Loading...
HomeMy WebLinkAboutTB Resolution - 2025-05-13 - Findings Statement - AMS 800 E. Main StDiana L. Quast, Town Clerk OF Registrar of Vital Statistics dquast@yorktownny.org 434X"iy Telephone: (914) 962-5722 x 208 ti Fax: (914) 962 6591 1788 11. TOWN OF YORKTOWN 363 Underhill Avenue, P.O. Box 703 Yorktown Heights, NY 10598 This is a resolution adopted by the Town Board of the Town of Yorktown at its regular meeting held on May 13, 2025. Whereas, on October 24, 2022, 800 E Main Yorktown Dev AMS LLC submitted to the Town Board a petition for amendments to the Zoning Code of the Town of Yorktown modifying provisions of the RSP-2 Senior Citizens District of the Town and an amendment to the zoning map of the Town of Yorktown to rezone the parcel of land located at 800 East Main Street and known on the Tax Map of the Town of Yorktown as Tax ID# 5.19-1-15 from OB-1 Research Laboratory and Office District to RSP-2 Senior Citizens District to accommodate a proposed age-restricted residential redevelopment project(the"Petition"); and Whereas, on November 28, 2022, the Town Board circulated a Notice of Intent to assume the role of lead agency in connection with the environmental review of the Petition and related actions collectively, the "Proposed Action") pursuant the State Environmental Quality Review Act SEQRA") and the regulation Part 617 of the New York Code Rules and Regulations(the"SEQRA Regulations"); and Whereas, on March 7, 2023, the Town Board issued a Positive Declaration of Environmental Significance with respect to the Proposed Action pursuant to Section 617.7 of the SEQRA Regulations; and Whereas, the Town Board produced and circulated a scoping document and considered public comment on the draft scope of the Draft Environmental Impact Statement for the Proposed Action the "DEIS") at a public hearing held on April 4, 2024; and Whereas, on May 2, 2023, the Town Board adopted the final scoping document and directed the Applicant to prepare and submit the DEIS in accordance with the adopted scoping document; and Whereas, on July 16, 2024,the Town Board accepted the DEIS as complete and adequate for public review and scheduled a public hearing on the Petition and the DEIS (the "Public Hearing") for September 3, 2024; and Whereas, on September 3, 2024 and October 8, 2024, the Town Board held the duly noticed Public Hearing; and Whereas, on February 25, 2025, the Town Board adopted and filed a Final Environmental Impact Statement for the Proposed Action; now Therefore Be It Resolved, that pursuant to Section 617.11 of the SEQRA Regulations, the Town Board hereby issues as its written findings statement with respect to the Proposed Action the Lead Agency Findings Statement dated May 8, 2025, attached to this resolution. Diana L. Quast, Town Clerk Master Municipal Clerk Date: May 14, 2025 To: Edward A. Lachterman, Town Supervisor cc: John Tegeder, Director of Planning Janet J. Giris, Esq. Peter Feroe, AKRF, Inc. Gennelle MacNeil, Town Comptroller Adam Rodriguez, Town Attorney file FINAL 1 05/13/2025 LEAD AGENCY FINDINGS STATEMENT State Environmental Quality Review Act This Findings Statement has been prepared in accordance with Article 8 of the Environmental Conservation Law, the State Environmental Quality Review Act (SEQRA), and its implementing regulations promulgated at 6 NYCRR Part 617. Lead Agency: Town of Yorktown Town Board Address: Town Hall 363 Underhill Avenue Yorktown Heights, New York 10598 Contact: John A. Tegeder, Director of Planning 914-962-6565 Name of Proposed Action: 800 East Main Street Redevelopment SEQRA Classification: Type I Action Project Location: 800 East Main Street, Yorktown, New York, 10588 Tax Map: 5.19-1-15 Summary of Proposed Action: 800 East Main Street Dev AMS LLC (“Applicant”) is seeking amendments to the Town of Yorktown Zoning Map and the Town of Yorktown Zoning Ordinance (together, the “Proposed Zoning”), from the Town Board of the Town of Yorktown (the “Town Board” or “Lead Agency”) in order to redevelop the approximately 35.5-acre property located at 800 East Main Street, Town of Yorktown, Westchester County, New York (the “Project Site” or “Site”). The Applicant proposes to remove the Project Site’s two existing office buildings and develop the Project Site with 180 units of age-restricted (55+) housing in two multifamily buildings, consisting of 60 one-bedroom units and 120 two-bedroom units, along with site amenities, internal roadways, and stormwater management features (the “Revised Proposed Project”). The Revised Proposed Project, together with the Proposed Zoning, is referred to as the Revised Proposed Action. 800 East Main Street Redevelopment 05/13/2025 2 FINAL A. SEQRA PROCESS 800 E Main Yorktown Dev AMS LLC (the “Applicant”) proposes to construct the Revised Proposed Project that would replace the existing, vacant, office buildings at the Project Site. To effectuate the Revised Proposed Project, the Applicant has petitioned the Town Board to amend the Town Zoning Map (the “Zoning Map”) to rezone the Project Site from OB Research Laboratory and Office District (the “OB District”) to the RSP-2 Senior Citizens District (“RSP-2 District”) and for amendments to the Town of Yorktown Zoning Ordinance (the “Zoning Ordinance”) to modify the regulations of the RSP-2 District. On October 24, 2022, the Applicant submitted its original zoning petition to the Town Board. On March 7, 2023, the Town Board, as the designated Lead Agency, determined that the Proposed Action has the potential to result in one or more significant adverse environmental impacts and directed the Applicant to prepare a Draft Environmental Impact Statement (DEIS) pursuant to the rules and regulations of the New York State Environmental Quality Review Act (“SEQRA,” Article 8 of the Environmental Conservation Law and its implementing regulations at 6 NYCRR Part 617). A Scoping Document was prepared to guide the preparation of the DEIS. As required by SEQRA regulations, and in order to allow the public sufficient opportunity to comment on the draft Scoping Document, the Town Board accepted written comments on the document from March 24, 2023 through April 14, 2023. A public scoping session, for the purposes or receiving oral comments, was held by the Town Board on April 4, 2023 and the draft Scoping Document was reviewed at the April 10, 2023 meeting of the Planning Board and at the April 18, 2023 and April 19, 2023 meetings of the Yorktown Advisory Board on Architecture and Community Appearance (“ABACA”) and Yorktown Conservation Board, respectively. On May 2, 2023, the Town Board adopted the final Scoping Document, which identifies the issues to be addressed in the DEIS. On July 10, 2024, the Applicant submitted a preliminary DEIS to the Town Board, and on July 16, 2024, the Town Board accepted the DEIS as complete. Two duly noticed public hearings were held on the DEIS by the Town Board on September 3, 2024, and October 8, 2024. During the DEIS comment period, which was open through October 18, 2024, comments were received from the public, Town staff and consultants, and other Involved and Interested Agencies. A Final Environmental Impact Statement (FEIS) was prepared by the Applicant pursuant to SEQRA and submitted to the Town Board for its completeness review. As required by SEQRA, the FEIS responds to all substantive comments received on the DEIS. On February 25, 2025, the Town Board accepted the FEIS as complete and filed the FEIS. Table 1 identifies Involved and Interested Agencies that participated in the SEQRA review of the Revised Proposed Action, as well as the approvals/reviews required for the Revised Proposed Action. Findings Statement FINAL 3 05/13/2025 Table 1 Involved and Interested Agencies Involved Agencies Approval/Review Town of Yorktown Town Board Zoning Map Amendment; Zoning Ordinance Amendment Town of Yorktown Planning Board Site Plan Approval; Stormwater Permit; Tree Removal; MS4 Approvals Westchester County Department of Health Water Main Construction, Improvements, Connection New York State Department of Transportation Traffic Mitigation Measures along U.S. Route 6 New York State Department of Environmental Conservation [NYSDEC] State Pollution Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity; Stormwater Pollution Prevention Plan Approval; Potential 5-Acre Waiver New York State Office of Parks, Recreation, and Historic Preservation Section 14.09 Review Interested Agencies Town of Yorktown Building Department Building Permit Town of Yorktown Water Department Town of Yorktown Advisory Board on Architecture and Community Appearance (the ABACA) Town of Yorktown Conservation Board Town of Yorktown Tree Conservation Advisory Committee Town of Putnam Valley Westchester County Department of Planning Putnam County Department of Planning B. DESCRIPTION OF REVISED PROPOSED ACTION A description of the initially proposed Revised Proposed Action without the project modifications and mitigation measures the Town Board, acting as Lead Agency, imposes under this Statement of Findings (which are discussed in Section C of this Statement of Findings) is presented below. PROJECT SITE The Project Site is a 35.5-acre parcel situated at 800 East Main Street in the Town (Tax Parcel 5.19-1-15), located along the northern boundary of the Town within the hamlet of Jefferson Valley, the largest of the Town’s five hamlets. The Project Site is presently zoned OB District. The Project Site is situated east of the Taconic State Parkway (the “Parkway”) and north of U.S. Route 6. The Project Site is presently owned by Contractors Register, Inc., and the Applicant is the contract-vendee. The central portion of the Project Site is developed with two, three-story office buildings, comprising approximately 63,617 square feet (sf), and approximately 288 surface parking spaces, as well as driveways, landscaping, and associated infrastructure. The elevation of the developed portion of the Project Site in the vicinity of the existing office buildings is approximately 70 feet higher than the elevation of the Project Site’s entrance from Old Route 6. 800 East Main Street Redevelopment 05/13/2025 4 FINAL The office buildings on the Project Site are currently vacant and have been for several years. Approximately 30 percent of the Project Site (10.74 acres) is currently developed, with the northern 70 percent of the Project Site (approximately 24.79 acres) undeveloped and in a forested state. The Project Site is accessed by a single driveway that enters the Project Site at its southeastern corner, where it connects to Old Route 6. The Project Site generally slopes north to south. There is a steep drop in elevation between the two existing office buildings, such that the first floor of the northern office building is approximately 25 feet higher than the first floor of the southern office building. To the north and northeast, the Project Site is bordered by the Donald J. Trump State Park, a 436-acre State Park that spans the Towns of Yorktown and Putnam Valley. To the west, the Project Site is bordered by the Parkway, a New York State Scenic Byway, which runs north-south within the Town. There is an approximately 150-foot-wide vegetative buffer between the Parkway and the Project Site, which provides a natural visual screen between the Parkway and Project Site. This buffer would remain as part of the Revised Proposed Project. The Project Site is bordered to the southeast by several single-family homes, and to the south by East Main Street and U.S. Route 6. Further west of the Project Site (on the western side of the Parkway) is Trump Park Residences, a senior residential community located in the RSP-2 District. PROPOSED ZONING The Applicant has petitioned the Town Board for an amendment to the Zoning Map to rezone the Project Site from the OB District to the RSP-2 District. The Applicant has also petitioned the Town Board for amendments to the regulations of the RSP-2 District that will, for sites greater than 25 acres, increase the permitted floor area ratio (FAR) from 0.35 to 0.55 and increase the maximum main building height from 45 to 55 feet, and accessory building height from 15 to 45 feet. REVISED PROPOSED PROJECT SEQRA permits and encourages applicants to modify proposed projects in response to public and agency comment. Consistent with this, the redevelopment project proposed by the Applicant evolved throughout the SEQRA review process, in response to input from the Lead Agency, various Involved and Interested Agencies, and the public. The Applicant’s petition to the Town Board originally sought amendment to the Zoning Map and Zoning Ordinance to accommodate a 250-unit age-restricted community (55+), consisting of 200 rental units located in 12 buildings (of varying building types), and 50 for-sale townhouses located in 12 buildings. This development would have 96 one- bedroom units and 154 two-bedroom units (this alternative is referred to as the “Original Project” in this Findings Statement and was called the “Proposed Project” in the DEIS). In the DEIS, the Applicant also analyzed a 185-unit age-restricted community (55+), consisting of 165 dwelling units in two multifamily buildings, and 20 cottages. This development would have 71 one-bedroom units and 114 two-bedroom units (this alternative is referred to as the “Alternative Site Layout”). At the time the DEIS was completed, the Alternative Site Layout was the Applicant’s preferred alternative. The Alternative Site Layout would require significantly less site disturbance than the Original Project, result in less impervious surfaces and more manageable stormwater flows, generate less traffic, and, overall, is a less intense redevelopment of the Project Site than the Original Project. Findings Statement FINAL 5 05/13/2025 Consistent with SEQRA regulations (6 NYCRR section 617.9(b)(8)) and based on comments received on the DEIS, the Applicant developed the “Revised Proposed Project,” which the Applicant identified in the FEIS as its current preferred alternative. The Revised Proposed Project is similar to, and an evolution of, the Alternative Site Layout but has fewer residential units, and comparatively further reduces site disturbance, slope disturbance, parking, impervious areas, and tree removal quantities compared to both the Original Project and the Alternative Site Layout. The Revised Proposed Project consists of 180-units of age-restricted multifamily housing in two buildings, consisting of 60 one-bedroom units and 120 two-bedroom units. Dwelling units in the multi-family buildings would range from approximately 845 sf to 1,369 sf. The average size of the one- bedroom units would be 860 sf and the average size of the two-bedroom units would be 1,162 sf, and all dwelling units would include balconies. Interior amenities for the multi- family buildings would include a clubhouse with club room, demonstration kitchen, catering kitchen, fitness center, spa, screening room, sports lounge, reading room, and an art studio. Exterior amenities would include a pool and barbeque area within the courtyard between the multi-family buildings, as well as sports courts and natural walking trails. The multifamily buildings of the Revised Proposed Project are in the same location, and are the same height, as the multi-family buildings in the Alternative Site Layout. Each multi-family building would be four stories and approximately 55-feet tall and would feature similar architectural design to the building in the Alternative Site Layout. The architectural design of the buildings would emphasize large windows and outdoor spaces, evident through the shared program spaces, including the courtyard between the two multi-family buildings, and also at the individual scale, as each unit would have its own balcony. The overall design aesthetic would be transitional, embracing traditional design with a minimalist focus both in massing and in finish choices, similar to the Alternative Site Layout. The residences would be served by 270 parking spaces, open spaces, walking trails, and other recreational amenities. The multifamily buildings would have a total of approximately 246,000 gross sf, including approximately 12,000 sf of amenity space, resulting in a proposed site-wide FAR of 0.16. No cottages are proposed in the Revised Proposed Project. The Proposed Zoning would permit the Original Project, the Alternative Site Layout, and the Revised Proposed Project. PURPOSE AND NEED Since its peak the 1980s, the demand for professional office space in a corporate park setting has declined substantially. The demand for campus office buildings in Westchester County is continuing to decline due to evolving market trends, office space needs, and work styles. The Town Board finds that the existing office buildings on the Project Site are no different, and do not meet the needs of the current corporate office market, as evidenced by their continued vacancy. At the same time, the demand for housing types other than single-family detached houses remains strong within the region, including within the Town. The Revised Proposed Project would replace underutilized office buildings with an active residential use, creating a development with minimal impact to adjacent residential neighborhoods. In addition, the Revised Proposed Project would support the Town’s tax base by introducing new residents to support existing businesses and institutions. 800 East Main Street Redevelopment 05/13/2025 6 FINAL C. ENVIRONMENTAL FINDINGS AND MITIGATION MEASURES The Town Board finds that among all the alternatives studied, the Revised Proposed Action, consisting of the Proposed Zoning and Revised Proposed Project, and as modified by this Statement of Findings, avoids or mitigates significant adverse impacts to the maximum extent practicable. The Lead Agency has made modifications to the Revised Proposed Action and to certain Applicant-proposed mitigation measures, and has added additional mitigation measures, in order to avoid or mitigate significant adverse impacts. These modifications and additional mitigation measures are based on the entire record of the application including, but not limited to, the Applicant’s petition, the DEIS, the FEIS, and the comments from the public and Involved and Interested Agencies. The following sections address the Revised Proposed Action and set forth the Town Board’s findings and determinations regarding benefits and impacts of the Revised Proposed Action, and the modifications to the Revised Proposed Action and mitigation measures that the Town Board determines to be necessary to avoid or mitigate significant adverse impacts to the maximum extent practicable. The impacts of the Revised Proposed Project are compared below to those of the Original Project and Alternative Site Layout, as appropriate. LAND USE, ZONING, AND PUBLIC POLICY Land Use The Project Site is approximately 35.5 acres and is currently improved with two office buildings that, combined, have approximately 63,617 sf of space, as well as related surface parking, infrastructure, lighting, and landscaping. Approximately 30 percent of the Project Site (±10.74 acres) is currently developed, with the northern 70 percent of the Project Site (approximately 24.79 acres) in a forested state. The predominant land use within ½-mile of the Project Site is residential, followed by commercial, parks and open space, community services, public services, recreation and entertainment, and vacant land. To the north and northeast, the Project Site is bordered by the Donald J. Trump State Park, a 436- acre state park that spans the towns of Yorktown and Putnam Valley. To the west, the Project Site is bordered by the Parkway, which runs north-south within the Town. There is an approximately 150-foot-wide vegetative buffer between the Parkway and the Project Site, which provides a natural visual screen between the Parkway and Project Site, and which would remain as part of the Revised Proposed Project. The Project Site is bordered to the southeast by a few single-family homes, and to the south by East Main Street and U.S. Route 6. Further west of the Project Site (on the western side of the Parkway) is Trump Park Residences, a senior residential community located in the RSP-2 District. Commercial land uses are located to the southeast and southwest of the Project Site. The Town Board finds that the proposed age-restricted (55+) residential community is consistent with surrounding residential land uses, including Trump Park Residences, and with the commercial uses within ½-mile of the Project Site. Moreover, it is the Town Board’s finding that the Revised Proposed Project, Findings Statement FINAL 7 05/13/2025 owing to its lesser density (fewer units) and the significantly lesser amount of site disturbance, would have less impact on proximate land uses than the Original Project or the Alternative Site Layout. Zoning The Project Site is within the Town’s OB District. Principal permitted uses in the OB District include laboratories devoted exclusively to research, product development and testing, engineering development and sales development, as well as offices for professional or business use (including executive, engineering, accounting, scientific, research and development, educational, statistical and financial purposes).1 The OB District has a minimum lot area of 20 acres and a permitted FAR of 0.10. Maximum allowable main building height in the OB District is three stories or 45 feet. Within ½-mile of the Project Site there are 13 other residential and commercial zoning districts. Among them, the Town’s RSP-2 District is a senior citizens district with a minimum lot area of five acres. This zoning district permits one residential unit per 2,200 sf of lot area, provided the dwelling unit is no larger than a “3-room living unit” or “2-bedroom apartment,” and one unit per 10,000 sf of lot area, if the dwelling unit is a “4-room living unit” or larger, or a unit with more than two bedrooms. The maximum permitted FAR is 0.35 and the maximum height is 45 feet. The RSP-2 District is mapped directly to the west of the Project Site, on the western side of the Parkway, where the Trump Park Residences development is located. Additionally, several smaller parcels throughout the Town are mapped RSP-2 District. To facilitate the Revised Proposed Project, the Applicant petitioned the Town Board for an amendment to the Zoning Map to rezone the Project Site from the OB District to the RSP-2 District. The Town Board finds that the rezoning of the Project Site to RSP-2 District to permit the development of a residential community in an area with adjacent residential development, including the Trump Park Residences (also zoned RSP-2 District), would not result in any significant adverse impacts related to zoning. The Applicant has also petitioned the Town Board for amendments to the regulations of the RSP-2 District that would, solely for sites greater than 25 acres, increase the maximum FAR from 0.35 to 0.55 and increase the maximum main building height from 45 to 55 feet, and accessory building height from 15 to 45 feet. As described in more detail below, the Town Board carefully reviewed the visual impact analysis, including photosimulations, in the DEIS and finds that the proposed increase in building height in the RSP-2 District would not result in adverse impacts. The Applicant’s Original Project would have had a FAR of 0.50, and therefore would have necessitated the increase in the permitted FAR of the RSP-2 District that is requested in its petition. However, neither the Alternative Site Layout (0.23 1 Town Code §§ 300-21(C)(14), and 300-105. 800 East Main Street Redevelopment 05/13/2025 8 FINAL FAR) nor the Revised Proposed Project (0.16 FAR) require the current maximum FAR permitted in the RSP-2 District (0.35 FAR) to be increased. Similarly, the Revised Proposed Project does not require a change to the maximum height of accessory buildings. Because both the Applicant and, as discussed in this Statement of Findings, the Town Board, prefer the Revised Proposed Project, the Town Board determines that FAR in the RSP-2 District does not need to be increased from 0.35 to 0.55, as requested in the petition. The Town Board notes that any future proposed development at the Project Site that would have a FAR greater than .23 (as is studied in the DEIS for the Alternative Site Layout) would require additional review under SEQRA. The Town Board also finds that no change to the maximum height of accessory structures in the RSP-2 district is required. Public Policy C.1.c.i Town of Yorktown Comprehensive Plan (2010) The Town of Yorktown Comprehensive Plan (the “Comprehensive Plan”) was adopted by the Town Board on June 15, 2010, and presents the Town’s land use vision for its future. The Town Board finds that the Revised Proposed Project, on balance, is consistent with the Comprehensive Plan. Below is a discussion of the relevant policies, including those with which the Revised Proposed Project is not fully consistent:  “Goal 5-C: In and around the five hamlet business centers, promote housing diversity in a format compatible with both commercial uses and adjacent single-family residential areas.” The Town Board finds that the Revised Proposed Project would be compatible with the surrounding neighborhood, introducing compatible residential use (in place of the existing commercial use) into an area that includes various residential neighborhoods, such as the age-restricted Trump Park Residences community, a commercial center (The Jefferson Valley Mall), and the hamlet center of Jefferson Valley. In support of Goal 5-C, the Comprehensive Plan advocates that “Yorktown should also strive for housing diversity throughout the Town [and] balance the need for housing with the community’s desire to limit and better manage the negative impacts of development.” The Town Board finds that the Revised Proposed Project would increase housing diversity in the Town by adding to the limited stock of age-restricted rental housing, providing an option for existing residents wishing to downsize and remain in the Town. The Town Board notes that the Comprehensive Plan observes that “the supply of townhouse units, condos, apartments, and senior living is limited, some of the demand goes unmet, [and] empty-nesters often want to downsize, but have limited options for housing in Town,” and finds that the Revised Proposed Project directly addresses this by increasing the supply of housing for residents 55 years of age and older. The Town Board notes that no individual project can meet all Findings Statement FINAL 9 05/13/2025 of any municipality’s housing needs, and that the Revised Proposed Project cannot address housing needs for all demographic and socioeconomic groups. However, the Town Board finds that the Revised Proposed Project would meet an existing market need for senior rental housing and assist the Town in meeting its overall housing goals.  “Goal 5-E: Ensure that new homes are compatible with the character of their neighborhoods.” The Town Board finds that the Revised Proposed Project would transform the visual character of the Project Site from primarily a large surface parking area and two commercial office buildings, to a landscaped residential neighborhood. The multi-family buildings would incorporate local vernacular architectural design against a backdrop of rolling hills and natural landscape, with emphasis on large windows and outdoor spaces. As the Project Site is currently improved with office buildings, and would be redeveloped with residential housing consistent with neighboring styles, the Town Board finds that the character of the Revised Proposed Project is consistent with the surrounding area.  “Goal 5-H: Protect street trees and woodland areas, particularly significant trees, in residential areas where they contributed to the character of the community.” The Revised Proposed Project would retain nearly all of the forested areas of the Project Site, as it would be developed almost entirely within the footprint of the existing office buildings and associated parking lots. The Town Board finds that, compared to the tree removal required to facilitate the Original Project and the Alternative Site Layout, the Revised Proposed Project would further reduce the number of trees to be removed, thereby retaining the wooded character of the Project Site.  “Goal 7-C: promote sustainable development patterns, which consume less open space,” and “Goal 7-E: limit development on steep slopes and reduce the potential for soil erosion.” The Town Board finds that the Revised Proposed Project would promote sustainable development, as encouraged by the Town Comprehensive Plan, by repurposing an already commercially developed site as a residential neighborhood. The Town Board also finds that the Revised Proposed Project would be sited to minimize development on steep slopes, thereby reducing the potential for soil erosion and runoff to adjacent properties.  “Goal 9-B: Provide a diverse range of park and recreational facilities that serve residents of all ages and physical abilities” and “Goal 9-C: Provide plentiful opportunities for both active and passive recreation in Yorktown.” In alignment with these goals, the Revised Proposed Project would include large areas of open space, some programmed, to encourage passive and active recreation on the Project Site. 800 East Main Street Redevelopment 05/13/2025 10 FINAL Recreational amenities would include walking trails, a swimming pool, pickleball courts, and an exercise room. If trails are constructed in the adjacent Donald J. Trump State Park in the future, the Applicant shall consider connecting its walking paths to those trails, subject to Planning Board review and approval.  Policy 4-63, which identifies the Project Site, recommends that the Town “promote corporate or multi-tenant office development in select locations near major entrances to the Taconic Parkway and Route 6” (page 4-33). While the Revised Proposed Project would not align with Policy 4-63, the Town Board acknowledges that the economic realities of corporate office parks in the region have evolved since the Comprehensive Plan’s adoption, and that the current trend throughout the region is re-use or redevelopment of existing office campuses for residential and other uses. The Town Board finds that the Revised Proposed Project responds to this trend, replacing an underutilized, vacant office campus ripe for adaptive reuse with a residential community Accordingly, the Town Board finds that inconsistency with Policy 4-63 is not an adverse impact of the Revised Proposed Project.  Policy 5-47, which discusses the Jefferson Valley hamlet in detail, notes its “eclectic mix of retail, office (and) recreational” uses that are surrounded by residential areas. As part of that discussion, Policy 5-47 suggests “provid[ing] sidewalk connections along East Main Street to the shopping areas with crosswalks at Hill Boulevard and Lee Boulevard.” The Lead Agency re-affirms that providing sidewalk connections along East Main Street is a goal of the Town Board and that sidewalks, in general, are a benefit to the community. At the same time, the Town Board notes that this policy does not specifically refer to the Project Site and, further, notes that the provision of sidewalks is not necessarily the responsibility of private property owners. Further, as discussed below, walkability from the Project Site to nearby commercial areas and the Jefferson Valley hamlet is constrained based on the difference in elevation between the Project Site and surrounding areas. Nevertheless, consistent with the Town’s comprehensive planning and community goals, the Applicant and the Town shall investigate the possibility of adding sidewalks along East Main Street and the feasibility of new sidewalks at the newly constructed signals during the traffic signal design phase of the Revised Proposed Project. The responsibility for constructing and maintaining potential new sidewalks (e.g., Applicant, Town, other parties) will be determined during this investigation. .  Goal 5-D: “Continue to support affordable workforce housing (as defined by the Community Housing Board) and workforce housing for people in all stages of life, from young adults and couples, to families with children, to seniors.” The Town Board finds that the Findings Statement FINAL 11 05/13/2025 Revised Proposed Project does not meet the Town’s goal of providing affordable workforce housing. The Town Board also finds that not every project can respond to every need of a community, but that adding to the supply of housing in the Town and region can help slow the increase in housing costs, and that the Revised Proposed Project would meet the need in the Town and region for additional senior rental housing. C.1.c.ii Westchester County’s Patterns for Westchester and Westchester 2025 The Town Board finds that the Revised Proposed Project is consistent with Westchester County’s Patterns for Westchester and Westchester 2025 (the “County Plan”). The relevant policies are addressed below.  Enhance transportation corridors – U.S. Route 6 is an important transportation corridor that generally runs east/west through the northern portion of the Town. As part of the Revised Proposed Project, improvements would be made to the E. Main Street & U.S. Route 6 intersection and the adjacent East Main Street & Old Route 6 intersection. Both intersections would be signalized, the eastbound turning lane would be extended to 300 feet, a northbound right turn lane would be added at the East Main Street & Old Route 6 intersection, and the southbound left turn at East Main Street & U.S. Route 6 would be restricted. These improvements are subject to review and approval by the New York State Department of Transportation (NYSDOT).  Nurture economic climate / Track and respond to trends – The Town Board notes that the County has recognized that there is decreased demand for corporate office park development and increased demand for mixed-use infill development, including a diverse housing stock. The Town Board finds that the Revised Proposed Project responds to this trend, replacing an underutilized, vacant office campus ripe for adaptive reuse with a residential community.  Preserve natural resources – The large size of the Project Site, and proximity to natural resources, including Donald J. Trump State Park, provide opportunities for preservation of natural resources. The Town Board finds that the Revised Proposed Project would preserve nearly all of the remaining forested areas on the Project Site, and provide common open space for residents of the community to use at their leisure. Additionally, by concentrating development almost entirely within the footprint of the existing office buildings and improvements, disturbance to currently unimproved areas on the Project Site would be minimal.  Provide recreational opportunities to serve residents – The Revised Proposed Project would include recreational amenities for residents. 800 East Main Street Redevelopment 05/13/2025 12 FINAL Interior amenities for the multi-family buildings would include a clubhouse with club room, demonstration kitchen, catering kitchen, fitness center, spa, screening room, sports lounge, reading room, and an art studio. Exterior amenities would include a pool and barbeque area within the courtyard between the multi-family buildings, as well as sports courts and natural walking trails. The Town Board finds that the proposed amenities are consistent with this goal of the County Plan.  Maintain utility infrastructure – To accommodate development of the Revised Proposed Project, the Applicant would retain the existing water and sewer connections that serve the Project Site, and make any necessary upgrades. The Revised Proposed Project would utilize two water service connections, allowing water service to be looped within the Project Site, and providing continuous water supply in the event of a disruption. The Town Board finds that the Revised Proposed Project would maintain utility infrastructure consistent with the County Plan.  Define and protect community character – Consistent with the County Plan, the Revised Proposed Project would promote housing diversity (by introducing age-restricted rental units) in a format compatible with the character of the area, including adjacent residential areas. The Revised Proposed Project would make use of the already developed portions of the Site, consistent with the County Plan’s goal of enhancing character through focus on location, setting, aesthetic design and scale of development. The height and size of the buildings of the Revised Proposed Project would align with the County Plan’s goal of encouraging scenic preservation, as the new residential buildings would be of limited visibility from the Parkway because of the existing vegetative barrier which would remain, and also because the buildings would generally be below the tree line. Furthermore, the Revised Proposed Project would protect and improve neighborhood quality of life by providing a housing option for empty-nesters that want to downsize and remain in the Town.  Promote sustainable technology – The Revised Proposed Project would incorporate sustainable building practices and green technologies, including LED interior and exterior lighting, “right- sized” HVAC systems, and the use of activity-sensing and photovoltaic sensing lighting controls, where appropriate. The Revised Proposed Project would include Electric Vehicle chargers at various locations within the Project Site. Incorporation of these practices and technologies would be consistent with the County Plan’s promotion of reliable, sustainable energy and conservation practices to create a sustainable County. Findings Statement FINAL 13 05/13/2025 C.1.c.iii 2019 Westchester County Housing Needs Assessment (including Appendix B, the Town of Yorktown Municipal Housing Snapshot) The Westchester County Housing Needs Assessment offers observations applicable to the Revised Proposed Project, including that since 2000, the Town has experienced growth in older population cohorts (at an even greater pace than the County), that there is a further need for senior housing throughout the County, and that vacant and abandoned office parks are prime candidates for reuse. The Town Board finds that consistent with the Westchester County Housing Needs Assessment, the Revised Proposed Project would increase housing stock in the County, by adding to the Town’s limited supply of age-restricted (55+) housing, and in turn provide a viable option for residents wishing to downsize and remain in the Town. Adding senior housing would positively impact demand for existing housing by potentially freeing up existing homes for younger generations. Town residents downsizing but remaining in the Town would be able to maintain their support network of family, friends, churches, civic associations, and services, such as doctors and pharmacists. The Revised Proposed Project is anticipated to meet current demand for market-rate senior housing. VISUAL AND COMMUNITY CHARACTER The Town Board assessed the potential for impacts on visual resources and community character from the development of the Revised Proposed Project. On-Site Visual Character The southern portion of the Project Site is improved with an existing office campus, consisting of two office buildings that are surrounded by surface parking lots. The Project Site is accessed by a single driveway that connects to Old Route 6 and East Main Street, with nearby access from there to U.S. Route 6. The driveway into the Project Site is relatively steeply sloping, connecting Old Route 6, at a lower elevation, with the developed portion of the Project Site, at a higher elevation. The western portion of the Project Site slopes steeply down to its border with the Parkway. Given the topography of the Project Site, with the developed portion of the Project Site sitting at a significantly higher elevation than Route 6, Old Route 6 and East Main Street, the interior of the Project Site is, for the most part, visually screened from the adjacent roadways and neighborhoods. Much of the developed portion of the Project Site is devoted to surface parking that is interspersed with landscaped medians, manicured plantings, and mature trees. The Project Site is illuminated by light poles on the drive aisles and parking lots, and by short, pedestrian-scaled bollards along sidewalks closer to the buildings. The perimeter of the Project Site is wooded, which visually buffers the interior of the Project Site from the Parkway and proximate residential uses. One neighboring property, 764-768 East Main Street, is partially visible from the Project Site through a wooded buffer in the leaf-off condition. The Project Site is contiguous, or nearly contiguous, with hundreds of acres of woodland to the north and east, including State parklands. 800 East Main Street Redevelopment 05/13/2025 14 FINAL Off-Site Visual Character North and northeast of the Project Site are forested areas comprising Donald J. Trump State Park. West of the Project Site is the Taconic State Parkway, a NYS Scenic Byway, beyond which are forested areas and the Trump Park Residences, an age-restricted community set on approximately 50 acres. South of the Project Site is U.S Route 6, beyond which is a Town-owned Par 3 golf course and single-family residential neighborhoods. The streets and residential lots in these neighborhoods feature manicured landscaping and lawns, and tree plantings. The houses are generally one- to two-stories tall and set on roughly ¼- to ½-acre lots. To the east and southeast of the Project Site is a mix of one- to two-and-one-half-story single-family homes, set on larger lots. Many of the properties are dense with tree cover and the structures are set back from the road. To the east of the Project Site are several townhouse communities, featuring buildings that are two- to three-stories in height and that are landscaped with flowers, bushes, and trees throughout. Southeast of the Project Site is a mix of commercial developments, including a DeCicco’s grocery store, gas station, strip malls, small office buildings, a self-storage facility, and the Jefferson Valley Mall. Visibility of the Project Site The Town Board considered the visual analyses in the DEIS, including photosimulations, line of sight profiles, renderings, and photographs of the Project Site and surrounding areas. The Town Board required visual analysis from seven vantage points identified in the final Scoping Document:  Vantage Point 1: Taconic State Parkway (traveling northbound)  Vantage Point 2: Taconic State Parkway (traveling southbound)  Vantage Point 3: U.S. Route 6 and East Main Street  Vantage Point 4: U.S. Route 6 between East Main Street and Lee Boulevard  Vantage Point 5: U.S. Route 6 between Taconic State Parkway and Barger Street  Vantage Point 6: Service Road for Town Golf Course  Vantage Point 7: Donald J. Trump State Park (Indian Hill Section) Photosimulations were prepared for the Original Project and Alternative Site Layout. Because the multifamily buildings of the Alternative Site Layout and the Revised Proposed Project would be in the same location and of the same height, the views of the Alternative Site Layout are used to evaluate the visibility of the Revised Proposed Project. Based on the photosimulations, the Town Board finds that the buildings of the Revised Proposed Project would not be visible from Vantage Point 7 and would have minimal, if any, visibility from Vantage Point 3, Vantage Point 4, or Vantage Point 5. Any visibility from these locations would occur only in the leaf-off condition and would be through dense, existing vegetation. From Vantage Point 6, the Service Road for the Town Golf Course, there may be limited visibility of the Revised Proposed Project through intervening vegetation in the leaf-off condition. The Revised Proposed Project would be less visible than Findings Statement FINAL 15 05/13/2025 the Original Project from this location because the buildings proposed are farther away (i.e., set back to the north). The tops of the buildings of the Revised Proposed would be below the tree line. From Vantage Point 2, west of the Site along the Parkway traveling southbound, portions of the buildings of the Original Project and the Revised Proposed Project would be visible through the 150-foot wide vegetated buffer in the leaf-off condition. During the leaf-on condition, the buildings would be obscured. The buildings of the Original Project would be slightly more visible than those of the Revised Proposed Project. As shown by the photosimulations and the sectional diagrams, the buildings of the Revised Proposed Project would be well below the tree line. From Vantage Point 1, south of the Site along the Parkway traveling northbound, a small portion of the roof of one of the buildings of the Revised Proposed Project would likely be visible at or above the tree line. The balance of the buildings would be obscured by intervening vegetation. A small portion of one of the Revised Proposed Project’s buildings may be visible through the existing tree canopy in the leaf-off condition, but likely completely obscured during leaf-on condition. It is noted that this view is only available to motorists traveling at highway speeds, and only for a short distance. Based on the above, the Town Board finds that the Revised Proposed Project would have less visibility than the Original Project from offsite vantage points. Further, the Town Board finds that the minimal visibility of the buildings of the Revised Proposed Project would be insignificant. The Town Board finds that preservation of the 150-foot-wide vegetative buffer between the Parkway and the Project Site would help maintain the character of the Project Site as visually disconnected from the adjacent roadways and neighborhoods. In addition, siting the new residential buildings in the same area of the Project Site as the existing office buildings and maintaining the Project Site’s existing topography and wooded buffers would be largely maintained. The Town Board finds that views of the Revised Proposed Project would be consistent with the visual character of the existing residential uses to the east and west of the Project Site and that the Revised Proposed Project would not interfere with the public’s enjoyment of parks and other public community assets in the Town. The Applicant presented conceptual landscaping and lighting plans in the DEIS. The conceptual landscaping plan would introduce various plantings throughout the Site, including different varieties of trees, shrubs, perennials, and grasses. The conceptual lighting plan would utilize cut-off luminaires that are Dark-Sky compliant. Both plans would be refined and finalized during the site plan review process. In addition to the Planning Board’s code-required review of these plans (e.g., of the lighting plan under Chapter 200 of the Town Code), the Town Board requires the plans to meet the following goals: 800 East Main Street Redevelopment 05/13/2025 16 FINAL  Landscaping shall serve to define and compliment, and be appropriate to, the specific areas of the Site in which they are located (e.g., driveways, parking areas, residential areas, amenity areas, buffer areas).  Landscaping shall be designed and constructed in such a manner that the plantings will be sustainable and appropriate for the climate.  Lighting fixtures shall feature LED sources to minimize energy usage.  Light spillover off the Site shall be avoided. Building architectural details including color schemes and building elevations shall be reviewed by the Planning Board and the ABACA. The Town Board finds that with the above mitigation measures, conditions and requirements, the Revised Proposed Project would not result in a significant adverse impact to visual resources or community character and that such impacts have been minimized and mitigated to the maximum extent practicable. CULTURAL RESOURCES Archaeological Resources The Project Site is located in an area indicated as potentially sensitive for archaeological resources by the New York State Office of Parks, Recreation, and Historic Preservation (“OPRHP”). Pursuant to Section 14.09 of the New York State Historic Preservation Act, the Applicant initiated consultation with OPRHP. OPRHP determined that a Phase 1A/1B Archaeological Survey (“Phase 1A Study”) should be completed for those portions of the Project Site that would experience ground disturbance as a result of the Original Project unless prior disturbance could be documented. The Phase 1A Study in turn recommends Phase 1B archaeological testing in the northern portion of the Project Site that would be disturbed by the Original Project. In a comment letter dated January 19, 2024, OPRHP concurred with the conclusions and recommendations of the Phase 1A Study. The Revised Proposed Project eliminates ground disturbing activities in the northern portion of the Site determined to have archaeological sensitivity. The Applicant shall continue to consult with OPRHP regarding the Revised Proposed Project. If OPRHP finds that the Revised Proposed Project would occur wholly within areas deemed not sensitive for archaeological resources, then no further testing is required. If disturbance is required in areas of the Site determined to be archaeologically sensitive, then further investigations (i.e., a Phase 1B Archaeological Survey) and continued consultations with OPRHP would be required. The Town Board finds that the Revised Proposed Project, through avoidance of the archaeologically sensitive area in the northern portion of the Site and compliance with OPRHP requirements, would not have an adverse impact on archaeological resources. Historic Resources There are no improvements on the Project Site that are listed on or determined eligible for listing on the State or National Register of Historic Places (the Findings Statement FINAL 17 05/13/2025 “S/NR”), as determined by OPRHP in a letter dated November 2, 2023. In that letter, OPRHP also determined that they do not have any architectural or above- ground concerns about the Original Project (see November 2, 2023 letter from OPRHP, included in DEIS Appendix B). Two historic properties were identified in the vicinity of the Project Site: the Hyatt House on Old Route 6, and the Taconic State Parkway. The Town Board finds that the Revised Proposed Project would have no adverse impacts on the Hyatt House or the Parkway. (See Section C.15, “Construction,” for a discussion of potential impacts to the Hyatt House as a result of construction.) These historic resources are sufficiently buffered from the Project Site by vegetated and wooded areas, and these vegetative buffers would be retained with the Revised Proposed Project. Views along the Parkway would continue to include the dense vegetated areas on either side of it, including the large rock outcroppings that line the east side of the Parkway in the vicinity of the Project Site. The Revised Proposed Project is designed so that the two new buildings would be below the height of the tree line along the Parkway and would therefore not project above the existing vegetative buffer on the east side of the Parkway. As discussed below, the Applicant shall take certain measures to mitigate potential construction-period impacts on the Hyatt House. The Town Board finds that, with the mitigation measures identified above, the Revised Proposed Project would not have an adverse impact on historic resources. GEOLOGY, SOILS, AND TOPOGRAPHY Seven soil complexes are situated within or immediately adjacent to the Project Site. The mapped soils are consistent with areas characterized by hills and/or steep slopes. Approximately 10.74 acres of the Project Site have been previously disturbed to accommodate the current commercial office use. The undeveloped northern portion of the Project Site consists of forested land. The Town Board finds that compared to the Original Project and the Alternative Site Layout, the Revised Proposed Project would further reduce disturbance to steep slopes, require less cut and fill, remove fewer trees, and result in less impervious surfaces (See Table 1 through Table 4, below). Approximately 6.29 acres would be disturbed during construction of the Revised Proposed Project, which is less than the 8.65 acres would be disturbed during construction of the Alternative Site Layout, and less than the 20.29 acres that would be disturbed to develop the Original Project. With the Revised Proposed Project, almost all (98 percent) of the disturbance would occur within the area of the Project Site previously disturbed to construct the existing office campus, which the Town Board finds is a significant benefit of the Revised Proposed Project as compared to the Original Project and Alternative Site Layout. The earthwork for the Revised Proposed Project would result in a net cut of approximately 700 cubic yards, significantly less than the net cut of 8,915 cubic yards required for the Alternative Site Layout and 81,836 cubic yards required for the Original Project. If all of the net cut material is removed from the Project Site, approximately 39 truck trips would be required for the Revised Proposed Project, compared to 496 for the Alternative Site 800 East Main Street Redevelopment 05/13/2025 18 FINAL Layout and 4,546 for the Original Project, based on 18 cubic yards per truck. These trips would be spread out over the Revised Proposed Project’s construction, such that the number of truck trips per day would be reduced to a level that would not affect traffic operations. Earthwork would be conducted pursuant to an excavation and regrading permit issued pursuant to Chapter 248, “Stormwater Management and Erosion and Sediment Control,” of the Town Code. Pursuant to that Chapter of the Town Code, as well as State requirements, a Soil Erosion and Sediment Control Plan has been developed as part of the stormwater pollution prevention plan (SWPPP) for the Revised Proposed Project. Rock removal is likely to be required. The Applicant and its geotechnical engineer would determine the need for rock removal as construction plans are advanced and additional data collected. If rock removal is necessary, hydraulic hammers would be used. While unlikely, if blasting is required it shall be conducted in accordance with Chapter 124, “Blasting and Explosives,” of the Town Code and pursuant to a blasting permit that would be obtained from the Town. Table 1 Slope Disturbance Slope Grade Disturbance Area – Original Project (acres) Disturbance Area – Alternative Site Layout (acres) Disturbance Area – Revised Proposed Project (acres) 0% to 10% 7.39 3.21 3.28 10% to 15% 4.35 2.35 0.72 Greater than 15% 8.55 3.09 2.29 Total 20.29 8.65 6.29 Source: Site Design Consultants Table 2 Land Use Impacts Land Use or Covertypes Existing Acreage Acreage with Original Project Acreage with Alternative Site Layout Acreage with Revised Proposed Project Roads, buildings, and other paved or impervious surfaces 5.20 9.3 7.5 6.18 Forested 26.85 15.2 18.86 26.85 Meadows, grasslands, or brushlands 3.45 11.0 9.14 2.56 Source: Site Design Consultants Findings Statement FINAL 19 05/13/2025 Table 3 Revised Proposed Project - Tree Removal Quantities Tree Type or Condition Total Diameter Number of Trees To Be Removed Total Number of Regulated Trees To Be Removed Protected 2626 239 274 Specimen 960 35 Invasive - - 27 Dead/Dying 410 27 301 Sources: Site Design Consultants; Dynamic Survey Table 4 Existing and Proposed Building and Impervious Surface Coverage Existing Condition Original Project Revised Proposed Project Total Site Area (acres) 35.5 35.5 35.5 Total Permeable Area (acres) 30.3 26.2 29.8 Total Impervious Area (acres) 5.2 9.3 6.18 Percent Impervious 14.6% 26.2% 16.0% Total Building Area (acres) 0.7 3.7 1.6 Percent Building Coverage 1.9% 10.5% 4.5% Note: Totals may not sum due to rounding. Source: Site Design Consultants, Perkins Eastman During construction, the Soil Erosion and Sediment Control Plan shall be implemented to mitigate potential soil erosion impacts. The SWPPP shall be implemented to manage stormwater runoff after the Revised Proposed Project is completed. Both plans shall be subject to the review and approval of the Town Engineer and Planning Board. With the implementation of these mitigation measures, the Town Board finds that the Revised Proposed Project would not have a significant adverse impact on geology, soils, or topography and that potential impacts have been mitigated to the maximum extent practicable. ECOLOGICAL RESOURCES Based on a review of State and federal databases, as well as a site reconnaissance, federal and State-listed threatened, endangered, and special concern species that have the potential to occur on or adjacent to the Project Site include Indiana bat (Myotis sodalis), northern long-eared bat (Myotis septentrionalis), red-shouldered hawk (Buteo lineatus), and eastern box turtle (Terrapene Carolina). The Town Board determines that tree clearing activities shall be limited to the period between November 1 and March 31, to avoid impacts to potentially nesting birds and roosting bats within the Project Site. The Revised Proposed Project would not impact the eastern box turtle as there would be little, if any, removal of forested edge habitat. Therefore, the Revised Proposed Project would not adversely impact threatened, endangered, or special concern species, or critical habitat for these species. The Original Project would require the removal of 1,320 trees, the Alternative Site Layout would require the removal of 651 trees, and the Revised Proposed Project would require the removal of approximately 301 Town-regulated trees, 274 of which are in good to fair 800 East Main Street Redevelopment 05/13/2025 20 FINAL health. The Town Board finds that the reduction in tree removal, as compared to the Original Project and Alternative Site Layout, is a positive change in the development program. The Applicant shall be required to mitigate the impacts of the tree removal in accordance with Chapter 270 of the Town Code. A Tree Mitigation Plan shall be submitted during the site plan review process and shall be subject to the review and approval of the Planning Board, and review and comment by the Conservation Board and Tree Conservation Advisory Commission. The Tree Mitigation Plan shall include:  Extensive on-Site plantings of native deciduous, conifer, shrub, and herbaceous species.  Removal of invasive species and vines, as well as tree litter from dead and fallen limbs, trees, and roots within the area of the Project Site to be disturbed.  A tree protection plan, which shall require implementation of Best Management Practices for the protection of root zones of trees and shrubs on the fringe of the construction disturbance.  Preservation of existing vegetation and tree buffers.  Planting of conifers in strategic locations to augment visual screening.  If determined by the Planning Board to be required, the donation of trees to the Town nursery stock at Willow Park in quantities to be determined as part of site plan approval. The Town Board finds that with the mitigation measures identified above, the Revised Proposed Project would not have a significant adverse impact on ecological resources and that adverse impacts have been mitigated to the maximum extent practicable. SOCIOECONOMIC AND FISCAL IMPACTS The DEIS analyzes the socioeconomic and fiscal impacts of the Original Project and Alternative Site Layout. As the Revised Proposed Project would develop approximately the same number of units as the Alternative Site Layout, quantified impacts presented in this section C.6, unless otherwise noted, are from the analysis of the Alternative Site Layout. It can reasonably be assumed that the impacts of the Revised Proposed Project would be slightly less than the impacts of the Alternative Site Layout, presented below. Population The Revised Proposed Project (180 dwelling units) would increase the population of the Town by approximately 216 residents. If all of these residents were new to Yorktown, the population of the Town would increase by approximately 0.59 percent based on the Town’s 2021 population of 36,424. Construction Benefits The employment generated by construction would result in labor income for the Town, County, and State. Direct labor income is estimated to be approximately $38.41 million. Including indirect and induced employment activity, the total labor income generated by construction is estimated to be $38.54 million in the Town, $45.74 million in Westchester County, and $48.59 million in New York State. Findings Statement FINAL 21 05/13/2025 Construction is anticipated to generate approximately $64 million in direct economic output. Including indirect and induced economic activity, construction is anticipated to generate approximately $64.58 million in total economic output for the Town, $83.71 million for Westchester County, and $91.83 million for New York State. The Town Board finds that the similar construction benefits of the Revised Proposed Project would be a beneficial impact of the Revised Proposed Project. Annual Operational Benefits Once completed and fully tenanted, the facility is anticipated to support approximately 10 total jobs in New York State, including 9 full- and part-time jobs in Westchester County, and 7 full- and part-time jobs in the Town. Employment is anticipated to support approximately $317,000 in total annual labor income in the Town, ultimately producing a total of $507,300 in Westchester County and $554,600 in New York State. The Town Board finds that the similar annual operational revenues of the Revised Proposed Project would be a beneficial impact of the Revised Proposed Project. Residential Spending The facility is anticipated to support approximately two additional jobs through induced residential spending, which in turn is anticipated to produce approximately $116,000 in labor income and approximately $328,000 in economic output in the Town. The local spending generated by the residents would provide economic activity and support to local businesses in the area. The Town Board finds that residential spending is a benefit of the Revised Proposed Project. Municipal Fiscal Impacts In 2023, the Project Site generated approximately $270,670 dollars in property taxes, including approximately $29,831 in annual property taxes for the Town, as well as $24,149 for Westchester County. In addition, benefit assessments are paid to an EMS service, and a fire district, refuse district, water district, and two sewer districts. The Project Site generated approximately $26,972 in assessment revenue for these local jurisdictions in 2023. In addition, the Project Site generated approximately $189,718 per year in tax revenue for the Lakeland Central School District (the “School District” or “District”) in 2023 (see Table 5). 800 East Main Street Redevelopment 05/13/2025 22 FINAL Table 5 2023 Annual Property Tax Revenues for Project Site Taxing Jurisdiction Tax Rate per $1,000 of Assessed Value Taxable Assessed Value Property Taxes Westchester County 134.16 $180,000.00 $24,149 Town of Yorktown 165.73 $29,831 EMS – Advanced Life Support 5.46 $982 Lake Mohegan Fire District 81.22 $14,620 Westchester County Peekskill Sewer 32.63 $5,873 Westchester County Garbage 16.30 $2,935 Yorktown Consolidated Water 14.14 $2,545 Osceola Lateral Sewage Operating 16.97 1.00 $17 Lakeland Central School District 1,053.99 $180,000.00 $189,718 Total Property Taxes $270,670 Note: Numbers may not add due to rounding. Source: 2023 Final Assessment Roll; tax rates from Westchestergov.com The Town Board finds that if it is not redeveloped, the Project Site would continue to generate limited taxes, as the buildings are not occupied, and are anticipated to be in the near future, given market conditions and office campus trends in the County and region. Therefore, in the future without the Revised Proposed Project, the tax revenue generated by the Project Site is anticipated to be similar to the existing condition. The Town of Yorktown Tax Assessor estimated the taxable assessed value of the Alternative Site Layout, upon stabilization of the facility, to be $894,250, which equates to a full market value of $51,990,000. Based on this estimate, the Alternative Site Layout would generate approximately $1,344,634 in property tax revenue per year (see Table 6). Table 6 Projected Annual Property Tax Revenues for Alternartive Site Layout Taxing Jurisdiction Tax Rate per $1,000 of Assessed Value Taxable Assessed Value Property Taxes Westchester County 134.16 $894,250 $119,973 Town of Yorktown 165.73 $148,203 Advanced Life Support 5.46 $4,883 Lake Mohegan Fire District 81.22 $72,631 Westchester County Peekskill Sewer District 32.63 $29,179 Westchester County Garbage 16.30 $14,576 Yorktown Consolidated Water 14.14 $12,645 Osceola Lateral Sewage Operating 16.97 1.00 $17 Lakeland Central School District 1,053.99 $894,250 $942,528 Total Property Taxes $1,344,634 Note: Numbers may not add due to rounding. Source: Tax rates from Westchestergov.com The Town Board finds that the Revised Proposed Project would generate similar property tax revenue as the Alternative Site Layout: approximately $1,073,965 more in property taxes per year than is currently generated by the Project Site, including an additional $118,372 to the Town and an additional $752,810 to the Lakeland Central School District. For the reasons set forth below, the Town Board finds that the increase in property taxes Findings Statement FINAL 23 05/13/2025 is sufficient to offset any potential fiscal impacts to the Town from the provision of community services, particularly since no additional children are anticipated to reside in the age-restricted Revised Proposed Project, as discussed in section C.7.f, below. The Town Board finds that the Revised Proposed Project would not have a significant adverse fiscal or socioeconomic impact, and to the extent there are any impacts, they would be avoided or minimized to the maximum extent practicable through the generation of tax revenue to the Town. The Town Board finds that the increase in tax revenue that would be generated by the Revised Proposed Project is a benefit to the Town. COMMUNITY FACILITIES Police The Project Site is served by the Town of Yorktown Police Department. In correspondence dated October 10, 2023, Police Chief Robert Noble indicated that the Police Department’s authorized staffing level is 63 police officers, ten of whom are full time school resource officers and do not respond to calls for service. Chief Noble estimated that response time to the Project Site would range from five to ten minutes. The projected quantities of police personnel, equipment, and facilities attributable to the Revised Proposed Project’s estimated population are below (see Table 7). Table 7 Revised Proposed Project – Projected Police Service Level Police Service Multiplier Estimated Population Projected Service Level Personnel 2/1,000 population 216 0.43 police personnel Vehicles 0.6/1,000 population 216 0.129 vehicles Facilities 200 sf/1,000 population 216 43.2 sf of facility space Sources: Model Factors for Social Impact Analysis (Police), Development Impact Assessment Handbook, ULI, 1994. In his correspondence, the Town Police Chief indicated that based on his experience, age-restricted communities may generate a greater per capita demand for police services, owing to the “aided type calls for service” received from such developments. Therefore, the Town Board finds that the Revised Proposed Project’s demand for police services would likely be slightly higher than the average residential demand, as set forth above. However, The Town Board also finds that the marginal increase in the demand for police services as a result of the Revised Proposed Project is not anticipated to require a significant increase in Police Department resources. The Alternative Site Layout, which has only 5 more units than the Revised Proposed Project, would have a population of approximately 226 residents and could result in the need for an additional 0.45 police personnel. Like Fire Department calls for service (discussed below) Police Department calls would be anticipated to be less than one per week, which would not require the Town to hire another police officer. The Town Board also notes that, the potential additional demand for police services would not all be new as the Project Site currently (and previously, during period of greater occupancy) has some level of demand for police services. 800 East Main Street Redevelopment 05/13/2025 24 FINAL The Revised Proposed Project is anticipated to generate approximately $148,203 per year in tax revenue to the Town. That tax revenue can be utilized to offset any impacts of the Revised Proposed Project on Police Department resources. Therefore, the Town Board finds that the Revised Proposed Project would not result in a significant adverse impact to police services. Fire The Project Site is served by the Lake Mohegan Fire District (the “Fire Department”), which is a combination fire department, meaning that it is staffed by both career (on-duty) firefighters as well as volunteer firefighters. Based on the information provided by Fire Chief Thomas Eade in a letter dated November 14, 2023, the average response time of the Fire Department is four to eight minutes throughout its jurisdiction. However, owing to the close proximity of the Project Site to one of the Fire Department’s substations, the Chief anticipates an “excellent response time” to the Project Site of “under four minutes.” In 2022, the Fire Department responded to 4,462 emergencies, comprised of 1,217 fire related emergencies, and 3,425 medical emergencies. The Chief noted that the Fire Department responded to approximately 4,000 emergencies in 2023. From 2018 to the present, the Fire Department responded to a total of five calls at the Project Site; all were for fire alarms within the office buildings (there were no calls for medical emergencies). To estimate the potential impact to the Fire Department as a result of the Revised Proposed Project, the call history of the Trump Park Residences, a 141-unit age- restricted residential development located in the Town, is analyzed in the DEIS. Since 2018, the Fire Department has responded to approximately 145 incidents at the Trump Park Residences (both fire related and medical), the majority of which were for medical emergencies. This equates to approximately 0.18 incidents per unit per year. Applying this rate to the number of units of the Revised Proposed Project, it is anticipated that the Fire Department would respond to the Revised Proposed Project for fire and medical service a total of approximately 33 times each year, or approximately three calls per month. The Town Board finds that the Revised Proposed Project buildings would not be a unique construction or occupancy type in the Town. Further, and in accordance with Town Code Section 130-2 (“Mandatory use of Sprinkler System”), the Revised Proposed Project would be equipped with fire sprinkler systems, and would be served by on-site fire hydrants. During site plan review, the Town Building Department would review the final building designs to ensure compliance with the State Building Code and State Fire Code, including requirements for emergency response vehicle access, and that the design is compatible with Lake Mohegan Fire District and Town equipment. The Revised Proposed Project would generate approximately $72,631 per year in tax revenue to the Lake Mohegan Fire District, which would offset costs incurred by the Fire Department in providing services to the Revised Proposed Project. Therefore, the Town Board finds that the Revised Proposed Project would not result in a significant adverse impact to fire services. Findings Statement FINAL 25 05/13/2025 Emergency Medical Services The Project Site is served by the Mohegan Volunteer Ambulance Corps of the Mohegan Volunteer Fire Association (MVAC). The MVAC does not receive direct funding from the Town or the Lake Mohegan Fire District. MVAC funding comes from insurance reimbursements. As with police and fire services, the Revised Proposed Project is anticipated to result in an increased demand for emergency medical services as compared to the demand of the existing office use. The Town Board finds that, given that this alternative is an age-restricted (55+) residential community, it is likely that its demand, while less than a comparably sized assisted-living facility, would be higher than a non-age restricted residential community. The MVAC, in response to the DEIS, stated that they believe that the facility would generate EMS calls for service at a rate greater than the Trump Park Residences (e.g., 33 per year) and suggested a comparison to the Jacobs Hill development in the Town of Cortlandt (that is also within the MVAC service area). Information on the number of MVAC calls to Jacobs Hill was not available at the time the FEIS was completed. However, subsequently, a Town Board member represented that in 2024, MVAC responded to 66 calls for service to Jacobs Hill. As the Jacobs Hill community includes 160 units, this represents a rate of approximately 0.41 calls for service per unit per year. Applied to the Revised Proposed Project, this would be approximately 74 calls per year, or one to two calls per week. The Town Board finds that the increase in demand for emergency medical services, of between approximately 33 calls per year and 74 calls per year, would be mitigated by both the increase in tax revenue to the Lake Mohegan Fire District (which responds with the MVAC to calls), as well as through insurance reimbursements and other fees paid to MVAC for service. Further, although the one to two percent per year increase in call volume would require additional resources, the Town Board finds that this increase would not result in a significant adverse impact on the provision of emergency medical services. Parks, Recreation and Open Space There are several public recreational facilities proximate to the Project Site, including Donald J. Trump State Park, Shrub Oak Memorial Pavilion and Park, the Brian J. Slavin Aquatic Center, and the Links at Valley Fields (a Town-owned, par 3 golf course). The Revised Proposed Project is anticipated to have a population of approximately 216 residents upon completion, which is approximately 0.59 percent of the Town’s 2021 population. In order to serve resident demand for recreational facilities, the Revised Proposed Project includes various interior and exterior recreational amenities for residents. Interior amenities would include a clubhouse with club room, fitness center, spa, and sports lounge. Exterior amenities would include a pool and barbeque area within the courtyard between the multi-family buildings, as well as sports courts and natural walking trails within the Site. 800 East Main Street Redevelopment 05/13/2025 26 FINAL During the site plan approval process, the Planning Board shall, in accordance with State Law (§274-a.6 of the NYS Town Law), determine whether in addition to the on-site recreational facilities that are part of the Revised Proposed Project “a proper case exists for requiring that a park or parks be suitably located [on the Site] for playgrounds or other recreational purposes within the town.” As provided in Town Law §274-a.6, this determination shall be based on “an evaluation of the present and anticipated future needs for park and recreational facilities in the town based on projected population growth to which the [Revised Proposed Project] will contribute.” Given the on-site recreational facilities of the Revised Proposed Project, and subject to the Planning Board’s required review under Town Law §274-a.6, the Town Board finds that the Revised Proposed Project would not have a significant adverse impact on parks, recreation, and open space. Solid Waste and Recycling With an estimated population of 216 residents, it is anticipated the Revised Proposed Project would generate approximately 1.84 tons of solid waste per week. Waste and recycling generated by the Revised Proposed Project would be collected by a private carting company contracted directly with the property management. Residents would be responsible for taking their solid waste and recycling to collection rooms within the multi-family buildings. Building plans submitted as part of Planning Board site plan review shall demonstrate sufficiency of recyclables storage space in the multifamily buildings. The Town Board finds that, as private carters would collect waste and recycling generated by the Revised Proposed Project, the Revised Proposed Project would not result in an increased demand on municipal waste and recycling collection services. Public School Aged Children The Revised Proposed Project would be age-restricted to those 55 and over, and, therefore, is not anticipated to generate a significant number of public school aged children. At the request of the Town Board, information was requested from the Lakeland Central School District with respect to the number of public school students at Trump Park Residences, an age-restricted development proximate to the Project Site. The School District responded on October 31, 2024. In the 2022- 2023, 2023-2024, and 2024-2025 school years, 3 students, 2 students, and 2 students lived at Trump Park Residences, respectively. In addition, the Town Board reviewed a summary of a 2018 study prepared for an age-restricted project in the Village of Rye Brook. That study of nearly 1,400 units in Westchester, Putnam, and Nassau Counties, determined that three public school age children in total lived in those units. Taken together, this data indicates that the Revised Proposed Project would generate a minimal number of students. Enrollment in the School District has declined by 478 students (8 percent) since the 2014-15 school year. At the request of the Town Board, the School District provided their latest enrollment projection, which indicates that total enrollment is anticipated to further decline from 5,141 students in the 2025-2025 school year, to 4,936 students in the 2034-2035 school year (a decline of 205 students, or 4 percent). Findings Statement FINAL 27 05/13/2025 Based on the data for Trump Park Residences and other age-restricted developments and enrollment trends and projections from the School District, the Town Board acknowledges that a few school-age children could reside at the Revised Proposed Project. In the event that a few students do live at the Revised Proposed Project and attend the public schools, the Town Board finds that any increased costs to the School District for those few students would be more than offset by the increased property tax revenue to the School District, and that the School District would have capacity for the students, given its historic and projected (declining) enrollment trend. Therefore, the Town Board finds that the Revised Proposed Project would not have an adverse impact on the School District’s provision of educational services. WATER AND WASTEWATER The Project Site is within the Yorktown Consolidated Water District, which is part of the Northern Westchester Joint Water Works (NWJWW). The Project Site is served by an 8- inch public water main within Old Route 6. Once on-site, the water main is reduced in size to a 6-inch main, which provides service to the two existing buildings. Water consumption at peak usage of the office buildings was approximately 5,875 gallons per day (gpd). The Project Site is located within the Westchester County Peekskill Sanitary Sewer District. An 8-inch PVC pipe sanitary sewer main runs from the two existing office buildings to the sewer in East Main Street. The existing sewer connects to a pump station, owned by the Town, which is located on Old Route 6, before its intersection with East Main Street. The Revised Proposed Project is estimated to have a water demand of approximately 33,000 gpd (see Table 8). Therefore, the Revised Proposed Project would result in a net increase in water demand of approximately 27,125 gpd. Table 8 Estimated Water/Sanitary Generation Unit Type Number of Units Water Usage in Gallons Per Day per Unit Total Gallons Per Day 1 Bedroom 60 110 6,600 2 Bedroom 120 220 26,400 Total -- -- 33,000 Source: New York State Design Standards For Intermediate Sized Wastewater Treatment Systems, NYSDEC, March 4, 2014 The Assistant Superintendent of the Yorktown Consolidated Water District indicated that the water system has adequate pressure to serve the Original Project, which had a significantly higher demand, and, therefore has adequate pressure to serve the Revised Proposed Project. The Revised Proposed Project would utilize two (2) water service connections, one along the southwestern frontage of the property within the driveway, and one at the public water main southeast of the Project Site near the existing cul de sac. This would allow for the water service to be looped within the Project Site, providing continuous water supply in the event of a disruption to one connection. The design and construction of any new water supply systems shall meet all applicable American Water Works Association, Westchester County Health Department, and Town requirements. Pursuant to County regulations, the water mains would be owned by the 800 East Main Street Redevelopment 05/13/2025 28 FINAL Town, which would be granted an easement for access and maintenance. Fire hydrants would be placed throughout the Project Site, in accordance with the requirements of the NYS Building & Fire Code as well as the Lake Mohegan Fire District, which shall be demonstrated during the site plan review process. The anticipated sanitary wastewater generation for the Revised Proposed Project is 33,000 gpd, an increase of approximately 27,125 gpd compared to full occupancy of the existing office buildings. The Revised Proposed Project would utilize the Project Site’s existing 8- inch PVC sanitary sewer pipe. The design and construction of any extensions to the sanitary system would meet all applicable Ten State Standards, Westchester County Health Department, and Town requirements. Pursuant to County regulations, the sewer mains would be owned by the Town, which would be granted an easement for access and maintenance. Through correspondence and meetings with the Town Engineer, it was determined that the pump station that serves the Project Site is not adequate to serve the increased flow that would be generated by the Revised Proposed Project. At the request of the Town Board, the potential for other wastewater conveyance options, including connecting to a point south of Route 6 within the Par 3 golf course, or by using a gravity-fed system that would generally travel along East Main Street, were studied. Based on the above-noted consultation with the Town Engineer, it was determined that those alternatives are not practicable, as outlined in a letter from the Applicant’s engineer to the Town Engineer dated November 4, 2024. The Town Engineer confirmed this conclusion to the Town Board. Specifically, the Town Engineer determined that installing a gravity main under Route 6 via “Horizontal Directional Drilling” was not a viable option given existing constraints on both sides of the road, the likely presence of unknown utilities under the roadway, and prior experience with the NYSDOT indicating that it would not permit a cut trench across the roadway. A gravity main from the Project Site to East Main Street was also determined to be infeasible from a technical standpoint, because there is a low point, which is below the elevation needed to pass the pipe. Accordingly, the Town Board finds that the appropriate and only feasible option is to replace the existing sanitary sewer pump station. The Applicant shall be financially responsible for replacing the sanitary sewer pump station as part of the Revised Proposed Project. With this replacement, and the mitigation measures identified above, the Town Board finds that the Revised Proposed Project would not have an adverse impact on water and wastewater systems and that adverse impacts have been mitigated to the maximum extent practicable. STORMWATER MANAGEMENT The predominant soil types on the Project Site are well drained, typically found on hilltops and hillsides. The erosion hazard level for these soils is slight to moderate with greater hazards on steep slopes. The Project Site is presently developed with stormwater management practices that serve the existing improvements on the Project Site. The surface runoff pattern on the Project Site is generally from the east to the southwest and consists of a combination of sheet flow and concentrated flow. Surface runoff from most of the existing impervious areas, including the buildings, parking, and roadways as well as adjoining areas, is collected and transported to the existing stormwater management basins where the runoff receives water quality treatment and attenuation. Findings Statement FINAL 29 05/13/2025 To analyze stormwater conditions on the Project Site, the Project Site was divided into two existing drainage areas, each draining to a “design point.” Preliminary stormwater management practices were located and designed to maximize the treatment and retention of stormwater from the new impervious surfaces introduced by the Original Project. With the implementation of these practices, it was determined that the Original Project would reduce the peak runoff rate for all storms at one design point but would increase the peak runoff rate for all storms at the other design point. The Original Project therefore would not meet stormwater quality goals. The Alternative Site Layout and Revised Proposed Project reduce the amount of disturbance area on the Project Site, including the development footprint, which in turn eliminates the potential stormwater quality impacts of the Original Project (see Table 9). Table 9 Area of Disturbance and Impervious Area Total Area of Disturbance (acres) Disturbance of Currently Undisturbed areas (acres) Total Impervious Area (acres) Original Project 20.3 11.7 4.1 Alternative Site Layout 8.7 5.8 2.3 Revised Proposed Project 6.3 0.1 1.0 Source: Site Design Consultants. A hydraulic analysis was conducted for the Revised Proposed Project to determine the expected runoff depth for each storm event. The results of the analysis were used to calculate the stormwater management practices sizes required for each of the two drainage areas. With the implementation of stormwater management practices set forth in the preliminary SWPPP prepared for the Revised Proposed Project, the Town Board finds that runoff rates for the Revised Proposed Project would be reduced in all the analyzed storms compared to the existing condition. The preliminary SWPPP prepared for the Revised Proposed Project, which would be finalized at the time of site plan review, includes a Soil Erosion and Sediment Control plan which would mitigate the potential adverse impact from stormwater runoff during construction of the Revised Proposed Project. Temporary control measures and facilities include silt fences, interceptor swales, stabilized construction entrances, temporary seeding, mulching, and sediment traps. Throughout construction, temporary sediment and erosion control measures would be inspected and maintained as appropriate. Toward the completion of construction of the Revised Proposed Project, permanent sediment and erosion control measures would be developed for long-term erosion protection. With the implementation of the above stormwater treatment practices outlined in the preliminary SWPPP, and given the reduction in disturbance area from the Original Project to the Revised Proposed Project, the Town Board finds that the Revised Proposed Project would not result in any adverse impacts to stormwater management. 800 East Main Street Redevelopment 05/13/2025 30 FINAL USE AND CONSERVATION OF ENERGY Con Edison (“Con Ed”) provides electric service to the Project Site from overhead lines situated in the right-of-way along Old Route 6. The electric line then extends overhead to a privately-owned pole on the southern side of the Project Site, where the service then continues underground. The underground line supplies the Project Site’s tap box, which then feeds two existing on-site transformers. The Project Site is not currently served by natural gas. However, there is a Con Ed main approximately 800 feet away from the Project Site, within East Main Street. The Revised Proposed Project would be served by a new electric distribution system on the Project Site and may also be served by natural gas. Each multi-family building would have its own pad-mounted transformer to supply electricity. An emergency generator would supply each multifamily building’s emergency/standby power. The generators can either be powered by natural gas from Con Ed or by diesel fuel oil stored in sub-base fuel tanks beneath the generators. The Applicant has not yet determined whether the buildings’ HVAC systems would be electric- or natural gas-powered systems. As part of the DEIS, the Applicant requested information from Con Ed regarding the on- and off-site improvements that would be required in both an all-electric and a natural gas scenario. Con Ed determined for the all- electric scenario, it would re-use the existing pole and T-tap box on the Project Site to serve the new development, and that there would be no off-site improvements required. If cooking and heating were fueled by natural gas, Con Ed determined that the existing four- inch-high pressure polyethylene (HPPE) gas main in East Main Street would need to be extended approximately 800 feet down East Main Street to the Project Site. From there, the Applicant would need to install a two-inch HPPE gas service line from the property line into the Project Site. The Applicant would be required to pay for all but 100 feet of the gas main extension. The Town Board finds that while the electric and gas demand anticipated for the Original Project and the Alternative Site Layout would be greater than that of the Revised Proposed Project, the off-site improvements required to serve the Revised Proposed Project would be the same. During the site plan approval process, the Applicant shall confirm with Con Ed the final off-site mitigation measures that would be necessary to serve the facility based on the final design. The Revised Proposed Project would include various energy conservation measures, including the use of LED interior and exterior lighting, right-sized HVAC systems, and the use of activity-sensing and photovoltaic sensing lighting controls. Is it anticipated that each apartment unit within the multifamily buildings would have a dedicated high- efficiency one-to-one split system heat pump. The buildings would be insulated in accordance with all applicable building and conservation codes, including the use of insulated windows. The Revised Proposed Project would also include Electric Vehicle (EV) chargers at various locations within the Project Site. The Applicant shall also undertake a feasibility study, during the site plan approval process, to determine if solar power can be utilized. The Town Board finds that, with the inclusion of these measures, as well as any measures required by Con Ed, the Revised Proposed Project would not have a significant adverse Findings Statement FINAL 31 05/13/2025 impact on electric or natural gas services and that adverse impacts have been mitigated to the maximum extent practicable. TRAFFIC AND TRANSPORTATION A Traffic Impact Study (TIS) was conducted to analyze the potential traffic impacts of the Original Project (250 dwelling units) and the Alternative Site Layout (185 dwelling units). Data on the existing conditions at nine intersections identified by the Town and its consultants were obtained. To determine the conditions that are likely to occur at the intersections in the future with or without the proposed facility (i.e., the “No Action” condition), the TIS added traffic volumes to the existing conditions to account for general background growth, as well as certain larger projects identified by the Town that could be constructed prior to the facility. This “No Action” condition was then compared to the “With Action” condition, which added the traffic volumes attributable to the facility (either the Original Project or the Alternative Site Layout). Changes in operating conditions were identified and measures to mitigate significant impacts of the project were developed. As the Revised Proposed Project would have five fewer units than the Alternative Site Layout, and therefore generate slightly less, but essentially the same, traffic than Alternative Site Layout, a quantified analysis of the Revised Proposed Project was not undertaken. Because the traffic impacts of the Revised Proposed Project would be essentially the same as the Alternative Siter Layout, the mitigation measures required would be the same. The results of the TIS are discussed below. Data Collection Consistent with the DEIS Scoping Document adopted by the Town Board, traffic conditions were evaluated at nine intersections (collectively, the “Traffic Study Area”) for the “Weekday AM,” “Weekday PM,” and “Saturday Midday” peak hours delineated below:  U.S. Route 6 and Barger Street  Taconic State Parkway Southbound Ramp and U.S. Route 6  Taconic State Parkway Northbound Ramp and U.S. Route 6  U.S. Route 6 and East Main Street  Old Route 6 and East Main Street  U.S. Route 6 and Lee Boulevard  East Main Street and Lee Road  U.S. Route 6 and Hill Boulevard*  East Main Street and Hill Boulevard / Old Jefferson Valley Road* Two additional intersections were identified for safety analysis only:  East Main Street and Indian Hill Road  East Main Street and Old Jefferson Valley Road Traffic volumes for the intersections marked with an * were based on historical 2019 traffic counts provided by the Town, which were grown to estimated 2023 levels by 1.0 percent per year and balanced with the adjacent intersections. Turning movement counts (TMC) with vehicle classification were collected at the other intersections during the Weekday AM (7:00 AM to 9:00 AM), Weekday PM (4:00 PM to 6:00 PM), and Saturday Midday (12:00 PM to 2:00 PM) periods. 800 East Main Street Redevelopment 05/13/2025 32 FINAL Automatic Traffic Recorder (ATR) counts were collected for one full week concurrently with the TMC. Traffic data collection occurred in May and June 2023 while school was in session; weekday TMC data was collected on a midweek day. Based on a review of the traffic count data, the peak hours for the Traffic Study Area were determined to be as follows:  Weekday AM peak hour: 7:15–8:15 AM  Weekday PM peak hour: 4:00–5:00 PM  Saturday Midday peak hour: 12:00–1:00 PM To determine whether the proposed facility would have a significant adverse impact for which mitigation would be required, the following industry standard criteria were used: (1) a change in Level of Service (LOS) D or better to LOS E or F; (2) a change from LOS E to LOS F; or (3) an increase of 10 percent or greater in traffic volumes for LOS F. In addition, and as explicitly set forth in the Scoping Document, mitigation measures could be required by the Town in certain circumstances that do not meet the industry standard criteria. Existing Conditions Traffic operating conditions at each Traffic Study Area intersection were analyzed using the Synchro percentile delay (for signalized intersections) and the HCM (for unsignalized intersections) methodologies, to compute delays, volume to capacity (v/c) ratios, and LOS. LOS D operations during peak hours are generally considered to be acceptable operating conditions for signalized and unsignalized intersections. The following intersections and lane groups were operating at LOS E and/or F in the existing condition:  Barger Street and U.S. Route 6  Northbound left turn/through turn movement – Weekday PM peak hour: LOS F  East Main Street and U.S. Route 6  Eastbound left turn movement – Weekday PM peak hour: LOS F  Southbound left turn/through/right turn movement – Weekday AM peak hour: LOS F, Saturday Midday peak hour: LOS F Put another way, in the existing condition, the left turn from U.S. Route 6 onto East Main Street operates at an LOS F in the morning, while in the afternoon and during midday on Saturday, the turns from East Main Street onto U.S. Route 6 operate at an LOS F. No Action Condition Existing condition traffic volumes were then increased to establish a baseline condition that would be expected to occur in the future with or without the proposed facility through the following. It is to this “No Action” condition that the impacts of the proposed facility are compared.  The existing condition traffic volumes were increased by 1.0 percent per year from 2023 (existing year) to 2026 to account for background growth, resulting in an overall compounded growth rate of 3.03 percent; and Findings Statement FINAL 33 05/13/2025  Trips were added from other pending developments (“No Action projects”) located in the vicinity of the Project Site. The “No Action project” list was developed in coordination with the Town. Project traffic volumes for developments marked with an * were based data provided by the Town. Traffic volumes associated with the other No action projects were estimated using ITE standards.  Roc-Shrub Oak Associates  3000 Navajo Road*  670 East Main Street  The Links at Valley Fields In the No Action condition, in addition to the intersections/lane groups operating at LOS E or LOS F in the existing conditions, the eastbound left turning from U.S. Route 6 onto East Main Street would also operate at LOS F in the midday on Saturday. With Action Condition Facility generated trips were estimated using industry standard factors that were determined by the Town’s traffic consultant to be appropriate and conservative, in that they assumed the higher end of the range of potential facility-generated trips. These trips were added to the network and the resulting “With Action” condition was compared to the “No Action” condition to determine the facility’s impact to each intersection. C.11.d.i Original Project The Original Project would generate 108, 128, and 80 total vehicle trips during the Weekday AM, Weekday PM, and Saturday Midday peak hours, respectively. Absent mitigation the Original Project would result in significant impacts at the East Main Street and U.S. Route 6 intersection as follows:  Eastbound left turn movement – Weekday AM peak hour (degrade from LOS D to LOS E)  Eastbound left turn movement – Weekday PM peak hour, Saturday Midday peak hour (increase of 10 percent or greater in traffic volumes for LOS F)  Southbound left turn/through/right turn movement – Weekday AM peak hour (increase of 10 percent or greater in traffic volumes for LOS F). C.11.d.ii Alternative Site Layout The Alternative Site Layout would result in 90, 111, and 60 total vehicle trips during the Weekday AM, Weekday PM, and Saturday Midday peak hours, respectively. The Alternative Site Layout would result in a significant impact at the East Main Street and U.S. Route 6 intersection as follows: 800 East Main Street Redevelopment 05/13/2025 34 FINAL  Southbound left turn/through/right turn movement – Weekday AM peak hour (increase of 10 percent or greater in traffic volumes for LOS F). Traffic Mitigation Measures to mitigate the impact at the East Main Street and U.S. Route 6 intersection that would occur with both the Original Project and the Alternative Site Layout were evaluated. One such alternative, construction of a roundabout at the East Main Street and U.S. Route 6 intersection, was determined to be infeasible due to the amount of space required for a roundabout of sufficient diameter and the corresponding land takings that would be necessary. Another option, creating an alternative access into the Project Site, was evaluated and determined to be not practicable (see Section C.11.g, “Alternative Site Access”). Based on the operating conditions at the intersection and traffic volumes that meet signal warrant criteria, it was determined that the East Main Street and U.S. Route 6 intersection and the adjacent East Main Street and Old Route 6 intersection, which experiences similar turning volumes, should be signalized. These two closely spaced intersections are proposed to operate using one controller as a “clustered” intersection, such that turning vehicles between U.S. Route 6 and East Main Street would be able to continue their trip without stopping between the new traffic signals. In addition to the new traffic signals, additional mitigation measures were identified at the intersection, including:  Extending the existing eastbound left turn lane on U.S. Route 6 to 300 feet.  Adding a northbound right lane at the Old Route 6 and East Main Street intersection so that the northbound movement has dedicated lanes for left and right turns.  Restricting left turns from East Main Street onto U.S. Route 6. With the implementation of these measures, all lane groups at both affected intersections would operate at an acceptable LOS D, or better, during all peak hours. The Town Board closely examined the practical implications of signalizing these intersections to ensure that the signals would have the intended benefits and would not have adverse unintended consequences. In essence, signalizing these two intersections would reduce vehicle conflicts (e.g., left turns onto East Main Street and right turns onto U.S. Route 6), by providing separate, dedicated, time for the movements. This dedicated time would improve safety conditions as well as reduce delays for these turning movements, which experience significant queuing under existing conditions. Further, by doubling the length of the eastbound left turn lane on U.S. Route 6, a total of 12 to 15 vehicles would be able to safely queue without interfering with the mainline. Finally, the “clustered” signal design dedicates time for vehicles turning left off of East Main Street onto Old Route 6 that are heading toward the Project Site. Given that the proposed facility would result in increased utilization of this movement, it is paramount that the proposed signalization provides sufficient vehicle queuing space and time to turn left so as not to back up onto U.S. Route 6. The analysis determined that the proposed signalization will achieve this goal. Nonetheless, to enhance the safety of this movement, the Town Board requires the final signal design to be Findings Statement FINAL 35 05/13/2025 coordinated with the U.S. Route 6 signals at the Taconic State Parkway and at Barger Street, which are currently part of a coordinated system, so that vehicles would be less likely to make an additional stop as a result of the proposed signal at U.S. Route 6 and East Main Street. This shall be the responsibility of the Applicant. For the reasons discussed above, the Town Board requires the identified mitigation measures to be implemented by the Applicant. This requirement shall be made a condition of site plan approval of the Revised Proposed Project. To further improve the operation of the “clustered” intersection and reduce the potential for adverse impacts as a result of the new traffic signal, the proposed new signals shall be coordinated with the U.S. Route 6 signals at the Taconic State Parkway and at Barger Street, which are currently part of a coordinated system, such that vehicles would be less likely to make an additional stop as a result of the proposed traffic signal at U.S. Route 6 and East Main Street. This shall be the responsibility of the Applicant. The TIS addresses the cumulative impact of the proposed facility together with the “No action projects.” As demonstrated by the analysis, the mitigation measures proposed for the U.S. Route 6 and East Main Street intersection would not only accommodate additional vehicles generated by the proposed facility, but also additional traffic generated by the potential future No action projects within the corridor. The Town Board therefore finds that the measures required to mitigate the impacts of the facility are appropriately designed to accommodate potential future growth in the corridor. Recognizing that the future No action projects along the U.S. Route 6 corridor may result in impacts to other intersections, the Town Board finds that it is appropriate for the new signals to be designed and constructed with adaptive technology (e.g., communications, sensors, etc.) so that they could be part of a potential future adaptive traffic control system along the corridor. Incorporating this technology at the new traffic signals shall be the responsibility of the Applicant and confirmed during the signal design phase. For such corridor-wide coordination to occur in the future, the other traffic signals along the U.S. Route 6 corridor require hardware and software updates. The updates to these signals, which is not the responsibility of the Applicant, could cost between $20,000 and $100,000 per intersection depending on the type of system ultimately implemented. The mitigation measures described above for the “clustered” East Main Street and U.S. Route 6 and East Main Street and Old Route 6 intersection are subject to the review and approval of the NYSDOT. While these measures may improve upon existing conditions, they would not be necessary in the absence of the Revised Proposed Project and, therefore, are properly the responsibility of the Applicant. The Town Board finds that these measures are necessary to mitigate the impacts of the Revised Proposed Project, including increased delays, potential decreases in vehicular safety, and the addition of conflicting movements at an intersection that is functional, but constrained. In addition, and as necessitated by the results of the traffic analysis described above, the Town Board finds that the following items shall be considered in the traffic signal design phase: 800 East Main Street Redevelopment 05/13/2025 36 FINAL  “Back of Queue” detectors to prevent spillback onto U.S. Route 6.  Additional conduit to facilitate future connections with the signals at Lee Boulevard.  Mast arm or span wire support.  Context-sensitive materials for the Old Route 6 intersection reflective of its location as a gateway to the hamlet.  Appropriate drainage.  A Work Zone Traffic Control/ Maintenance of Traffic Plan.  All other design and construction details required by the NYSDOT. Finally, the Town Boards finds that should NYSDOT require additional measures to mitigate the impacts of the Revised Proposed Project beyond those identified above, the Applicant shall be responsible for implementing those improvements. Pedestrian and Bicycle Conditions Within the Project Site, internal sidewalks between buildings would be provided. Due to the steep grade of the Project Site and driveway, which exceeds 10 percent, together with the fact that there are currently no sidewalks along Old Route 6 and East Main Street, the Revised Proposed Project does not include sidewalks along its driveway. However, during the site plan approval process, the safety of pedestrians that may occasionally use the Project Site driveway in the absence of sidewalks shall be considered in the final driveway design. In addition, and consistent with the Town’s comprehensive planning and community goals, during the traffic signal design phase, the Applicant and the Town would investigate the possibility of adding sidewalks along East Main Street and the feasibility of new sidewalks along East Main Street. The responsibility for constructing and maintaining potential new sidewalks (e.g., Applicant, Town, other parties) will be determined during this investigation. The potential for shuttle service for residents was considered. It is not anticipated that there would be sufficient demand at an active age-restricted facility to make shuttle service feasible. Demand would be evaluated when the facility reaches stabilized (95%) occupancy, and if it sufficient to warrant the service, a shuttle would be provided as a resident paid amenity. Alternative Site Access The potential for creating a secondary means of access to the Site was evaluated, including:  Direct access from U.S. Route 6 between at the Parkway northbound ramps.  Additional driveway connection from the cul-de-sac at Old East Main Street to the eastern side of the Site. Based on the analysis in the DEIS, the Town Board finds that the steepness of the grade between the Project Site and U.S. Route 6 and Old Route 6 make it infeasible to provide a direct secondary connection to the Project Site. Therefore, the Town Board finds that improvements to the existing driveway are appropriate and necessary to accommodate the traffic of the Revised Proposed Project as well as to improve conditions for emergency vehicles. Specifically, the existing 24- feet wide roadway would be expanded 8 feet, for a total width of 32 feet. The Findings Statement FINAL 37 05/13/2025 driveway would establish two, 10-feet-wide travel lanes with a 12-feet-wide center strip that would act as an emergency lane. The emergency lane would be constructed of grass pavers, designed to bear the load of emergency vehicles. Final details regarding the driveway improvements would be discussed during the site plan approval process. The Town Board finds that with the improvements to the existing driveway, the Revised Proposed Project provides adequate site access. Parking Conditions To serve the Revised Proposed Project’s 180 dwelling units and amenities, 270 parking spaces are proposed, in compliance with Town Code. As the Revised Proposed Project would comply with the Town Code parking requirement, significant adverse parking impacts are not anticipated, and no mitigation is required. Crash History and Safety Assessment The DEIS identifies improvements that the Town and/or NYSDOT could consider making to improve vehicular safety based on the existing conditions. These improvements are not required to mitigate an impact of the proposed facility and are not the responsibility of the Applicant. Rather, they were provided for informational purposes as required by the adopted Scoping Document: Barger Street and U.S. Route 6  Install yellow retroreflective signal backplates to improve signal visibility;  Improve roadway surface friction through repaving and high-friction surface treatments; and  Install “slippery when wet” Manual on Uniform Traffic Devices (MUTCD)W8-5 sign along U.S. Route 6. Lee Boulevard and U.S. Route 6  Install yellow retroreflective signal backplates to improve signal visibility;  Improve roadway lighting at the intersection;  Review the clearance intervals at the intersection and revise as needed;  Improve roadway surface friction through repaving and high-friction surface treatments; and  Install “slippery when wet” MUTCD W8-5 signs along U.S. Route 6. Hill Boulevard and U.S. Route 6  Install yellow retroreflective signal backplates to improve signal visibility;  Install lane line extensions through the intersection to delineate space for left turning vehicles;  Install left turn flashing yellow arrow signals for permitted left turns with supplemental traffic signs with text “Left Turn Yield on Flashing Yellow Arrow”; and  Improve roadway lighting at the intersection. 800 East Main Street Redevelopment 05/13/2025 38 FINAL AIR QUALITY The potential adverse impacts to air quality resulting from the Original Project were analyzed. A stationary source screening analysis was performed to assess potential air quality impacts associated with emissions from heat and hot water systems for each of the buildings of the Original Project, which proposes a total of 250 residential units throughout 24 buildings. The screening procedures utilize information regarding the type of fuel to be used, the maximum development size, the heat and hot water systems’ exhaust stack height, and the distance to the nearest building of similar or greater height. For this analysis, it was conservatively assumed that natural gas would be used for the buildings’ HVAC systems, and that the exhaust stack(s) would be located three feet above roof height. The screening analysis concluded that the Original Project would not result in a significant adverse air quality impact. The Town Board finds that because the Revised Proposed Project would be less development on the Project Site than the Original Project and Alternative Site Layout, the Revised Proposed Project’s HVAC systems would likewise not result in a significant adverse air quality impact, and therefore no mitigation is required. If the Revised Proposed Project’s HVAC systems are electric and not natural gas, there would be no adverse air quality impacts from the HVAC systems. A mobile source screening analysis was also performed. The area roadway intersections analyzed were reviewed based on NYSDOT’s Transportation Environmental Manual (TEM) criteria for determining locations that may warrant a microscale air quality analysis. The screening analysis examined the Level of Service and projected traffic volume increases by intersection. The results of the screening analysis demonstrated that none of the intersections affected by the Original Project (and thus by the Revised Proposed Project) required a detailed microscale air quality analysis, indicating that the Original Project would not have a significant adverse air quality impact. As the Revised Proposed Project would generate less traffic than the Original Project, the Town Board finds that the traffic associated with the Revised Proposed Project would not have a significant adverse air quality impact, and therefore no mitigation is required. NOISE The Town Board required the Applicant to undertake sound monitoring to determine existing ambient sound levels during different times of the day and night along the Project Site property boundaries and in the vicinity of the Project Site. A total of three receptor locations were selected for evaluation of existing and future noise levels:  Receptor 1: Old Route 6 between East Main Street and Project Site.  Receptor 2: Southwest corner of Project Site.  Receptor 3: Approximate center of Project Site. The receptor locations were selected to represent noise-sensitive uses (e.g., residences) near the Project Site as well as representing the Project Site itself. At each receptor location, existing noise levels were determined by field measurements, and noise monitoring was performed. Roadway traffic on Old Route 6 and U.S. Route 6 was the dominant noise source at Receptor 1, and roadway traffic on the Parkway was the dominant noise source at Receptors 2 and 3. Noise levels along adjacent roadways in the study area are moderate Findings Statement FINAL 39 05/13/2025 to relatively high, reflecting the proximity to the roadway and the level of vehicular activity present. In the future, due to relatively small changes in the volume of vehicular traffic on roadways near the Project Site, noise levels would increase by up to approximately 0.4 dBA with the Original Project, which would not be perceptible. As the Revised Proposed Project would generate less traffic than the Original Project, the increase in noise as a result of traffic would be less than 0.4 dBA. No change in noise levels would occur at Receptors 2 and 3, because the dominant noise source at these Receptors is the Parkway, and the volume of vehicular traffic on this roadway is not expected to substantially change in the future. The Revised Proposed Project would include amenity features that are expected to generate noise. However, noise generated from an age-restricted residential development would not be more noticeable than the noise generated from traffic on the Parkway. In addition, the outdoor amenity spaces would be located at least 500 feet away from the nearest existing receptors (i.e., residences along Old Route 6 or Donald J. Trump State Park) and would not be frequently used during night-time hours when residences would be most sensitive to noise. As a result, the Town Board finds that the amenity features of the Revised Proposed Project do not have the potential to result in significant adverse noise impacts to proximate off-site receptors. The Revised Proposed Project would include building mechanical systems that have the potential to generate noise. To minimize potential impacts, the building mechanical systems shall be located and designed to avoid producing significant noise level increments at nearby receptors. The final design of these systems shall be reviewed during the Planning Board’s site plan approval process to confirm that no significant noise level increment would result. Maximum measured and predicted noise levels from all sources throughout the Project Site (as represented by Receptors 2 and 3) would not exceed the 65 dBA criteria recommended by the New York State Department of Environmental Conservation (NYSDEC) guidelines for residential use. The Town Board finds that noise exposure at the Revised Proposed Project would not be a significant adverse impact. The Town Board finds that the Revised Proposed Project would not result in significant adverse impacts at nearby residential receptors and that future interior noise levels in the proposed buildings would be acceptable for residential use. Thus, the Revised Proposed Project would not result in significant adverse impacts from noise. HAZARDOUS MATERIALS A Phase I Environmental Site Assessment (“ESA”) of the Project Site was performed by William Silveri, LLC (“WVS”) on April 11, 2022. The ESA was performed in conformance with the scope and limitations of ASTM International (ASTM) Standard Practice E1527-21. The ESA was conducted to identify recognized environmental conditions (“RECs”) and any other environmental concerns associated with the Project Site resulting from past or current Project Site usage and usage of neighboring properties. The ESA does not identify any RECs at the Project Site; however, certain “de minimis” conditions and business environmental risks are identified. 800 East Main Street Redevelopment 05/13/2025 40 FINAL Regarding de minimis conditions, historic aerial photographs indicate an orchard or other agricultural use between 1941 and 1954. The potential extent and impacts of historic usage of herbicides and pesticides is a de minimis condition because the former agricultural use appears to affect only limited areas of the Project Site and limited information is available pertaining to the use herbicides and pesticides at the Project Site. There is one (1) 2,500-gallon No. 2 fuel oil underground storage tank (UST), one (1) 2,000-gallon UST at the Project Site and one (1) 1,000-gallon UST at the Project Site. The ESA concludes that they are unlikely to have caused a significant release due to their age and date of operation, their design, and their oversight by the building maintenance staff. On August 23, 2023, an on-site assessment was performed by the Applicant’s consultant, AKRF, Inc., to confirm the findings of the ESA and existing site conditions. The August 2023 assessment was conducted using ASTM methodology and included: an inspection of the Project Site; reconnaissance of the vicinity; interviews with the Project Site facilities manager; a review of historic fire insurance (Sanborn) maps and Town directories; a review of aerial photographs and historical topographic maps, historical resources, and the ESA; a review of regulatory databases, including NYSDEC and U.S. Environmental Protection Agency records; a review of available files maintained by the Town of Yorktown Tax Assessor, Town Building Department, and Town Fire Marshal; and a review of the WCDOH records and the updated Petroleum Bulk Storage registration certificate. Each of the findings of the ESA was confirmed, and two additional de minimis conditions were identified as well:  Although the USTs and two 50-gallon above-ground storage tanks (ASTs) at the Project Site would typically be considered a REC based on the age of the tanks, their date of operation, their design, and because the USTs and their leak detection systems are regularly inspected by building maintenance staff, the USTs and ASTs are considered to be a de minimis condition.  On October 11, 2011, a tank tightness failed on the 2,000-gallon UST, and a spill was reported to NYSDEC (Spill No. 1108736). Based on the tank closure report, the former 2,000-gallon fuel oil UST is considered a de minimis condition. On June 2, 2022, GLS Inspection LLC (“GLS”) of Fairlawn, New Jersey performed a comprehensive pre-demolition asbestos containing materials (ACM) survey to determine the potential for the buildings to contain ACM. The results of the ACM survey are presented in GLS’s June 2022 Non-ACM Report, which concludes that no ACMs were found on the interior or exterior portions of the Project Site. Since the current buildings on the Project Site were developed after the use of lead based paint (LBP) was banned in 1978, the presence of LBP is unlikely and was not tested. To avoid and mitigate the potential for any adverse impacts, the Town Board finds that the Revised Proposed Project shall include the following mitigation measures:  Prior to Project Site redevelopment, the USTs and ASTs shall be taken out of service and removed in accordance with the prevailing regulations and requirements, the registration shall be closed with NYSDEC and/or the WCDOH, and any contaminated soil (if encountered) shall be addressed in accordance with applicable regulations.  Any soil or fill excavated as part of future Project Site redevelopment activities shall be managed in accordance with applicable regulations. All material intended for off- site disposal shall be tested in accordance with the requirements of the intended Findings Statement FINAL 41 05/13/2025 receiving facility. Transportation of soil leaving for off-site disposal shall be in accordance with requirements covering licensing of haulers and trucks, placarding, truck routes, manifesting, etc. If more significant soil contamination is discovered, such contamination shall be further investigated and/or remediated in accordance with applicable regulations.  If any additional or previously unknown USTs and/or petroleum contaminated soil are encountered, the tanks shall be closed in accordance with applicable NYSDEC and WCDOH regulations, and any contaminated soil shall be properly removed.  If any additional suspect ACMs are encountered during demolition, the material shall be sampled in accordance with applicable regulations. If any of the tested materials are positive for ACM (greater than 1 percent asbestos), they shall be removed prior to demolition by a licensed asbestos abatement contractor in accordance with applicable regulations.  If dewatering is required during construction, treatment and discharge of dewatering fluids shall be conducted in accordance with all applicable regulations, including obtaining any required permits.  The Soil Erosion and Sediment Control plan (“ESCP”) shall be implemented in accordance with NYSDEC SWPPP requirements.  A Soil Management Plan shall be prepared prior to site demolition and grading activities to address removal and closure of the on-site USTs and ASTs and any previously unknown tanks (if encountered), petroleum contamination, and/or residual contamination (if encountered) during construction, and also to identify procedures for testing and handling any soil intended for off-site disposal. The Town Board finds that with the implementation of the mitigation measures noted above, no significant adverse impacts related to hazardous materials would occur as a result of the Revised Proposed Project. CONSTRUCTION Construction of the Revised Proposed Project is expected to take approximately 30 months and would be conducted in a single phase, differentiated by six stages: (1) perimeter fencing and tree clearing [8 to 10 weeks]; (2) mobilization, earthwork, and site utilities [16 weeks]; (3) foundations and site stabilization [18 weeks]; (4) building framing and mechanical/electrical/plumbing rough-in [35 weeks]; (5) interior finishes [35 weeks]; and (6) site work, landscaping, and occupancy [16 weeks]. During the site plan approval process, and based on the final building and site design, the Applicant shall prepare a detailed Construction Management Protocol (“CMP”), which shall formalize the measures to avoid and mitigate potential adverse impacts described below. The Town-approved ESCP shall meet State and Town requirements, and shall detail how the Project Site would be protected from erosion and sedimentation during construction activity when soil would be disturbed, in order to avoid and mitigate potential impacts associated with the off-site migration of sediment during construction. To avoid an adverse impact from soil erosion, the Revised Proposed Project shall conform to the requirements of the applicable NYSDEC State Pollution Discharge Elimination System (SPDES) General Permit for Stormwater Discharges Associated with Construction Activity, the applicable “New York State Standards and Specifications for Erosion and Sediment Control,” and Chapter 248 “Stormwater Management and Erosion 800 East Main Street Redevelopment 05/13/2025 42 FINAL and Sediment Control” of the Town Code. The SPDES permit requires that projects disturbing more than one acre of land must develop a SWPPP, containing both temporary erosion control measures during construction and post-construction stormwater management practices. The preliminary SWPPP for the Revised Proposed Project includes an ESCP requiring the following measures: silt fencing, stabilized construction entrance, drainage diversion methods to minimize erosion during grading, and erosion control matting and seeding. In addition, to reduce the potential for fugitive dust emissions, on-site construction vehicle speed shall be limited to 5 mph and truck covers/tarp rollers to cover fully loaded trucks shall be utilized. Construction of the Revised Proposed Project would create daily construction-related traffic to and from the Project Site, including construction workers and the delivery of materials and equipment. The CMP shall provide that all construction worker parking, equipment loading, unloading, and queuing would occur on-site, no construction vehicles shall be permitted to park or queue on any public roadway, and construction vehicles (including but not limited to trucks, trailers, and oversized vehicles) shall be prohibited from using the U.S. Route 6/East Main Street intersection for access to or from the Project Site, and instead, shall be required to access East Main Street from the east at Lee Blvd. or Hill Blvd. The Town Board finds that the Original Project would result in a maximum net export of approximately 81,836 cubic yards of earthen material from the Project Site, and the Alternative Site Layout would result in a maximum net export of approximately 8,915 cubic yards. In comparison, the Revised Proposed Project would result in a maximum net export of 700 cubic yards of earthen material. Removal of this material would occur intermittently over the course of construction. Only material that could not be re-used to re- establish grades would be exported off-site. If all of the “net cut” material is removed from the Project Site, approximately 39 trucks trips would be required, based on 18 cubic yards per truck, compared to 4,546 truck trips for the Original Project, and 496 truck trips for the Alternative Site Layout. The Town Board finds that construction of the Revised Proposed Project would result in typical pollutant emissions from on-site construction equipment, construction vehicles traveling to the Project Site, and potential fugitive dust emissions. Measures to reduce fugitive dust and emissions from construction vehicles to the maximum extent practicable shall be incorporated into the Revised Proposed Project. Implementation of these measures would avoid and minimize potential adverse air quality impacts during construction, in accordance with all applicable laws, regulations, and building codes. An adjacent existing residence located southeast of the Project Site would be the closest sensitive air quality receptor location. Construction activities shall be set back from the eastern perimeter of the Project Site by at least 100 feet, with most activities being located more than 200 feet from the Project Site’s eastern property line. The Revised Proposed Project would maintain existing trees and vegetation between the perimeter of the Project Site and the areas of construction—minimizing the potential for emissions to travel from the Project Site to the residence. The Town Board finds that construction of the Revised Proposed Project is expected to result in elevated noise levels at nearby receptors during certain periods of construction. However, noise from construction would be intermittent and of limited duration. While Findings Statement FINAL 43 05/13/2025 rock hammering may be required, it is not anticipated that the Revised Proposed Project would require blasting. There are no sensitive receptors in the immediate vicinity with the exception of three single family houses near the southeast corner of the Project Site along Old Route 6. Construction activities shall comply with the hour limitations set forth in Chapter 216 of the Town Code, to minimize noise intrusion from construction activities during weekends and nights when residential uses are more sensitive to noise. In addition, construction equipment utilized shall incorporate sound attenuation practices to further reduce the potential impact to the residences. Based on the temporary and intermittent nature of construction noise incident at surrounding noise receptors, together with the fact that the construction activities with the most potential to create a significant noise impact would occur proximate to the three identified residences for a short period of time, the Town Board finds that the potential noise generated by construction of the Revised Proposed Project would not create a significant adverse noise impact. The potential for construction truck traffic to adversely affect the Hyatt House, built circa 1732, was analyzed. Pursuant to construction vibration analysis procedures established in the Federal Transit Administration's (FTA) Transit Noise and Vibration Assessment Manual (September, 2018), loaded trucks passing by the Hyatt House at a distance of 45 feet (which is the approximate distance between the structure and the pavement edge of Old Route 6) would result in Peak Particle Velocity of 0.031 inches/second. According to FTA guidance, the threshold of potential damage for "buildings extremely susceptible to vibration damage" is 0.12 inches/second. Vibration levels from operation of demolition equipment on the Project Site within the limit of disturbance of the Revised Proposed Project would be even lower at the Hyatt House, which is approximately 125 feet from the disturbance areas. However, the projected vibration level of 78 VdB from loaded trucks passing the Hyatt House would be expected to result in annoyance at a frequency of 30 times per day or greater. Although construction of the Revised Proposed Project would be unlikely to cause structural damage to the Hyatt House, the Town Board finds that the Applicant shall conduct a pre-construction survey of the Hyatt House, which would be compared to post- construction conditions. In addition, the Applicant shall conduct vibration monitoring during the period of construction that has the greatest levels of vibration and, therefore, the largest potential to adversely affect the Hyatt House. Vibration alert thresholds would be set to provide a warning before vibration levels reach the threshold of potential damage. Upon receiving an alert, the construction team would determine the specific cause of the elevated vibration level and if that activity continued to produce elevated vibration levels, construction means and methods would be reviewed. As necessary, construction means and methods would be altered to ensure that vibration would not result in damage to the Hyatt House. The Town Board finds that with these measures, the Revised Proposed Project would not result in a significant adverse impact to the Hyatt House from construction activities and adverse impacts would be mitigated to the maximum extent practicable. The Town Board finds that the following measures, which shall be incorporated as part of the Revised Proposed Project, would mitigate construction noise levels to the maximum extent practicable:  Construction activities shall be conducted in compliance with the Town’s existing noise regulations (Chapter 216 of the Town Code), including local day and hour 800 East Main Street Redevelopment 05/13/2025 44 FINAL construction limitations. As required, construction activities on the Project Site shall be limited to the hours of 7:00 AM–11:00 PM during the week and from 8:00 AM– 10:00 PM on weekends and legal holidays;  As early in the construction period as logistics allow (pending provision of adequate electrical service by the local utility provider), diesel- or gas-powered equipment shall be replaced with electrical-powered equipment such as welders, water pumps, bench saws, and table saws to the extent practicable;  Trucks shall not be allowed to idle more than 3 minutes at the Project Site;  Contractors and subcontractors shall be required to properly maintain their equipment and mufflers; and  Where logistics allow, noisy equipment, such as cranes, concrete pumps, concrete trucks, and delivery trucks, shall be located away from, and shielded from, the three single-family houses located along Old Route 6. The Town Board notes that while rock hammering may be required, it is not anticipated that the Revised Proposed Project would require blasting. To the extent blasting is determined to be necessary, it shall be conducted in accordance with Town regulations, including Town Code Chapter 124, “Blasting and Explosives,” and all required permits would be obtained. If required by final design of the Revised Proposed Project and geotechnical investigations, a site-specific blasting protocol would be finalized during the site plan approval process, and shall ensure that all blasting activities would be protective of public health and safety to the maximum extent practicable. At a minimum, any blasting protocol for the Revised Proposed Project shall require that:  Blasting activities would comply with applicable Town, County, and State codes;  Blasting activities would be monitored by a licensed professional engineer;  No blasting would take place without the proper permits being issued by the Town, including but not limited to a blasting permit;  The blasting contractor would provide the Town with proof of adequate liability insurance;  All blasts would be covered with metal rope or metal matting, or other suitable screens of sufficient size, weight and strength, to prevent the escape of broken rock or other material;  All residents within 300 feet of the proposed blast location would be notified as to the date and time that blasting would take place;  Blasting would not be conducted after 5:00 pm or before 8:00 am, nor would it be conducted on a Sunday;  No explosives would be stored on-site overnight; and  During blasting operations, explosives would be stored separately from igniters, explosives would be stored in appropriate magazines, and no more than a one-day supply of explosives would be stored on-site. With the incorporation of the above protocol, the Town Board finds that no significant adverse impacts related to construction and blasting activities would occur as a result of the Revised Proposed Project and that adverse impacts would be mitigated to the maximum extent practicable. Findings Statement FINAL 45 05/13/2025 ALTERNATIVES SEQRA requires a description and evaluation of a range of reasonable alternatives to the Original Project that are feasible, considering the objectives and capabilities of the Applicant. In addition to the Original Project, Alternative Site Layout, and Revised Proposed Project, four other alternatives were studied: No Action – Existing Site Conditions and Re-Occupancy of Office Buildings Under this alternative the Proposed Zoning would not be adopted, the Project Site would continue to be zoned OB District, and no demolition of existing improvements or new construction would occur at the Project Site. The Project Site would continue to be improved with approximately 63,617 sf of office space within the two existing office buildings, as well as the surface parking lots and landscaping. This alternative assumes that absent the Original Project, the office buildings would be fully re-occupied by office tenants, and that no new structures or site improvements would be constructed. Given market conditions and trends and the limited occupancy of the Project Site’s office buildings during the past several years, the Town Board finds that full occupancy of the office buildings in the future is unlikely. This alternative would not meet the Town’s housing goals, would not result in increased tax revenue to the Town, and, despite increases in traffic from current levels, would not result in mitigation measures being implemented at the U.S. Route 6 and East Main Street intersection, which would continue to operate at LOS F. The Town Board finds that this alternative would not meet the Applicant’s purposes and need, would not be consistent with the Town’s goals, and would not result in financial benefits to the Town. Development Under Existing OB District Zoning This alternative considers development of the Project Site to the maximum extent permitted under the existing OB District regulations. A hypothetical site plan was developed for this analysis, in which the two existing office buildings were retained, and three additional office buildings as well as additional parking areas to serve those new buildings were constructed. In total, this alternative would result in 204,901 sf of office space, of which 141,284 sf would be newly constructed space, and a total of 608 parking spaces, an increase of 320 spaces. One new office building would be constructed to the south of the two existing office buildings. This east building would be developed in an area with steep topography, to the south of the existing parking lot. The other two newly constructed office buildings would be north of the existing site improvements, in a currently undisturbed (wooded) area of the Project Site. The new parking areas required for these two buildings would cover approximately 7.9-acres of the Project Site. The Town Board notes that the Comprehensive Plan identifies the Project Site in Policy 4-63, which recommends that the Town “promote corporate or multi- tenant office development in select locations near major entrances to the Taconic Parkway and Route 6” (page 4-33). The Town Board recognizes that the economic realities of corporate office parks in the region have evolved since the 800 East Main Street Redevelopment 05/13/2025 46 FINAL Comprehensive Plan’s adoption approximately 15 years ago, making re-use of existing office campus economically infeasible. The Town Board therefore finds that Policy 4-63 does not inform the redevelopment of the Project Site. This alternative would result in 13.62 acres of disturbance, more than double the 6.29 acres that would be disturbed by the Revised Proposed Project. It would also result in 18.2 acres of impervious surface, nearly three times the 6.18 acres of impervious surface of the Revised Proposed Project. Additionally, this alternative would generate nearly three times the number of weekday peak hour vehicle trips generated by the Original Project. In addition to signalizing the East Main Street and U.S. Route 6 intersections, as is required of the Revised Proposed Project, it is likely that improvements would be required at other intersections as well. The Town Board finds that this alternative would not meet the Applicant’s purposes and need, would not achieve the housing goals established in the Comprehensive Plan, is likely not economically feasible, and would have the potential for significant adverse traffic impacts. Non-Age-Restricted Development Under this alternative, the Project Site would be developed with the same layout as the Original Project (250 residential units, with 200 rental units located throughout 12 buildings (of varying building types), and 50 for-sale townhouses throughout 12 buildings), but without an age-restriction. Impacts of this Non-Age-Restricted Alternative would be mostly the same as the Original Project owing to the identical building program. This alternative would generate substantially similar property tax revenues as the Original Project. It would be anticipated that under this alternative, approximately 45 public school aged children would be generated. Although the cost to the School District of educating these students would be covered by the property tax revenue, the Town Board notes that the Revised Proposed Project is not anticipated to add any students to the School District, and therefore, would not generate additional costs to the School District. Demand for emergency services would be greater with this alternative than the Original Project and the Revised Proposed Project owing to the greater population that would be generated by this alternative (521 persons). Impacts to traffic and transportation would be similar to those of the Original Project and greater than the Revised Proposed Project and impacts to air quality and noise, owing to the larger population and thus greater number of vehicle trips),would be similar as well. In addition, and as was the case for the Original Project, this alternative has the potential to result in an adverse stormwater quality impact. The Town Board finds that this alternative is not preferred because the potential adverse physical impacts to the environment are the same as the Original Project. In addition, for this Project Site, a non-age-restricted alternative is less preferable than the Revised Proposed Project based on a non-age-restricted facility’s comparatively larger population, larger school impacts, and greater impacts to the School District. Development Under Existing RSP-2 District Regulations This alternative studied a variation of the Alternative Site Layout to analyze the potential environmental impacts of redeveloping the Project Site pursuant to the Findings Statement FINAL 47 05/13/2025 existing height and FAR requirements of the RSP-2 District. To evaluate this alternative, the Applicant developed two RSP-2 District compliant plans, which were compared to the Alternative Site Layout. Option 1: Existing RSP-2 District Regulations with Fewer Residential Units. This option would develop the Project Site with the same building footprint as the Alternative Site Layout, but the multi-family buildings would each be one story shorter to comply with the existing RSP-2 District height requirement. This option would result in the development of 122 units in the multi-family buildings, together with 20 cottages, for a total of 278,680 square feet of development. Based on the analysis in the DEIS, a 142-unit facility would not meet the Applicant’s goals and needs as rental revenue would not be sufficient to cover costs of construction, including fixed costs of site preparation, utilities, and infrastructure. In addition, this 142-unit alternative would require more site disturbance, more disturbance of forested area, and result in more impervious surfaces than the 180-unit Revised Proposed Project. Finally, since the Revised Proposed Project would not have an adverse visual impact, the reduction in building height associated with this alternative would not result in a noticeable change in potential visual impacts. Option 2: Existing RSP-2 District Regulations with Larger Building Footprint. This option would develop the Project Site with the same number of units as the Alternative Site Layout (185 units). To achieve this program in multi-family buildings that are one story less than the Alternative Site Layout, the multi-family buildings would have larger footprints. While the buildings in this option would not be as high as the Alternative Site Layout, there would be little to no difference in visibility from the off-site Vantage Points. The larger footprints for the multi-family buildings and the development of a large parking field to the south and east of the buildings would result in significantly greater total site disturbance than the Revised Proposed Project. This option would also have the potential to result in more tree clearing than the Revised Proposed Project, owing to the larger building footprints and concomitant larger area of disturbance, and would result in more impervious coverage, requiring larger stormwater management practices than the Revised Proposed Project. The Town Board finds that this Alternative is less preferable than the Revised Proposed Project because it results in a larger area of disturbance on the Site. CUMULATIVE IMPACTS OF PROPOSED ZONING TEXT CHANGE The Proposed Zoning would apply to sites zoned RSP-2 that are greater than 25 acres. In addition to the Project Site, there are two sites zoned RSP-2 that are greater than 25 acres: the parcel located at 3770 Barger Street, which is presently developed with Trump Park Residences and the parcels on Catherine Street, which were recently rezoned to RSP-2 and on which Toll Brothers is pursuing a development of approximately 118 townhomes. The Town Board notes that neither the Barger Street parcel or the Catherine Street site are likely to be affected as the former is already developed and the latter just received approvals for their townhome development. In addition, and as noted above, the FAR in the RSP-2 District would not be increased. Therefore, no new additional FAR would be 800 East Main Street Redevelopment 05/13/2025 48 FINAL available to either site. Therefore, the Town Board finds that there would not be a significant adverse cumulative impact as a result of the Proposed Zoning. SUSTAINABILITY Energy consumption would occur during construction and occupancy of the Revised Proposed Project. During construction, energy would be used for power equipment and various construction vehicles. Once construction is completed and the residences are occupied, energy would be required for heating, air conditioning, lighting, and the use of household appliances and electrical equipment. To reduce the energy consumed by the Revised Proposed Project, energy efficient lighting (i.e., LED lighting and activity-sensing and photovoltaic sensing lighting controls) and appliances would be used. In addition, high-efficiency building envelope features, including windows and facades, would be incorporated and HVAC systems would be “right-sized.” The use of energy-efficient features would also reduce the greenhouse gas emissions attributable to the Revised Proposed Project. During the site plan approval process, and based on the advanced design of the facility, the Applicant shall consider incorporating additional green approaches and green building technology, which could include EV charging stations, indoor water use reduction (low-flow faucets, toilets, fixtures), use of low Volatile Organic Compound (VOC) materials (paints, adhesives, flooring), water metering, drip irrigation, and recycling of demolition materials. Following approvals, the Applicant shall assess whether incorporation of solar power is practicable. The Revised Proposed Project shall include electric vehicle chargers at various locations within the Project Site. Building materials, to the extent possible, would be recycled or locally sourced. In addition, the buildings would be designed to maximize natural light and ventilation, reducing the need for artificial light and air conditioning. The stormwater management features discussed in this Statement of Findings , which are based on green practices, would be implemented. The Applicant may also incorporate additional green building technology as part of the Revised Proposed Project, to be determined during the site plan approval process, including: indoor water use reduction (low-flow faucets, toilets, fixtures); energy efficient appliances and equipment; use of low VOC materials (paints, adhesives, flooring); water metering; drip irrigation; bicycle storage; light sensors and programmable thermostats; and recycling of demolition materials. The Town Board finds that the sustainability measures incorporated into the Revised Proposed Project are consistent with the goals of the Town and Comprehensive Plan, that the impacts on the use and conservation of energy are not significant, and no that no further mitigation is required. GROWTH-INDUCING ASPECTS The Town Board finds that the Revised Proposed Project would not induce growth elsewhere in the Town of Yorktown or surrounding region, as the Revised Proposed Project is being proposed to serve a current and existing need—one that has been identified in the Comprehensive Plan—to increase the amount and diversity of housing in the Town. The Town Board acknowledges that throughout Westchester County and the region there has been a decreased demand for corporate office park development and increased demand for mixed-use and residential infill development. Findings Statement FINAL 49 05/13/2025 The Town Board finds that while the Revised Proposed Project would introduce 180 age- restricted residential units, this population would not create significant new commercial development pressure. The Town Board finds that the off-site spending of the Revised Proposed Project’s residents would be expected to increase the patronage of existing regional businesses, and not create demand for new development. The Town Board finds that the Revised Proposed Project is not anticipated to induce growth elsewhere in the Town, and that mitigation measures are not required. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES The Town Board notes that certain resources, both natural and human-made, would be expended in the construction and operation of the Revised Proposed Project. These resources include use of the land, building materials, energy, and human effort (time and labor) required to develop, construct, and operate the Revised Proposed Project. These resources are considered irretrievably committed because their reuse for some purpose other than the Revised Proposed Project is highly unlikely. The land that makes up the Project Site is the most basic resource irretrievably committed. The existing office buildings on the Project Site would be removed, and the previously developed portion of the Project Site would be redeveloped with residential uses and would not be available for another future use for some period of time. Given that much of the Project Site is already developed, the Town Board finds that the redevelopment of the Project Site for the Revised Proposed Project is not a significant or an adverse impact. The actual building materials used in the construction of the Revised Proposed Project (e.g., wood, steel, concrete, and glass) and energy (in the form of gas, diesel, and electricity) consumed during the construction and operation of the Revised Proposed Project or by construction equipment, and the various mechanical systems (heating, hot water, and air conditioning), would be irretrievably committed. The Town Board finds that this is not a significant impact. Construction of the Revised Proposed Project would require a commitment of person hours of labor, beneficial to the community, the local economy, and the construction industry with respect to the generation of jobs. The Town Board anticipates that a portion of the construction-related workers at the Project Site would come from Yorktown and surrounding Westchester County communities. The Town Board finds that these workers would have a positive impact on existing local businesses. The Town Board finds that none of these irreversible or irretrievable commitments of resources are a significant impact, and therefore no mitigation is required. UNAVOIDABLE ADVSERE IMPACTS The Revised Proposed Project would result in physical changes to, and new construction and uses within, the Project Site. These changes would result in impacts to various environmental resources; however, the Town Board finds that these potential impacts, as described more fully above, would not be significant. The Town Board also finds that the design of the Revised Proposed Project avoids certain impacts that would have occurred with the Original Project and the Alternative Site Layout, and mitigates other potential impacts to levels that are not considered significant. The Revised Proposed Project 800 East Main Street Redevelopment 05/13/2025 50 FINAL proposes less intense development on the Project Site compared to the Original Project and Alternative Site Layout. The Town Board finds that the Revised Proposed Project would not result in unavoidable significant adverse impacts, and that the mitigation measures incorporated into the project and the additional measures required by this Findings Statement mitigate adverse impacts to the maximum extent practicable.  Findings Statement FINAL 51 05/13/2025 CERTIFICATE OF FINDINGS TO APPROVE THE ACTION: Accordingly, having considered the DEIS and FEIS, the Town Board through this Findings Statement, certifies that: A. It has considered the relevant environmental impacts, facts and conclusions disclosed in the DEIS and FEIS; B. It has weighed and balanced the relevant environmental impacts with social, economic and other considerations; C. The requirements of 6 NYCRR Part 617 have been met; D. Consistent with social, economic and other essential considerations from among the reasonable alternatives available, the Revised Proposed Action avoids or minimizes adverse environmental impacts to the maximum extent practicable; and E. Adverse environmental impacts will be avoided or minimized to the maximum extent practicable by incorporating as conditions of the site plan approval of the Revised Proposed Project the mitigation measures identified in the DEIS, FEIS and this Statement of Findings. Certified by the Town Board by Resolution adopted on _____________, 2025. Town of Yorktown By:_______________________ Diana Quast Town Clerk