impacts of the Revised Proposed Project on Police Department resources.
Therefore, the Town Board finds that the Revised Proposed Project would not
result in a significant adverse impact to police services.
Fire
The Project Site is served by the Lake Mohegan Fire District (the “Fire
Department”), which is a combination fire department, meaning that it is staffed
by both career (on-duty) firefighters as well as volunteer firefighters.
Based on the information provided by Fire Chief Thomas Eade in a letter dated
November 14, 2023, the average response time of the Fire Department is four to
eight minutes throughout its jurisdiction. However, owing to the close proximity
of the Project Site to one of the Fire Department’s substations, the Chief
anticipates an “excellent response time” to the Project Site of “under four
minutes.”
In 2022, the Fire Department responded to 4,462 emergencies, comprised of 1,217
fire related emergencies, and 3,425 medical emergencies. The Chief noted that
the Fire Department responded to approximately 4,000 emergencies in 2023.
From 2018 to the present, the Fire Department responded to a total of five calls at
the Project Site; all were for fire alarms within the office buildings (there were no
calls for medical emergencies).
To estimate the potential impact to the Fire Department as a result of the Revised
Proposed Project, the call history of the Trump Park Residences, a 141-unit age-
restricted residential development located in the Town, is analyzed in the DEIS.
Since 2018, the Fire Department has responded to approximately 145 incidents at
the Trump Park Residences (both fire related and medical), the majority of which
were for medical emergencies. This equates to approximately 0.18 incidents per
unit per year. Applying this rate to the number of units of the Revised Proposed
Project, it is anticipated that the Fire Department would respond to the Revised
Proposed Project for fire and medical service a total of approximately 33 times
each year, or approximately three calls per month.
The Town Board finds that the Revised Proposed Project buildings would not be
a unique construction or occupancy type in the Town. Further, and in accordance
with Town Code Section 130-2 (“Mandatory use of Sprinkler System”), the
Revised Proposed Project would be equipped with fire sprinkler systems, and
would be served by on-site fire hydrants. During site plan review, the Town
Building Department would review the final building designs to ensure
compliance with the State Building Code and State Fire Code, including
requirements for emergency response vehicle access, and that the design is
compatible with Lake Mohegan Fire District and Town equipment.
The Revised Proposed Project would generate approximately $72,631 per year in
tax revenue to the Lake Mohegan Fire District, which would offset costs incurred
by the Fire Department in providing services to the Revised Proposed Project.
Therefore, the Town Board finds that the Revised Proposed Project would not
result in a significant adverse impact to fire services.
Findings Statement
FINAL 25 05/13/2025
Emergency Medical Services
The Project Site is served by the Mohegan Volunteer Ambulance Corps of the
Mohegan Volunteer Fire Association (MVAC). The MVAC does not receive
direct funding from the Town or the Lake Mohegan Fire District. MVAC funding
comes from insurance reimbursements.
As with police and fire services, the Revised Proposed Project is anticipated to
result in an increased demand for emergency medical services as compared to the
demand of the existing office use. The Town Board finds that, given that this
alternative is an age-restricted (55+) residential community, it is likely that its
demand, while less than a comparably sized assisted-living facility, would be
higher than a non-age restricted residential community.
The MVAC, in response to the DEIS, stated that they believe that the facility
would generate EMS calls for service at a rate greater than the Trump Park
Residences (e.g., 33 per year) and suggested a comparison to the Jacobs Hill
development in the Town of Cortlandt (that is also within the MVAC service
area). Information on the number of MVAC calls to Jacobs Hill was not available
at the time the FEIS was completed. However, subsequently, a Town Board
member represented that in 2024, MVAC responded to 66 calls for service to
Jacobs Hill. As the Jacobs Hill community includes 160 units, this represents a
rate of approximately 0.41 calls for service per unit per year. Applied to the
Revised Proposed Project, this would be approximately 74 calls per year, or one
to two calls per week.
The Town Board finds that the increase in demand for emergency medical
services, of between approximately 33 calls per year and 74 calls per year, would
be mitigated by both the increase in tax revenue to the Lake Mohegan Fire District
(which responds with the MVAC to calls), as well as through insurance
reimbursements and other fees paid to MVAC for service. Further, although the
one to two percent per year increase in call volume would require additional
resources, the Town Board finds that this increase would not result in a significant
adverse impact on the provision of emergency medical services.
Parks, Recreation and Open Space
There are several public recreational facilities proximate to the Project Site,
including Donald J. Trump State Park, Shrub Oak Memorial Pavilion and Park,
the Brian J. Slavin Aquatic Center, and the Links at Valley Fields (a Town-owned,
par 3 golf course).
The Revised Proposed Project is anticipated to have a population of
approximately 216 residents upon completion, which is approximately 0.59
percent of the Town’s 2021 population. In order to serve resident demand for
recreational facilities, the Revised Proposed Project includes various interior and
exterior recreational amenities for residents. Interior amenities would include a
clubhouse with club room, fitness center, spa, and sports lounge. Exterior
amenities would include a pool and barbeque area within the courtyard between
the multi-family buildings, as well as sports courts and natural walking trails
within the Site.
800 East Main Street Redevelopment
05/13/2025 26 FINAL
During the site plan approval process, the Planning Board shall, in accordance
with State Law (§274-a.6 of the NYS Town Law), determine whether in addition
to the on-site recreational facilities that are part of the Revised Proposed Project
“a proper case exists for requiring that a park or parks be suitably located [on the
Site] for playgrounds or other recreational purposes within the town.” As
provided in Town Law §274-a.6, this determination shall be based on “an
evaluation of the present and anticipated future needs for park and recreational
facilities in the town based on projected population growth to which the [Revised
Proposed Project] will contribute.” Given the on-site recreational facilities of the
Revised Proposed Project, and subject to the Planning Board’s required review
under Town Law §274-a.6, the Town Board finds that the Revised Proposed
Project would not have a significant adverse impact on parks, recreation, and open
space.
Solid Waste and Recycling
With an estimated population of 216 residents, it is anticipated the Revised
Proposed Project would generate approximately 1.84 tons of solid waste per
week. Waste and recycling generated by the Revised Proposed Project would be
collected by a private carting company contracted directly with the property
management. Residents would be responsible for taking their solid waste and
recycling to collection rooms within the multi-family buildings. Building plans
submitted as part of Planning Board site plan review shall demonstrate sufficiency
of recyclables storage space in the multifamily buildings.
The Town Board finds that, as private carters would collect waste and recycling
generated by the Revised Proposed Project, the Revised Proposed Project would
not result in an increased demand on municipal waste and recycling collection
services.
Public School Aged Children
The Revised Proposed Project would be age-restricted to those 55 and over, and,
therefore, is not anticipated to generate a significant number of public school aged
children. At the request of the Town Board, information was requested from the
Lakeland Central School District with respect to the number of public school
students at Trump Park Residences, an age-restricted development proximate to
the Project Site. The School District responded on October 31, 2024. In the 2022-
2023, 2023-2024, and 2024-2025 school years, 3 students, 2 students, and 2
students lived at Trump Park Residences, respectively. In addition, the Town
Board reviewed a summary of a 2018 study prepared for an age-restricted project
in the Village of Rye Brook. That study of nearly 1,400 units in Westchester,
Putnam, and Nassau Counties, determined that three public school age children
in total lived in those units. Taken together, this data indicates that the Revised
Proposed Project would generate a minimal number of students.
Enrollment in the School District has declined by 478 students (8 percent) since
the 2014-15 school year. At the request of the Town Board, the School District
provided their latest enrollment projection, which indicates that total enrollment
is anticipated to further decline from 5,141 students in the 2025-2025 school year,
to 4,936 students in the 2034-2035 school year (a decline of 205 students, or 4
percent).
Findings Statement
FINAL 27 05/13/2025
Based on the data for Trump Park Residences and other age-restricted
developments and enrollment trends and projections from the School District, the
Town Board acknowledges that a few school-age children could reside at the
Revised Proposed Project. In the event that a few students do live at the Revised
Proposed Project and attend the public schools, the Town Board finds that any
increased costs to the School District for those few students would be more than
offset by the increased property tax revenue to the School District, and that the
School District would have capacity for the students, given its historic and
projected (declining) enrollment trend.
Therefore, the Town Board finds that the Revised Proposed Project would not
have an adverse impact on the School District’s provision of educational services.
WATER AND WASTEWATER
The Project Site is within the Yorktown Consolidated Water District, which is part of the
Northern Westchester Joint Water Works (NWJWW). The Project Site is served by an 8-
inch public water main within Old Route 6. Once on-site, the water main is reduced in
size to a 6-inch main, which provides service to the two existing buildings. Water
consumption at peak usage of the office buildings was approximately 5,875 gallons per day
(gpd). The Project Site is located within the Westchester County Peekskill Sanitary Sewer
District. An 8-inch PVC pipe sanitary sewer main runs from the two existing office
buildings to the sewer in East Main Street. The existing sewer connects to a pump station,
owned by the Town, which is located on Old Route 6, before its intersection with East
Main Street.
The Revised Proposed Project is estimated to have a water demand of approximately
33,000 gpd (see Table 8). Therefore, the Revised Proposed Project would result in a net
increase in water demand of approximately 27,125 gpd.
Table 8
Estimated Water/Sanitary Generation
Unit Type Number of Units Water Usage in Gallons Per Day per Unit Total Gallons Per Day
1 Bedroom 60 110 6,600
2 Bedroom 120 220 26,400
Total -- -- 33,000
Source: New York State Design Standards For Intermediate Sized Wastewater Treatment Systems, NYSDEC,
March 4, 2014
The Assistant Superintendent of the Yorktown Consolidated Water District indicated that
the water system has adequate pressure to serve the Original Project, which had a
significantly higher demand, and, therefore has adequate pressure to serve the Revised
Proposed Project. The Revised Proposed Project would utilize two (2) water service
connections, one along the southwestern frontage of the property within the driveway, and
one at the public water main southeast of the Project Site near the existing cul de sac. This
would allow for the water service to be looped within the Project Site, providing
continuous water supply in the event of a disruption to one connection.
The design and construction of any new water supply systems shall meet all applicable
American Water Works Association, Westchester County Health Department, and Town
requirements. Pursuant to County regulations, the water mains would be owned by the
800 East Main Street Redevelopment
05/13/2025 28 FINAL
Town, which would be granted an easement for access and maintenance. Fire hydrants
would be placed throughout the Project Site, in accordance with the requirements of the
NYS Building & Fire Code as well as the Lake Mohegan Fire District, which shall be
demonstrated during the site plan review process.
The anticipated sanitary wastewater generation for the Revised Proposed Project is 33,000
gpd, an increase of approximately 27,125 gpd compared to full occupancy of the existing
office buildings. The Revised Proposed Project would utilize the Project Site’s existing 8-
inch PVC sanitary sewer pipe. The design and construction of any extensions to the
sanitary system would meet all applicable Ten State Standards, Westchester County
Health Department, and Town requirements. Pursuant to County regulations, the sewer
mains would be owned by the Town, which would be granted an easement for access and
maintenance. Through correspondence and meetings with the Town Engineer, it was
determined that the pump station that serves the Project Site is not adequate to serve the
increased flow that would be generated by the Revised Proposed Project.
At the request of the Town Board, the potential for other wastewater conveyance options,
including connecting to a point south of Route 6 within the Par 3 golf course, or by using
a gravity-fed system that would generally travel along East Main Street, were studied.
Based on the above-noted consultation with the Town Engineer, it was determined that
those alternatives are not practicable, as outlined in a letter from the Applicant’s engineer
to the Town Engineer dated November 4, 2024. The Town Engineer confirmed this
conclusion to the Town Board. Specifically, the Town Engineer determined that installing
a gravity main under Route 6 via “Horizontal Directional Drilling” was not a viable option
given existing constraints on both sides of the road, the likely presence of unknown
utilities under the roadway, and prior experience with the NYSDOT indicating that it
would not permit a cut trench across the roadway. A gravity main from the Project Site to
East Main Street was also determined to be infeasible from a technical standpoint, because
there is a low point, which is below the elevation needed to pass the pipe.
Accordingly, the Town Board finds that the appropriate and only feasible option is to
replace the existing sanitary sewer pump station. The Applicant shall be financially
responsible for replacing the sanitary sewer pump station as part of the Revised Proposed
Project. With this replacement, and the mitigation measures identified above, the Town
Board finds that the Revised Proposed Project would not have an adverse impact on water
and wastewater systems and that adverse impacts have been mitigated to the maximum
extent practicable.
STORMWATER MANAGEMENT
The predominant soil types on the Project Site are well drained, typically found on hilltops
and hillsides. The erosion hazard level for these soils is slight to moderate with greater
hazards on steep slopes.
The Project Site is presently developed with stormwater management practices that serve
the existing improvements on the Project Site. The surface runoff pattern on the Project
Site is generally from the east to the southwest and consists of a combination of sheet flow
and concentrated flow. Surface runoff from most of the existing impervious areas,
including the buildings, parking, and roadways as well as adjoining areas, is collected and
transported to the existing stormwater management basins where the runoff receives water
quality treatment and attenuation.
Findings Statement
FINAL 29 05/13/2025
To analyze stormwater conditions on the Project Site, the Project Site was divided into
two existing drainage areas, each draining to a “design point.” Preliminary stormwater
management practices were located and designed to maximize the treatment and retention
of stormwater from the new impervious surfaces introduced by the Original Project. With
the implementation of these practices, it was determined that the Original Project would
reduce the peak runoff rate for all storms at one design point but would increase the peak
runoff rate for all storms at the other design point. The Original Project therefore would
not meet stormwater quality goals.
The Alternative Site Layout and Revised Proposed Project reduce the amount of
disturbance area on the Project Site, including the development footprint, which in turn
eliminates the potential stormwater quality impacts of the Original Project (see Table 9).
Table 9
Area of Disturbance and Impervious Area
Total Area of
Disturbance
(acres)
Disturbance of
Currently Undisturbed
areas (acres)
Total Impervious
Area (acres)
Original Project 20.3 11.7 4.1
Alternative Site Layout 8.7 5.8 2.3
Revised Proposed
Project 6.3 0.1 1.0
Source: Site Design Consultants.
A hydraulic analysis was conducted for the Revised Proposed Project to determine the
expected runoff depth for each storm event. The results of the analysis were used to
calculate the stormwater management practices sizes required for each of the two drainage
areas. With the implementation of stormwater management practices set forth in the
preliminary SWPPP prepared for the Revised Proposed Project, the Town Board finds
that runoff rates for the Revised Proposed Project would be reduced in all the analyzed
storms compared to the existing condition.
The preliminary SWPPP prepared for the Revised Proposed Project, which would be
finalized at the time of site plan review, includes a Soil Erosion and Sediment Control
plan which would mitigate the potential adverse impact from stormwater runoff during
construction of the Revised Proposed Project. Temporary control measures and facilities
include silt fences, interceptor swales, stabilized construction entrances, temporary
seeding, mulching, and sediment traps. Throughout construction, temporary sediment and
erosion control measures would be inspected and maintained as appropriate. Toward the
completion of construction of the Revised Proposed Project, permanent sediment and
erosion control measures would be developed for long-term erosion protection.
With the implementation of the above stormwater treatment practices outlined in the
preliminary SWPPP, and given the reduction in disturbance area from the Original Project
to the Revised Proposed Project, the Town Board finds that the Revised Proposed Project
would not result in any adverse impacts to stormwater management.
800 East Main Street Redevelopment
05/13/2025 30 FINAL
USE AND CONSERVATION OF ENERGY
Con Edison (“Con Ed”) provides electric service to the Project Site from overhead lines
situated in the right-of-way along Old Route 6. The electric line then extends overhead to
a privately-owned pole on the southern side of the Project Site, where the service then
continues underground. The underground line supplies the Project Site’s tap box, which
then feeds two existing on-site transformers. The Project Site is not currently served by
natural gas. However, there is a Con Ed main approximately 800 feet away from the
Project Site, within East Main Street.
The Revised Proposed Project would be served by a new electric distribution system on
the Project Site and may also be served by natural gas. Each multi-family building would
have its own pad-mounted transformer to supply electricity. An emergency generator
would supply each multifamily building’s emergency/standby power. The generators can
either be powered by natural gas from Con Ed or by diesel fuel oil stored in sub-base fuel
tanks beneath the generators.
The Applicant has not yet determined whether the buildings’ HVAC systems would be
electric- or natural gas-powered systems. As part of the DEIS, the Applicant requested
information from Con Ed regarding the on- and off-site improvements that would be
required in both an all-electric and a natural gas scenario. Con Ed determined for the all-
electric scenario, it would re-use the existing pole and T-tap box on the Project Site to
serve the new development, and that there would be no off-site improvements required. If
cooking and heating were fueled by natural gas, Con Ed determined that the existing four-
inch-high pressure polyethylene (HPPE) gas main in East Main Street would need to be
extended approximately 800 feet down East Main Street to the Project Site. From there,
the Applicant would need to install a two-inch HPPE gas service line from the property
line into the Project Site. The Applicant would be required to pay for all but 100 feet of
the gas main extension.
The Town Board finds that while the electric and gas demand anticipated for the Original
Project and the Alternative Site Layout would be greater than that of the Revised Proposed
Project, the off-site improvements required to serve the Revised Proposed Project would
be the same. During the site plan approval process, the Applicant shall confirm with Con
Ed the final off-site mitigation measures that would be necessary to serve the facility based
on the final design.
The Revised Proposed Project would include various energy conservation measures,
including the use of LED interior and exterior lighting, right-sized HVAC systems, and
the use of activity-sensing and photovoltaic sensing lighting controls. Is it anticipated that
each apartment unit within the multifamily buildings would have a dedicated high-
efficiency one-to-one split system heat pump. The buildings would be insulated in
accordance with all applicable building and conservation codes, including the use of
insulated windows. The Revised Proposed Project would also include Electric Vehicle
(EV) chargers at various locations within the Project Site. The Applicant shall also
undertake a feasibility study, during the site plan approval process, to determine if solar
power can be utilized.
The Town Board finds that, with the inclusion of these measures, as well as any measures
required by Con Ed, the Revised Proposed Project would not have a significant adverse
Findings Statement
FINAL 31 05/13/2025
impact on electric or natural gas services and that adverse impacts have been mitigated to
the maximum extent practicable.
TRAFFIC AND TRANSPORTATION
A Traffic Impact Study (TIS) was conducted to analyze the potential traffic impacts of the
Original Project (250 dwelling units) and the Alternative Site Layout (185 dwelling units).
Data on the existing conditions at nine intersections identified by the Town and its
consultants were obtained. To determine the conditions that are likely to occur at the
intersections in the future with or without the proposed facility (i.e., the “No Action”
condition), the TIS added traffic volumes to the existing conditions to account for general
background growth, as well as certain larger projects identified by the Town that could be
constructed prior to the facility. This “No Action” condition was then compared to the
“With Action” condition, which added the traffic volumes attributable to the facility
(either the Original Project or the Alternative Site Layout). Changes in operating
conditions were identified and measures to mitigate significant impacts of the project were
developed. As the Revised Proposed Project would have five fewer units than the
Alternative Site Layout, and therefore generate slightly less, but essentially the same,
traffic than Alternative Site Layout, a quantified analysis of the Revised Proposed Project
was not undertaken. Because the traffic impacts of the Revised Proposed Project would
be essentially the same as the Alternative Siter Layout, the mitigation measures required
would be the same. The results of the TIS are discussed below.
Data Collection
Consistent with the DEIS Scoping Document adopted by the Town Board, traffic
conditions were evaluated at nine intersections (collectively, the “Traffic Study
Area”) for the “Weekday AM,” “Weekday PM,” and “Saturday Midday” peak
hours delineated below:
U.S. Route 6 and Barger Street
Taconic State Parkway Southbound Ramp and U.S. Route 6
Taconic State Parkway Northbound Ramp and U.S. Route 6
U.S. Route 6 and East Main Street
Old Route 6 and East Main Street
U.S. Route 6 and Lee Boulevard
East Main Street and Lee Road
U.S. Route 6 and Hill Boulevard*
East Main Street and Hill Boulevard / Old Jefferson Valley Road*
Two additional intersections were identified for safety analysis only:
East Main Street and Indian Hill Road
East Main Street and Old Jefferson Valley Road
Traffic volumes for the intersections marked with an * were based on historical
2019 traffic counts provided by the Town, which were grown to estimated 2023
levels by 1.0 percent per year and balanced with the adjacent intersections.
Turning movement counts (TMC) with vehicle classification were collected at the
other intersections during the Weekday AM (7:00 AM to 9:00 AM), Weekday
PM (4:00 PM to 6:00 PM), and Saturday Midday (12:00 PM to 2:00 PM) periods.
800 East Main Street Redevelopment
05/13/2025 32 FINAL
Automatic Traffic Recorder (ATR) counts were collected for one full week
concurrently with the TMC. Traffic data collection occurred in May and June
2023 while school was in session; weekday TMC data was collected on a
midweek day. Based on a review of the traffic count data, the peak hours for the
Traffic Study Area were determined to be as follows:
Weekday AM peak hour: 7:15–8:15 AM
Weekday PM peak hour: 4:00–5:00 PM
Saturday Midday peak hour: 12:00–1:00 PM
To determine whether the proposed facility would have a significant adverse
impact for which mitigation would be required, the following industry standard
criteria were used: (1) a change in Level of Service (LOS) D or better to LOS E
or F; (2) a change from LOS E to LOS F; or (3) an increase of 10 percent or
greater in traffic volumes for LOS F. In addition, and as explicitly set forth in the
Scoping Document, mitigation measures could be required by the Town in certain
circumstances that do not meet the industry standard criteria.
Existing Conditions
Traffic operating conditions at each Traffic Study Area intersection were
analyzed using the Synchro percentile delay (for signalized intersections) and the
HCM (for unsignalized intersections) methodologies, to compute delays, volume
to capacity (v/c) ratios, and LOS.
LOS D operations during peak hours are generally considered to be acceptable
operating conditions for signalized and unsignalized intersections. The following
intersections and lane groups were operating at LOS E and/or F in the existing
condition:
Barger Street and U.S. Route 6
Northbound left turn/through turn movement – Weekday PM peak
hour: LOS F
East Main Street and U.S. Route 6
Eastbound left turn movement – Weekday PM peak hour: LOS F
Southbound left turn/through/right turn movement – Weekday AM
peak hour: LOS F, Saturday Midday peak hour: LOS F
Put another way, in the existing condition, the left turn from U.S. Route 6 onto
East Main Street operates at an LOS F in the morning, while in the afternoon and
during midday on Saturday, the turns from East Main Street onto U.S. Route 6
operate at an LOS F.
No Action Condition
Existing condition traffic volumes were then increased to establish a baseline
condition that would be expected to occur in the future with or without the
proposed facility through the following. It is to this “No Action” condition that
the impacts of the proposed facility are compared.
The existing condition traffic volumes were increased by 1.0 percent per year
from 2023 (existing year) to 2026 to account for background growth, resulting
in an overall compounded growth rate of 3.03 percent; and
Findings Statement
FINAL 33 05/13/2025
Trips were added from other pending developments (“No Action projects”)
located in the vicinity of the Project Site.
The “No Action project” list was developed in coordination with the Town.
Project traffic volumes for developments marked with an * were based data
provided by the Town. Traffic volumes associated with the other No action
projects were estimated using ITE standards.
Roc-Shrub Oak Associates
3000 Navajo Road*
670 East Main Street
The Links at Valley Fields
In the No Action condition, in addition to the intersections/lane groups operating
at LOS E or LOS F in the existing conditions, the eastbound left turning from
U.S. Route 6 onto East Main Street would also operate at LOS F in the midday
on Saturday.
With Action Condition
Facility generated trips were estimated using industry standard factors that were
determined by the Town’s traffic consultant to be appropriate and conservative,
in that they assumed the higher end of the range of potential facility-generated
trips. These trips were added to the network and the resulting “With Action”
condition was compared to the “No Action” condition to determine the facility’s
impact to each intersection.
C.11.d.i Original Project
The Original Project would generate 108, 128, and 80 total vehicle trips
during the Weekday AM, Weekday PM, and Saturday Midday peak
hours, respectively. Absent mitigation the Original Project would result
in significant impacts at the East Main Street and U.S. Route 6
intersection as follows:
Eastbound left turn movement – Weekday AM peak hour (degrade
from LOS D to LOS E)
Eastbound left turn movement – Weekday PM peak hour, Saturday
Midday peak hour (increase of 10 percent or greater in traffic
volumes for LOS F)
Southbound left turn/through/right turn movement – Weekday AM
peak hour (increase of 10 percent or greater in traffic volumes for
LOS F).
C.11.d.ii Alternative Site Layout
The Alternative Site Layout would result in 90, 111, and 60 total vehicle
trips during the Weekday AM, Weekday PM, and Saturday Midday peak
hours, respectively. The Alternative Site Layout would result in a
significant impact at the East Main Street and U.S. Route 6 intersection
as follows:
800 East Main Street Redevelopment
05/13/2025 34 FINAL
Southbound left turn/through/right turn movement – Weekday AM
peak hour (increase of 10 percent or greater in traffic volumes for
LOS F).
Traffic Mitigation
Measures to mitigate the impact at the East Main Street and U.S. Route 6
intersection that would occur with both the Original Project and the Alternative
Site Layout were evaluated. One such alternative, construction of a roundabout at
the East Main Street and U.S. Route 6 intersection, was determined to be
infeasible due to the amount of space required for a roundabout of sufficient
diameter and the corresponding land takings that would be necessary. Another
option, creating an alternative access into the Project Site, was evaluated and
determined to be not practicable (see Section C.11.g, “Alternative Site Access”).
Based on the operating conditions at the intersection and traffic volumes that meet
signal warrant criteria, it was determined that the East Main Street and U.S. Route
6 intersection and the adjacent East Main Street and Old Route 6 intersection,
which experiences similar turning volumes, should be signalized. These two
closely spaced intersections are proposed to operate using one controller as a
“clustered” intersection, such that turning vehicles between U.S. Route 6 and East
Main Street would be able to continue their trip without stopping between the new
traffic signals. In addition to the new traffic signals, additional mitigation
measures were identified at the intersection, including:
Extending the existing eastbound left turn lane on U.S. Route 6 to 300 feet.
Adding a northbound right lane at the Old Route 6 and East Main Street
intersection so that the northbound movement has dedicated lanes for left and
right turns.
Restricting left turns from East Main Street onto U.S. Route 6.
With the implementation of these measures, all lane groups at both affected
intersections would operate at an acceptable LOS D, or better, during all peak
hours.
The Town Board closely examined the practical implications of signalizing these
intersections to ensure that the signals would have the intended benefits and
would not have adverse unintended consequences. In essence, signalizing these
two intersections would reduce vehicle conflicts (e.g., left turns onto East Main
Street and right turns onto U.S. Route 6), by providing separate, dedicated, time
for the movements. This dedicated time would improve safety conditions as well
as reduce delays for these turning movements, which experience significant
queuing under existing conditions. Further, by doubling the length of the
eastbound left turn lane on U.S. Route 6, a total of 12 to 15 vehicles would be
able to safely queue without interfering with the mainline. Finally, the “clustered”
signal design dedicates time for vehicles turning left off of East Main Street onto
Old Route 6 that are heading toward the Project Site. Given that the proposed
facility would result in increased utilization of this movement, it is paramount that
the proposed signalization provides sufficient vehicle queuing space and time to
turn left so as not to back up onto U.S. Route 6. The analysis determined that the
proposed signalization will achieve this goal. Nonetheless, to enhance the safety
of this movement, the Town Board requires the final signal design to be
Findings Statement
FINAL 35 05/13/2025
coordinated with the U.S. Route 6 signals at the Taconic State Parkway and at
Barger Street, which are currently part of a coordinated system, so that vehicles
would be less likely to make an additional stop as a result of the proposed signal
at U.S. Route 6 and East Main Street. This shall be the responsibility of the
Applicant.
For the reasons discussed above, the Town Board requires the identified
mitigation measures to be implemented by the Applicant. This requirement shall
be made a condition of site plan approval of the Revised Proposed Project.
To further improve the operation of the “clustered” intersection and reduce the
potential for adverse impacts as a result of the new traffic signal, the proposed
new signals shall be coordinated with the U.S. Route 6 signals at the Taconic State
Parkway and at Barger Street, which are currently part of a coordinated system,
such that vehicles would be less likely to make an additional stop as a result of
the proposed traffic signal at U.S. Route 6 and East Main Street. This shall be the
responsibility of the Applicant.
The TIS addresses the cumulative impact of the proposed facility together with
the “No action projects.” As demonstrated by the analysis, the mitigation
measures proposed for the U.S. Route 6 and East Main Street intersection would
not only accommodate additional vehicles generated by the proposed facility, but
also additional traffic generated by the potential future No action projects within
the corridor. The Town Board therefore finds that the measures required to
mitigate the impacts of the facility are appropriately designed to accommodate
potential future growth in the corridor.
Recognizing that the future No action projects along the U.S. Route 6 corridor
may result in impacts to other intersections, the Town Board finds that it is
appropriate for the new signals to be designed and constructed with adaptive
technology (e.g., communications, sensors, etc.) so that they could be part of a
potential future adaptive traffic control system along the corridor. Incorporating
this technology at the new traffic signals shall be the responsibility of the
Applicant and confirmed during the signal design phase. For such corridor-wide
coordination to occur in the future, the other traffic signals along the U.S. Route
6 corridor require hardware and software updates. The updates to these signals,
which is not the responsibility of the Applicant, could cost between $20,000 and
$100,000 per intersection depending on the type of system ultimately
implemented.
The mitigation measures described above for the “clustered” East Main Street and
U.S. Route 6 and East Main Street and Old Route 6 intersection are subject to the
review and approval of the NYSDOT. While these measures may improve upon
existing conditions, they would not be necessary in the absence of the Revised
Proposed Project and, therefore, are properly the responsibility of the Applicant.
The Town Board finds that these measures are necessary to mitigate the impacts
of the Revised Proposed Project, including increased delays, potential decreases
in vehicular safety, and the addition of conflicting movements at an intersection
that is functional, but constrained. In addition, and as necessitated by the results
of the traffic analysis described above, the Town Board finds that the following
items shall be considered in the traffic signal design phase:
800 East Main Street Redevelopment
05/13/2025 36 FINAL
“Back of Queue” detectors to prevent spillback onto U.S. Route 6.
Additional conduit to facilitate future connections with the signals at Lee
Boulevard.
Mast arm or span wire support.
Context-sensitive materials for the Old Route 6 intersection reflective of its
location as a gateway to the hamlet.
Appropriate drainage.
A Work Zone Traffic Control/ Maintenance of Traffic Plan.
All other design and construction details required by the NYSDOT.
Finally, the Town Boards finds that should NYSDOT require additional measures
to mitigate the impacts of the Revised Proposed Project beyond those identified
above, the Applicant shall be responsible for implementing those improvements.
Pedestrian and Bicycle Conditions
Within the Project Site, internal sidewalks between buildings would be provided.
Due to the steep grade of the Project Site and driveway, which exceeds 10 percent,
together with the fact that there are currently no sidewalks along Old Route 6 and
East Main Street, the Revised Proposed Project does not include sidewalks along
its driveway. However, during the site plan approval process, the safety of
pedestrians that may occasionally use the Project Site driveway in the absence of
sidewalks shall be considered in the final driveway design. In addition, and
consistent with the Town’s comprehensive planning and community goals, during
the traffic signal design phase, the Applicant and the Town would investigate the
possibility of adding sidewalks along East Main Street and the feasibility of new
sidewalks along East Main Street. The responsibility for constructing and
maintaining potential new sidewalks (e.g., Applicant, Town, other parties) will be
determined during this investigation.
The potential for shuttle service for residents was considered. It is not anticipated
that there would be sufficient demand at an active age-restricted facility to make
shuttle service feasible. Demand would be evaluated when the facility reaches
stabilized (95%) occupancy, and if it sufficient to warrant the service, a shuttle
would be provided as a resident paid amenity.
Alternative Site Access
The potential for creating a secondary means of access to the Site was evaluated,
including:
Direct access from U.S. Route 6 between at the Parkway northbound ramps.
Additional driveway connection from the cul-de-sac at Old East Main Street
to the eastern side of the Site.
Based on the analysis in the DEIS, the Town Board finds that the steepness of the
grade between the Project Site and U.S. Route 6 and Old Route 6 make it
infeasible to provide a direct secondary connection to the Project Site. Therefore,
the Town Board finds that improvements to the existing driveway are appropriate
and necessary to accommodate the traffic of the Revised Proposed Project as well
as to improve conditions for emergency vehicles. Specifically, the existing 24-
feet wide roadway would be expanded 8 feet, for a total width of 32 feet. The
Findings Statement
FINAL 37 05/13/2025
driveway would establish two, 10-feet-wide travel lanes with a 12-feet-wide
center strip that would act as an emergency lane. The emergency lane would be
constructed of grass pavers, designed to bear the load of emergency vehicles.
Final details regarding the driveway improvements would be discussed during the
site plan approval process. The Town Board finds that with the improvements to
the existing driveway, the Revised Proposed Project provides adequate site
access.
Parking Conditions
To serve the Revised Proposed Project’s 180 dwelling units and amenities, 270
parking spaces are proposed, in compliance with Town Code. As the Revised
Proposed Project would comply with the Town Code parking requirement,
significant adverse parking impacts are not anticipated, and no mitigation is
required.
Crash History and Safety Assessment
The DEIS identifies improvements that the Town and/or NYSDOT could
consider making to improve vehicular safety based on the existing conditions.
These improvements are not required to mitigate an impact of the proposed
facility and are not the responsibility of the Applicant. Rather, they were provided
for informational purposes as required by the adopted Scoping Document:
Barger Street and U.S. Route 6
Install yellow retroreflective signal backplates to improve signal visibility;
Improve roadway surface friction through repaving and high-friction surface
treatments; and
Install “slippery when wet” Manual on Uniform Traffic Devices
(MUTCD)W8-5 sign along U.S. Route 6.
Lee Boulevard and U.S. Route 6
Install yellow retroreflective signal backplates to improve signal visibility;
Improve roadway lighting at the intersection;
Review the clearance intervals at the intersection and revise as needed;
Improve roadway surface friction through repaving and high-friction surface
treatments; and
Install “slippery when wet” MUTCD W8-5 signs along U.S. Route 6.
Hill Boulevard and U.S. Route 6
Install yellow retroreflective signal backplates to improve signal visibility;
Install lane line extensions through the intersection to delineate space for left
turning vehicles;
Install left turn flashing yellow arrow signals for permitted left turns with
supplemental traffic signs with text “Left Turn Yield on Flashing Yellow
Arrow”; and
Improve roadway lighting at the intersection.
800 East Main Street Redevelopment
05/13/2025 38 FINAL
AIR QUALITY
The potential adverse impacts to air quality resulting from the Original Project were
analyzed. A stationary source screening analysis was performed to assess potential air
quality impacts associated with emissions from heat and hot water systems for each of the
buildings of the Original Project, which proposes a total of 250 residential units
throughout 24 buildings. The screening procedures utilize information regarding the type
of fuel to be used, the maximum development size, the heat and hot water systems’
exhaust stack height, and the distance to the nearest building of similar or greater height.
For this analysis, it was conservatively assumed that natural gas would be used for the
buildings’ HVAC systems, and that the exhaust stack(s) would be located three feet above
roof height. The screening analysis concluded that the Original Project would not result
in a significant adverse air quality impact. The Town Board finds that because the Revised
Proposed Project would be less development on the Project Site than the Original Project
and Alternative Site Layout, the Revised Proposed Project’s HVAC systems would
likewise not result in a significant adverse air quality impact, and therefore no mitigation
is required. If the Revised Proposed Project’s HVAC systems are electric and not natural
gas, there would be no adverse air quality impacts from the HVAC systems.
A mobile source screening analysis was also performed. The area roadway intersections
analyzed were reviewed based on NYSDOT’s Transportation Environmental Manual
(TEM) criteria for determining locations that may warrant a microscale air quality
analysis. The screening analysis examined the Level of Service and projected traffic
volume increases by intersection. The results of the screening analysis demonstrated that
none of the intersections affected by the Original Project (and thus by the Revised
Proposed Project) required a detailed microscale air quality analysis, indicating that the
Original Project would not have a significant adverse air quality impact. As the Revised
Proposed Project would generate less traffic than the Original Project, the Town Board
finds that the traffic associated with the Revised Proposed Project would not have a
significant adverse air quality impact, and therefore no mitigation is required.
NOISE
The Town Board required the Applicant to undertake sound monitoring to determine
existing ambient sound levels during different times of the day and night along the Project
Site property boundaries and in the vicinity of the Project Site. A total of three receptor
locations were selected for evaluation of existing and future noise levels:
Receptor 1: Old Route 6 between East Main Street and Project Site.
Receptor 2: Southwest corner of Project Site.
Receptor 3: Approximate center of Project Site.
The receptor locations were selected to represent noise-sensitive uses (e.g., residences)
near the Project Site as well as representing the Project Site itself. At each receptor
location, existing noise levels were determined by field measurements, and noise
monitoring was performed.
Roadway traffic on Old Route 6 and U.S. Route 6 was the dominant noise source at
Receptor 1, and roadway traffic on the Parkway was the dominant noise source at
Receptors 2 and 3. Noise levels along adjacent roadways in the study area are moderate
Findings Statement
FINAL 39 05/13/2025
to relatively high, reflecting the proximity to the roadway and the level of vehicular
activity present.
In the future, due to relatively small changes in the volume of vehicular traffic on
roadways near the Project Site, noise levels would increase by up to approximately 0.4
dBA with the Original Project, which would not be perceptible. As the Revised Proposed
Project would generate less traffic than the Original Project, the increase in noise as a
result of traffic would be less than 0.4 dBA. No change in noise levels would occur at
Receptors 2 and 3, because the dominant noise source at these Receptors is the Parkway,
and the volume of vehicular traffic on this roadway is not expected to substantially change
in the future.
The Revised Proposed Project would include amenity features that are expected to
generate noise. However, noise generated from an age-restricted residential development
would not be more noticeable than the noise generated from traffic on the Parkway. In
addition, the outdoor amenity spaces would be located at least 500 feet away from the
nearest existing receptors (i.e., residences along Old Route 6 or Donald J. Trump State
Park) and would not be frequently used during night-time hours when residences would
be most sensitive to noise. As a result, the Town Board finds that the amenity features of
the Revised Proposed Project do not have the potential to result in significant adverse
noise impacts to proximate off-site receptors.
The Revised Proposed Project would include building mechanical systems that have the
potential to generate noise. To minimize potential impacts, the building mechanical
systems shall be located and designed to avoid producing significant noise level
increments at nearby receptors. The final design of these systems shall be reviewed during
the Planning Board’s site plan approval process to confirm that no significant noise level
increment would result.
Maximum measured and predicted noise levels from all sources throughout the Project
Site (as represented by Receptors 2 and 3) would not exceed the 65 dBA criteria
recommended by the New York State Department of Environmental Conservation
(NYSDEC) guidelines for residential use. The Town Board finds that noise exposure at
the Revised Proposed Project would not be a significant adverse impact.
The Town Board finds that the Revised Proposed Project would not result in significant
adverse impacts at nearby residential receptors and that future interior noise levels in the
proposed buildings would be acceptable for residential use. Thus, the Revised Proposed
Project would not result in significant adverse impacts from noise.
HAZARDOUS MATERIALS
A Phase I Environmental Site Assessment (“ESA”) of the Project Site was performed by
William Silveri, LLC (“WVS”) on April 11, 2022. The ESA was performed in
conformance with the scope and limitations of ASTM International (ASTM) Standard
Practice E1527-21. The ESA was conducted to identify recognized environmental
conditions (“RECs”) and any other environmental concerns associated with the Project
Site resulting from past or current Project Site usage and usage of neighboring properties.
The ESA does not identify any RECs at the Project Site; however, certain “de minimis”
conditions and business environmental risks are identified.
800 East Main Street Redevelopment
05/13/2025 40 FINAL
Regarding de minimis conditions, historic aerial photographs indicate an orchard or other
agricultural use between 1941 and 1954. The potential extent and impacts of historic usage
of herbicides and pesticides is a de minimis condition because the former agricultural use
appears to affect only limited areas of the Project Site and limited information is available
pertaining to the use herbicides and pesticides at the Project Site.
There is one (1) 2,500-gallon No. 2 fuel oil underground storage tank (UST), one (1)
2,000-gallon UST at the Project Site and one (1) 1,000-gallon UST at the Project Site. The
ESA concludes that they are unlikely to have caused a significant release due to their age
and date of operation, their design, and their oversight by the building maintenance staff.
On August 23, 2023, an on-site assessment was performed by the Applicant’s consultant,
AKRF, Inc., to confirm the findings of the ESA and existing site conditions. The August
2023 assessment was conducted using ASTM methodology and included: an inspection
of the Project Site; reconnaissance of the vicinity; interviews with the Project Site facilities
manager; a review of historic fire insurance (Sanborn) maps and Town directories; a
review of aerial photographs and historical topographic maps, historical resources, and
the ESA; a review of regulatory databases, including NYSDEC and U.S. Environmental
Protection Agency records; a review of available files maintained by the Town of
Yorktown Tax Assessor, Town Building Department, and Town Fire Marshal; and a
review of the WCDOH records and the updated Petroleum Bulk Storage registration
certificate. Each of the findings of the ESA was confirmed, and two additional de minimis
conditions were identified as well:
Although the USTs and two 50-gallon above-ground storage tanks (ASTs) at the
Project Site would typically be considered a REC based on the age of the tanks, their
date of operation, their design, and because the USTs and their leak detection systems
are regularly inspected by building maintenance staff, the USTs and ASTs are
considered to be a de minimis condition.
On October 11, 2011, a tank tightness failed on the 2,000-gallon UST, and a spill was
reported to NYSDEC (Spill No. 1108736). Based on the tank closure report, the
former 2,000-gallon fuel oil UST is considered a de minimis condition.
On June 2, 2022, GLS Inspection LLC (“GLS”) of Fairlawn, New Jersey performed a
comprehensive pre-demolition asbestos containing materials (ACM) survey to determine
the potential for the buildings to contain ACM. The results of the ACM survey are
presented in GLS’s June 2022 Non-ACM Report, which concludes that no ACMs were
found on the interior or exterior portions of the Project Site. Since the current buildings
on the Project Site were developed after the use of lead based paint (LBP) was banned in
1978, the presence of LBP is unlikely and was not tested.
To avoid and mitigate the potential for any adverse impacts, the Town Board finds that
the Revised Proposed Project shall include the following mitigation measures:
Prior to Project Site redevelopment, the USTs and ASTs shall be taken out of service
and removed in accordance with the prevailing regulations and requirements, the
registration shall be closed with NYSDEC and/or the WCDOH, and any contaminated
soil (if encountered) shall be addressed in accordance with applicable regulations.
Any soil or fill excavated as part of future Project Site redevelopment activities shall
be managed in accordance with applicable regulations. All material intended for off-
site disposal shall be tested in accordance with the requirements of the intended
Findings Statement
FINAL 41 05/13/2025
receiving facility. Transportation of soil leaving for off-site disposal shall be in
accordance with requirements covering licensing of haulers and trucks, placarding,
truck routes, manifesting, etc. If more significant soil contamination is discovered,
such contamination shall be further investigated and/or remediated in accordance with
applicable regulations.
If any additional or previously unknown USTs and/or petroleum contaminated soil
are encountered, the tanks shall be closed in accordance with applicable NYSDEC
and WCDOH regulations, and any contaminated soil shall be properly removed.
If any additional suspect ACMs are encountered during demolition, the material shall
be sampled in accordance with applicable regulations. If any of the tested materials
are positive for ACM (greater than 1 percent asbestos), they shall be removed prior to
demolition by a licensed asbestos abatement contractor in accordance with applicable
regulations.
If dewatering is required during construction, treatment and discharge of dewatering
fluids shall be conducted in accordance with all applicable regulations, including
obtaining any required permits.
The Soil Erosion and Sediment Control plan (“ESCP”) shall be implemented in
accordance with NYSDEC SWPPP requirements.
A Soil Management Plan shall be prepared prior to site demolition and grading
activities to address removal and closure of the on-site USTs and ASTs and any
previously unknown tanks (if encountered), petroleum contamination, and/or residual
contamination (if encountered) during construction, and also to identify procedures
for testing and handling any soil intended for off-site disposal.
The Town Board finds that with the implementation of the mitigation measures noted
above, no significant adverse impacts related to hazardous materials would occur as a
result of the Revised Proposed Project.
CONSTRUCTION
Construction of the Revised Proposed Project is expected to take approximately 30
months and would be conducted in a single phase, differentiated by six stages: (1)
perimeter fencing and tree clearing [8 to 10 weeks]; (2) mobilization, earthwork, and site
utilities [16 weeks]; (3) foundations and site stabilization [18 weeks]; (4) building framing
and mechanical/electrical/plumbing rough-in [35 weeks]; (5) interior finishes [35 weeks];
and (6) site work, landscaping, and occupancy [16 weeks].
During the site plan approval process, and based on the final building and site design, the
Applicant shall prepare a detailed Construction Management Protocol (“CMP”), which
shall formalize the measures to avoid and mitigate potential adverse impacts described
below. The Town-approved ESCP shall meet State and Town requirements, and shall
detail how the Project Site would be protected from erosion and sedimentation during
construction activity when soil would be disturbed, in order to avoid and mitigate potential
impacts associated with the off-site migration of sediment during construction.
To avoid an adverse impact from soil erosion, the Revised Proposed Project shall conform
to the requirements of the applicable NYSDEC State Pollution Discharge Elimination
System (SPDES) General Permit for Stormwater Discharges Associated with
Construction Activity, the applicable “New York State Standards and Specifications for
Erosion and Sediment Control,” and Chapter 248 “Stormwater Management and Erosion
800 East Main Street Redevelopment
05/13/2025 42 FINAL
and Sediment Control” of the Town Code. The SPDES permit requires that projects
disturbing more than one acre of land must develop a SWPPP, containing both temporary
erosion control measures during construction and post-construction stormwater
management practices.
The preliminary SWPPP for the Revised Proposed Project includes an ESCP requiring the
following measures: silt fencing, stabilized construction entrance, drainage diversion
methods to minimize erosion during grading, and erosion control matting and seeding. In
addition, to reduce the potential for fugitive dust emissions, on-site construction vehicle
speed shall be limited to 5 mph and truck covers/tarp rollers to cover fully loaded trucks
shall be utilized.
Construction of the Revised Proposed Project would create daily construction-related
traffic to and from the Project Site, including construction workers and the delivery of
materials and equipment. The CMP shall provide that all construction worker parking,
equipment loading, unloading, and queuing would occur on-site, no construction vehicles
shall be permitted to park or queue on any public roadway, and construction vehicles
(including but not limited to trucks, trailers, and oversized vehicles) shall be prohibited
from using the U.S. Route 6/East Main Street intersection for access to or from the Project
Site, and instead, shall be required to access East Main Street from the east at Lee Blvd.
or Hill Blvd.
The Town Board finds that the Original Project would result in a maximum net export of
approximately 81,836 cubic yards of earthen material from the Project Site, and the
Alternative Site Layout would result in a maximum net export of approximately 8,915
cubic yards. In comparison, the Revised Proposed Project would result in a maximum net
export of 700 cubic yards of earthen material. Removal of this material would occur
intermittently over the course of construction. Only material that could not be re-used to re-
establish grades would be exported off-site. If all of the “net cut” material is removed from
the Project Site, approximately 39 trucks trips would be required, based on 18 cubic yards
per truck, compared to 4,546 truck trips for the Original Project, and 496 truck trips for
the Alternative Site Layout.
The Town Board finds that construction of the Revised Proposed Project would result in
typical pollutant emissions from on-site construction equipment, construction vehicles
traveling to the Project Site, and potential fugitive dust emissions. Measures to reduce
fugitive dust and emissions from construction vehicles to the maximum extent practicable
shall be incorporated into the Revised Proposed Project. Implementation of these
measures would avoid and minimize potential adverse air quality impacts during
construction, in accordance with all applicable laws, regulations, and building codes. An
adjacent existing residence located southeast of the Project Site would be the closest
sensitive air quality receptor location. Construction activities shall be set back from the
eastern perimeter of the Project Site by at least 100 feet, with most activities being located
more than 200 feet from the Project Site’s eastern property line. The Revised Proposed
Project would maintain existing trees and vegetation between the perimeter of the Project
Site and the areas of construction—minimizing the potential for emissions to travel from
the Project Site to the residence.
The Town Board finds that construction of the Revised Proposed Project is expected to
result in elevated noise levels at nearby receptors during certain periods of construction.
However, noise from construction would be intermittent and of limited duration. While
Findings Statement
FINAL 43 05/13/2025
rock hammering may be required, it is not anticipated that the Revised Proposed Project
would require blasting. There are no sensitive receptors in the immediate vicinity with the
exception of three single family houses near the southeast corner of the Project Site along
Old Route 6. Construction activities shall comply with the hour limitations set forth in
Chapter 216 of the Town Code, to minimize noise intrusion from construction activities
during weekends and nights when residential uses are more sensitive to noise. In addition,
construction equipment utilized shall incorporate sound attenuation practices to further
reduce the potential impact to the residences. Based on the temporary and intermittent
nature of construction noise incident at surrounding noise receptors, together with the fact
that the construction activities with the most potential to create a significant noise impact
would occur proximate to the three identified residences for a short period of time, the
Town Board finds that the potential noise generated by construction of the Revised
Proposed Project would not create a significant adverse noise impact.
The potential for construction truck traffic to adversely affect the Hyatt House, built circa
1732, was analyzed. Pursuant to construction vibration analysis procedures established in
the Federal Transit Administration's (FTA) Transit Noise and Vibration Assessment
Manual (September, 2018), loaded trucks passing by the Hyatt House at a distance of 45
feet (which is the approximate distance between the structure and the pavement edge of
Old Route 6) would result in Peak Particle Velocity of 0.031 inches/second. According to
FTA guidance, the threshold of potential damage for "buildings extremely susceptible to
vibration damage" is 0.12 inches/second. Vibration levels from operation of demolition
equipment on the Project Site within the limit of disturbance of the Revised Proposed
Project would be even lower at the Hyatt House, which is approximately 125 feet from
the disturbance areas. However, the projected vibration level of 78 VdB from loaded
trucks passing the Hyatt House would be expected to result in annoyance at a frequency
of 30 times per day or greater.
Although construction of the Revised Proposed Project would be unlikely to cause
structural damage to the Hyatt House, the Town Board finds that the Applicant shall
conduct a pre-construction survey of the Hyatt House, which would be compared to post-
construction conditions. In addition, the Applicant shall conduct vibration monitoring
during the period of construction that has the greatest levels of vibration and, therefore,
the largest potential to adversely affect the Hyatt House. Vibration alert thresholds would
be set to provide a warning before vibration levels reach the threshold of potential damage.
Upon receiving an alert, the construction team would determine the specific cause of the
elevated vibration level and if that activity continued to produce elevated vibration levels,
construction means and methods would be reviewed. As necessary, construction means
and methods would be altered to ensure that vibration would not result in damage to the
Hyatt House.
The Town Board finds that with these measures, the Revised Proposed Project would not
result in a significant adverse impact to the Hyatt House from construction activities and
adverse impacts would be mitigated to the maximum extent practicable.
The Town Board finds that the following measures, which shall be incorporated as part of
the Revised Proposed Project, would mitigate construction noise levels to the maximum
extent practicable:
Construction activities shall be conducted in compliance with the Town’s existing
noise regulations (Chapter 216 of the Town Code), including local day and hour
800 East Main Street Redevelopment
05/13/2025 44 FINAL
construction limitations. As required, construction activities on the Project Site shall
be limited to the hours of 7:00 AM–11:00 PM during the week and from 8:00 AM–
10:00 PM on weekends and legal holidays;
As early in the construction period as logistics allow (pending provision of adequate
electrical service by the local utility provider), diesel- or gas-powered equipment shall
be replaced with electrical-powered equipment such as welders, water pumps, bench
saws, and table saws to the extent practicable;
Trucks shall not be allowed to idle more than 3 minutes at the Project Site;
Contractors and subcontractors shall be required to properly maintain their equipment
and mufflers; and
Where logistics allow, noisy equipment, such as cranes, concrete pumps, concrete
trucks, and delivery trucks, shall be located away from, and shielded from, the three
single-family houses located along Old Route 6.
The Town Board notes that while rock hammering may be required, it is not anticipated
that the Revised Proposed Project would require blasting. To the extent blasting is
determined to be necessary, it shall be conducted in accordance with Town regulations,
including Town Code Chapter 124, “Blasting and Explosives,” and all required permits
would be obtained. If required by final design of the Revised Proposed Project and
geotechnical investigations, a site-specific blasting protocol would be finalized during the
site plan approval process, and shall ensure that all blasting activities would be protective
of public health and safety to the maximum extent practicable. At a minimum, any blasting
protocol for the Revised Proposed Project shall require that:
Blasting activities would comply with applicable Town, County, and State codes;
Blasting activities would be monitored by a licensed professional engineer;
No blasting would take place without the proper permits being issued by the Town,
including but not limited to a blasting permit;
The blasting contractor would provide the Town with proof of adequate liability
insurance;
All blasts would be covered with metal rope or metal matting, or other suitable screens
of sufficient size, weight and strength, to prevent the escape of broken rock or other
material;
All residents within 300 feet of the proposed blast location would be notified as to the
date and time that blasting would take place;
Blasting would not be conducted after 5:00 pm or before 8:00 am, nor would it be
conducted on a Sunday;
No explosives would be stored on-site overnight; and
During blasting operations, explosives would be stored separately from igniters,
explosives would be stored in appropriate magazines, and no more than a one-day
supply of explosives would be stored on-site.
With the incorporation of the above protocol, the Town Board finds that no significant adverse
impacts related to construction and blasting activities would occur as a result of the Revised
Proposed Project and that adverse impacts would be mitigated to the maximum extent practicable.
Findings Statement
FINAL 45 05/13/2025
ALTERNATIVES
SEQRA requires a description and evaluation of a range of reasonable alternatives to the Original
Project that are feasible, considering the objectives and capabilities of the Applicant. In addition
to the Original Project, Alternative Site Layout, and Revised Proposed Project, four other
alternatives were studied:
No Action – Existing Site Conditions and Re-Occupancy of Office Buildings
Under this alternative the Proposed Zoning would not be adopted, the Project Site
would continue to be zoned OB District, and no demolition of existing
improvements or new construction would occur at the Project Site. The Project
Site would continue to be improved with approximately 63,617 sf of office space
within the two existing office buildings, as well as the surface parking lots and
landscaping. This alternative assumes that absent the Original Project, the office
buildings would be fully re-occupied by office tenants, and that no new structures
or site improvements would be constructed. Given market conditions and trends
and the limited occupancy of the Project Site’s office buildings during the past
several years, the Town Board finds that full occupancy of the office buildings in
the future is unlikely.
This alternative would not meet the Town’s housing goals, would not result in
increased tax revenue to the Town, and, despite increases in traffic from current
levels, would not result in mitigation measures being implemented at the U.S.
Route 6 and East Main Street intersection, which would continue to operate at
LOS F.
The Town Board finds that this alternative would not meet the Applicant’s
purposes and need, would not be consistent with the Town’s goals, and would not
result in financial benefits to the Town.
Development Under Existing OB District Zoning
This alternative considers development of the Project Site to the maximum extent
permitted under the existing OB District regulations. A hypothetical site plan was
developed for this analysis, in which the two existing office buildings were
retained, and three additional office buildings as well as additional parking areas
to serve those new buildings were constructed. In total, this alternative would
result in 204,901 sf of office space, of which 141,284 sf would be newly
constructed space, and a total of 608 parking spaces, an increase of 320 spaces.
One new office building would be constructed to the south of the two existing
office buildings. This east building would be developed in an area with steep
topography, to the south of the existing parking lot. The other two newly
constructed office buildings would be north of the existing site improvements, in
a currently undisturbed (wooded) area of the Project Site. The new parking areas
required for these two buildings would cover approximately 7.9-acres of the
Project Site.
The Town Board notes that the Comprehensive Plan identifies the Project Site in
Policy 4-63, which recommends that the Town “promote corporate or multi-
tenant office development in select locations near major entrances to the Taconic
Parkway and Route 6” (page 4-33). The Town Board recognizes that the
economic realities of corporate office parks in the region have evolved since the
800 East Main Street Redevelopment
05/13/2025 46 FINAL
Comprehensive Plan’s adoption approximately 15 years ago, making re-use of
existing office campus economically infeasible. The Town Board therefore finds
that Policy 4-63 does not inform the redevelopment of the Project Site.
This alternative would result in 13.62 acres of disturbance, more than double the
6.29 acres that would be disturbed by the Revised Proposed Project. It would also
result in 18.2 acres of impervious surface, nearly three times the 6.18 acres of
impervious surface of the Revised Proposed Project. Additionally, this alternative
would generate nearly three times the number of weekday peak hour vehicle trips
generated by the Original Project. In addition to signalizing the East Main Street
and U.S. Route 6 intersections, as is required of the Revised Proposed Project, it
is likely that improvements would be required at other intersections as well.
The Town Board finds that this alternative would not meet the Applicant’s
purposes and need, would not achieve the housing goals established in the
Comprehensive Plan, is likely not economically feasible, and would have the
potential for significant adverse traffic impacts.
Non-Age-Restricted Development
Under this alternative, the Project Site would be developed with the same layout
as the Original Project (250 residential units, with 200 rental units located
throughout 12 buildings (of varying building types), and 50 for-sale townhouses
throughout 12 buildings), but without an age-restriction.
Impacts of this Non-Age-Restricted Alternative would be mostly the same as the
Original Project owing to the identical building program. This alternative would
generate substantially similar property tax revenues as the Original Project. It
would be anticipated that under this alternative, approximately 45 public school
aged children would be generated. Although the cost to the School District of
educating these students would be covered by the property tax revenue, the Town
Board notes that the Revised Proposed Project is not anticipated to add any
students to the School District, and therefore, would not generate additional costs
to the School District. Demand for emergency services would be greater with this
alternative than the Original Project and the Revised Proposed Project owing to
the greater population that would be generated by this alternative (521 persons).
Impacts to traffic and transportation would be similar to those of the Original
Project and greater than the Revised Proposed Project and impacts to air quality
and noise, owing to the larger population and thus greater number of vehicle
trips),would be similar as well. In addition, and as was the case for the Original
Project, this alternative has the potential to result in an adverse stormwater quality
impact. The Town Board finds that this alternative is not preferred because the
potential adverse physical impacts to the environment are the same as the Original
Project. In addition, for this Project Site, a non-age-restricted alternative is less
preferable than the Revised Proposed Project based on a non-age-restricted
facility’s comparatively larger population, larger school impacts, and greater
impacts to the School District.
Development Under Existing RSP-2 District Regulations
This alternative studied a variation of the Alternative Site Layout to analyze the
potential environmental impacts of redeveloping the Project Site pursuant to the
Findings Statement
FINAL 47 05/13/2025
existing height and FAR requirements of the RSP-2 District. To evaluate this
alternative, the Applicant developed two RSP-2 District compliant plans, which
were compared to the Alternative Site Layout.
Option 1: Existing RSP-2 District Regulations with Fewer Residential Units.
This option would develop the Project Site with the same building footprint
as the Alternative Site Layout, but the multi-family buildings would each be
one story shorter to comply with the existing RSP-2 District height
requirement. This option would result in the development of 122 units in the
multi-family buildings, together with 20 cottages, for a total of 278,680
square feet of development. Based on the analysis in the DEIS, a 142-unit
facility would not meet the Applicant’s goals and needs as rental revenue
would not be sufficient to cover costs of construction, including fixed costs
of site preparation, utilities, and infrastructure. In addition, this 142-unit
alternative would require more site disturbance, more disturbance of forested
area, and result in more impervious surfaces than the 180-unit Revised
Proposed Project. Finally, since the Revised Proposed Project would not have
an adverse visual impact, the reduction in building height associated with this
alternative would not result in a noticeable change in potential visual impacts.
Option 2: Existing RSP-2 District Regulations with Larger Building
Footprint. This option would develop the Project Site with the same number
of units as the Alternative Site Layout (185 units). To achieve this program
in multi-family buildings that are one story less than the Alternative Site
Layout, the multi-family buildings would have larger footprints. While the
buildings in this option would not be as high as the Alternative Site Layout,
there would be little to no difference in visibility from the off-site Vantage
Points. The larger footprints for the multi-family buildings and the
development of a large parking field to the south and east of the buildings
would result in significantly greater total site disturbance than the Revised
Proposed Project. This option would also have the potential to result in more
tree clearing than the Revised Proposed Project, owing to the larger building
footprints and concomitant larger area of disturbance, and would result in
more impervious coverage, requiring larger stormwater management
practices than the Revised Proposed Project. The Town Board finds that this
Alternative is less preferable than the Revised Proposed Project because it
results in a larger area of disturbance on the Site.
CUMULATIVE IMPACTS OF PROPOSED ZONING TEXT CHANGE
The Proposed Zoning would apply to sites zoned RSP-2 that are greater than 25 acres. In
addition to the Project Site, there are two sites zoned RSP-2 that are greater than 25 acres:
the parcel located at 3770 Barger Street, which is presently developed with Trump Park
Residences and the parcels on Catherine Street, which were recently rezoned to RSP-2
and on which Toll Brothers is pursuing a development of approximately 118 townhomes.
The Town Board notes that neither the Barger Street parcel or the Catherine Street site are
likely to be affected as the former is already developed and the latter just received
approvals for their townhome development. In addition, and as noted above, the FAR in
the RSP-2 District would not be increased. Therefore, no new additional FAR would be
800 East Main Street Redevelopment
05/13/2025 48 FINAL
available to either site. Therefore, the Town Board finds that there would not be a
significant adverse cumulative impact as a result of the Proposed Zoning.
SUSTAINABILITY
Energy consumption would occur during construction and occupancy of the Revised
Proposed Project. During construction, energy would be used for power equipment and
various construction vehicles. Once construction is completed and the residences are
occupied, energy would be required for heating, air conditioning, lighting, and the use of
household appliances and electrical equipment.
To reduce the energy consumed by the Revised Proposed Project, energy efficient lighting
(i.e., LED lighting and activity-sensing and photovoltaic sensing lighting controls) and
appliances would be used. In addition, high-efficiency building envelope features,
including windows and facades, would be incorporated and HVAC systems would be
“right-sized.” The use of energy-efficient features would also reduce the greenhouse gas
emissions attributable to the Revised Proposed Project. During the site plan approval
process, and based on the advanced design of the facility, the Applicant shall consider
incorporating additional green approaches and green building technology, which could
include EV charging stations, indoor water use reduction (low-flow faucets, toilets,
fixtures), use of low Volatile Organic Compound (VOC) materials (paints, adhesives,
flooring), water metering, drip irrigation, and recycling of demolition materials.
Following approvals, the Applicant shall assess whether incorporation of solar power is
practicable. The Revised Proposed Project shall include electric vehicle chargers at
various locations within the Project Site. Building materials, to the extent possible, would
be recycled or locally sourced. In addition, the buildings would be designed to maximize
natural light and ventilation, reducing the need for artificial light and air conditioning. The
stormwater management features discussed in this Statement of Findings , which are based
on green practices, would be implemented.
The Applicant may also incorporate additional green building technology as part of the
Revised Proposed Project, to be determined during the site plan approval process,
including: indoor water use reduction (low-flow faucets, toilets, fixtures); energy efficient
appliances and equipment; use of low VOC materials (paints, adhesives, flooring); water
metering; drip irrigation; bicycle storage; light sensors and programmable thermostats;
and recycling of demolition materials.
The Town Board finds that the sustainability measures incorporated into the Revised
Proposed Project are consistent with the goals of the Town and Comprehensive Plan, that
the impacts on the use and conservation of energy are not significant, and no that no
further mitigation is required.
GROWTH-INDUCING ASPECTS
The Town Board finds that the Revised Proposed Project would not induce growth
elsewhere in the Town of Yorktown or surrounding region, as the Revised Proposed
Project is being proposed to serve a current and existing need—one that has been
identified in the Comprehensive Plan—to increase the amount and diversity of housing in
the Town. The Town Board acknowledges that throughout Westchester County and the
region there has been a decreased demand for corporate office park development and
increased demand for mixed-use and residential infill development.
Findings Statement
FINAL 49 05/13/2025
The Town Board finds that while the Revised Proposed Project would introduce 180 age-
restricted residential units, this population would not create significant new commercial
development pressure. The Town Board finds that the off-site spending of the Revised
Proposed Project’s residents would be expected to increase the patronage of existing
regional businesses, and not create demand for new development.
The Town Board finds that the Revised Proposed Project is not anticipated to induce
growth elsewhere in the Town, and that mitigation measures are not required.
IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES
The Town Board notes that certain resources, both natural and human-made, would be
expended in the construction and operation of the Revised Proposed Project. These
resources include use of the land, building materials, energy, and human effort (time and
labor) required to develop, construct, and operate the Revised Proposed Project. These
resources are considered irretrievably committed because their reuse for some purpose
other than the Revised Proposed Project is highly unlikely.
The land that makes up the Project Site is the most basic resource irretrievably committed.
The existing office buildings on the Project Site would be removed, and the previously
developed portion of the Project Site would be redeveloped with residential uses and
would not be available for another future use for some period of time. Given that much of
the Project Site is already developed, the Town Board finds that the redevelopment of the
Project Site for the Revised Proposed Project is not a significant or an adverse impact.
The actual building materials used in the construction of the Revised Proposed Project
(e.g., wood, steel, concrete, and glass) and energy (in the form of gas, diesel, and
electricity) consumed during the construction and operation of the Revised Proposed
Project or by construction equipment, and the various mechanical systems (heating, hot
water, and air conditioning), would be irretrievably committed. The Town Board finds
that this is not a significant impact.
Construction of the Revised Proposed Project would require a commitment of person
hours of labor, beneficial to the community, the local economy, and the construction
industry with respect to the generation of jobs. The Town Board anticipates that a portion
of the construction-related workers at the Project Site would come from Yorktown and
surrounding Westchester County communities. The Town Board finds that these workers
would have a positive impact on existing local businesses.
The Town Board finds that none of these irreversible or irretrievable commitments of
resources are a significant impact, and therefore no mitigation is required.
UNAVOIDABLE ADVSERE IMPACTS
The Revised Proposed Project would result in physical changes to, and new construction
and uses within, the Project Site. These changes would result in impacts to various
environmental resources; however, the Town Board finds that these potential impacts, as
described more fully above, would not be significant. The Town Board also finds that the
design of the Revised Proposed Project avoids certain impacts that would have occurred
with the Original Project and the Alternative Site Layout, and mitigates other potential
impacts to levels that are not considered significant. The Revised Proposed Project
800 East Main Street Redevelopment
05/13/2025 50 FINAL
proposes less intense development on the Project Site compared to the Original Project
and Alternative Site Layout.
The Town Board finds that the Revised Proposed Project would not result in unavoidable
significant adverse impacts, and that the mitigation measures incorporated into the project
and the additional measures required by this Findings Statement mitigate adverse impacts
to the maximum extent practicable.
Findings Statement
FINAL 51 05/13/2025
CERTIFICATE OF FINDINGS TO APPROVE THE ACTION:
Accordingly, having considered the DEIS and FEIS, the Town Board through this Findings
Statement, certifies that:
A. It has considered the relevant environmental impacts, facts and conclusions
disclosed in the DEIS and FEIS;
B. It has weighed and balanced the relevant environmental impacts with social,
economic and other considerations;
C. The requirements of 6 NYCRR Part 617 have been met;
D. Consistent with social, economic and other essential considerations from among
the reasonable alternatives available, the Revised Proposed Action avoids or
minimizes adverse environmental impacts to the maximum extent practicable;
and
E. Adverse environmental impacts will be avoided or minimized to the maximum
extent practicable by incorporating as conditions of the site plan approval of the
Revised Proposed Project the mitigation measures identified in the DEIS, FEIS
and this Statement of Findings.
Certified by the Town Board by Resolution adopted on _____________, 2025.
Town of Yorktown
By:_______________________
Diana Quast
Town Clerk